Fareed Himmati
- Listed as
- architect, engineer
- Firm
- Himmati Engineering
- Based in
- Fremont
- On San Francisco permits
- Jan 2005 to Sep 2026
31 permits since 2000 (engineer on 24 permits, architect on 7 permits): 16 completed, 8 in progress, 5 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 3795 Market St | 265sqft 2nd flr bedroom addition above an existing street level garage at the front of home. horizontal addition. total aggregate flr area is less than 1000sqft.Details
265sqft 2nd flr bedroom addition above an existing street level garage at the front of home. horizontal addition. total aggregate flr area is less than 1000sqft. | $50,615 | |
| May 18, 2026 | In progress filed May 2026, not yet issued | 99 Mendosa Av | respond to nov 2025393596: remove e) cmu block retaining wall in rear yard, construct new concrete retaining wall in rear yard, construct new wooden deck in rear yardDetails
respond to nov 2025393596: remove e) cmu block retaining wall in rear yard, construct new concrete retaining wall in rear yard, construct new wooden deck in rear yard | $10,000 | |
| Apr 29, 2026 | Completed final sign-off May 2026 | 1749 San Jose Av | revise permit 2025-0110-8129 to document changes to foundation that occurred during construction. permit application for documentation purposes, no work to be performed, all work performed under permit 2025-0110-8129.Details
revise permit 2025-0110-8129 to document changes to foundation that occurred during construction. permit application for documentation purposes, no work to be performed, all work performed under permit 2025-0110-8129. | ||
| Feb 23, 2026 | In progress issued Mar 2026 | 374 Funston Av | Victor Remodel & Construction | kitchen remodel, demo wall btw dining & kitchen, kitchen cabinet & countertop replacement. bathroom remodel: add 1) half bathroom, remodel 2 e) bathrooms. laundry room: sink, washer, dryer replacement.Details
kitchen remodel, demo wall btw dining & kitchen, kitchen cabinet & countertop replacement. bathroom remodel: add 1) half bathroom, remodel 2 e) bathrooms. laundry room: sink, washer, dryer replacement. | $90,000 |
| Dec 19, 2025 | Completed final sign-off Sep 2026 | 1940 Vallejo St | Noa Construction Llc | 3rd/f unit 3: temporary removal of localized concrete slab for plumbing work, replace w/ new slab after plumbing completed. ref pa 202511149678: slab work for ref permitDetails
3rd/f unit 3: temporary removal of localized concrete slab for plumbing work, replace w/ new slab after plumbing completed. ref pa 202511149678: slab work for ref permit | $6,000 |
| Sep 30, 2025 | Completed final sign-off Nov 2025 | 4249 Mission St | to adhere to nov# 202539895: facade localized repair and one garage door repair, dmaged by car impact.Details
to adhere to nov# 202539895: facade localized repair and one garage door repair, dmaged by car impact. | $15,000 | |
| Jul 22, 2025 | Completed final sign-off Dec 2025 | 155 Hartford St | Edri Construction Inc *See Notes* | renovation of kitchen , 2nd floor bathroom, flooring and interior stair railing. localized bearing wall remodel, related framing strengthening. window infill at lightwell.Details
renovation of kitchen , 2nd floor bathroom, flooring and interior stair railing. localized bearing wall remodel, related framing strengthening. window infill at lightwell. | $65,000 |
| Jun 23, 2025 | In progress issued Jul 2025 | 246 28th Av | De Jong Construction | 270 sqft rear yard addition at 2nd fl. partial renovation to bathrooms at 2nd flDetails
270 sqft rear yard addition at 2nd fl. partial renovation to bathrooms at 2nd fl | $175,000 |
| May 7, 2025 | Completed final sign-off May 2026 | 70 07th Av | Gngc Builders Inc | upper lvl unit: renovation of kitchen & 2 bathrooms, replace 11 windows (not visible from st) w/ new marvin aluminum clad unitsDetails
