Javed J. Tharavi

License
C57676
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C57676 at the Board for Professional Engineers
Listed as
architect, authorized agent-others, engineer
Firm
Nabi Const. & Engineering
Based in
San Francisco
On San Francisco permits
Dec 2004 to Oct 2026

149 permits since 2000 (engineer on 138 permits, architect on 10 permits, authorized agent-others on 1 permit): 115 completed, 12 in progress, 10 never finaled, 12 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Nabi Construction & Engineering Inc (94), Kadon Construction (2), L C Builders Inc.
Architects
Troy Kashanipour (4), Daniel Piechota (2), E. B. Min (2), Roberta Wahl (2), Stephanie Strauhacker
Engineers
Darren Wong, John Dal Pino, Ross Esfandiari
Authorized agents
Andy Ehsani (5)

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

Showing the 100 most recent of 149.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 30, 2026In progress
issued Oct 2026
1319 Cole StNabi Construction & Engineering Incremove existing wood beam and replace with steel beam and column grid line 3; new shear walls panels grid line a and d; provide new moment frame grid line 1
Details
Permit
202610300148
Permit issued
Oct 30, 2026

remove existing wood beam and replace with steel beam and column grid line 3; new shear walls panels grid line a and d; provide new moment frame grid line 1

Open the permit page

$30,000
Oct 9, 2026In progress
issued Oct 2026
2001 Fillmore StNabi Construction & Engineering Increvision to pa #202607084730 to remove existing wall and provide new bearing wall at gl-b
Details
Permit
202610099285
Permit issued
Oct 21, 2026

revision to pa #202607084730 to remove existing wall and provide new bearing wall at gl-b

Open the permit page

$8,000
Oct 6, 2026In progress
issued Oct 2026
2100 Pine StNabi Construction & Engineering Incremove (e) wood bearing wall and provide (n) beam & (n) columns at grid lines 4 at 3rd fl. provide (n) wood shear wall panels @ grid line a,b & d at 1st fl. provide (n) wood beam for window opening at gridline 1 at 2nd & 3rd fl.
Details
Permit
202610069069
Permit issued
Oct 9, 2026

remove (e) wood bearing wall and provide (n) beam & (n) columns at grid lines 4 at 3rd fl. provide (n) wood shear wall panels @ grid line a,b & d at 1st fl. provide (n) wood beam for window opening at gridline 1 at 2nd & 3rd fl.

Open the permit page

$55,000
Sep 4, 2026In progress
filed Sep 2026, not yet issued
250 El Camino Del Marmod & replace ext finishes - replace windows and skylight. infill at 2 terraces on 3/f. n/s 2/f - infill patio under overhang. mod front bay. at roof terrace provide (n) w/p membrane, new ceramic paves on pedestals,(n) railings. add sauna & laundry. ab-112
Details
Permit
202608186750

mod & replace ext finishes - replace windows and skylight. infill at 2 terraces on 3/f. n/s 2/f - infill patio under overhang. mod front bay. at roof terrace provide (n) w/p membrane, new ceramic paves on pedestals,(n) railings. add sauna & laundry. ab-112

Open the permit page

$790,000
Jul 8, 2026In progress
issued Aug 2026
2001 Fillmore StNabi Construction & Engineering Inc@ e uft shaft @ ground fl: remove e lift. remove e wood post @ lift area. provide new steel columns, n steel columns, new beam at 2nd fl. new lift by others.
Details
Permit
202607084730
Permit issued
Aug 21, 2026

@ e uft shaft @ ground fl: remove e lift. remove e wood post @ lift area. provide new steel columns, n steel columns, new beam at 2nd fl. new lift by others.

Open the permit page

$45,000
Jun 1, 2026In progress
issued Sep 2026
2261 Fillmore Stseismic upgrade. demolition of structural elements & exterior features. shoring for historcal facade protection. make 2261 fillmore st structural independent of 2259 fillmore street. demolition of existing second floor and replace with new flooring framing.
Details
Permit
202606012231
Permit issued
Sep 23, 2026

seismic upgrade. demolition of structural elements & exterior features. shoring for historcal facade protection. make 2261 fillmore st structural independent of 2259 fillmore street. demolition of existing second floor and replace with new flooring framing.

Open the permit page

$457,467
Jun 1, 2026In progress
issued Sep 2026
2259 Fillmore Stseismic upgrade. make 2259 fillmore st. make structurally independent of 2261 fillmore street.
Details
Permit
202606012226
Permit issued
Sep 23, 2026

seismic upgrade. make 2259 fillmore st. make structurally independent of 2261 fillmore street.

Open the permit page

$141,606
May 27, 2026In progress
issued Jun 2026
250 El Camino Del MarNabi Construction & Engineering Inc1) demo (e) stairs & storage and build (n) stair & storage between grid lines b & d. 2) demo (e) stair and build (n) stair & deck between grid lines f & g. to comply with nov 202314852.
Details
Permit
202605271968
Permit issued
Jun 1, 2026

1) demo (e) stairs & storage and build (n) stair & storage between grid lines b & d. 2) demo (e) stair and build (n) stair & deck between grid lines f & g. to comply with nov 202314852.

Open the permit page

$35,000
May 13, 2026In progress
issued May 2026
2220 Fillmore StNabi Construction & Engineering Increvision to pa# 202508042264: add (n) 2x8 @ 16" o.c to 2nd floor framing to support additional (n) clg. wt. of 10psf at 2nd floor as shown on plans.
Details
Permit
202605131179
Permit issued
May 13, 2026

revision to pa# 202508042264: add (n) 2x8 @ 16" o.c to 2nd floor framing to support additional (n) clg. wt. of 10psf at 2nd floor as shown on plans.

