- Jul 2010 to Sep 2026
101 permits since 2000 (contractor on 101 permits, authorized agent-others on 2 permits): 75 completed, 4 in progress, 20 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 101.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2026 | In progress issued Sep 2026 | 3101 Mission St | Jon K Takata Corp Dba Restoration Mgmt | ground fl: repair damaged wall framing, interior & exterior finishes like for like. damage in office labeled "room 10".Details
ground fl: repair damaged wall framing, interior & exterior finishes like for like. damage in office labeled "room 10". | $45,000 |
| Aug 24, 2026 | In progress issued Aug 2026 | 535 Stockton St | Jon K Takata Corp Dba Restoration Mgmt | unit(s): 75,66,65,56,55,46,45,36 and 35: remove and replace wet drywall, and floor covering, detach and reset cabinet(s) and paint in kitchen(s). unit#76 remove and replace wet drywall, and floor covering in kitchen and living room, and paint entire unit. to complywith nov 202661234.Details
unit(s): 75,66,65,56,55,46,45,36 and 35: remove and replace wet drywall, and floor covering, detach and reset cabinet(s) and paint in kitchen(s). unit#76 remove and replace wet drywall, and floor covering in kitchen and living room, and paint entire unit. to complywith nov 202661234. | $90,000 |
| Jun 2, 2026 | Completed final sign-off Aug 2026 | 27 Taylor St | Jon K Takata Corp Dba Restoration Mgmt | 90 sqft of drywall repair from water damage - flooring/carpet ~ 900 sqft.Details
90 sqft of drywall repair from water damage - flooring/carpet ~ 900 sqft. | $100,000 |
| Dec 31, 2025 | Completed final sign-off Apr 2026 | 50 Jones St | Jon K Takata Corp Dba Restoration Mgmt | common area: to abate nov 202537823- floating lobby ceiling, face is being replaced with new material in kind due to water leakDetails
common area: to abate nov 202537823- floating lobby ceiling, face is being replaced with new material in kind due to water leak | $35,000 |
| Apr 9, 2025 | In progress issued Apr 2025 | 3469 18th St | Jon K Takata Corp Dba Restoration Mgmt | revision 202410293933- reducation of scope to inlclude retain (e) windows and update title 24Details
revision 202410293933- reducation of scope to inlclude retain (e) windows and update title 24 | |
| Mar 26, 2025 | Completed final sign-off Dec 2025 | 445 Hugo St | Jon K Takata Corp Dba Restoration Mgmt | unit 3, 6, 9: repair fire damaged area. replace damaged wall framing (studs, plates, rim) as noted, replace damaged interior & exterior finishes, & mep infrastrucure, like for like. unit 9: replace damaged roof framing (rafters, clg joists, kickers) as notedDetails
unit 3, 6, 9: repair fire damaged area. replace damaged wall framing (studs, plates, rim) as noted, replace damaged interior & exterior finishes, & mep infrastrucure, like for like. unit 9: replace damaged roof framing (rafters, clg joists, kickers) as noted | $400,000 |
| Oct 29, 2024 | Completed final sign-off Apr 2025 | 3469 18th St | Jon K Takata Corp Dba Restoration Mgmt | revisions to p/a 2024-0422-0462 to address field inspector comments and construction related issues and as-built conditions, no significant changes in scope of project, dmj 11/21/2024;additional interior gypsum finishes, floor shet and anchorage repair, removed ext door from elec roomDetails
revisions to p/a 2024-0422-0462 to address field inspector comments and construction related issues and as-built conditions, no significant changes in scope of project, dmj 11/21/2024;additional interior gypsum finishes, floor shet and anchorage repair, removed ext door from elec room | |
| Aug 26, 2024 | Completed final sign-off Oct 2024 | 350 Ellis St | Jon K Takata Corp Dba Restoration Mgmt | units 1b,1c,1d, 1e, 1f, 1g and 1h: insulaiton, drywall, paint and base from water damage, work in common halls on 2nd floor in 7 units and work in common halls on 1st floor: 2 offices, lobby, conf. room and maintenance room. all gwb to be replaced in kindDetails
units 1b,1c,1d, 1e, 1f, 1g and 1h: insulaiton, drywall, paint and base from water damage, work in common halls on 2nd floor in 7 units and work in common halls on 1st floor: 2 offices, lobby, conf. room and maintenance room. all gwb to be replaced in kind | $50,000 |
| Aug 26, 2024 | Completed final sign-off Apr 2025 | 1308 Hayes St | Jon K Takata Corp Dba Restoration Mgmt | revision to permit 202308235022 repair dry rotted framing at basement.Details
revision to permit 202308235022 repair dry rotted framing at basement. | $10,000 |
| Jun 6, 2024 | Completed final sign-off Jan 2025 | 10 Inca Ln | Jon K Takata Corp Dba Restoration Mgmt | unit 2 - fire/smoke/water damage repair. drywall, cabinets, bathtub, sinks like for like. no exterior workDetails
unit 2 - fire/smoke/water damage repair. drywall, cabinets, bathtub, sinks like for like. no exterior work | $200,000 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 10 Inca Ln | Jon K Takata Corp Dba Restoration Mgmt | fire/smoke/water damage repair to 2nd fl unit 3. like for like. drywall cabinets, bathtub, sinksDetails
fire/smoke/water damage repair to 2nd fl unit 3. like for like. drywall cabinets, bathtub, sinks | $250,000 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 10 Inca Ln | Jon K Takata Corp Dba Restoration Mgmt | unit 5: fire/smoke/water damage repair to 3rd fl unit 5. like for like. drywall cabinets, bathtub, sinksDetails
unit 5: fire/smoke/water damage repair to 3rd fl unit 5. like for like. drywall cabinets, bathtub, sinks | $200,000 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 10 Inca Ln | Jon K Takata Corp Dba Restoration Mgmt | #6: fire/smoke/water damage repair to 3rd fl unit 6. like for like. drywall cabinets, bathtub, sinksDetails
