Loona Construction Inc
- Based in
- Newark
- On San Francisco permits
- Mar 2024 to May 2026
- Last 24 months
- 6 permits filed
10 permits since 2000: 3 completed, 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2026 | Completed final sign-off Jul 2026 | 1590 Pacific Av | deferred electrical plans for beauty salon ti under pa# 202602256537.Details
deferred electrical plans for beauty salon ti under pa# 202602256537. | $10,000 |
| May 8, 2026 | In progress issued Jul 2026 | 400 Crescent Av | revision changes to 202408269501, 202411145012 to comply with planning 2021-004379 enfl reconstruct structure at rear of lot to rebuild toilet and washroom areas for mosque to address 202173058, 20217523 and 201889991/horiz addition above toilet/washroom area to existing storage room. window changesDetails
revision changes to 202408269501, 202411145012 to comply with planning 2021-004379 enfl reconstruct structure at rear of lot to rebuild toilet and washroom areas for mosque to address 202173058, 20217523 and 201889991/horiz addition above toilet/washroom area to existing storage room. window changes | |
| May 7, 2026 | In progress issued Jul 2026 | 400 Crescent Av | revision changes to 202408269501, 202411145012 to comply with planning 2021-004379 enfl reconstruct structure at rear of lot to rebuild toilet and washroom areas for mosque to address 202173058, 20217523 and 201889991/horiz addition above toilet/washroom area to existing storage room. window changesDetails
revision changes to 202408269501, 202411145012 to comply with planning 2021-004379 enfl reconstruct structure at rear of lot to rebuild toilet and washroom areas for mosque to address 202173058, 20217523 and 201889991/horiz addition above toilet/washroom area to existing storage room. window changes | |
| Feb 25, 2026 | Completed final sign-off Jul 2026 | 1590 Pacific Av | tenant improvement project including new non-loading bearing metal studs, finishes, minor plumbing, electrical and mechanical modifications.Details
tenant improvement project including new non-loading bearing metal studs, finishes, minor plumbing, electrical and mechanical modifications. | $39,250 |
| Dec 18, 2024 | In progress issued Dec 2024 | 400 Crescent Av | revision to pa 202408269501 & 202411145012 modify approved foundation plan/framingDetails
revision to pa 202408269501 & 202411145012 modify approved foundation plan/framing | |
| Nov 14, 2024 | In progress issued Nov 2024 | 400 Crescent Av | rebuild e) washroom & bathroom structure at gruond fl. horizontal addition to 2nd fl office. this scope of work shall be for the exterior envolope only. ref to interior work 202408269501Details
rebuild e) washroom & bathroom structure at gruond fl. horizontal addition to 2nd fl office. this scope of work shall be for the exterior envolope only. ref to interior work 202408269501 | $60,000 |
| Aug 30, 2024 | In progress filed Aug 2024, not yet issued | 17 Chula Ln | removal of non load bearing wall btw kitchen & living rm, install header by enigeer detail, dry wall finihes. closet project exterior siding replacement (2 walls) reframing 2 walls where siding replaced. add insulation, interior drywall finishes. replace 4 posts under closet(like-for-like)Details
removal of non load bearing wall btw kitchen & living rm, install header by enigeer detail, dry wall finihes. closet project exterior siding replacement (2 walls) reframing 2 walls where siding replaced. add insulation, interior drywall finishes. replace 4 posts under closet(like-for-like) | $39,000 |
| Aug 26, 2024 | In progress issued Nov 2024 | 400 Crescent Av | reconst. exist-bathroom/wash room struct at east side of lot for existing mosque and provide at horizontal addition at second level to an existing office- to comply with n.o.v. # 202173058, 202175223 & 201889991. interior work only. ref to exterior work 202411145012Details
reconst. exist-bathroom/wash room struct at east side of lot for existing mosque and provide at horizontal addition at second level to an existing office- to comply with n.o.v. # 202173058, 202175223 & 201889991. interior work only. ref to exterior work 202411145012 | $150,000 |
| Aug 21, 2024 | In progress issued Aug 2024 | 17 Chula Ln | balcony replacment of floor and waterproofing and railings (less than 50%). entrance foyer room interior insulation & drywallDetails
balcony replacment of floor and waterproofing and railings (less than 50%). entrance foyer room interior insulation & drywall | $21,000 |
| Mar 19, 2024 | Completed final sign-off Mar 2025 | 17 Chula Ln | 2 in kind bathroom remodel. project involves replacement of shower pan add bathtub, replacement of shower valves, tiles, around the shower and walls and the floors. replacement of plumbing and electrical fixtures, adding floor warming system.Details
2 in kind bathroom remodel. project involves replacement of shower pan add bathtub, replacement of shower valves, tiles, around the shower and walls and the floors. replacement of plumbing and electrical fixtures, adding floor warming system. | $47,750 |