Open the permit page

$10,000
Mar 26, 2026Expired or cancelled
withdrawn Sep 2026
2259 Fillmore StNabi Construction & Engineering Incnew bearing wall & footing. remove (e) column and provide new column. assessibility deferred under future ti per ab-017.
Details
Permit
202603268349

new bearing wall & footing. remove (e) column and provide new column. assessibility deferred under future ti per ab-017.

Open the permit page

$24,000
Feb 24, 2026Completed
final sign-off Jul 2026
1729 Polk StNabi Construction & Engineering Incg/f: demo (e) portion of 1/f courtyard and replace with new floor. remove portion of (e) concrete topping and replace with new topping as shown on plan. deck is for residential use only.
Details
Permit
202602246425
Permit issued
Mar 16, 2026
Final sign-off
Jul 28, 2026

g/f: demo (e) portion of 1/f courtyard and replace with new floor. remove portion of (e) concrete topping and replace with new topping as shown on plan. deck is for residential use only.

Open the permit page

$15,000
Jan 13, 2026Completed
final sign-off Apr 2026
1650 Jones StNabi Construction & Engineering Increvision to 202505065918: replace e) footing as shown on detail 1 &2. remove damaged 3 x 4 studs & replace w/ new 4 x 6 stud as requires at lightwell
Details
Permit
202601133712
Permit issued
Jan 13, 2026
Final sign-off
Apr 2, 2026

revision to 202505065918: replace e) footing as shown on detail 1 &2. remove damaged 3 x 4 studs & replace w/ new 4 x 6 stud as requires at lightwell

Open the permit page

Dec 3, 2025Completed
final sign-off Mar 2026
1373 Clay StNabi Construction & Engineering Incremove existing slab on grade in electrical room and lower slap on grade by 2'-0"
Details
Permit
202512030852
Permit issued
Dec 3, 2025
Final sign-off
Mar 24, 2026

remove existing slab on grade in electrical room and lower slap on grade by 2'-0"

Open the permit page

$35,000
Oct 27, 2025In progress
issued Oct 2025
2220 Fillmore StNabi Construction & Engineering Increvision to pa # 2025-0804-2264. provide new steel beam at 2nd fl midspan between grid line 3.2 & 4
Details
Permit
202510278192
Permit issued
Oct 29, 2025

revision to pa # 2025-0804-2264. provide new steel beam at 2nd fl midspan between grid line 3.2 & 4

Open the permit page

Aug 4, 2025In progress
issued Aug 2025
2220 Fillmore StNabi Construction & Engineering Inclower floor at back at vacant space for future t.i. accessiblity deferred per ab17. lower portion of (e) first floor between grid line 3 & 4 and provide new steel moment frame.
Details
Permit
202508042264
Permit issued
Aug 5, 2025

lower floor at back at vacant space for future t.i. accessiblity deferred per ab17. lower portion of (e) first floor between grid line 3 & 4 and provide new steel moment frame.

Open the permit page

$55,000
May 21, 2025Completed
final sign-off Apr 2026
1650 Jones StNabi Construction & Engineering Incmandatory soft story retrofit in accordance with city ordinance 66-13, following 2022 cebc chapter 4d and appendix a-4.
Details
Permit
202505065918
Permit issued
Sep 17, 2025
Final sign-off
Apr 2, 2026

mandatory soft story retrofit in accordance with city ordinance 66-13, following 2022 cebc chapter 4d and appendix a-4.

Open the permit page

$85,000
Dec 23, 2024In progress
issued Jan 2025
4172 23rd StNabi Construction & Engineering Incremodel sfd: convert first story storage area to habitable bedroom, bath & laundry closet with (n) stair. remove bath @ 2nd story, add powder room. add bathroom @ top fl & remodel (e) bath. replace aluminum windows at front facade
Details
Permit
202412237337
Permit issued
Jan 14, 2025

remodel sfd: convert first story storage area to habitable bedroom, bath & laundry closet with (n) stair. remove bath @ 2nd story, add powder room. add bathroom @ top fl & remodel (e) bath. replace aluminum windows at front facade

Open the permit page

$328,000
Jul 26, 2024Completed
final sign-off Mar 2025
900 Pine StNabi Construction & Engineering Increvision to pa # 202407106178: at gridline 2: remove (e) wood wall between 1/f & 2/f, provide new beam at 2/f w/ new post and footing.
Details
Permit
202407267397
Permit issued
Jul 26, 2024
Final sign-off
Mar 6, 2025

revision to pa # 202407106178: at gridline 2: remove (e) wood wall between 1/f & 2/f, provide new beam at 2/f w/ new post and footing.

Open the permit page

$5,000
Jul 11, 2024Completed
final sign-off Nov 2024
565 Chenery StNabi Construction & Engineering Inclegalize a 2-story, 246 sq. ft. +/-, rear yard-facing addition to a sfr that was built without a permit, perform sterngthening of existing vertical and lateral force resisting elements to be in compliance with current building code requirements.
Details
Permit
202407116283
Permit issued
Aug 16, 2024
Final sign-off
Nov 21, 2024

legalize a 2-story, 246 sq. ft. +/-, rear yard-facing addition to a sfr that was built without a permit, perform sterngthening of existing vertical and lateral force resisting elements to be in compliance with current building code requirements.

Open the permit page

$15,000
Jul 10, 2024Completed
final sign-off Mar 2025
900 Pine StNabi Construction & Engineering Incvoluntary seismic upgrade for soft story as per san francisco (e) building code chapter 4d and appendix a-4. new accessible restroom at ground level.
Details
Permit
202407106178
Permit issued
Jul 22, 2024
Final sign-off
Mar 6, 2025

voluntary seismic upgrade for soft story as per san francisco (e) building code chapter 4d and appendix a-4. new accessible restroom at ground level.