#6: fire/smoke/water damage repair to 3rd fl unit 6. like for like. drywall cabinets, bathtub, sinks | $200,000 |
| Jun 4, 2024 | Completed final sign-off Jan 2025 | 10 Inca Ln | Jon K Takata Corp Dba Restoration Mgmt | fire/smoke/water damage repair to 2nd fl unit 4. like for like. drywall cabinets, bathtub, sinksDetails
fire/smoke/water damage repair to 2nd fl unit 4. like for like. drywall cabinets, bathtub, sinks | $200,000 |
| Apr 22, 2024 | In progress issued Jun 2024 | 3469 18th St | Jon K Takata Corp Dba Restoration Mgmt | repair to fire damamged area of 2-story mixed use bulidng as follows: repair damaged interior gypsum and exterior wood siding finishes. repair damaged roof framinmg (rafter and sheating) and waterproofing. repair floor framing (joists and sheating in kind). mep trade work will need separte permits.Details
repair to fire damamged area of 2-story mixed use bulidng as follows: repair damaged interior gypsum and exterior wood siding finishes. repair damaged roof framinmg (rafter and sheating) and waterproofing. repair floor framing (joists and sheating in kind). mep trade work will need separte permits. | $175,000 |
| Oct 3, 2023 | Completed final sign-off Aug 2024 | 456 Castro St | Jon K Takata Corp Dba Restoration Mgmt | saw cut concrete & install 2" vent & trap primer to existing 4" ss. patch & repair slab on grade to match existing at area of work. proposed layout under pa# 202006128532.Details
saw cut concrete & install 2" vent & trap primer to existing 4" ss. patch & repair slab on grade to match existing at area of work. proposed layout under pa# 202006128532. | $3,000 |
| Aug 23, 2023 | Completed final sign-off Apr 2025 | 1308 Hayes St | Jon K Takata Corp Dba Restoration Mgmt | to comply with nov# 202302294. fire damage repair in basement, unit 1312, 1310, & 1308. all repair works are like for like to match original conditions remove & replace entire roof materials. complete electrical rewire. repair all damaged interior & exterior finishes to match original conditions.Details
to comply with nov# 202302294. fire damage repair in basement, unit 1312, 1310, & 1308. all repair works are like for like to match original conditions remove & replace entire roof materials. complete electrical rewire. repair all damaged interior & exterior finishes to match original conditions. | $2,000,000 |
| Feb 2, 2023 | Completed final sign-off Jun 2023 | 1101 Connecticut St | Jon K Takata Corp Dba Restoration Mgmt | repairs to unit 412 & adjacent hallways due to fire in kitchen, to include drywall, electrical, minor plumbing, cabinets, flooring. to comply w/bid nov #202297807 dated 10/25/2022. no structural damage or repair. no changes in floor layout. all repairs to be in kind.Details
repairs to unit 412 & adjacent hallways due to fire in kitchen, to include drywall, electrical, minor plumbing, cabinets, flooring. to comply w/bid nov #202297807 dated 10/25/2022. no structural damage or repair. no changes in floor layout. all repairs to be in kind. | $65,000 |
| Dec 7, 2022 | Completed final sign-off Sep 2023 | 2634 Judah St | Jon K Takata Corp Dba Restoration Mgmt | unit #4: to comply w/nov 20228803. repair fire damage, like for like approach. repairs include damaged wall/ ceiling/ roof framing at the rear corner of the living room, damaged gyp/insulatiion/electrical fixtures in living rm, hallway, partial at bedroom and partiial kitchen replacement.Details
unit #4: to comply w/nov 20228803. repair fire damage, like for like approach. repairs include damaged wall/ ceiling/ roof framing at the rear corner of the living room, damaged gyp/insulatiion/electrical fixtures in living rm, hallway, partial at bedroom and partiial kitchen replacement. | $115,000 |
| Oct 17, 2022 | Never finaled issued Oct 2022, no final | 100 Van Ness Av | Jon K Takata Corp Dba Restoration Mgmt | demo of water damaged floor coverings, base, drywall, insulation, paint. plumbing repairs if needed. 11th down to ground floor plus 3 level parking garage. affected areas to remain vacant until repairs are completed. under sep permit.Details
demo of water damaged floor coverings, base, drywall, insulation, paint. plumbing repairs if needed. 11th down to ground floor plus 3 level parking garage. affected areas to remain vacant until repairs are completed. under sep permit. | $1,500,000 |
| Oct 7, 2022 | Completed final sign-off Jan 2025 | 10 Inca Ln | Jon K Takata Corp Dba Restoration Mgmt | to comply with nov# 202290970. repair fire damage throughout building, like-for-like. full guy of units 2-6, partial gut to unit 1. repair front decks to units 4 & 6, including structural repaids to deck floor and roof framing. repair roof to match original.Details
to comply with nov# 202290970. repair fire damage throughout building, like-for-like. full guy of units 2-6, partial gut to unit 1. repair front decks to units 4 & 6, including structural repaids to deck floor and roof framing. repair roof to match original. | $1,100,000 |
| Aug 4, 2022 | Completed final sign-off May 2023 | 1150 Webster St | Jon K Takata Corp Dba Restoration Mgmt | unit 1212 only (buchanan st mall):fire damange repair: all work to be like for like to match original conditions.repair all roof furring damaged by sffd including roof materials and roof plywood.repair all damaged interior and exterior finshes to match original conditions.to comply w/ nov202287985.Details
unit 1212 only (buchanan st mall):fire damange repair: all work to be like for like to match original conditions.repair all roof furring damaged by sffd including roof materials and roof plywood.repair all damaged interior and exterior finshes to match original conditions.to comply w/ nov202287985. | $160,000 |
