Block 3590, lot 033
2217 Mission St
- City’s use
- Multi-Family Residential
- Built
- 1904
- Stories
- 3
- Units
- 9
- Rooms
- 9 bedrooms, 9 bathrooms
- Building
- 8,347 sq ft
- Lot
- 3,675 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
19 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 15, 2021 | Completed final sign-off Jan 2022 | 2217 Mission St | Blackline Construction | unit 203: remodel of bathroom and kitchen in unit #203. like of like, no wall removal.Details
unit 203: remodel of bathroom and kitchen in unit #203. like of like, no wall removal. | $22,000 |
| Oct 6, 2021 | Completed final sign-off Jan 2022 | 2217 Mission St | Blackline Construction | remodel one kitchen and three bathrooms: no walls will be altered. remodel in-kind. comply w/ cec 150.0(k)3 and 150.0(k)5.Details
remodel one kitchen and three bathrooms: no walls will be altered. remodel in-kind. comply w/ cec 150.0(k)3 and 150.0(k)5. | $59,700 |
| Oct 30, 2019 | Completed final sign-off Nov 2019 | 2217 Mission St | Crime Watch Security Sys Llc | upgrade e fire alarm system to comply with sffc section 1103.7.6.1 ref 201812118043Details
upgrade e fire alarm system to comply with sffc section 1103.7.6.1 ref 201812118043 | $18,000 |
| Jul 5, 2019 | Completed final sign-off Jul 2019 | 2217 Mission St | Gateway Roofing And Water Proofing Inc | reroofingDetails
reroofing | $6,900 |
| Dec 11, 2018 | Never finaled issued Jan 2019, no final | 2217 Mission St | Guzman Construction Group Inc. | mod, units 101, 103, 104, 201, 202, 203 & 204 - partial window r &r, kitchen and bath remodel, flooring & paint as needed, electrical wall heaters, hot waters heaters. unit 104 - installation of hvi (communication unit).Details
mod, units 101, 103, 104, 201, 202, 203 & 204 - partial window r &r, kitchen and bath remodel, flooring & paint as needed, electrical wall heaters, hot waters heaters. unit 104 - installation of hvi (communication unit). | $85,000 |
| Nov 19, 2018 | Never finaled issued Nov 2018, no final | 2217 Mission St | street spaceDetails
street space | ||
| Sep 11, 2018 | Completed final sign-off Aug 2019 | 2217 Mission St | Jon K Takata Corp Dba Restoration Mgmt | all work in unit 102. remodel kitchen and bathroom in kind. new sinks, and shower stall. replace 4 window(s). 2 windows in the living room area, 1 in bedroom area and 1 in bathroom. all windows not visible from street.Details
all work in unit 102. remodel kitchen and bathroom in kind. new sinks, and shower stall. replace 4 window(s). 2 windows in the living room area, 1 in bedroom area and 1 in bathroom. all windows not visible from street. | $10,000 |
| Aug 9, 2018 | Completed final sign-off Mar 2019 | 2221 Mission St | J & J South West Construction Inc | interior renovation of tenant space on ground floor of 3 story multiunit building. minor ada compliance work to restroom at 1st floor, new wall at office area, new door to rear office and restroom area, new shelving modifications to extg electrical system, plmg modification, new ceiling fans.Details
interior renovation of tenant space on ground floor of 3 story multiunit building. minor ada compliance work to restroom at 1st floor, new wall at office area, new door to rear office and restroom area, new shelving modifications to extg electrical system, plmg modification, new ceiling fans. | $40,000 |
| Feb 9, 2016 | Completed final sign-off Apr 2017 | 2217 Mission St | Sincere Construction Company Inc | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. residential apartments only.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. residential apartments only. | $40,000 |
| Feb 9, 2016 | Completed final sign-off Apr 2017 | 2217 Mission St | Sincere Construction Company Inc | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, commercial retail at ground floor only.Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4, commercial retail at ground floor only. | $20,000 |
| Oct 31, 2013 | Never finaled issued Oct 2013, no final | 2217 Mission St | street spaceDetails
street space | ||
| Aug 22, 2013 | Never finaled issued Aug 2013, no final | 2217 Mission St | street spaceDetails
street space | ||
| May 29, 2013 | Never finaled issued May 2013, no final | 2217 Mission St | street spaceDetails
street space | ||
| Mar 26, 2013 | Never finaled issued Mar 2013, no final | 2221 Mission St | street space permitDetails
street space permit | ||
| Jan 14, 2013 | Never finaled issued Jan 2013, no final | 2221 Mission St | street spaceDetails
street space | ||
| Jan 4, 2013 | Never finaled issued Feb 2013, no final | 2217 Mission St | Wah Wong Construction Co. | revision to app#201210262922. extg bay window will be strengthen and repair the crawl space retaining wall.Details
revision to app#201210262922. extg bay window will be strengthen and repair the crawl space retaining wall. | $5,000 |
| Nov 30, 2012 | Never finaled issued Nov 2012, no final | 2217 Mission St | street spaceDetails
street space | ||
| Oct 26, 2012 | Never finaled issued Nov 2012, no final | 2217 Mission St | Wah Wong Construction Co. | remove extg storefront window. install new steel moment resisting frame. construct new foundation to support new mrf ada entry and toilet room on grnd flr is already existingDetails
remove extg storefront window. install new steel moment resisting frame. construct new foundation to support new mrf ada entry and toilet room on grnd flr is already existing | $60,000 |
| Oct 20, 2004 | Never finaled issued Oct 2004, no final | 2217 Mission St | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Blackline Construction (2), Sincere Construction Company Inc (2), Wah Wong Construction Co. (2), Crime Watch Security Sys Llc, Gateway Roofing And Water Proofing Inc, Guzman Construction Group Inc., J & J South West Construction Inc, Jon K Takata Corp Dba Restoration Mgmt
- Engineers
- Darren Wong (2)
- Authorized agent-otherss
- Henry H. Kwang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.