Open the permit page

$140,000
Jun 24, 2024Completed
final sign-off May 2026
160 Noe StNabi Construction & Engineering Incremodel kitchen and bath at unit 160. reconfigure closets and interior partitions, open wall between kitchen and living area. remodel kitchen and bath at unit 162. reconfigure closets and interior partitions, open wall between kitchen and living area
Details
Permit
202406245066
Permit issued
Jul 2, 2024
Final sign-off
May 1, 2026

remodel kitchen and bath at unit 160. reconfigure closets and interior partitions, open wall between kitchen and living area. remodel kitchen and bath at unit 162. reconfigure closets and interior partitions, open wall between kitchen and living area

Open the permit page

$433,000
Apr 23, 2024Completed
final sign-off Oct 2024
1350 Washington StNabi Construction & Engineering Inc1) remove portion extg damaged retaining wall and replace with new pour in place concrete retaining wall at grid line a. 2) remove extg damaged footing and replace with new pour in place concrete footing at grid line b
Details
Permit
202404230555
Permit issued
Apr 23, 2024
Final sign-off
Oct 30, 2024

1) remove portion extg damaged retaining wall and replace with new pour in place concrete retaining wall at grid line a. 2) remove extg damaged footing and replace with new pour in place concrete footing at grid line b

Open the permit page

$40,000
Mar 28, 2024Completed
final sign-off Jul 2024
595 Diamond StNabi Construction & Engineering Incnew deck over existing garage roof
Details
Permit
202403288860
Permit issued
Apr 25, 2024
Final sign-off
Jul 5, 2024

new deck over existing garage roof

Open the permit page

$25,000
Feb 21, 2024Completed
final sign-off Apr 2024
2660 Webster StNabi Construction & Engineering Increvision to 202312041843. repair (e) balcony, replace (e) framing w/ new framing in kind on ground fl unit only
Details
Permit
202402216252
Permit issued
Feb 22, 2024
Final sign-off
Apr 5, 2024

revision to 202312041843. repair (e) balcony, replace (e) framing w/ new framing in kind on ground fl unit only

Open the permit page

$5,000
Dec 15, 2023Completed
final sign-off May 2024
49 Linda StNabi Construction & Engineering Incremove existing exterior stairs and replace in kind with new stairs
Details
Permit
202312152590
Permit issued
Dec 19, 2023
Final sign-off
May 22, 2024

remove existing exterior stairs and replace in kind with new stairs

Open the permit page

$20,000
Dec 11, 2023Completed
final sign-off Apr 2024
808 Cabrillo StNabi Construction & Engineering Incstructural stengthening of existing building (voluntary).
Details
Permit
202312112281
Permit issued
Dec 11, 2023
Final sign-off
Apr 11, 2024

structural stengthening of existing building (voluntary).

Open the permit page

$20,000
Dec 4, 2023Completed
final sign-off Apr 2024
2660 Webster StNabi Construction & Engineering Incremove (e) damaged 5 ft height retaining wall with new pour in place concrete retaining wall at grid line a.
Details
Permit
202312041843
Permit issued
Dec 4, 2023
Final sign-off
Apr 5, 2024

remove (e) damaged 5 ft height retaining wall with new pour in place concrete retaining wall at grid line a.

Open the permit page

$10,000
Nov 14, 2023Completed
final sign-off Feb 2024
406 Clayton StNabi Construction & Engineering Incremove e 3 columns under 2nd fl and portion of e wood beam at 2nd fl at line b. add 3 hss steel column and steel beam. no exterior work.
Details
Permit
202311140761
Permit issued
Nov 16, 2023
Final sign-off
Feb 2, 2024

remove e 3 columns under 2nd fl and portion of e wood beam at 2nd fl at line b. add 3 hss steel column and steel beam. no exterior work.

Open the permit page

$25,000
Aug 22, 2023Completed
final sign-off Sep 2023
332 Presidio AvNabi Construction & Engineering Increvision to permit application 202307071699. add new concrete footing to new wall panel to strengthen (e) damaged retaining wall to comply with nov 202200131.
Details
Permit
202308224929
Permit issued
Aug 25, 2023
Final sign-off
Sep 21, 2023

revision to permit application 202307071699. add new concrete footing to new wall panel to strengthen (e) damaged retaining wall to comply with nov 202200131.

Open the permit page

Jul 7, 2023Completed
final sign-off Sep 2023
332 Presidio AvNabi Construction & Engineering Incprovide new concrete wall panel to strenghten existing damage retaining wall to comply with nov 202200131
Details
Permit
202307071699
Permit issued
Jul 10, 2023
Final sign-off
Sep 21, 2023

provide new concrete wall panel to strenghten existing damage retaining wall to comply with nov 202200131

Open the permit page

$10,000
Jul 7, 2023Completed
final sign-off Aug 2023
2525 Fillmore StNabi Construction & Engineering Increvision to 202301300975: move down shear wall at gridline 1. shift shear wall from gridline c to c.5. new foundation for shear wall at gridline d. modify moment frame top connection at gridline e
Details
Permit
202307071656
Permit issued
Jul 13, 2023
Final sign-off
Aug 18, 2023

revision to 202301300975: move down shear wall at gridline 1. shift shear wall from gridline c to c.5. new foundation for shear wall at gridline d. modify moment frame top connection at gridline e

Open the permit page

Jul 5, 2023Completed
final sign-off Jan 2024
1136 Kearny StNabi Construction & Engineering Incsoft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4
Details
Permit
202307051456
Permit issued
Sep 25, 2023
Final sign-off
Jan 8, 2024

soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4

Open the permit page

$45,000
Jun 29, 2023Completed
final sign-off Jun 2024
3263 Mission StNabi Construction & Engineering Incto comply w/ nov #202304518 remove (e) illegal additon at back of building. inatall resilient channel 5/8 dej wall over e) plastered ceiling for sound @ 3265 mission. horizontal addition under pa2015-1118-3037 to be recognized by planning
Details
Permit
202306291247
Permit issued
May 17, 2024
Final sign-off
Jun 25, 2024

to comply w/ nov #202304518 remove (e) illegal additon at back of building. inatall resilient channel 5/8 dej wall over e) plastered ceiling for sound @ 3265 mission. horizontal addition under pa2015-1118-3037 to be recognized by planning

Open the permit page

$10,000
May 5, 2023Expired or cancelled
cancelled Jan 2026
1000 Mariposa StNabi Construction & Engineering Increplace in-kind of existing wood framing damaged by fire at existing loading dock.
Details
Permit
202305057213

replace in-kind of existing wood framing damaged by fire at existing loading dock.

