Block 0301, lot 009
930 Post St
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 6
- Units
- 44
- Rooms
- 44 bathrooms
- Building
- 30,675 sq ft
- Lot
- 7,936 sq ft
- Zoning
- RC4
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
26 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 31, 2026 | In progress issued Aug 2026 | 930 Post St | Elemental Builders Incorporated | unit 14 -renovate interior unit like for like cabinets, flooring, countertops, interior finishes. add washer dryer all in one.Details
unit 14 -renovate interior unit like for like cabinets, flooring, countertops, interior finishes. add washer dryer all in one. | $40,000 |
| Jun 11, 2020 | Never finaled issued Aug 2020, no final | 930 Post St | street spaceDetails
street space | ||
| Mar 3, 2020 | Expired or cancelled cancelled Jan 2026 | 930 Post St | reonvatio of 1 apt unit 43. new kitchen cabinets, new plumbing fixtures, new lighting at e jbox locations. no change to mech. no exterior work. no fire alarm or sprinkler workDetails
reonvatio of 1 apt unit 43. new kitchen cabinets, new plumbing fixtures, new lighting at e jbox locations. no change to mech. no exterior work. no fire alarm or sprinkler work | $65,000 | |
| Feb 12, 2020 | Completed final sign-off Feb 2021 | 930 Post St | San Francisco Fire Protection | like for like in common areas & upgrade installation fire alarm system in none sprinkler bldg. replace exg fac with new ifp.75, smoke detector, heat detector, pull station & bells. low frequency,modules and new aes 7707 power supplyDetails
like for like in common areas & upgrade installation fire alarm system in none sprinkler bldg. replace exg fac with new ifp.75, smoke detector, heat detector, pull station & bells. low frequency,modules and new aes 7707 power supply | $67,451 |
| Feb 11, 2020 | Never finaled issued Feb 2020, no final | 930 Post St | street spaceDetails
street space | ||
| Feb 4, 2020 | Completed final sign-off Sep 2020 | 930 Post St | Halyard Inc | remodel kitchen & bathroom at unit 43 on 6/f. (n) counters, cabinets and plumbing fixtures in kind. (n) tile, vanity & fixtures in kind. no change to mech, no exterior work, fire alarm & sprinkler. no structural.Details
remodel kitchen & bathroom at unit 43 on 6/f. (n) counters, cabinets and plumbing fixtures in kind. (n) tile, vanity & fixtures in kind. no change to mech, no exterior work, fire alarm & sprinkler. no structural. | $11,000 |
| Jan 13, 2020 | Never finaled issued Feb 2020, no final | 930 Post St | Grizzly Builders Inc. | unit 25: renovation of unit 25 4th level, convert studio to 1 bedroom, new kitchen cabinets and plumbing fixtures, new washer/dryer and dishwasher, new lighting at (e) j-box location, no change to mechanical, no exterior, fire alarm or sprinkler work no structural work n/a maherDetails
unit 25: renovation of unit 25 4th level, convert studio to 1 bedroom, new kitchen cabinets and plumbing fixtures, new washer/dryer and dishwasher, new lighting at (e) j-box location, no change to mechanical, no exterior, fire alarm or sprinkler work no structural work n/a maher | $65,000 |
| Oct 23, 2019 | Never finaled issued Oct 2019, no final | 930 Post St | street spaceDetails
street space | ||
| Sep 18, 2019 | Never finaled issued Sep 2019, no final | 930 Post St | street spaceDetails
street space | ||
| Sep 12, 2019 | Completed final sign-off Nov 2020 | 930 Post St | Us Construction California, Inc | reno of 1 apt unit 6 on 2nd flr - new kitchen, bathroom, cabinets and plm fixtures, w/d, d/w, lighting at (e) jbox locations. no change to mech/ext/fa/sprinkler/structralDetails
reno of 1 apt unit 6 on 2nd flr - new kitchen, bathroom, cabinets and plm fixtures, w/d, d/w, lighting at (e) jbox locations. no change to mech/ext/fa/sprinkler/structral | $65,000 |
| Aug 6, 2019 | Completed final sign-off Nov 2020 | 930 Post St | Us Construction California, Inc | renovation of 5 apartments: 02//05/08/20/21. unit 2 on 1st fl, 5 and 8 on 2nd floor, 20 and 21 on 3rd fl. new bedrooms and baths. new kitchen cabinets, plumbing fixtures. new washer/dryers. new lighting at e j boxes. no change to mech. no exterior fire alarm, sprinkler or structural work.Details
renovation of 5 apartments: 02//05/08/20/21. unit 2 on 1st fl, 5 and 8 on 2nd floor, 20 and 21 on 3rd fl. new bedrooms and baths. new kitchen cabinets, plumbing fixtures. new washer/dryers. new lighting at e j boxes. no change to mech. no exterior fire alarm, sprinkler or structural work. | $300,000 |
| Jul 30, 2019 | Never finaled issued Jul 2019, no final | 930 Post St | street spaceDetails
street space | ||
