Michael Terndrup
- Listed as
- architect, authorized agent-others
- Firm
- Eag Studio Architecture
- Based in
- Sf
- On San Francisco permits
- Jun 2020 to Sep 2026
39 permits since 2000 (architect on 37 permits, authorized agent-others on 3 permits): 11 completed, 24 in progress, 4 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 8, 2026 | In progress issued Sep 2026 | 1220 Church St | revision to pa# 202412036100. reconfigure the fenestration at the rear. reduce the width of the 2nd front door. move the rear southwest wall to 3'-0" from the property line. reconfigure the ktichen of the lower unit. reconfigure the bathrooms, closets & laundry room. reconfigure & add skylight.Details
revision to pa# 202412036100. reconfigure the fenestration at the rear. reduce the width of the 2nd front door. move the rear southwest wall to 3'-0" from the property line. reconfigure the ktichen of the lower unit. reconfigure the bathrooms, closets & laundry room. reconfigure & add skylight. | ||
| Aug 17, 2026 | In progress filed Aug 2026, not yet issued | 2316 Leavenworth St | add (n) bay window to rear facadeDetails
add (n) bay window to rear facade | $47,000 | |
| Jul 31, 2026 | In progress issued Sep 2026 | 58 Digby St | Flmc Development Corp Dba Adamo Campagna | shear wall relocation and enlargement- remove and replace gypsum wall board on interior side of exterior walls to add insulation and upgrade electrical wiring- update bathroom fixtures and finishes in the upper floor bathroom, reconfigure the closet in the den/office- relocate micorwave/ oven & nookDetails
shear wall relocation and enlargement- remove and replace gypsum wall board on interior side of exterior walls to add insulation and upgrade electrical wiring- update bathroom fixtures and finishes in the upper floor bathroom, reconfigure the closet in the den/office- relocate micorwave/ oven & nook | $39,624 |
| May 29, 2026 | In progress issued Jun 2026 | 1772 Vallejo St | Flmc Development Corp Dba Adamo Campagna | rear cottage (detached garage): in kind overhead door replacement, voluntary strengthening by bracing of openings and in kind repair of masonry at garage only.Details
rear cottage (detached garage): in kind overhead door replacement, voluntary strengthening by bracing of openings and in kind repair of masonry at garage only. | $12,000 |
| May 4, 2026 | In progress filed May 2026, not yet issued | 10 Miller Pl | minor interior remodel of (e) kitchen. add partition for (n) pantry. remove (e) fireplace and accompanying partition walls at living room, add partition walls for additional closet and (n) laundry, (n) interior finishes and fixtures in line with (e) plumbing.Details
minor interior remodel of (e) kitchen. add partition for (n) pantry. remove (e) fireplace and accompanying partition walls at living room, add partition walls for additional closet and (n) laundry, (n) interior finishes and fixtures in line with (e) plumbing. | $166,539 | |
| Apr 20, 2026 | In progress issued Jul 2026 | 3641 Clement St | Citywest Construction Inc. | add a new 479 sq.ft roof patio w/ stair access from (e) gardenDetails
add a new 479 sq.ft roof patio w/ stair access from (e) garden | $13,000 |
| Apr 9, 2026 | Completed final sign-off Apr 2026 | 1151 Fell St | revise p/a 2019-1122-7984 to include document property line locations per parcel map 12532, revise ground floor plan to show the location of the electric meters to be in a 1-hour enclosure in the adjacent egress component as required by pg&e.Details
revise p/a 2019-1122-7984 to include document property line locations per parcel map 12532, revise ground floor plan to show the location of the electric meters to be in a 1-hour enclosure in the adjacent egress component as required by pg&e. | ||
| Mar 2, 2026 | In progress issued Mar 2026 | 831 27th St | Marquez Builders | revision 202508072549 to include raise (e) window opening (vertically ) located on balacony facing front. add awning to hang over rear patio doors and waterproofing. relocate and infill (e) bedroom windows from south side and create (n) opening for windows on east side of propertyDetails
revision 202508072549 to include raise (e) window opening (vertically ) located on balacony facing front. add awning to hang over rear patio doors and waterproofing. relocate and infill (e) bedroom windows from south side and create (n) opening for windows on east side of property | $4,200 |