| Jul 7, 2022 | Completed final sign-off May 2023 | 3636 Broderick St | Jon K Takata Corp Dba Restoration Mgmt | insulation drywall, paint, flooring, reset toilets and sinks due to water damage to comply with nov 202185013Details
insulation drywall, paint, flooring, reset toilets and sinks due to water damage to comply with nov 202185013 | $200,000 |
| Apr 7, 2022 | Completed final sign-off Jul 2024 | 456 Castro St | Jon K Takata Corp Dba Restoration Mgmt | revision to permit 202006128561. to comply with nov 202036301. 2nd and 3rd flr units: changing layouts to bathroom, laundry and kitchen areas. adding a door to 3/f family room to match (e) conditions. upgrading exterior stairs to comply with code. installing new foundation below ext. stairs.Details
revision to permit 202006128561. to comply with nov 202036301. 2nd and 3rd flr units: changing layouts to bathroom, laundry and kitchen areas. adding a door to 3/f family room to match (e) conditions. upgrading exterior stairs to comply with code. installing new foundation below ext. stairs. | $120,000 |
| Mar 21, 2022 | Expired or cancelled cancelled Jan 2026 | 1200 Turk St | Jon K Takata Corp Dba Restoration Mgmt | demo on 1st floor level due to fire. removing drywall from all wall ceiling on first floor. laminate flooring as well as cabinets.Details
demo on 1st floor level due to fire. removing drywall from all wall ceiling on first floor. laminate flooring as well as cabinets. | $15,000 |
| Feb 18, 2022 | Never finaled issued Feb 2022, no final | 146 Mcallister St | Jon K Takata Corp Dba Restoration Mgmt | unit 623: fire damage: replace like for like: electrical, plumbing, drywall flooring, kitchen cabinets. bathroom sink and tubDetails
unit 623: fire damage: replace like for like: electrical, plumbing, drywall flooring, kitchen cabinets. bathroom sink and tub | $75,142 |
| Jan 4, 2022 | Completed final sign-off May 2023 | 3636 Broderick St | Jon K Takata Corp Dba Restoration Mgmt | to comply with nov# 202185013. unit # 1, 2, 5, 6, 9, 10, & lobby. remove & dispose of all wallboard & flooring that was affected by water damage from a roof leak. replace with insulation, drywall and plywood to match (e).Details
to comply with nov# 202185013. unit # 1, 2, 5, 6, 9, 10, & lobby. remove & dispose of all wallboard & flooring that was affected by water damage from a roof leak. replace with insulation, drywall and plywood to match (e). | $60,000 |
| Oct 22, 2021 | Completed final sign-off Aug 2022 | 125 Mason St | Jon K Takata Corp Dba Restoration Mgmt | emergency repair. water damage repair to insulation, drywall, carpets and paint. drywall to be 5/8" type x. all work will be like for like to restore residences back to original. all drywall to meet fire rating in each area repaired. maintain (e) fire-rating , 1-hr. or 2-hrs.Details
emergency repair. water damage repair to insulation, drywall, carpets and paint. drywall to be 5/8" type x. all work will be like for like to restore residences back to original. all drywall to meet fire rating in each area repaired. maintain (e) fire-rating , 1-hr. or 2-hrs. | $1,404,000 |
| Aug 17, 2021 | Completed final sign-off Oct 2023 | 134 Dublin St | Jon K Takata Corp Dba Restoration Mgmt | removal of drywall, cabinets, floors due to fire damage only interior work. replace sheetrock. whole 2nd floor.Details
removal of drywall, cabinets, floors due to fire damage only interior work. replace sheetrock. whole 2nd floor. | $12,000 |
| Aug 5, 2021 | Completed final sign-off Nov 2022 | 1536 Great Hy | Jon K Takata Corp Dba Restoration Mgmt | unit 27: fire damage project to remove and replace interior and exterior finishes, windows, doors, and electrical wiring and insulation to match original (return to last legal condition)Details
unit 27: fire damage project to remove and replace interior and exterior finishes, windows, doors, and electrical wiring and insulation to match original (return to last legal condition) | $50,000 |
| May 13, 2021 | Completed final sign-off Nov 2021 | 173 Shipley St | Jon K Takata Corp Dba Restoration Mgmt | demolish existing type v 1-story warehouse due to fire damage.Details
demolish existing type v 1-story warehouse due to fire damage. | $138,000 |
| Feb 25, 2021 | Never finaled issued Mar 2021, no final | 1280 Ellis St | Jon K Takata Corp Dba Restoration Mgmt | unit #12: repair damage caused by a fire to the balcany and the effected exterior portion of the condo including windows and stucco finish.Details
unit #12: repair damage caused by a fire to the balcany and the effected exterior portion of the condo including windows and stucco finish. | $60,000 |
| Jan 5, 2021 | Completed final sign-off Jun 2021 | 100 Van Ness Av | Jon K Takata Corp Dba Restoration Mgmt | (unit #405) fire & water damage to interior walls & ceiling, drywall, insulation, hvac cleaning, flooring & interior cabinets. all repairs are in kind bago to original walls & ceilings.Details
(unit #405) fire & water damage to interior walls & ceiling, drywall, insulation, hvac cleaning, flooring & interior cabinets. all repairs are in kind bago to original walls & ceilings. | $59,450 |
| Jan 5, 2021 | Completed final sign-off Mar 2021 | 431 Bush St | Jon K Takata Corp Dba Restoration Mgmt | fire & water damge basement. replace in like. drywall, plumbing leak & electrical fixturesDetails
fire & water damge basement. replace in like. drywall, plumbing leak & electrical fixtures | $48,500 |
| Oct 22, 2020 | Completed final sign-off Nov 2020 | 1275 Market St | Jon K Takata Corp Dba Restoration Mgmt | 4,5/fl: drywall repair, plywood wall repair all due to water damage. drywall vent holes repair, insulation, vinyl flooring repair.Details
