Back to kitchen remodel contractors
Loona Construction Inc
- Based in
- Newark
- On San Francisco permits
- Mar 2024 to May 2026
- Last 24 months
- 6 permits filed
10 permits since 2000: 3 completed, 7 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 in progress.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 30, 2024 | In progress filed Aug 2024, not yet issued | 17 Chula Ln | removal of non load bearing wall btw kitchen & living rm, install header by enigeer detail, dry wall finihes. closet project exterior siding replacement (2 walls) reframing 2 walls where siding replaced. add insulation, interior drywall finishes. replace 4 posts under closet(like-for-like)Details
removal of non load bearing wall btw kitchen & living rm, install header by enigeer detail, dry wall finihes. closet project exterior siding replacement (2 walls) reframing 2 walls where siding replaced. add insulation, interior drywall finishes. replace 4 posts under closet(like-for-like) | $39,000 |