| Feb 19, 2026 | In progress issued May 2026 | 1772 Vallejo St | Flmc Development Corp Dba Adamo Campagna | replace driveway in kind. trench for utilities under driveway location w/ replacement of trench drain & collection drain. new landscaping including planting & site wall repair with replacement of (e) french drain. all work under 30" in height.Details
replace driveway in kind. trench for utilities under driveway location w/ replacement of trench drain & collection drain. new landscaping including planting & site wall repair with replacement of (e) french drain. all work under 30" in height. | $12,000 |
| Dec 1, 2025 | In progress issued May 2026 | 460 Fair Oaks St | Marquez Builders | expand unit on level 1 (#462a) to add a bathroom and relocate bedrooms. interior remodel/reconfigure level 2 (#460) & level 3 (#462). add new 297 sqft roof deck.Details
expand unit on level 1 (#462a) to add a bathroom and relocate bedrooms. interior remodel/reconfigure level 2 (#460) & level 3 (#462). add new 297 sqft roof deck. | $429,000 |
| Nov 26, 2025 | In progress issued Dec 2025 | 831 27th St | Marquez Builders | revision to pa # 202508072549: add peaked skylight & flat skylight over stairs. revise retaining walls at the ground fl per structuralDetails
revision to pa # 202508072549: add peaked skylight & flat skylight over stairs. revise retaining walls at the ground fl per structural | $14,500 |
| Nov 21, 2025 | In progress issued May 2026 | 1018 Shrader St | Orchard Construction | revision to pa #202507110631 infill redundant doorway and steps on the lower level. provide verified sffd ladder path which has been confirmed in the fieldDetails
revision to pa #202507110631 infill redundant doorway and steps on the lower level. provide verified sffd ladder path which has been confirmed in the field | $1,200 |
| Aug 7, 2025 | In progress issued Aug 2025 | 831 27th St | Marquez Builders | reconfigure the ground floor layout to add a (n) bedroom & closets. excavate 23 cu.yrd to add a (n) storage/laundry room. remove (e) skylights, remodel kitchen in place. increase 238 sf habitable area.Details
reconfigure the ground floor layout to add a (n) bedroom & closets. excavate 23 cu.yrd to add a (n) storage/laundry room. remove (e) skylights, remodel kitchen in place. increase 238 sf habitable area. | $65,000 |
| Jun 30, 2025 | In progress issued Feb 2026 | 1437 Mason St | facade improvements, full interior remodel, remove rear stair, replace front stair w/in (e) envelope, (n) foundation interior conversion of basement, all work w/in (e) envelope.Details
facade improvements, full interior remodel, remove rear stair, replace front stair w/in (e) envelope, (n) foundation interior conversion of basement, all work w/in (e) envelope. | $467,000 | |
| Jun 20, 2025 | Completed final sign-off Jan 2026 | 166 10th Av | Citywest Construction Inc. | unit #3: replace window on front facade w/smaller window to raise sill heightDetails
unit #3: replace window on front facade w/smaller window to raise sill height | $500 |
| Jun 18, 2025 | Completed final sign-off Jan 2026 | 166 10th Av | Citywest Construction Inc. | unit3; reconfigure and remodel (1) bedroom, (2) bathrooms and the kitchen of unit 3. add (3) new skylights - min 60" from the property line parapets.Details
unit3; reconfigure and remodel (1) bedroom, (2) bathrooms and the kitchen of unit 3. add (3) new skylights - min 60" from the property line parapets. | $72,800 |
| May 9, 2025 | In progress filed May 2025, not yet issued | 1357 Francisco St | Miann Builder | unit 1357 francisco- revision 201912311108- layout changes to level 1 (ground floor) to convert portion of (e) garage into (n) gardening room and structrual components added in scope. minor interior changes to upper levels and to change orignal permit scope to remove 4th floor addition.Details
unit 1357 francisco- revision 201912311108- layout changes to level 1 (ground floor) to convert portion of (e) garage into (n) gardening room and structrual components added in scope. minor interior changes to upper levels and to change orignal permit scope to remove 4th floor addition. | |
| May 9, 2025 | In progress filed May 2025, not yet issued | 1355 Francisco St | Miann Builder | unit 1355 francisco- revision 201912311108- layout changes to level 1 (ground floor) to convert portion of (e) garage into (n) gardening room and structrual components added in scope. minor interior changes to upper levels and to change orignal permit scope to remove 4th floor addition.Details