4,5/fl: drywall repair, plywood wall repair all due to water damage. drywall vent holes repair, insulation, vinyl flooring repair. | $23,160 |
| Oct 22, 2020 | Completed final sign-off Mar 2021 | 295 Bay St | Jon K Takata Corp Dba Restoration Mgmt | drywall repair from water damage from 3/f. drywall repair all 3 floors in water damage areas. repair drying holes for venting.Details
drywall repair from water damage from 3/f. drywall repair all 3 floors in water damage areas. repair drying holes for venting. | $108,500 |
| Oct 16, 2020 | Never finaled issued Oct 2020, no final | 1466 Waller St | Jon K Takata Corp Dba Restoration Mgmt | unit 1466: remove & dispose of wet walls & ceiling, floors in kitchen, hall,bedroom, dining. unit 1468: remove & dispose of wet walls, ceiling, carpet in dining, bedroom, hall & kitchen unit 1470: remove & dispose of wet wall, ceiling, carpet in hall, kitchen, dining, bedroom & bathroomDetails
unit 1466: remove & dispose of wet walls & ceiling, floors in kitchen, hall,bedroom, dining. unit 1468: remove & dispose of wet walls, ceiling, carpet in dining, bedroom, hall & kitchen unit 1470: remove & dispose of wet wall, ceiling, carpet in hall, kitchen, dining, bedroom & bathroom | $56,579 |
| Oct 16, 2020 | Never finaled issued Oct 2020, no final | 1480 Waller St | Jon K Takata Corp Dba Restoration Mgmt | units 1,3,5: remove & dispose of wet walls ceiling, cabinet & flooring in bedroom, kitchen, hall. units 2,4,8: remove & dispose of wet wall, ceiling, floor in hall & bedroom. unit 10: remove and dispose of wet walls, ceiling and floor in living room, kitchen, bedroom, bath and hall. 1)removal of...Details
units 1,3,5: remove & dispose of wet walls ceiling, cabinet & flooring in bedroom, kitchen, hall. units 2,4,8: remove & dispose of wet wall, ceiling, floor in hall & bedroom. unit 10: remove and dispose of wet walls, ceiling and floor in living room, kitchen, bedroom, bath and hall. 1)removal of... | $89,511 |
| Sep 14, 2020 | Never finaled issued Sep 2020, no final | 1000 Market St | Jon K Takata Corp Dba Restoration Mgmt | 4th fl community bathroom - water damage repair in-kind: floors, hallway. replace bathtub & sub floor. drywall repair. 3rd fl community bathroom ceiling repair only.Details
4th fl community bathroom - water damage repair in-kind: floors, hallway. replace bathtub & sub floor. drywall repair. 3rd fl community bathroom ceiling repair only. | $17,000 |
| Jul 8, 2020 | Completed final sign-off Aug 2020 | 835 Ofarrell St | Jon K Takata Corp Dba Restoration Mgmt | unit# 409: remove clawfoot tub and replace with stand up shower stall. changing out a free standing bathtub for easy access shower stall with handicap rails, will relocate supply lines and waste line. all fixtures stays at same place.Details
unit# 409: remove clawfoot tub and replace with stand up shower stall. changing out a free standing bathtub for easy access shower stall with handicap rails, will relocate supply lines and waste line. all fixtures stays at same place. | $11,500 |
| Jun 12, 2020 | Completed final sign-off Jul 2024 | 456 Castro St | Jon K Takata Corp Dba Restoration Mgmt | to comply with nov #202036301 to repair fire damage caused to the (2) sfd on the 2nd & 3rd flr of this mixed-use property, returning them to original conditions using a "like-for-like" replacement. the repairs to the first floor commercial space will be under a separate permit.Details
to comply with nov #202036301 to repair fire damage caused to the (2) sfd on the 2nd & 3rd flr of this mixed-use property, returning them to original conditions using a "like-for-like" replacement. the repairs to the first floor commercial space will be under a separate permit. | $650,000 |
| Jun 12, 2020 | Completed final sign-off Aug 2024 | 456 Castro St | Jon K Takata Corp Dba Restoration Mgmt | to comply with nov # 202036301. repair fire damage caused to the bar located on ground floor of this mixed-use property to return it to its original condition using a like-for-like 00....Details
to comply with nov # 202036301. repair fire damage caused to the bar located on ground floor of this mixed-use property to return it to its original condition using a like-for-like 00.... | $300,000 |
| May 11, 2020 | Never finaled issued Jun 2020, no final | 333 Bush St | Jon K Takata Corp Dba Restoration Mgmt | 9th, 10th, 11th flr: repair water damage. repairs include drywall replacement and patching, painting, cabinet repair, and flooring replacement. all materials to be replaced like-for-like, kind, and quality.Details
9th, 10th, 11th flr: repair water damage. repairs include drywall replacement and patching, painting, cabinet repair, and flooring replacement. all materials to be replaced like-for-like, kind, and quality. | $100,000 |
| Nov 8, 2019 | Completed final sign-off Oct 2020 | 196 Parker Av | Jon K Takata Corp Dba Restoration Mgmt | drywall, flooring, plumbing bathrooms, rough frame, windows plaster due to explosion on city street. all repairs with plaster back to original. existing fixtures to remain in kitchen and bathsDetails
drywall, flooring, plumbing bathrooms, rough frame, windows plaster due to explosion on city street. all repairs with plaster back to original. existing fixtures to remain in kitchen and baths | $149,000 |
| Nov 8, 2019 | Completed final sign-off Feb 2020 | 1150 Pierce St | Jon K Takata Corp Dba Restoration Mgmt | unit #204: drywall, plumbing, electrical repairs, due to water damage by tenant drywall typ x "1". all walls. p trap supply lines new tub, sink in bathroom and kitchen. replace outlets to new. no new wiringDetails
