Block 7501, lot 010
5157 Diamond Heights Blvd
- City’s use
- Multi-Family Residential
- Built
- 1981
- Stories
- 4
- Units
- 21
- Rooms
- 13 bedrooms, 13 bathrooms
- Building
- 17,710 sq ft
- Lot
- 13,662 sq ft
- Zoning
- RM4
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 26, 2024 | Completed final sign-off Nov 2025 | 5157 Diamond Heights Bl | San Francisco Fire Protection | as built replace smoke detectors with heat detector due to exposure to outsdie elements per fire inspector. remove elevator relay modules as there is no elevator recall function in this system. ref pa: 202204263057Details
as built replace smoke detectors with heat detector due to exposure to outsdie elements per fire inspector. remove elevator relay modules as there is no elevator recall function in this system. ref pa: 202204263057 | $1,000 |
| Apr 26, 2022 | Completed final sign-off Nov 2025 | 5157 Diamond Heights Bl | San Francisco Fire Protection | like for like fire alarm system with new control panel, smoke detector, pull stations at the same locations. tie-in (e) horn/strobes to new panel. install all new radio , modules and low freq horns inside all units.Details
like for like fire alarm system with new control panel, smoke detector, pull stations at the same locations. tie-in (e) horn/strobes to new panel. install all new radio , modules and low freq horns inside all units. | $27,000 |
| Oct 31, 2018 | Completed final sign-off Mar 2019 | 5157 Diamond Heights Bl | Jon K Takata Corp Dba Restoration Mgmt | water damage repair in units 202/302/402: insulation, double layer drywall replacement. all in kitchen area.Details
water damage repair in units 202/302/402: insulation, double layer drywall replacement. all in kitchen area. | $39,000 |
| Mar 13, 2018 | Completed final sign-off Jun 2018 | 5157 Diamond Heights Bl | Vasona Management Inc. | unit 304 - new installation fo a stacked washer/dryer. all electric no gas. remove sheetrock in bedroom closet. run hot & cold supply line and wasteline to coat closet. relocate electrical subpanel onto hallway wall.Details
unit 304 - new installation fo a stacked washer/dryer. all electric no gas. remove sheetrock in bedroom closet. run hot & cold supply line and wasteline to coat closet. relocate electrical subpanel onto hallway wall. | $10,700 |
| Jan 22, 2016 | Never finaled issued Jan 2016, no final | 5157 Diamond Heights Bl | Golden Shark Construction Inc | unit #104: r&r balcony tiling at rear - in kindDetails
unit #104: r&r balcony tiling at rear - in kind | $7,355 |
| Feb 13, 2015 | Completed final sign-off May 2015 | 5157 Diamond Heights Bl | Golden Shark Construction Inc | work in unit 303: remove existing bathtub and install new 30"60" inch composite shower pan and fiberglass wall surround providing wheelchair accessibility. all materials ada compliant. no structuralDetails
work in unit 303: remove existing bathtub and install new 30"60" inch composite shower pan and fiberglass wall surround providing wheelchair accessibility. all materials ada compliant. no structural | $10,355 |
| Nov 18, 2008 | Never finaled issued Nov 2008, no final | 5157 Diamond Heights Bl | Dolan Construction | remove & replace approx 600 sq. ft. of ceder sidewall shingles. not visible from street. repair work.Details
remove & replace approx 600 sq. ft. of ceder sidewall shingles. not visible from street. repair work. | $10,000 |
| Dec 10, 2007 | Never finaled issued Dec 2007, no final | 5157 Diamond Heights Bl | Bay Area Stoneworks Inc/Dba Hameed Shake | remodel of formica counter tops in accessible housing. also will change out old sinks with new ada compliant sinks, new countertop to be granite installed on existing cabinets. no changes of layout. work will be done on 21 units and the lounge.Details
remodel of formica counter tops in accessible housing. also will change out old sinks with new ada compliant sinks, new countertop to be granite installed on existing cabinets. no changes of layout. work will be done on 21 units and the lounge. | $58,000 |
| Jan 15, 2004 | Completed final sign-off Feb 2004 | 5157 Diamond Heights Bl | Bay City Windows Inc | replace existing windows (total 84) in existing holesDetails
replace existing windows (total 84) in existing holes | $94,538 |
| Jul 11, 2003 | Completed final sign-off Jul 2003 | 5157 Diamond Heights Bl | Cal Bees Construction Co | reroofingDetails
reroofing | $27,500 |
| Jul 1, 2003 | Expired or cancelled expired Feb 2004 | 5157 Diamond Heights Bl | Hai's Roofing Company | reroofingDetails
reroofing | $15,000 |
| Mar 12, 2001 | Expired or cancelled expired Jul 2001 | 5157 Diamond Heights Bl | sidewalkDetails
sidewalk |