Block 1754, lot 022
445 Hugo St
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 3
- Units
- 9
- Rooms
- 9 bathrooms
- Building
- 8,064 sq ft
- Lot
- 3,323 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 5, 2025 | Completed final sign-off Dec 2025 | 445 Hugo St | Byington Electric Corp | replace the (e) f/a system w/a new f/a system to the sf/ca code interpretation 1103.6.71 and add the lf horns inside of the units & wireless monitoringDetails
replace the (e) f/a system w/a new f/a system to the sf/ca code interpretation 1103.6.71 and add the lf horns inside of the units & wireless monitoring | $50,000 |
| Mar 26, 2025 | Completed final sign-off Dec 2025 | 445 Hugo St | Jon K Takata Corp Dba Restoration Mgmt | unit 3, 6, 9: repair fire damaged area. replace damaged wall framing (studs, plates, rim) as noted, replace damaged interior & exterior finishes, & mep infrastrucure, like for like. unit 9: replace damaged roof framing (rafters, clg joists, kickers) as notedDetails
unit 3, 6, 9: repair fire damaged area. replace damaged wall framing (studs, plates, rim) as noted, replace damaged interior & exterior finishes, & mep infrastrucure, like for like. unit 9: replace damaged roof framing (rafters, clg joists, kickers) as noted | $400,000 |
| Mar 14, 2022 | Completed final sign-off Aug 2022 | 445 Hugo St | Acme Builders | unit 1: kitchen and bathroom remodel in kind.Details
unit 1: kitchen and bathroom remodel in kind. | $30,000 |
| Mar 2, 2016 | Completed final sign-off Nov 2016 | 445 Hugo St | Roberto De Leon | soft sotry retrofit per sfbc chapter 34b engineering criteria, 2012 iebc appendix a-4. soft sotry seismic retrofit per sf ordinance 66-13 sf bldg code chapter 34b & sf ab 106-107 analysis per iebc a-4Details
soft sotry retrofit per sfbc chapter 34b engineering criteria, 2012 iebc appendix a-4. soft sotry seismic retrofit per sf ordinance 66-13 sf bldg code chapter 34b & sf ab 106-107 analysis per iebc a-4 | $105,000 |
| Apr 19, 2007 | Never finaled issued Apr 2007, no final | 445 Hugo St | street space and sidewalk permitDetails
street space and sidewalk permit | ||
| Nov 26, 2003 | Completed final sign-off Jan 2004 | 445 Hugo St | revision of app # 200308041159/add post connection detail and as built handrail revisionDetails
revision of app # 200308041159/add post connection detail and as built handrail revision | ||
| Aug 4, 2003 | Completed final sign-off Jan 2004 | 445 Hugo St | repair or replace existing dry-rotten stair & corridor, in kindDetails
repair or replace existing dry-rotten stair & corridor, in kind | $12,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Acme Builders, Byington Electric Corp, Jon K Takata Corp Dba Restoration Mgmt, Roberto De Leon
- Engineers
- Jeremy Andreasen, W.Charles Perry
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.