unit #204: drywall, plumbing, electrical repairs, due to water damage by tenant drywall typ x "1". all walls. p trap supply lines new tub, sink in bathroom and kitchen. replace outlets to new. no new wiring | $49,957 |
| Oct 25, 2019 | Completed final sign-off Jul 2020 | 500 Sutter St | Jon K Takata Corp Dba Restoration Mgmt | demo (e) millwork and installing new millworkDetails
demo (e) millwork and installing new millwork | $50,000 |
| May 29, 2019 | Never finaled issued Oct 2019, no final | 3308 Geary Bl | Jon K Takata Corp Dba Restoration Mgmt | to comply with nov 201927571 3-story office/community ctr is being repaired like for like following fire/smoke damage (full gut)Details
to comply with nov 201927571 3-story office/community ctr is being repaired like for like following fire/smoke damage (full gut) | $50,000 |
| May 21, 2019 | Completed final sign-off Aug 2020 | 1226 Page St | Jon K Takata Corp Dba Restoration Mgmt | to partially comply with nov #201930061. interior soft demo of plaster walls/ceiling, fixtures and flooring caused by fire. partial exterior asbestos siding removal. no removal of meps or structural supports.Details
to partially comply with nov #201930061. interior soft demo of plaster walls/ceiling, fixtures and flooring caused by fire. partial exterior asbestos siding removal. no removal of meps or structural supports. | $125,000 |
| May 17, 2019 | Completed final sign-off Oct 2019 | 3250 Geary Bl | Jon K Takata Corp Dba Restoration Mgmt | due to fire damage rewire electrical, insulation, metal framing, drywall, replace (13) windows, replace glass at storefront.Details
due to fire damage rewire electrical, insulation, metal framing, drywall, replace (13) windows, replace glass at storefront. | $116,000 |
| Apr 18, 2019 | Completed final sign-off May 2019 | 399 Fremont St | Jon K Takata Corp Dba Restoration Mgmt | revision to bpa#201902213504, remove units 301, 302 & 303Details
revision to bpa#201902213504, remove units 301, 302 & 303 | |
| Apr 16, 2019 | Completed final sign-off Jun 2019 | 190 Coleridge St | Jon K Takata Corp Dba Restoration Mgmt | repair drywall up to 2' ttl using type x drywall approx 430 sq ft, units 108,109 & 209 kitchen area repair in kindDetails
repair drywall up to 2' ttl using type x drywall approx 430 sq ft, units 108,109 & 209 kitchen area repair in kind | $24,000 |
| Apr 12, 2019 | Completed final sign-off May 2019 | 150 Van Ness Av | Jon K Takata Corp Dba Restoration Mgmt | comply with nov 201817181; demo of illegal walls, repair to wall finishes that are remaining in 5 apts, 2 bedrooms each.Details
comply with nov 201817181; demo of illegal walls, repair to wall finishes that are remaining in 5 apts, 2 bedrooms each. | $40,000 |
| Apr 4, 2019 | Completed final sign-off Sep 2019 | 405 Davis Ct | Jon K Takata Corp Dba Restoration Mgmt | replacement in kind of fir damaged interior finishes and mep 4 apratment units total maher naDetails
replacement in kind of fir damaged interior finishes and mep 4 apratment units total maher na | $425,000 |
| Apr 3, 2019 | Completed final sign-off Jun 2019 | 1222 Harrison St | Jon K Takata Corp Dba Restoration Mgmt | units 4323 & 4223 2nd floor common hallway insulation/druywall on ceiling and wall repair like kindDetails
units 4323 & 4223 2nd floor common hallway insulation/druywall on ceiling and wall repair like kind | $30,000 |
| Mar 7, 2019 | Never finaled issued Mar 2019, no final | 3308 Geary Bl | Jon K Takata Corp Dba Restoration Mgmt | to partially comply with nov 201927571: to remove all water and smoke damage and exploratory demo of interior plaster and drywall. repair and remodel will be under separate permit.Details
to partially comply with nov 201927571: to remove all water and smoke damage and exploratory demo of interior plaster and drywall. repair and remodel will be under separate permit. | $30,000 |
| Feb 22, 2019 | Completed final sign-off Feb 2019 | 190 Parker Av | Jon K Takata Corp Dba Restoration Mgmt | comply w/ n.o.v 201927561. units 190, 192, 194. remove board up on windows and doors so tenants can re-occupy. no damages to units. ref from fergal clancy. no new work, replace (e) door w/ equal fire ratingDetails
comply w/ n.o.v 201927561. units 190, 192, 194. remove board up on windows and doors so tenants can re-occupy. no damages to units. ref from fergal clancy. no new work, replace (e) door w/ equal fire rating | $10,000 |
| Feb 21, 2019 | Completed final sign-off May 2019 | 399 Fremont St | Jon K Takata Corp Dba Restoration Mgmt | reapir drywall using 5/8" type x due to water leak. flood cuts up 2' tall corridors on the 3,4,6,7,8,9th floors. units: 702,601,603, 302, 301, 303. repairs are approx 1600 sf. no stud at (e) wall will be cut or replaced.Details
reapir drywall using 5/8" type x due to water leak. flood cuts up 2' tall corridors on the 3,4,6,7,8,9th floors. units: 702,601,603, 302, 301, 303. repairs are approx 1600 sf. no stud at (e) wall will be cut or replaced. | $200,000 |
| Feb 14, 2019 | Completed final sign-off Oct 2019 | 330 Clementina St | Jon K Takata Corp Dba Restoration Mgmt | to comply with n.o.v # 201804841: unit#503- new electrical and plumbing for kitchen remodel. kitchen cabinets, drywalls (full remodel repair like for like)Details
to comply with n.o.v # 201804841: unit#503- new electrical and plumbing for kitchen remodel. kitchen cabinets, drywalls (full remodel repair like for like) | $89,000 |
| Feb 8, 2019 | Completed final sign-off Oct 2019 | 1625 Eddy St | Jon K Takata Corp Dba Restoration Mgmt | comply with nov 201805743. repair fire damage in unit 412 abd 414 onlyDetails