Open the permit page

$5,000
Jan 30, 2023Completed
final sign-off Sep 2023
2525 Fillmore StNabi Construction & Engineering Incseismic upgrade for soft story as per san francisco bldg code chapter 4d, 2019 cebc appendiz a-4.
Details
Permit
202301300975
Permit issued
Jan 30, 2023
Final sign-off
Sep 11, 2023

seismic upgrade for soft story as per san francisco bldg code chapter 4d, 2019 cebc appendiz a-4.

Open the permit page

$45,000
Dec 22, 2022Never finaled
issued Dec 2022, no final
2200 Jerrold AvNabi Construction & Engineering Incanchor existing concrete walls with exsting roof diaphargm for out-of-place lateral loads
Details
Permit
202212228999
Permit issued
Dec 23, 2022

anchor existing concrete walls with exsting roof diaphargm for out-of-place lateral loads

Open the permit page

$150,000
Apr 19, 2022Completed
final sign-off Jul 2022
529 Broderick StNabi Construction & Engineering Incseismic upgrade for soft story as per sfbc ch 4d, 2019 cebc appendix a-4
Details
Permit
202204192538
Permit issued
Apr 21, 2022
Final sign-off
Jul 29, 2022

seismic upgrade for soft story as per sfbc ch 4d, 2019 cebc appendix a-4

Open the permit page

$75,000
Mar 10, 2022Completed
final sign-off Jun 2023
1400 17th StNabi Construction & Engineering Increvision to pa# 202106142352. demo (e) concrete slab on grade & replace with new concrete slab on grade.
Details
Permit
202203109699
Permit issued
Mar 10, 2022
Final sign-off
Jun 7, 2023

revision to pa# 202106142352. demo (e) concrete slab on grade & replace with new concrete slab on grade.

Open the permit page

$30,000
Oct 21, 2021Completed
final sign-off May 2022
1040 Mason StNabi Construction & Engineering Increplace of existing 8" brick and concrete wall with new concrete wall. not visible from street.
Details
Permit
202110210951
Permit issued
Feb 1, 2022
Final sign-off
May 11, 2022

replace of existing 8" brick and concrete wall with new concrete wall. not visible from street.

Open the permit page

$20,000
Sep 24, 2021Completed
final sign-off Jan 2022
43 Buena Vista TrKadon Constructionrevision to pa 202104158608. partial wood guardrail instead of all steel guardrail.
Details
Permit
202109249145
Permit issued
Oct 18, 2021
Final sign-off
Jan 7, 2022

revision to pa 202104158608. partial wood guardrail instead of all steel guardrail.

Open the permit page

Jun 2, 2021Completed
final sign-off Dec 2021
230 Sanchez StNabi Construction & Engineering Increv to pa #202011098537 (residential). relocate 1 frame @ gl f. relocate 1 frame at gl d. frame beam modificate @ gl 2. shearwall modificate at gl 2 & 5.
Details
Permit
202106021500
Permit issued
Jun 9, 2021
Final sign-off
Dec 16, 2021

rev to pa #202011098537 (residential). relocate 1 frame @ gl f. relocate 1 frame at gl d. frame beam modificate @ gl 2. shearwall modificate at gl 2 & 5.

Open the permit page

Jun 2, 2021Completed
final sign-off Dec 2021
230 Sanchez StNabi Construction & Engineering Increv to pa #202011098538 (commercial). relocate 1 frame @ gl f. relocate 1 frame at gl d. frame beam modificate @ gl 2. shearwall modificate at gl 2 & 5.
Details
Permit
202106021498
Permit issued
Jun 9, 2021
Final sign-off
Dec 16, 2021

rev to pa #202011098538 (commercial). relocate 1 frame @ gl f. relocate 1 frame at gl d. frame beam modificate @ gl 2. shearwall modificate at gl 2 & 5.

Open the permit page

Feb 10, 2021Completed
final sign-off Jul 2021
772 06th AvNabi Construction & Engineering Increvision to pa# 202003126906. modify moment frame connection. replace (e) brick with (n) cont ftg. add (n) conc ftg to (e) brick ftg. modify shear wall ftg.
Details
Permit
202102104346
Permit issued
Apr 13, 2021
Final sign-off
Jul 13, 2021

revision to pa# 202003126906. modify moment frame connection. replace (e) brick with (n) cont ftg. add (n) conc ftg to (e) brick ftg. modify shear wall ftg.

Open the permit page

$5,000
Nov 9, 2020Completed
final sign-off Dec 2021
230 Sanchez StNabi Construction & Engineering Increvision to pa 201809129917 (residential) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098538.
Details
Permit
202011098537
Permit issued
Dec 18, 2020
Final sign-off
Dec 16, 2021

revision to pa 201809129917 (residential) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098538.

Open the permit page

Nov 9, 2020Completed
final sign-off Dec 2021
230 Sanchez StNabi Construction & Engineering Increvision to pa 201809129921 (commercial) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098537.
Details
Permit
202011098538
Permit issued
Dec 18, 2020
Final sign-off
Dec 16, 2021

revision to pa 201809129921 (commercial) seismic upgrade for soft-story as per sfbc chapter 4d, 2019 cebc appendix a-4. share same plan set with pa 202011098537.

