Bay Area Stoneworks Inc/Dba Hameed Shake
- Based in
- Sunnyvale
- On San Francisco permits
- Dec 2007 to Dec 2007
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 10, 2007 | Never finaled issued Dec 2007, no final | 5157 Diamond Heights Bl | remodel of formica counter tops in accessible housing. also will change out old sinks with new ada compliant sinks, new countertop to be granite installed on existing cabinets. no changes of layout. work will be done on 21 units and the lounge.Details
remodel of formica counter tops in accessible housing. also will change out old sinks with new ada compliant sinks, new countertop to be granite installed on existing cabinets. no changes of layout. work will be done on 21 units and the lounge. | $58,000 |