Rajat Randev
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Fractured 9 Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Aug 2026
32 permits since 2000 (architect on 22 permits, authorized agent-others on 9 permits, engineer on 1 permit): 17 completed, 4 in progress, 7 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 5, 2026 | In progress filed Aug 2026, not yet issued | 258 Dorland St | unit #2 at second floor level. ref compliant no. 202656172.Details
unit #2 at second floor level. ref compliant no. 202656172. | $5,000 | |
| Apr 16, 2026 | In progress issued Apr 2026 | 1758 44th Av | Tgi Builders Ca Inc | kitchen remodel, partial wall removal between dining rm/kitchen and living area, provide new flushed beam support, provide new skylight above kitchen. update plumbing and electrical up to code.Details
kitchen remodel, partial wall removal between dining rm/kitchen and living area, provide new flushed beam support, provide new skylight above kitchen. update plumbing and electrical up to code. | $45,000 |
| Mar 18, 2026 | In progress issued Mar 2026 | 2694 Mcallister St | Hawthorne Construction | provide new stairs to replace the existing stair to/from basements. no exerior work. remove/remodel (e) kitchen & bathroom. new washer & dryer closets. remove partition wall between kitchen and dining room.Details
provide new stairs to replace the existing stair to/from basements. no exerior work. remove/remodel (e) kitchen & bathroom. new washer & dryer closets. remove partition wall between kitchen and dining room. | $75,000 |
| Aug 5, 2025 | In progress issued Sep 2026 | 3864 25th St | Bran Construction Inc | new 2 car garage, new spiral staircase from garage level to /from existing first flr. planning app# 2024-003281prj; 2024-003281 var; 2024-003281 hrr historic resource reiew.Details
new 2 car garage, new spiral staircase from garage level to /from existing first flr. planning app# 2024-003281prj; 2024-003281 var; 2024-003281 hrr historic resource reiew. | $265,000 |
| Aug 29, 2024 | Completed final sign-off Mar 2026 | 2750 Cabrillo St | Green City Construction Inc | as built revision to approved 201907024930. 1) eliminate some windows at property line north elev. (2) reconfigure space at kitchen area at 2nd flr and bedroom area at 3rd flr. 3)remove 2nd interior stairs at 3rd flr to/from 4th flrDetails
as built revision to approved 201907024930. 1) eliminate some windows at property line north elev. (2) reconfigure space at kitchen area at 2nd flr and bedroom area at 3rd flr. 3)remove 2nd interior stairs at 3rd flr to/from 4th flr | $10,000 |
| Jan 18, 2024 | Completed final sign-off Oct 2024 | 4490 Mission St | Manzyuk Enterprises Inc | revision to pa# 201609026754, alterations to 1/f level commercial space, restoration of storefront to its 1960s appearance. partial voluntary lateral upgrade (no calculations submitted. no special inspection).Details
revision to pa# 201609026754, alterations to 1/f level commercial space, restoration of storefront to its 1960s appearance. partial voluntary lateral upgrade (no calculations submitted. no special inspection). | |
| Jun 5, 2023 | Completed final sign-off Dec 2023 | 1462 Pine St | Dacora | occupany change from business (b) to community gathering (i-4); no work to be done. (e) hvac systems to remain.Details
occupany change from business (b) to community gathering (i-4); no work to be done. (e) hvac systems to remain. | $6,500 |
| Apr 27, 2023 | Completed final sign-off Dec 2023 | 1462 Pine St | Dacora | add 3 accessible bathroom and 1 regular bathroom back to back of the existing bathroomDetails
add 3 accessible bathroom and 1 regular bathroom back to back of the existing bathroom | $20,000 |
| Nov 4, 2022 | Completed final sign-off Mar 2023 | 791 09th Av | Mosvaler Construction Inc | unit 791 : to comply w/physical inspection report #cc-8541. remove kitchenette from 1/f (per letter dated 2/7/2022) & revert back to original building permit. no other work under this permit.Details
unit 791 : to comply w/physical inspection report #cc-8541. remove kitchenette from 1/f (per letter dated 2/7/2022) & revert back to original building permit. no other work under this permit. | $2,700 |
| Apr 21, 2022 | Completed final sign-off May 2022 | 2500 Leavenworth St | Justin Farrelly Incorporated | revision to pa# 201902122698. put in new powder room on lower level (1st fl).Details
revision to pa# 201902122698. put in new powder room on lower level (1st fl). | $5,000 |
| Aug 10, 2021 | Never finaled issued Jan 2023, no final | 634 19th Av | Dacora | new 2/f deck in rear with spiral stairs. no other work on any floor.Details
new 2/f deck in rear with spiral stairs. no other work on any floor. | $21,000 |
| Jan 21, 2021 | Completed final sign-off Jul 2022 | 725 Olmstead St | to comply with nov# 202057891 & 202057991: conversion of 1st fl garage/storage to add 1 bedroom and 1 bath.Details