upper lvl unit: renovation of kitchen & 2 bathrooms, replace 11 windows (not visible from st) w/ new marvin aluminum clad units | $98,000 |
| Feb 28, 2025 | Completed final sign-off Jun 2025 | 145 Broadmoor Dr | Rebase Building | revision to bpa 2025-0114-8242 remove additional walls, revise approved posts & beam; revise cabinets & counters; install new flueDetails
revision to bpa 2025-0114-8242 remove additional walls, revise approved posts & beam; revise cabinets & counters; install new flue | |
| Feb 18, 2025 | In progress issued Mar 2025 | 239 Randall St | Gorman Construction | seismic strengthening of the garage level. framing strengthening of the garage level.Details
seismic strengthening of the garage level. framing strengthening of the garage level. | $100,000 |
| Jan 23, 2025 | In progress issued Feb 2025 | 321 Clipper St | Cardenas Custom Builders Inc. | front building: 2/f - convert (e)bedroom into family rm, (e)dining and (e) living rms into 2(n)bedrms. new opening between kitchen and family room. 1/f: structural upgrade as needed.Details
front building: 2/f - convert (e)bedroom into family rm, (e)dining and (e) living rms into 2(n)bedrms. new opening between kitchen and family room. 1/f: structural upgrade as needed. | $7,000 |
| Jan 23, 2025 | Expired or cancelled withdrawn Oct 2025 | 82 Woodward St | Doran Construction & Design | 1/f: raised garage entry door. 2/f: remodel powder, bath and kitchen. 3/f: new office, dining, bed and bath. remodel powder, bath and kitchen. replace in kind window at rear 2/f and 3/f. new heat pump system.Details
1/f: raised garage entry door. 2/f: remodel powder, bath and kitchen. 3/f: new office, dining, bed and bath. remodel powder, bath and kitchen. replace in kind window at rear 2/f and 3/f. new heat pump system. | $85,000 |
| Jan 17, 2025 | In progress issued Feb 2025 | 3106 Gough St | Buzzer 9 Development Inc | voluntary seismic strengthening of ground fl/ 1st fl levelDetails
voluntary seismic strengthening of ground fl/ 1st fl level | $15,000 |
| Sep 17, 2024 | In progress filed Sep 2024, not yet issued | 1318 05th Av | replacement of original foundation in sections. excavation to create a consistent 8"6" ceiling height in basement. existing patio to be excavated to same fl plane as basement. new drainage to be installed. ref planning 2024-005033prvDetails
replacement of original foundation in sections. excavation to create a consistent 8"6" ceiling height in basement. existing patio to be excavated to same fl plane as basement. new drainage to be installed. ref planning 2024-005033prv | $150,000 | |
| Aug 21, 2024 | Completed final sign-off Dec 2024 | 302 Warren Dr | per complaint 202421751: rear yard garden retaining wall/ deck at gradeDetails
per complaint 202421751: rear yard garden retaining wall/ deck at grade | $10,000 | |
| Oct 21, 2021 | Never finaled issued Oct 2021, no final | 2424 Folsom St | Alex R Construction | shoring house. no other work to take placeDetails
shoring house. no other work to take place | $6,000 |
| Sep 28, 2021 | Never finaled issued Sep 2021, no final | 3678 18th St | Level 8 Construction Inc | unit 4: open wall from dining room into kitchenDetails
unit 4: open wall from dining room into kitchen | $5,000 |
| Mar 11, 2021 | Completed final sign-off Feb 2022 | 944 Chestnut St | Noa Construction Llc | interior stair design (part of deferred submittal)Details
interior stair design (part of deferred submittal) | $8,000 |
| Dec 18, 2020 | Completed final sign-off Apr 2021 | 102 Baker St | Actually Design Build Inc | geogrout for soil stabilization. ref pa# 201905140612.Details
geogrout for soil stabilization. ref pa# 201905140612. | $15,000 |