comply with nov 201805743. repair fire damage in unit 412 abd 414 only | $59,800 |
| Feb 5, 2019 | Expired or cancelled cancelled Jan 2026 | 100 Van Ness Av | Jon K Takata Corp Dba Restoration Mgmt | revision to pa 201901140279. submitting plans per fire inspector request. 29th flr utility room. ceiling drywall repairDetails
revision to pa 201901140279. submitting plans per fire inspector request. 29th flr utility room. ceiling drywall repair | |
| Jan 14, 2019 | Completed final sign-off Mar 2019 | 100 Van Ness Av | Jon K Takata Corp Dba Restoration Mgmt | 29/f: drywall repair in utility room. rated ceiling. repair to match (e). maher n/a.Details
29/f: drywall repair in utility room. rated ceiling. repair to match (e). maher n/a. | $2,500 |
| Dec 19, 2018 | Never finaled issued Dec 2018, no final | 2700 Arelious Walker Dr | Jon K Takata Corp Dba Restoration Mgmt | unit 206120 sqft frywall replacement, doorcasing replacement, baseboard replacement, carpet pad replacement, new bath rub and surround install. paint 200 sqftDetails
unit 206120 sqft frywall replacement, doorcasing replacement, baseboard replacement, carpet pad replacement, new bath rub and surround install. paint 200 sqft | $8,500 |
| Dec 3, 2018 | Completed final sign-off Sep 2019 | 405 Davis Ct | Russell Hinton Company, Jon K Takata Corp Dba Restoration Mgmt | fire damage repair to partition and ceilings- replace in kind. floors 12-20.Details
fire damage repair to partition and ceilings- replace in kind. floors 12-20. | $61,000 |
| Nov 27, 2018 | Completed final sign-off Sep 2019 | 405 Davis Ct | Russell Hinton Company, Jon K Takata Corp Dba Restoration Mgmt | fire damage repair to partitions and ceilings. replace in kind. 11th floor. n/a for maher.Details
fire damage repair to partitions and ceilings. replace in kind. 11th floor. n/a for maher. | $50,000 |
| Nov 20, 2018 | Completed final sign-off Sep 2019 | 405 Davis Ct | Russell Hinton Company, Jon K Takata Corp Dba Restoration Mgmt | repair in kind fire damage, floors 7-10.Details
repair in kind fire damage, floors 7-10. | $270,000 |
| Oct 31, 2018 | Completed final sign-off Mar 2019 | 5157 Diamond Heights Bl | Jon K Takata Corp Dba Restoration Mgmt | water damage repair in units 202/302/402: insulation, double layer drywall replacement. all in kitchen area.Details
water damage repair in units 202/302/402: insulation, double layer drywall replacement. all in kitchen area. | $39,000 |
| Oct 24, 2018 | Never finaled issued Oct 2018, no final | 405 Davis Ct | Russell Hinton Company, Jon K Takata Corp Dba Restoration Mgmt | demolition of approx 5000 sq ft of sheetrock and carpet due to fire and waer damage on floors 8,9,10,11 (2 units per floor) and floors 12 and 13 (8 units per floor) and floor 14(4 units). tenant improvement under separate permitDetails
demolition of approx 5000 sq ft of sheetrock and carpet due to fire and waer damage on floors 8,9,10,11 (2 units per floor) and floors 12 and 13 (8 units per floor) and floor 14(4 units). tenant improvement under separate permit | $100,000 |
| Oct 10, 2018 | Completed final sign-off Dec 2018 | 5740 Mission St | Jon K Takata Corp Dba Restoration Mgmt | damage survey stant garage (fire damage). replace burnt frames, in kind. siding and garage door. reroofing under seperate permit.Details
damage survey stant garage (fire damage). replace burnt frames, in kind. siding and garage door. reroofing under seperate permit. | $28,000 |
| Oct 10, 2018 | Completed final sign-off Dec 2018 | 5740 Mission St | Jon K Takata Corp Dba Restoration Mgmt | reroofingDetails
reroofing | $10,800 |
| Sep 13, 2018 | Completed final sign-off Jan 2019 | 545 Ofarrell St | Jon K Takata Corp Dba Restoration Mgmt | revision to appl # 2018-0301-2618 to add sffd review only. fire alarm permit/testing.Details
revision to appl # 2018-0301-2618 to add sffd review only. fire alarm permit/testing. | |
| Sep 11, 2018 | Completed final sign-off Aug 2019 | 2217 Mission St | Jon K Takata Corp Dba Restoration Mgmt | all work in unit 102. remodel kitchen and bathroom in kind. new sinks, and shower stall. replace 4 window(s). 2 windows in the living room area, 1 in bedroom area and 1 in bathroom. all windows not visible from street.Details
all work in unit 102. remodel kitchen and bathroom in kind. new sinks, and shower stall. replace 4 window(s). 2 windows in the living room area, 1 in bedroom area and 1 in bathroom. all windows not visible from street. | $10,000 |
| Jun 8, 2018 | Never finaled issued Jun 2018, no final | 587 Burnett Av | Jon K Takata Corp Dba Restoration Mgmt | 3rd floor: replace dry rot around bedroom window as per correction notice 5/8/018Details
3rd floor: replace dry rot around bedroom window as per correction notice 5/8/018 | $2,000 |
| May 8, 2018 | Completed final sign-off Mar 2019 | 545 Ofarrell St | Jon K Takata Corp Dba Restoration Mgmt | demo of wet walls, ceiling 2nd and 3rd floors. removal acm sprayed acoustic ceiling 1st floor comply with 201724591Details
demo of wet walls, ceiling 2nd and 3rd floors. removal acm sprayed acoustic ceiling 1st floor comply with 201724591 | $52,610 |
| Apr 11, 2018 | Completed final sign-off Jun 2018 | 655 Corbett Av | Jon K Takata Corp Dba Restoration Mgmt | insulation, drywall installation. repair in kind. work is at common area.Details
insulation, drywall installation. repair in kind. work is at common area. | $10,000 |
| Mar 22, 2018 | Completed final sign-off May 2018 | 1590 Pacific Av | Jon K Takata Corp Dba Restoration Mgmt | inkind repair of approx. 150 sf of stucco/frame at front of store due to auto accidentDetails
inkind repair of approx. 150 sf of stucco/frame at front of store due to auto accident | $15,000 |