unit 1355 francisco- revision 201912311108- layout changes to level 1 (ground floor) to convert portion of (e) garage into (n) gardening room and structrual components added in scope. minor interior changes to upper levels and to change orignal permit scope to remove 4th floor addition. | |
| Apr 25, 2025 | In progress issued Aug 2025 | 831 27th St | Marquez Builders | 2nd/fl- primary suite reconfigure bath and closet spaces, add rear facing window in bath. second bathroom replace tub with shower, replace fixtures and finishes. relocate skylight to be min 5 ft from property line. no work visible from street.Details
2nd/fl- primary suite reconfigure bath and closet spaces, add rear facing window in bath. second bathroom replace tub with shower, replace fixtures and finishes. relocate skylight to be min 5 ft from property line. no work visible from street. | $27,000 |
| Apr 10, 2025 | In progress issued Aug 2025 | 1312 South Van Ness Av | interior remodel of all units. new decks under 30" above grade with sliding doors. reconfigure all 3 units including new bathrooms, new kitchens which will subsequently address. nov #202533278 and nov#202297858. all work at existing front building. infill light wells, replace front windows.Details
interior remodel of all units. new decks under 30" above grade with sliding doors. reconfigure all 3 units including new bathrooms, new kitchens which will subsequently address. nov #202533278 and nov#202297858. all work at existing front building. infill light wells, replace front windows. | $129,000 | |
| Jan 23, 2025 | Completed final sign-off Nov 2025 | 877 Carolina St | Citywest Construction Inc. | level 1: remodel (e) bathroom/closet into (n) steam room and sauna level 2: add pocket door in media room no structural workDetails
level 1: remodel (e) bathroom/closet into (n) steam room and sauna level 2: add pocket door in media room no structural work | $13,500 |
| Oct 3, 2024 | Completed final sign-off Dec 2024 | 1567 Union St | Javier Magana Construction Services | add island to kitchen at 2nd level. replace induction cooktop w/ gas range. install cabinet doors on (e) shelves above sink, convert (e) cabinet to drawers under sink area.Details
add island to kitchen at 2nd level. replace induction cooktop w/ gas range. install cabinet doors on (e) shelves above sink, convert (e) cabinet to drawers under sink area. | $8,700 |
| Sep 6, 2024 | In progress filed Sep 2024, not yet issued | 3892 19th St | replace window with door to provide access to a (n) private roof deck over (e) garage facing streetDetails
replace window with door to provide access to a (n) private roof deck over (e) garage facing street | $43,000 | |
| Jul 23, 2024 | In progress issued Sep 2024 | 22 Jersey St | Marquez Builders | install new elevator inside a new 1-hour rated elevator shaft enclosureDetails
install new elevator inside a new 1-hour rated elevator shaft enclosure | $31,500 |
| Jun 6, 2024 | Completed final sign-off Jun 2025 | 620 El Camino Del Mar | Arrow Builders Inc | renovation of primary bedroom suite. add pocket door. enlarge closet. replace fireplace and lighting. add skylights.Details
renovation of primary bedroom suite. add pocket door. enlarge closet. replace fireplace and lighting. add skylights. | $43,000 |
| Feb 29, 2024 | In progress issued Mar 2024 | 831 27th St | Flmc Development Corp Dba Adamo Campagna | notch and repair foundation to allow electrical service upgrae.Details
notch and repair foundation to allow electrical service upgrae. | $1,000 |
| Jan 19, 2024 | Completed final sign-off Aug 2025 | 2762 Filbert St | Beyond The Horizon Construction | revision to approved bpa# 202206277164: to reduce bay window at rear. add (n) windows to resulting bay. (n) 10' fence at property lines at rear yard. 0.30 u factor.Details
revision to approved bpa# 202206277164: to reduce bay window at rear. add (n) windows to resulting bay. (n) 10' fence at property lines at rear yard. 0.30 u factor. | |
| Oct 26, 2023 | In progress issued Sep 2025 | 2300 Webster St | Flmc Development Corp Dba Adamo Campagna | creat (n) parking space with fencing and curbcutDetails
creat (n) parking space with fencing and curbcut | $5,000 |
| Aug 23, 2023 | Never finaled issued Aug 2023, no final | 3880 19th St | Citadel Inc | install pre-fab hot tub in pit in rear yard. top of the hot tub to be level with existing grade.Details