Open the permit page

Mar 13, 2020Completed
final sign-off Jan 2021
1488 Pine StNabi Construction & Engineering Inccommercial soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4. residential under pa #202003136992
Details
Permit
202003136990
Permit issued
Aug 4, 2020
Final sign-off
Jan 25, 2021

commercial soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4. residential under pa #202003136992

Open the permit page

$56,060
Mar 13, 2020Completed
final sign-off Jan 2021
1488 Pine StNabi Construction & Engineering Incresidential soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4. commercial under pa #202003136990
Details
Permit
202003136992
Permit issued
Aug 4, 2020
Final sign-off
Jan 25, 2021

residential soft story retrofit per sfebc chapter 4d engineering criteria 2019 cebc appendix a-4. commercial under pa #202003136990

Open the permit page

$112,140
Mar 12, 2020Completed
final sign-off Jul 2021
772 06th AvNabi Construction & Engineering Incseismic upgrade for soft story as per sf building code 4d, 2016 cebc appendix a-4
Details
Permit
202003126906
Permit issued
Jun 10, 2020
Final sign-off
Jul 13, 2021

seismic upgrade for soft story as per sf building code 4d, 2016 cebc appendix a-4

Open the permit page

$110,000
Dec 12, 2019Completed
final sign-off May 2020
801 Haight StNabi Construction & Engineering Incsoft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4.
Details
Permit
201912129395
Permit issued
Dec 13, 2019
Final sign-off
May 8, 2020

soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4.

Open the permit page

$95,000
Dec 12, 2019Completed
final sign-off Mar 2020
830 Hayes StNabi Construction & Engineering Increvision to app#201907095444 for soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. revision at moment frames and relocate shearwall from line 1 to line 1.3
Details
Permit
201912129396
Permit issued
Dec 13, 2019
Final sign-off
Mar 10, 2020

revision to app#201907095444 for soft story retrofit per sfebc chapter 4d per 2016 cebc appendix a-4. revision at moment frames and relocate shearwall from line 1 to line 1.3

Open the permit page

May 20, 2019Completed
final sign-off Jan 2022
43 Buena Vista TrKadon Constructioninterior remodel and minor extg improvement incl. increase with of gargae, door, nw int. stair, replace extg windw, kitchen remodel, bathroom remodel, nw laundry room, addition at basement & 1st fl., demo of exterior & interior stair in non-shared lightwell (south side of bldg)
Details
Permit
201905201150
Permit issued
Jul 31, 2019
Final sign-off
Jan 7, 2022

interior remodel and minor extg improvement incl. increase with of gargae, door, nw int. stair, replace extg windw, kitchen remodel, bathroom remodel, nw laundry room, addition at basement & 1st fl., demo of exterior & interior stair in non-shared lightwell (south side of bldg)

Open the permit page

$1,200,000
Apr 23, 2019Completed
final sign-off Nov 2019
860 Divisadero StNabi Construction & Engineering Incseismic uprgrade for soft story as per sfbc chap 4d 2016 cebc appzx a4 residential commercial -201904238744
Details
Permit
201904238743
Permit issued
Apr 26, 2019
Final sign-off
Nov 19, 2019

seismic uprgrade for soft story as per sfbc chap 4d 2016 cebc appzx a4 residential commercial -201904238744

Open the permit page

$84,723
Apr 23, 2019Completed
final sign-off Nov 2019
860 Divisadero StNabi Construction & Engineering Incseismic uprgrade for soft story as per sfbc chap 4d 2016 cebc appzx a4 commercial residential - 201904238743
Details
Permit
201904238744
Permit issued
Apr 26, 2019
Final sign-off
Nov 19, 2019

seismic uprgrade for soft story as per sfbc chap 4d 2016 cebc appzx a4 commercial residential - 201904238743

Open the permit page

$20,277
Mar 14, 2019Completed
final sign-off Jul 2019
3527 18th StNabi Construction & Engineering Incsoft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4
Details
Permit
201903145271
Permit issued
Mar 15, 2019
Final sign-off
Jul 10, 2019

soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4

Open the permit page

$110,000
Nov 20, 2018Expired or cancelled
cancelled Aug 2019
2350 Van Ness AvNabi Construction & Engineering Incseismic upgrade for soft story as per sfebc code chapter 4d 2016 cebc appx a4 maher na residential - 201811206487
Details
Permit
201811206488
Permit issued
Dec 5, 2018

seismic upgrade for soft story as per sfebc code chapter 4d 2016 cebc appx a4 maher na residential - 201811206487

Open the permit page

$8,300
Nov 20, 2018Expired or cancelled
cancelled Aug 2019
2350 Van Ness AvNabi Construction & Engineering Incseismic upgrade for soft story as per sfebc code chapter 4d 2016 cebc appx a4 maher na commercial - 201811206488
Details
Permit
201811206487
Permit issued
Dec 5, 2018

seismic upgrade for soft story as per sfebc code chapter 4d 2016 cebc appx a4 maher na commercial - 201811206488

Open the permit page

$98,100
Sep 27, 2018Completed
final sign-off Feb 2019
1400 17th StNabi Construction & Engineering Inc1)revision to app#201706220136. 2) replace extg windows by nw at north, south & east walls. 3) partially infill 2 wndow openings and replace extg windows w/nw re-sized windows at east wall. 4) replace 2 extg doors w/nw doors at south wall. 5) revise structural det. as per sheets s2.3.n/a for maher
Details
Permit
201809271634
Permit issued
Oct 1, 2018
Final sign-off
Feb 5, 2019

1)revision to app#201706220136. 2) replace extg windows by nw at north, south & east walls. 3) partially infill 2 wndow openings and replace extg windows w/nw re-sized windows at east wall. 4) replace 2 extg doors w/nw doors at south wall. 5) revise structural det. as per sheets s2.3.n/a for maher

Open the permit page

$30,000
Sep 27, 2018Completed
final sign-off Mar 2019
801 28th AvNabi Construction & Engineering Incseismic upgrade for soft story per sf building code chapter 4ed
Details
Permit
201809271653
Permit issued
Oct 1, 2018
Final sign-off
Mar 26, 2019

seismic upgrade for soft story per sf building code chapter 4ed

Open the permit page

$120,000
Sep 13, 2018Completed
final sign-off Sep 2022
695 33rd AvNabi Construction & Engineering Inccommercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809130147
Details
Permit
201809130146
Permit issued
Jul 6, 2021
Final sign-off
Sep 13, 2022

commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under pa 201809130147

Open the permit page

$30,000
Sep 5, 2018Expired or cancelled
cancelled Apr 2022
301 South Van Ness AvNabi Construction & Engineering Incresidential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809059201.
Details
Permit
201809059204
Permit issued
Oct 11, 2018

residential soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809059201.

