Timothy Stauffer
- Listed as
- engineer
- Firm
- Richard Avelar & Assocsiates
- Based in
- Oakland
- On San Francisco permits
- May 2019 to Jun 2026
6 permits since 2000 (engineer on 6 permits): 3 completed, 2 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 11, 2026 | In progress issued Jun 2026 | 819 Hampshire St | Richard Avelar &Assoc Reconstr/Dba Recon | framing repair exterior walls at mudrooms 2nd, 3rd and 4th floors. (revision to bpa: 202602065416)Details
framing repair exterior walls at mudrooms 2nd, 3rd and 4th floors. (revision to bpa: 202602065416) | $50,000 |
| Feb 6, 2026 | In progress issued Mar 2026 | 819 Hampshire St | Richard Avelar &Assoc Reconstr/Dba Recon | repair of (e) multi unit building including exterior cladding, window replacement, rear stair and walkway, structural upgrades, life safety and code compliance improvements and mep repairs. to comply with nov's 201918741, 201960951,and 202031691.Details
repair of (e) multi unit building including exterior cladding, window replacement, rear stair and walkway, structural upgrades, life safety and code compliance improvements and mep repairs. to comply with nov's 201918741, 201960951,and 202031691. | $1,126,000 |
| Dec 13, 2021 | Completed final sign-off May 2023 | 411 Joost Av | Andrew Chekene Enterprises/ Dba Ac Enter | remove outlets and switches. excavate main water supply, sanitary lines and tie into at water meter. demo exterior stairs, deck & concrete steps at rear. demo existing stucco, demo windows and door. remove shingle roofing and sheathing. install new stucco, trim, new windows, 2md fl deck footing...Details
remove outlets and switches. excavate main water supply, sanitary lines and tie into at water meter. demo exterior stairs, deck & concrete steps at rear. demo existing stucco, demo windows and door. remove shingle roofing and sheathing. install new stucco, trim, new windows, 2md fl deck footing... | $200,000 |
| Feb 4, 2021 | Never finaled issued Mar 2021, no final | 1780 Bancroft Av | Advance Construction Technology Inc | revision to pa# 2020-0822-2366 repairs of elevated walkways damaged from water intrusion, including structural components and associated waterproofing and finishesDetails
revision to pa# 2020-0822-2366 repairs of elevated walkways damaged from water intrusion, including structural components and associated waterproofing and finishes | $3,300,000 |
| Aug 22, 2020 | Completed final sign-off Nov 2021 | 1740 Bancroft Av | Advance Construction Technology Inc | repairs of elevated walkways damaged from water intrusion including structural components and associated waterproofing and finishes.Details
repairs of elevated walkways damaged from water intrusion including structural components and associated waterproofing and finishes. | $3,300,000 |
| May 21, 2019 | Completed final sign-off Aug 2020 | 1226 Page St | Jon K Takata Corp Dba Restoration Mgmt | to partially comply with nov #201930061. interior soft demo of plaster walls/ceiling, fixtures and flooring caused by fire. partial exterior asbestos siding removal. no removal of meps or structural supports.Details
to partially comply with nov #201930061. interior soft demo of plaster walls/ceiling, fixtures and flooring caused by fire. partial exterior asbestos siding removal. no removal of meps or structural supports. | $125,000 |