| Mar 1, 2018 | Completed final sign-off Feb 2019 | 545 Ofarrell St | Jon K Takata Corp Dba Restoration Mgmt | to comply with nov# 201724591. repair 4th flr hallways after fire in one of the units, replace affected electrical ,replace insulation, drywall & trim.Details
to comply with nov# 201724591. repair 4th flr hallways after fire in one of the units, replace affected electrical ,replace insulation, drywall & trim. | $62,000 |
| Feb 26, 2018 | Completed final sign-off Mar 2018 | 1160 Webster St | Jon K Takata Corp Dba Restoration Mgmt | unit #201; repair unit after small fire, most affected by smog. small drywall repairs, electrical and plumbin, replace part of the kitchen cabinets, 200 sq ft.Details
unit #201; repair unit after small fire, most affected by smog. small drywall repairs, electrical and plumbin, replace part of the kitchen cabinets, 200 sq ft. | $16,000 |
| Feb 16, 2018 | Never finaled issued Feb 2018, no final | 587 Burnett Av | Jon K Takata Corp Dba Restoration Mgmt | rebuild the interior of unit #10 damaged by fire. including insulation, drywall, electrical, plumbing for two bathrooms and kitchen. replace kitchen cabinets. bring unit to living condition. no structural damaged.Details
rebuild the interior of unit #10 damaged by fire. including insulation, drywall, electrical, plumbing for two bathrooms and kitchen. replace kitchen cabinets. bring unit to living condition. no structural damaged. | $60,000 |
| Oct 27, 2017 | Completed final sign-off Jul 2018 | 5550 Mission St | Jon K Takata Corp Dba Restoration Mgmt | roofing patch on commercial building of approx 500sf. no structural work. polyglass 0.76, 0.70, 0.80, 0.91, 92, 86. sri. maher naDetails
roofing patch on commercial building of approx 500sf. no structural work. polyglass 0.76, 0.70, 0.80, 0.91, 92, 86. sri. maher na | $4,000 |
| Aug 29, 2017 | Completed final sign-off Sep 2017 | 260 Cashmere St | Jon K Takata Corp Dba Restoration Mgmt | rev to 201706300885 -change unit f to unit d; correct desciption per pid.unit b:drywall,patch ceiling. unit d:electrical, plumbing for 1 bathroom,1 kitchen, insulation, drywall, flooring, window, wall heater.Details
rev to 201706300885 -change unit f to unit d; correct desciption per pid.unit b:drywall,patch ceiling. unit d:electrical, plumbing for 1 bathroom,1 kitchen, insulation, drywall, flooring, window, wall heater. | |
| Aug 15, 2017 | Completed final sign-off Nov 2021 | 1810 Page St | Jon K Takata Corp Dba Restoration Mgmt | to comply w/nov #201796841 - removal of walls, ceiling plaster, cabinets & rear exterior siding. (lead abatement only) t.i. by other.Details
to comply w/nov #201796841 - removal of walls, ceiling plaster, cabinets & rear exterior siding. (lead abatement only) t.i. by other. | $59,000 |
| Jun 30, 2017 | Completed final sign-off Sep 2017 | 260 Cashmere St | Jon K Takata Corp Dba Restoration Mgmt | remodel: unit b & f - new drywall; minor electrical and finishes in units b &f, insulation in #b, new kitchen cabinets anf finish plumbing and window in unit #b, new flooring & paint. all work to be in-kind.Details
remodel: unit b & f - new drywall; minor electrical and finishes in units b &f, insulation in #b, new kitchen cabinets anf finish plumbing and window in unit #b, new flooring & paint. all work to be in-kind. | $40,000 |
| Jan 9, 2017 | Never finaled issued Jan 2017, no final | 1411 Flounder Ct | Jon K Takata Corp Dba Restoration Mgmt | unit a & c: water damage to exterior wall remove and replace joists & 2x4 framing. some sheetrock cabinets & floor sheeting. half inch exterior sheer and patch stucco. n/a maherDetails
unit a & c: water damage to exterior wall remove and replace joists & 2x4 framing. some sheetrock cabinets & floor sheeting. half inch exterior sheer and patch stucco. n/a maher | $4,000 |
| Nov 14, 2016 | Completed final sign-off Apr 2017 | 628 Ofarrell St | Jon K Takata Corp Dba Restoration Mgmt | minor electrical & plumbing, insulate drywall, cabinets, flooring, paint. for both unit 3 & 5 each one bath & one kitchen remodel and approx 200 sf drywall repair, new flooring, no change in wall & opening layout. baths high efficacy lighting, kitchen min 50% wattage high efficacy.Details
minor electrical & plumbing, insulate drywall, cabinets, flooring, paint. for both unit 3 & 5 each one bath & one kitchen remodel and approx 200 sf drywall repair, new flooring, no change in wall & opening layout. baths high efficacy lighting, kitchen min 50% wattage high efficacy. | $70,000 |
| Oct 14, 2016 | Never finaled issued Oct 2016, no final | 1814 22nd Av | Jon K Takata Corp Dba Restoration Mgmt | selective demo in building units 1,2,4 kitchen and baths, unit 3 remove cabinets partial drywall/plaster. remove danaged drywall at entry all hallways. remove hardwood and floor that is damaged. unit 3 remove partial drywall and floors. maintain pl and roof/ceiling. fire rating.Details
selective demo in building units 1,2,4 kitchen and baths, unit 3 remove cabinets partial drywall/plaster. remove danaged drywall at entry all hallways. remove hardwood and floor that is damaged. unit 3 remove partial drywall and floors. maintain pl and roof/ceiling. fire rating. | $10,000 |
| Oct 13, 2016 | Completed final sign-off May 2017 | 360 04th St | Jon K Takata Corp Dba Restoration Mgmt | to obtain final inspection for work approved under pa#2010-0405-9635. all work is complete. n/a for maher.Details
to obtain final inspection for work approved under pa#2010-0405-9635. all work is complete. n/a for maher. | |
| Oct 13, 2016 | Never finaled issued Oct 2016, no final | 360 04th St | Jon K Takata Corp Dba Restoration Mgmt | to obtain final inspection for work approved under pa#2012-0302-5285. all work is complete. n/a for maher.Details