Open the permit page

$130,712
Sep 5, 2018Expired or cancelled
cancelled Apr 2022
301 South Van Ness AvNabi Construction & Engineering Inccommercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. & ada restroom upgrades. residential pa #201809059204.
Details
Permit
201809059201
Permit issued
Oct 11, 2018

commercial soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. & ada restroom upgrades. residential pa #201809059204.

Open the permit page

$19,288
Jun 14, 2018Completed
final sign-off Mar 2020
160 10th StNabi Construction & Engineering Inc1) revision to app#201803234524. 2)provide new gas meter room. 3)replace extg roll up door at south wall. 4)relocate accessible bathroom.
Details
Permit
201806141910
Permit issued
Jul 6, 2018
Final sign-off
Mar 5, 2020

1) revision to app#201803234524. 2)provide new gas meter room. 3)replace extg roll up door at south wall. 4)relocate accessible bathroom.

Open the permit page

$5,000
Mar 23, 2018Completed
final sign-off Mar 2020
160 10th StNabi Construction & Engineering Inca)voluntary seismic upgrade. b)remove extg restroom and provide (n) ada restroom. c)remove extg stair, & provide new acessable stair. maher na
Details
Permit
201803234524
Permit issued
Apr 4, 2018
Final sign-off
Mar 5, 2020

a)voluntary seismic upgrade. b)remove extg restroom and provide (n) ada restroom. c)remove extg stair, & provide new acessable stair. maher na

Open the permit page

$150,000
Nov 3, 2017Completed
final sign-off Jan 2018
1250 Vallejo StNabi Construction & Engineering Increvision to pa 2017-0621-0010 & 2017-1013-1222 - shift steel frame @ line 1; revise shear walls
Details
Permit
201711033126
Permit issued
Nov 6, 2017
Final sign-off
Jan 31, 2018

revision to pa 2017-0621-0010 & 2017-1013-1222 - shift steel frame @ line 1; revise shear walls

Open the permit page

Sep 22, 2017Completed
final sign-off Nov 2018
1429 Valencia StNabi Construction & Engineering Increv to pa#201609289070: replace (e) front windows @ grid line (6). demo (e) wood siding, barn door & provide (n) store front @ g.l. (6) . reconfigure accessible restrooms. n/a maher
Details
Permit
201709229340
Permit issued
Nov 20, 2017
Final sign-off
Nov 5, 2018

rev to pa#201609289070: replace (e) front windows @ grid line (6). demo (e) wood siding, barn door & provide (n) store front @ g.l. (6) . reconfigure accessible restrooms. n/a maher

Open the permit page

$15,000
Sep 8, 2017Completed
final sign-off Jan 2018
738 06th AvNabi Construction & Engineering Incseismic upgrade for soft story as per san francisco building code, chapter 4d, 2016 cebc appendix a-4.
Details
Permit
201709087418
Permit issued
Sep 11, 2017
Final sign-off
Jan 16, 2018

seismic upgrade for soft story as per san francisco building code, chapter 4d, 2016 cebc appendix a-4.

Open the permit page

$110,000
Sep 6, 2017Completed
final sign-off Sep 2018
2860 Pierce StNabi Construction & Engineering Incsoft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4
Details
Permit
201709067113
Permit issued
Sep 11, 2017
Final sign-off
Sep 19, 2018

soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4

Open the permit page

$120,000
Aug 30, 2017Completed
final sign-off Feb 2018
901 Greenwich StNabi Construction & Engineering Incsoft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4
Details
Permit
201708306470
Permit issued
Sep 11, 2017
Final sign-off
Feb 5, 2018

soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4

Open the permit page

$100,000
Aug 9, 2017Completed
final sign-off Jan 2018
107 Dolores StNabi Construction & Engineering Incsoft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4
Details
Permit
201708094389
Permit issued
Aug 23, 2017
Final sign-off
Jan 31, 2018

soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4

Open the permit page

$105,000
Jul 12, 2017Completed
final sign-off May 2018
1175 Chestnut StNabi Construction & Engineering Inc, L C Builders Inc.seismic upgrade for soft story as per sfebc, chapter 4d, 2016 cebc appendix a4
Details
Permit
201707121690
Permit issued
Aug 21, 2017
Final sign-off
May 22, 2018

seismic upgrade for soft story as per sfebc, chapter 4d, 2016 cebc appendix a4

Open the permit page

$160,000
Jun 28, 2017Completed
final sign-off Jun 2018
2919 22nd StNabi Construction & Engineering Increvision to appl #201706210021. soft story upgrade commercial portion. revision to frame foundation; provide ftg. extension in lieu of dowels in to (e) wall at grid line.
Details
Permit
201706280640
Permit issued
Jun 28, 2017
Final sign-off
Jun 28, 2018

revision to appl #201706210021. soft story upgrade commercial portion. revision to frame foundation; provide ftg. extension in lieu of dowels in to (e) wall at grid line.