| Dec 18, 2020 | Completed final sign-off Apr 2021 | 104 Baker St | Actually Design Build Inc | geogrout for soil stabilization at south property line foundation.Details
geogrout for soil stabilization at south property line foundation. | $15,000 |
| Nov 20, 2020 | Never finaled issued Feb 2021, no final | 634 19th Av | Dacora | revision to no plan pa# 202007150225: proposed 2nd fl remodel of kitchen & adjacent areas, bathroom, repair of (e) stairs & rear window replacements. 1st fl interior remodel. new habitable area for family room, bedroom & full bath. structural framing, foundation & lateral strengthening to 1st & 2nd.Details
revision to no plan pa# 202007150225: proposed 2nd fl remodel of kitchen & adjacent areas, bathroom, repair of (e) stairs & rear window replacements. 1st fl interior remodel. new habitable area for family room, bedroom & full bath. structural framing, foundation & lateral strengthening to 1st & 2nd. | $45,000 |
| Dec 12, 2018 | Never finaled issued Feb 2019, no final | 100 Northgate Dr | localized foundation strengthening and drainage.Details
localized foundation strengthening and drainage. | $15,000 | |
| May 22, 2008 | Completed final sign-off Apr 2009 | 1926 Taylor St | 4th floor interior & min. exterior remodel including (e) kitchen, master bath, dining/living, m. bedrm, guest bedrm; demolition & new wall const. int finishes, new skylight, windows, assoc mep & struct work.Details
4th floor interior & min. exterior remodel including (e) kitchen, master bath, dining/living, m. bedrm, guest bedrm; demolition & new wall const. int finishes, new skylight, windows, assoc mep & struct work. | $125,000 | |
| May 19, 2008 | Completed final sign-off May 2009 | 1926 Taylor St | revision to pa 200803116869, steel beam size revision for garage ceiling.Details
revision to pa 200803116869, steel beam size revision for garage ceiling. | $30,000 | |
| May 19, 2008 | Completed final sign-off Apr 2009 | 1926 Taylor St | seismic upgrade of 2nd, 3rd & 4th level, plywood shearwall add in both directions, garage level strengthening is already approved, under pa 200803116869. t i under separate permits.Details
seismic upgrade of 2nd, 3rd & 4th level, plywood shearwall add in both directions, garage level strengthening is already approved, under pa 200803116869. t i under separate permits. | ||
| Nov 9, 2007 | Completed final sign-off Oct 2008 | 1833 Jones St | new middle beam and column support with pad footings. infill (e) stair opening. construct new interior stair opening.Details
new middle beam and column support with pad footings. infill (e) stair opening. construct new interior stair opening. | $20,000 | |
| Apr 18, 2007 | Never finaled issued Apr 2007, no final | 1550 Fell St | voluntary replacement of interior brick foundation and concrete pads under extg wood postsDetails
voluntary replacement of interior brick foundation and concrete pads under extg wood posts | $10,000 | |
| Jun 19, 2006 | Completed final sign-off Sep 2006 | 4163 23rd St | kitchen to be remodeled/bathroom to be remodeled/new interior stair to extg storage below/new washer and dryer to be addedDetails
kitchen to be remodeled/bathroom to be remodeled/new interior stair to extg storage below/new washer and dryer to be added | $40,000 | |
| Feb 7, 2005 | Expired or cancelled cancelled Jun 2012 | 1 Aladdin Tr | S J L Construction*** Pls See 959755**** | voluntary structural upgrade in unit#3 only.Details
voluntary structural upgrade in unit#3 only. | $14,000 |
| Jan 28, 2005 | Completed final sign-off May 2009 | 722 Montgomery St | Bar Contractors Inc | strengtening of wall,provide epoxy dowers into brick walls,(n)reinforcement for shotcrete walDetails
strengtening of wall,provide epoxy dowers into brick walls,(n)reinforcement for shotcrete wal |