to obtain final inspection for work approved under pa#2012-0302-5285. all work is complete. n/a for maher. | |
| Sep 14, 2016 | Completed final sign-off Apr 2017 | 1870 Jefferson St | Chaney Construction, Jon K Takata Corp Dba Restoration Mgmt | work in unit #102: drywall and insulation repair due to water damage and to comply with nov #201633941Details
work in unit #102: drywall and insulation repair due to water damage and to comply with nov #201633941 | $10,000 |
| Jun 22, 2016 | Never finaled issued Jun 2016, no final | 930 Post St | Jon K Takata Corp Dba Restoration Mgmt | removal of interior drywall due to a fire damage unit #1 one bedroom apt.Details
removal of interior drywall due to a fire damage unit #1 one bedroom apt. | $15,000 |
| Jun 13, 2016 | Completed final sign-off Aug 2016 | 1656 15th St | Jon K Takata Corp Dba Restoration Mgmt | remove and replace one window damaged by small fire, replacement window will exactly match adjacent metal frame windows,Details
remove and replace one window damaged by small fire, replacement window will exactly match adjacent metal frame windows, | $7,200 |
| May 4, 2016 | Completed final sign-off May 2016 | 3525 17th St | Jon K Takata Corp Dba Restoration Mgmt | to comply w/nov # 201612642,for analysis of damage & plan submittal w/permit/exploratoy demo, demo in 15 of 17 units due to water & fire damage installation of scaffold for demo & shuteDetails
to comply w/nov # 201612642,for analysis of damage & plan submittal w/permit/exploratoy demo, demo in 15 of 17 units due to water & fire damage installation of scaffold for demo & shute | $20,000 |
| Jan 19, 2016 | Completed final sign-off Oct 2016 | 1419 Striped Bass St | Jon K Takata Corp Dba Restoration Mgmt | revision to pa#2015-1217-5369 to correct address to 1419 striped bass. n/a for maher.Details
revision to pa#2015-1217-5369 to correct address to 1419 striped bass. n/a for maher. | |
| Dec 17, 2015 | Completed final sign-off Oct 2016 | 1409 Flounder Ct | Jon K Takata Corp Dba Restoration Mgmt | replace water damaged header at top of stairs, new posts and spread footings. n/a maher ordinanceDetails
replace water damaged header at top of stairs, new posts and spread footings. n/a maher ordinance | $500 |
| Dec 17, 2015 | Never finaled issued Dec 2015, no final | 1403 Sturgeon St | Jon K Takata Corp Dba Restoration Mgmt | replace water damaged header at top of stairs. n/a maher ordinanceDetails
replace water damaged header at top of stairs. n/a maher ordinance | $500 |
| Jun 10, 2014 | Never finaled issued Jun 2014, no final | 2254 Market St | Jon K Takata Corp Dba Restoration Mgmt | remove & replace stucco on one side of building damaged by fire, remove & replace 1 window & 4 doors damaged by fire, check wiring on exterior damaged by fire, interior drywall holes cut by fire department.Details
remove & replace stucco on one side of building damaged by fire, remove & replace 1 window & 4 doors damaged by fire, check wiring on exterior damaged by fire, interior drywall holes cut by fire department. | $45,000 |
| Apr 2, 2013 | Completed final sign-off Apr 2013 | 862 28th Av | Jon K Takata Corp Dba Restoration Mgmt | install insulation in walls, hang & tape 5/8" sheetrock to close areas opened for mold remediation, 196 sq.ft.Details
install insulation in walls, hang & tape 5/8" sheetrock to close areas opened for mold remediation, 196 sq.ft. | $800 |
| Jan 20, 2012 | Never finaled issued Jan 2012, no final | 847 Clay St | Jon K Takata Corp Dba Restoration Mgmt | due to fire & water damage 6 units and hallways call for the remoal of wall, floor finishes to expose main subfloor and framing and allow to dry. area of work will be confined kitchen walls in unit 30 & 40. bedroom walls in units 26,36, 46. no structural work under this permit.Details
due to fire & water damage 6 units and hallways call for the remoal of wall, floor finishes to expose main subfloor and framing and allow to dry. area of work will be confined kitchen walls in unit 30 & 40. bedroom walls in units 26,36, 46. no structural work under this permit. | $30,000 |
| Sep 28, 2011 | Completed final sign-off Feb 2014 | 493 Haight St | Jon K Takata Corp Dba Restoration Mgmt | to comply with complaint, install fence on haight street elevation at sidewalk, cyclone fence to secure property, clean up non-structural debris.Details
to comply with complaint, install fence on haight street elevation at sidewalk, cyclone fence to secure property, clean up non-structural debris. | $100,000 |
| Mar 21, 2011 | Completed final sign-off Feb 2012 | 149 09th St | Jon K Takata Corp Dba Restoration Mgmt | interior demo per ab17. demo non struc. partition walls,doors, elec outlets, lighting , plbg fixtures, fl finishes and cabs for future ti. interior only on basement, 1st and 2nd fl. space currently vacant.Details
interior demo per ab17. demo non struc. partition walls,doors, elec outlets, lighting , plbg fixtures, fl finishes and cabs for future ti. interior only on basement, 1st and 2nd fl. space currently vacant. | $21,000 |
| Mar 16, 2011 | Completed final sign-off Feb 2012 | 149 09th St | Jon K Takata Corp Dba Restoration Mgmt | non structural exploratory demolition work for future remodeling permit, interior only. no exterior work, basement, 1/f & 2/f only. space currently vacant. all ada upgrade work under future t.i. permit per ab-017Details
non structural exploratory demolition work for future remodeling permit, interior only. no exterior work, basement, 1/f & 2/f only. space currently vacant. all ada upgrade work under future t.i. permit per ab-017 | $5,000 |