Open the permit page

Jun 21, 2017Completed
final sign-off Jan 2018
1250 Vallejo StNabi Construction & Engineering Incsoft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4
Details
Permit
201706210010
Permit issued
Aug 18, 2017
Final sign-off
Jan 31, 2018

soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4

Open the permit page

$110,000
Jun 21, 2017Completed
final sign-off Jun 2018
2919 22nd StNabi Construction & Engineering Inccommerical- soft story upgrade, revision to app#201610261213, revision to frame foundation at grids line 2 and 3
Details
Permit
201706210021
Permit issued
Jun 23, 2017
Final sign-off
Jun 28, 2018

commerical- soft story upgrade, revision to app#201610261213, revision to frame foundation at grids line 2 and 3

Open the permit page

Jun 14, 2017Completed
final sign-off Jan 2018
846 Capp StNabi Construction & Engineering Incsoft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4
Details
Permit
201706149385
Permit issued
Aug 2, 2017
Final sign-off
Jan 9, 2018

soft story retrofit per sfebc chapter 4d engineering criteria: 2016 cebc appendix a-4

Open the permit page

$130,000
Jun 7, 2017Completed
final sign-off Jan 2018
563 Capp StNabi Construction & Engineering Incseismic upgrade for soft story retrofit as per san francisco building code, chapter 4d, 2016 cebc appendix a-4.
Details
Permit
201706078694
Permit issued
Aug 2, 2017
Final sign-off
Jan 9, 2018

seismic upgrade for soft story retrofit as per san francisco building code, chapter 4d, 2016 cebc appendix a-4.

Open the permit page

$125,000
May 10, 2017Completed
final sign-off Nov 2017
1635 Jones StNabi Construction & Engineering Incseismic upgrade for soft story as per sfbc, chapter 4d, 2016 cebc appendix a-4.
Details
Permit
201705106253
Permit issued
Jun 28, 2017
Final sign-off
Nov 14, 2017

seismic upgrade for soft story as per sfbc, chapter 4d, 2016 cebc appendix a-4.

Open the permit page

$110,000
Apr 5, 2017Completed
final sign-off Mar 2019
650 Potrero AvNabi Construction & Engineering Incvoluntary seismic upgrade. maher n/a.
Details
Permit
201704053302
Permit issued
May 4, 2017
Final sign-off
Mar 6, 2019

voluntary seismic upgrade. maher n/a.

Open the permit page

$250,000
Mar 17, 2017Completed
final sign-off Nov 2017
1455 Clay StNabi Construction & Engineering Incseismic upgrade for soft story as per sfbc chapter 4d 2012 iebc appx a4
Details
Permit
201703171785
Permit issued
Mar 29, 2017
Final sign-off
Nov 15, 2017

seismic upgrade for soft story as per sfbc chapter 4d 2012 iebc appx a4

Open the permit page

$165,000
Dec 21, 2016Completed
final sign-off Mar 2017
1280 15th AvNabi Construction & Engineering Incsoft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4
Details
Permit
201612215617
Permit issued
Jan 9, 2017
Final sign-off
Mar 22, 2017

soft story retrofit per sfbc chapter 34b engineering criteria per 2012 iebc appendix a-4

Open the permit page

$150,000
Dec 7, 2016Completed
final sign-off Jul 2017
1849 Larkin StNabi Construction & Engineering Incseismic upgrade for soft story as per sfbc chapter 34b, 2012 iebc appx a4 design method for commercial space ada accessibility
Details
Permit
201612074396
Permit issued
Jan 9, 2017
Final sign-off
Jul 21, 2017

seismic upgrade for soft story as per sfbc chapter 34b, 2012 iebc appx a4 design method for commercial space ada accessibility

Open the permit page

$17,680
Dec 7, 2016Completed
final sign-off Jul 2017
1849 Larkin StNabi Construction & Engineering Incseismic upgrade for soft story as per sfbc chapter 34b, 2012 iebc appx a4 design method for residential
Details
Permit
201612074397
Permit issued
Jan 9, 2017
Final sign-off
Jul 24, 2017

seismic upgrade for soft story as per sfbc chapter 34b, 2012 iebc appx a4 design method for residential

Open the permit page

$62,400
Dec 1, 2016Never finaled
issued Aug 2019, no final
340 Division StNabi Construction & Engineering Incto erect 4 stories, no basement, type i-a / v-b, office building.
Details
Permit
201612013915
Permit issued
Aug 6, 2019

to erect 4 stories, no basement, type i-a / v-b, office building.

Open the permit page

$1,800,000
Sep 8, 2016Completed
final sign-off Nov 2016
3030 17th StNabi Construction & Engineering Increvision to pa #201511203230 - relocation of bathrooms & doors at 1st floor. removal of bathrooms from 2nd floor. provide partition walls for office, conference & utility rooms @ 2nd floor. 3 new canopy @ entry door @ east wall. n/a maher ordinance
Details
Permit
201609087079
Permit issued
Sep 13, 2016
Final sign-off
Nov 9, 2016

revision to pa #201511203230 - relocation of bathrooms & doors at 1st floor. removal of bathrooms from 2nd floor. provide partition walls for office, conference & utility rooms @ 2nd floor. 3 new canopy @ entry door @ east wall. n/a maher ordinance

Open the permit page

Jul 8, 2016Completed
final sign-off Sep 2016
1765 Vallejo StNabi Construction & Engineering Increvision to pa# 201606029014, reconfigure moment frame footing and drag at grid line 3
Details
Permit
201607081901
Permit issued
Jul 19, 2016
Final sign-off
Sep 19, 2016

revision to pa# 201606029014, reconfigure moment frame footing and drag at grid line 3