| Jul 2, 2019 | Completed final sign-off Jul 2019 | 930 Post St | Halyard Inc | to comply w/ nov 201619848 unit 1, only repalce tile in bathroom, deep cleaning throughout. install (n) flooring and (n) tile, repair damaged windows and replace ceilings and walls w/ (n) drywall.Details
to comply w/ nov 201619848 unit 1, only repalce tile in bathroom, deep cleaning throughout. install (n) flooring and (n) tile, repair damaged windows and replace ceilings and walls w/ (n) drywall. | $10,000 |
| Apr 10, 2019 | Never finaled issued Apr 2019, no final | 930 Post St | street spaceDetails
street space | ||
| Feb 13, 2019 | Never finaled issued Mar 2019, no final | 930 Post St | Grizzly Builders Inc. | remodel of (5) units: #7 & 9 on 2/f; #18 on 3/f, #29 on 4/f & #34 on 5/f: add bedroom in each unit. add bathroom in #29. add washer/dryer & d/w in ea unit. (n) plumbing fuxtures,kitchen appliances, lighting & trim. no ext work. no strutural work. no f/a or f/s work. maher n/a.Details
remodel of (5) units: #7 & 9 on 2/f; #18 on 3/f, #29 on 4/f & #34 on 5/f: add bedroom in each unit. add bathroom in #29. add washer/dryer & d/w in ea unit. (n) plumbing fuxtures,kitchen appliances, lighting & trim. no ext work. no strutural work. no f/a or f/s work. maher n/a. | $90,000 |
| Sep 13, 2017 | Never finaled issued Sep 2017, no final | 930 Post St | street spaceDetails
street space | ||
| Aug 16, 2017 | Never finaled issued Oct 2017, no final | 930 Post St | D F K Y Construction Inc | renovation of apt #39 on 3rd fl, including new bedroom, new laundry, renovate kitchen & bathroom, new lighting, relocation of partitions. replace exterior bedroom window to wood casement, sash size to match (e). maher naDetails
renovation of apt #39 on 3rd fl, including new bedroom, new laundry, renovate kitchen & bathroom, new lighting, relocation of partitions. replace exterior bedroom window to wood casement, sash size to match (e). maher na | $30,000 |
| Jul 19, 2017 | Never finaled issued Oct 2017, no final | 930 Post St | D F K Y Construction Inc | 2nd fl, unit 12: revision to 2017-0504-5742. relocate proposed lanundry, bedroom, bath, kitchen. all other scope remains the same. no exterior changes. f/a deferred if required.Details
2nd fl, unit 12: revision to 2017-0504-5742. relocate proposed lanundry, bedroom, bath, kitchen. all other scope remains the same. no exterior changes. f/a deferred if required. | $30,000 |
| Jun 21, 2017 | Completed final sign-off May 2019 | 930 Post St | Us Construction California, Inc, Make Ready Maintenance Inc | unit 1: kitchen & bathroom remodelDetails
unit 1: kitchen & bathroom remodel | $35,000 |
| May 17, 2017 | Completed final sign-off Oct 2017 | 930 Post St | D F K Y Construction Inc | renovation of apt 33 on 4th fl includes new bedroom, laundry, renovated kitchen and bath, relocate partitions, new lighting, no exterior changesDetails
renovation of apt 33 on 4th fl includes new bedroom, laundry, renovated kitchen and bath, relocate partitions, new lighting, no exterior changes | $35,000 |
| May 4, 2017 | Never finaled issued Jul 2017, no final | 930 Post St | D F K Y Construction Inc | unit #12: reconfiguration including new bedroom new laundry, renovate kitchen & bath, new lighting and renovated heating. no exterio worl or changes maher naDetails
unit #12: reconfiguration including new bedroom new laundry, renovate kitchen & bath, new lighting and renovated heating. no exterio worl or changes maher na | $30,000 |
| Jun 22, 2016 | Never finaled issued Jun 2016, no final | 930 Post St | Jon K Takata Corp Dba Restoration Mgmt | removal of interior drywall due to a fire damage unit #1 one bedroom apt.Details
removal of interior drywall due to a fire damage unit #1 one bedroom apt. | $15,000 |
| Apr 12, 2013 | Expired or cancelled withdrawn May 2013 | 930 Post St | all work done in unit 45 - remove/add interior walls. remodel kitchen & bath. convert (e) living into (n) bedroom.Details
all work done in unit 45 - remove/add interior walls. remodel kitchen & bath. convert (e) living into (n) bedroom. | $35,000 | |
| Apr 11, 2001 | Expired or cancelled expired Aug 2001 | 930 Post St | On-Site Maintenance | to renew permit#9919241 for final inspection.Details
to renew permit#9919241 for final inspection. | |
| Apr 4, 2001 | Completed final sign-off Jun 2001 | 930 Post St | On-Site Maintenance | remodel kitchen & bathroom (nov.#200115784)Details
remodel kitchen & bathroom (nov.#200115784) | $6,000 |
| Nov 10, 2000 | Expired or cancelled expired May 2001 | 930 Post St | California Constrution Co | reroofingDetails
reroofing | $24,000 |