Block 1307, lot 001T
620 El Camino Del Mar
- City’s use
- Single Family Residential
- Built
- 1926
- Stories
- 3
- Units
- 1
- Rooms
- 5 bedrooms, 5 bathrooms
- Building
- 5,632 sq ft
- Lot
- 5,950 sq ft
- Zoning
- RH1D
- Construction type
- WOO
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 8, 2026 | Completed final sign-off May 2026 | 620 El Camino Del Mar | Flmc Development Corp Dba Adamo Campagna | to obtain final inspection for work approved under pa# 201811286824/ 201903296589/ 202112083961. all work is complete.Details
to obtain final inspection for work approved under pa# 201811286824/ 201903296589/ 202112083961. all work is complete. | |
| May 8, 2026 | Completed final sign-off May 2026 | 620 El Camino Del Mar | Flmc Development Corp Dba Adamo Campagna | to obtain final inspection for work approved under pa# 202208261362. all work is complete.Details
to obtain final inspection for work approved under pa# 202208261362. all work is complete. | |
| Jan 24, 2025 | Completed final sign-off Jun 2025 | 620 El Camino Del Mar | Arrow Builders Inc | revision to 202407015607 and 202406063874. single pane glazed doors at dining room to be replaced with dbl pane glazed doors with a uvalue of .39. primary bath and closet interior door header to be raised and replaced. 3 fireplance framing to be replace, changes to skylightsDetails
revision to 202407015607 and 202406063874. single pane glazed doors at dining room to be replaced with dbl pane glazed doors with a uvalue of .39. primary bath and closet interior door header to be raised and replaced. 3 fireplance framing to be replace, changes to skylights | $1,800 |
| Jul 1, 2024 | Completed final sign-off Jun 2025 | 620 El Camino Del Mar | Arrow Builders Inc | door replacement in kind to higher energy performance doors. 3 double swing doors, 1 is street facing e openingsDetails
door replacement in kind to higher energy performance doors. 3 double swing doors, 1 is street facing e openings | $8,750 |
| Jun 6, 2024 | Completed final sign-off Jun 2025 | 620 El Camino Del Mar | Arrow Builders Inc | renovation of primary bedroom suite. add pocket door. enlarge closet. replace fireplace and lighting. add skylights.Details
renovation of primary bedroom suite. add pocket door. enlarge closet. replace fireplace and lighting. add skylights. | $43,000 |
| Dec 20, 2023 | Completed final sign-off Jun 2025 | 620 El Camino Del Mar | Arrow Builders Inc | window replacement only to highter energy performance, replace windows throuhout in kind w/wood clad windows w/true divided lites (tdl) -(9) street facingDetails
window replacement only to highter energy performance, replace windows throuhout in kind w/wood clad windows w/true divided lites (tdl) -(9) street facing | $47,500 |
| May 19, 2023 | Expired or cancelled expired Mar 2026 | 620 El Camino Del Mar | H C L Construction Inc. | recommencement and completion of work approved under new rear glass guardrail at 3rd fl.pa#201811286824 (new rear glass guardrail at 3rd fl.) & bpa#201903296589 (revision to 201811286824 new glass guardrail at first, second and third floor rear deck).Details
recommencement and completion of work approved under new rear glass guardrail at 3rd fl.pa#201811286824 (new rear glass guardrail at 3rd fl.) & bpa#201903296589 (revision to 201811286824 new glass guardrail at first, second and third floor rear deck). | |
| Aug 26, 2022 | Expired or cancelled expired Mar 2026 | 620 El Camino Del Mar | Flmc Development Corp Dba Adamo Campagna | new deck at rear of house less than 10ft h aff replacing two existing sliding rear doors to one large rear door assembly replacement of existing glass guardrails . changing rood deck surface materials and upgrading water proofinf/ new outdoor sink prep table.Details
new deck at rear of house less than 10ft h aff replacing two existing sliding rear doors to one large rear door assembly replacement of existing glass guardrails . changing rood deck surface materials and upgrading water proofinf/ new outdoor sink prep table. | $75,000 |