Open the permit page

Jun 2, 2016Completed
final sign-off Sep 2016
1765 Vallejo StNabi Construction & Engineering Incseismic upgrade for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4
Details
Permit
201606029014
Permit issued
Jun 10, 2016
Final sign-off
Sep 19, 2016

seismic upgrade for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4

Open the permit page

$90,000
Jun 2, 2016Completed
final sign-off Nov 2016
1957 15th StNabi Construction & Engineering Incseismic upgrade for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4
Details
Permit
201606029016
Permit issued
Aug 22, 2016
Final sign-off
Nov 15, 2016

seismic upgrade for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4

Open the permit page

$85,000
Jun 2, 2016Completed
final sign-off Jul 2016
801 Baker StNabi Construction & Engineering Increvision to pa#201604225507, relocate steel frame @ grid line "b", revise shear wall length & plywood nailing @ grid line "a"
Details
Permit
201606029017
Permit issued
Jun 20, 2016
Final sign-off
Jul 20, 2016

revision to pa#201604225507, relocate steel frame @ grid line "b", revise shear wall length & plywood nailing @ grid line "a"

Open the permit page

May 13, 2016Completed
final sign-off Aug 2016
1885 Golden Gate AvNabi Construction & Engineering Incsoft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4
Details
Permit
201605137420
Permit issued
May 20, 2016
Final sign-off
Aug 31, 2016

soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4

Open the permit page

$100,000
May 11, 2016Completed
final sign-off May 2016
2300 Lombard StNabi Construction & Engineering Increvision to pa 2015-1014-9575 & 2015-1014-9576, slope at entrance ramp revised to 14.2%. maher na
Details
Permit
201605117171
Permit issued
May 12, 2016
Final sign-off
May 17, 2016

revision to pa 2015-1014-9575 & 2015-1014-9576, slope at entrance ramp revised to 14.2%. maher na

Open the permit page

Apr 29, 2016Completed
final sign-off Jan 2017
2015 Sacramento StNabi Construction & Engineering Incsoft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4
Details
Permit
201604296170
Permit issued
Oct 21, 2016
Final sign-off
Jan 24, 2017

soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4

Open the permit page

$90,000
Apr 27, 2016Never finaled
issued May 2016, no final
974 Pine StNabi Construction & Engineering Increvision to pa #201604084316 (soft story retrofit) : provide (n) shear wall at line 'd" & relocate moment frame at line 'b'.
Details
Permit
201604275805
Permit issued
May 2, 2016

revision to pa #201604084316 (soft story retrofit) : provide (n) shear wall at line 'd" & relocate moment frame at line 'b'.

Open the permit page

$2,000
Apr 22, 2016Completed
final sign-off Aug 2016
185 Parker AvNabi Construction & Engineering Incsoft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4
Details
Permit
201604225502
Permit issued
May 20, 2016
Final sign-off
Aug 9, 2016

soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4

Open the permit page

$90,000
Apr 22, 2016Completed
final sign-off Jun 2016
443 15th AvNabi Construction & Engineering Increvision to pa 2016-0311-1816, revision to moment frames @ grid lines 3 & 4.
Details
Permit
201604225508
Permit issued
Apr 27, 2016
Final sign-off
Jun 3, 2016

revision to pa 2016-0311-1816, revision to moment frames @ grid lines 3 & 4.

Open the permit page

$5,000
Apr 22, 2016Completed
final sign-off Jul 2016
801 Baker StNabi Construction & Engineering Incsoft story retrofit per sfbc chapter 34b engineering criteria, 2012 iebc appendix a-4
Details
Permit
201604225507
Permit issued
May 2, 2016
Final sign-off
Jul 22, 2016

soft story retrofit per sfbc chapter 34b engineering criteria, 2012 iebc appendix a-4

Open the permit page

$100,000
Apr 8, 2016Completed
final sign-off Jun 2016
974 Pine StNabi Construction & Engineering Incsoft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.
Details
Permit
201604084316
Permit issued
Apr 11, 2016
Final sign-off
Jun 23, 2016

soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4.

Open the permit page

$80,000
Apr 5, 2016Completed
final sign-off Oct 2016
1200 Pine StNabi Construction & Engineering Incseismic upgrade for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a ordinance #155-13
Details
Permit
201604053969
Permit issued
Jun 14, 2016
Final sign-off
Oct 7, 2016

seismic upgrade for soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a ordinance #155-13

Open the permit page

$90,000
Jan 14, 2016Never finaled
issued Jan 2016, no final
1050 Columbus Avstreet space
Details
Permit
M655007
Permit issued
Jan 14, 2016

street space

Open the permit page

Dec 18, 2015Completed
final sign-off Aug 2016
4325 Balboa StNabi Construction & Engineering Incseismic upgrade for soft story as per san francisco building code chapter 34b, 2012 iebc appendix a-4 design method
Details
Permit
201512185538
Permit issued
Jan 8, 2016
Final sign-off
Aug 15, 2016

seismic upgrade for soft story as per san francisco building code chapter 34b, 2012 iebc appendix a-4 design method

Open the permit page

$95,000
Nov 20, 2015Completed
final sign-off Nov 2016
3030 17th StNabi Construction & Engineering Increvision to appl #201507020607 - all ada req for this permit will remain same as appl. replace (e) wall studs with new. build (n) wall above pg &e room. (n) roll up door in place of accordion door, relocate gas meter. n/a maher ordinance
Details
Permit
201511203230
Permit issued
Nov 23, 2015
Final sign-off
Nov 9, 2016

revision to appl #201507020607 - all ada req for this permit will remain same as appl. replace (e) wall studs with new. build (n) wall above pg &e room. (n) roll up door in place of accordion door, relocate gas meter. n/a maher ordinance

Open the permit page

$10,000
Nov 20, 2015Completed
final sign-off Feb 2016
410 44th AvNabi Construction & Engineering Incseismic upgrade for soft story as per san francisco building code chapter 34b, 2012 iebc appendix a-4.
Details
Permit
201511203226
Permit issued
Nov 23, 2015
Final sign-off
Feb 26, 2016

seismic upgrade for soft story as per san francisco building code chapter 34b, 2012 iebc appendix a-4.

Open the permit page

$80,000