install pre-fab hot tub in pit in rear yard. top of the hot tub to be level with existing grade. | $5,250 |
| Aug 11, 2023 | Never finaled issued Sep 2023, no final | 40 Sea View Tr | Level 8 Construction Inc | new landscaping at front and rear yards w/reduction of decks and (n) retaining walls, all modifications are under 36" of (e) gradeDetails
new landscaping at front and rear yards w/reduction of decks and (n) retaining walls, all modifications are under 36" of (e) grade | $25,000 |
| Jul 7, 2023 | In progress issued Oct 2025 | 428 Collingwood St | Citywest Construction Inc. | reduce the existing roof deck & convert/expand the stair penthouse in order to add a 4th floor home office.Details
reduce the existing roof deck & convert/expand the stair penthouse in order to add a 4th floor home office. | $200,000 |
| May 23, 2023 | Completed final sign-off Mar 2024 | 1567 Union St | revision to 202010206895- interior reconfigurarion of primary bath, family room, bath 1 & stairs. minor adjustments to front window size. new foundation at bedroom and family room. (no fixture count change)Details
revision to 202010206895- interior reconfigurarion of primary bath, family room, bath 1 & stairs. minor adjustments to front window size. new foundation at bedroom and family room. (no fixture count change) | ||
| Mar 31, 2023 | Completed final sign-off May 2024 | 3880 19th St | Citadel Inc | rebuild surface of rear facade of both units due to water proofing deficiences on previous permit, rear facade-n architectural detailing, minor window & door adjustments, n windows/ doors, no change to interior layout or massing.Details
rebuild surface of rear facade of both units due to water proofing deficiences on previous permit, rear facade-n architectural detailing, minor window & door adjustments, n windows/ doors, no change to interior layout or massing. | $50,000 |
| Mar 13, 2023 | Completed final sign-off Dec 2024 | 38 Rossi Av | Flmc Development Corp Dba Adamo Campagna | revision to bpa# 202210194741. reduce excavation and ceiling height of previoiusly permitted lower level. adjust stair location in rear yard under (e) deck.Details
revision to bpa# 202210194741. reduce excavation and ceiling height of previoiusly permitted lower level. adjust stair location in rear yard under (e) deck. | |
| Jan 18, 2023 | Never finaled filed Jan 2023, never issued | 1312 South Van Ness Av | erect a 5 story, 3 family dwelling with no basement type iv-cDetails
erect a 5 story, 3 family dwelling with no basement type iv-c | $1,400,000 | |
| Jan 12, 2023 | Completed final sign-off Feb 2023 | 1357 Francisco St | Gar-Cal Corporation | 2/f: relocation of laundry room (washer and dryer) in kitchen.Details
2/f: relocation of laundry room (washer and dryer) in kitchen. | $17,900 |
| May 11, 2021 | In progress issued Sep 2024 | 3271 Baker St | horizontal expansion of the first and second floors towards the rear. vertical additon to add a 3rd floor consisting of (3) bedrooms and (2) bathrooms. relocate the ktchen to the rear of the 2nd floor. new roof deck and elevator.Details
horizontal expansion of the first and second floors towards the rear. vertical additon to add a 3rd floor consisting of (3) bedrooms and (2) bathrooms. relocate the ktchen to the rear of the 2nd floor. new roof deck and elevator. | $600,000 | |
| Apr 22, 2021 | In progress issued May 2025 | 1060 Fulton St | interior remodel throughout w/ minor expansions under overhanging areas, (n) roof deck. nfpa 13-r fire sprinkler per cbc 903.1.1 shall be installed throughout bldg under seperate submittal.Details
interior remodel throughout w/ minor expansions under overhanging areas, (n) roof deck. nfpa 13-r fire sprinkler per cbc 903.1.1 shall be installed throughout bldg under seperate submittal. | $275,000 | |
| Jun 29, 2020 | Never finaled issued Jun 2023, no final | 1314 Ocean Av | Burke Construction | scope of work is to merge two commercial spaces in a non-sprinkler building. to remove wall between two spaces and refinish concrete floor. building change from b to a-2 occupancy. propose a 2nd exit at rear by utilize (e) easement to exit to public way. not a complete t.i.Details
scope of work is to merge two commercial spaces in a non-sprinkler building. to remove wall between two spaces and refinish concrete floor. building change from b to a-2 occupancy. propose a 2nd exit at rear by utilize (e) easement to exit to public way. not a complete t.i. | $18,000 |