| Dec 8, 2021 | Expired or cancelled expired Mar 2026 | 620 El Camino Del Mar | Flmc Development Corp Dba Adamo Campagna | replace in kind laundry room from sewer spill. cabinets, flooring no wall changesDetails
replace in kind laundry room from sewer spill. cabinets, flooring no wall changes | $10,000 |
| Mar 29, 2019 | Expired or cancelled expired Mar 2026 | 620 El Camino Del Mar | H C L Construction Inc. | revision to 201811286824 new glass guardrail at first, second and third floor rear deckDetails
revision to 201811286824 new glass guardrail at first, second and third floor rear deck | $18,000 |
| Nov 28, 2018 | Expired or cancelled expired Mar 2026 | 620 El Camino Del Mar | H C L Construction Inc. | new rear glass guardrail at 3rd fl.Details
new rear glass guardrail at 3rd fl. | $8,000 |
| Nov 13, 2018 | Completed final sign-off Dec 2018 | 620 El Camino Del Mar | Madden Plastering | replace 800 sq ft stucco (of approx 80%) of the back of the house (n-east). replace the z-bar flashing aboue windows with copper z-bar. replace stucco back to match existing. ( not visible from the street)Details
replace 800 sq ft stucco (of approx 80%) of the back of the house (n-east). replace the z-bar flashing aboue windows with copper z-bar. replace stucco back to match existing. ( not visible from the street) | $28,000 |
| Nov 8, 2018 | Never finaled issued Nov 2018, no final | 620 El Camino Del Mar | street space onlyDetails
street space only | ||
| Oct 1, 2018 | Never finaled issued Oct 2018, no final | 620 El Camino Del Mar | street spaceDetails
street space | ||
| Sep 27, 2018 | Completed final sign-off Nov 2018 | 620 El Camino Del Mar | H C L Construction Inc. | installation of steam unit in 2nd floor iffice bathroom. no change to bathroom layout.Details
installation of steam unit in 2nd floor iffice bathroom. no change to bathroom layout. | $10,000 |
| Apr 16, 2008 | Completed final sign-off Apr 2009 | 620 El Camino Del Mar | Ben Rogne Construction | complete 1 story garage begin for pa #200603066073 w/ dcp variance #2005.0004v. extend kitchen 6ft onto existing deck and remodel kitchen, deck off kitchen extends into side yard under variance 2005.0004v. the 3rd fl master bath is expanded 215 sq ft and remodeled. 311 notification sent in 2005.Details
complete 1 story garage begin for pa #200603066073 w/ dcp variance #2005.0004v. extend kitchen 6ft onto existing deck and remodel kitchen, deck off kitchen extends into side yard under variance 2005.0004v. the 3rd fl master bath is expanded 215 sq ft and remodeled. 311 notification sent in 2005. | $225,000 |
| Mar 6, 2006 | Expired or cancelled expired Apr 2008 | 620 El Camino Del Mar | Ben Rogne Construction | construct new 1 car garage, 1 story, 12 ft w x 26 ft deep. construct new outdoor fireplace and 6'-8' solid fence. see attached variance decision #2005.0004v.Details
construct new 1 car garage, 1 story, 12 ft w x 26 ft deep. construct new outdoor fireplace and 6'-8' solid fence. see attached variance decision #2005.0004v. | $75,000 |
| Dec 9, 2003 | Completed final sign-off Sep 2005 | 620 El Camino Del Mar | Ben Rogne Construction | remove exist garage in basement. parking will be behind house, in buildable area, already paved. newDetails
remove exist garage in basement. parking will be behind house, in buildable area, already paved. new | $125,000 |
| Nov 4, 2003 | Completed final sign-off Oct 2004 | 620 El Camino Del Mar | Ben Rogne Construction | remodel (e) bathroom, combine 2 bedrooms into master bedroomDetails
remodel (e) bathroom, combine 2 bedrooms into master bedroom | $40,000 |
| Jul 15, 2003 | Completed final sign-off Sep 2003 | 620 El Camino Del Mar | Towers Construction | replace exist roof water proofing at 3/fl level-1. install 3/4 teq. over existing skip sheathing.Details
replace exist roof water proofing at 3/fl level-1. install 3/4 teq. over existing skip sheathing. | $8,000 |
| Apr 30, 2002 | Completed final sign-off Jul 2002 | 620 El Camino Del Mar | Towers Construction | repair approx 22'-0" of fence & repair dry rotted tile deck patio.fence repair in kind less than 50%Details
repair approx 22'-0" of fence & repair dry rotted tile deck patio.fence repair in kind less than 50% | $8,000 |