to comply with nov# 202057891 & 202057991: conversion of 1st fl garage/storage to add 1 bedroom and 1 bath. | $20,000 | |
| Nov 24, 2020 | Completed final sign-off Mar 2023 | 536 40th Av | Green City Construction Inc | new staircase from 2nd to 1st floor. 2nd floor: move (e) kitchen from rear to front. remove (e) fireplace. convert (e) kitchen to study rm on 2nd flr. relocate (e) bathroom from 2nd floor to 1st. relocate (e) bedroom to 1st floor & incorporate open area.Details
new staircase from 2nd to 1st floor. 2nd floor: move (e) kitchen from rear to front. remove (e) fireplace. convert (e) kitchen to study rm on 2nd flr. relocate (e) bathroom from 2nd floor to 1st. relocate (e) bedroom to 1st floor & incorporate open area. | $72,000 |
| Nov 20, 2020 | Never finaled issued Feb 2021, no final | 634 19th Av | Dacora | revision to no plan pa# 202007150225: proposed 2nd fl remodel of kitchen & adjacent areas, bathroom, repair of (e) stairs & rear window replacements. 1st fl interior remodel. new habitable area for family room, bedroom & full bath. structural framing, foundation & lateral strengthening to 1st & 2nd.Details
revision to no plan pa# 202007150225: proposed 2nd fl remodel of kitchen & adjacent areas, bathroom, repair of (e) stairs & rear window replacements. 1st fl interior remodel. new habitable area for family room, bedroom & full bath. structural framing, foundation & lateral strengthening to 1st & 2nd. | $45,000 |
| Sep 8, 2020 | Expired or cancelled cancelled Jan 2026 | 2001 Union St | infill an existing one floor 2-story high interior space to create floor space at 2nd floor level in one location. new suite behind elevator. with total 533 sf filled floor space.Details
infill an existing one floor 2-story high interior space to create floor space at 2nd floor level in one location. new suite behind elevator. with total 533 sf filled floor space. | $28,000 | |
| Jun 1, 2020 | Completed final sign-off Jan 2022 | 1135 Pacific Av | Green City Construction Inc | remodel (e) kitchen. remove wall between living room and kitchen. relocate (e) bathroom & remodel (e) bedroom and relocate closet in bedroom. all interior work.Details
remodel (e) kitchen. remove wall between living room and kitchen. relocate (e) bathroom & remodel (e) bedroom and relocate closet in bedroom. all interior work. | $45,000 |
| Feb 20, 2020 | Completed final sign-off Dec 2020 | 1729 Balboa St | The Great Ocean General Contractor | 3rd fl unit 1729, no change to exterior. remodel (e) 3 bedrm orientation to create hallway for back bedrm #2 between bedrm 1 & 3. reconfigure (e) closet in bedrm # 2. (e) bedrm #3 to remodel. (n) bathrm (shower added). provide location for laundry, remodel (e) kitchen. remodel (e) split bathrm toDetails
3rd fl unit 1729, no change to exterior. remodel (e) 3 bedrm orientation to create hallway for back bedrm #2 between bedrm 1 & 3. reconfigure (e) closet in bedrm # 2. (e) bedrm #3 to remodel. (n) bathrm (shower added). provide location for laundry, remodel (e) kitchen. remodel (e) split bathrm to | $71,000 |
| Sep 19, 2019 | Expired or cancelled expired Oct 2025 | 2660 Chestnut St | Box Canyon Builders Dba The Englander | 1st fl remodel e bedroom, family rm change orientation. remodel existing bath in new location. no change to exterior. 2nd fl remodel e kitchen, ex pwdr room new location. new elevator from 1st to 3rd fl 1,2,3Details
1st fl remodel e bedroom, family rm change orientation. remodel existing bath in new location. no change to exterior. 2nd fl remodel e kitchen, ex pwdr room new location. new elevator from 1st to 3rd fl 1,2,3 | $180,000 |
| Aug 22, 2019 | Never finaled issued Mar 2022, no final | 4490 Mission St | Dacora | 05 feb '24 - new scope in oracle & sffd comments create 4 unit bldg by adding three units to (e) one unit mixed_use bldg. existing grnd fl retail to remain as is(no work). remodel (e) 1 unit on 2nd fl into two units on 2nd fl & add vert. addition on 3rd fl to create 3rd fl & restore hist storefrontDetails
05 feb '24 - new scope in oracle & sffd comments create 4 unit bldg by adding three units to (e) one unit mixed_use bldg. existing grnd fl retail to remain as is(no work). remodel (e) 1 unit on 2nd fl into two units on 2nd fl & add vert. addition on 3rd fl to create 3rd fl & restore hist storefront | $650,000 |
| Jul 2, 2019 | Never finaled issued Jan 2021, no final | 2750 Cabrillo St | Green City Construction Inc | erect type-v, 4-story, two dwelling units with no basement.Details
erect type-v, 4-story, two dwelling units with no basement. | $850,000 |
| Jun 14, 2019 | Completed final sign-off Feb 2021 | 886 28th Av | Dacora | comply with nov #2018289.front stucco to be complete redone. front window on 1st & 2nd fl to be put back to match (e) removed. 3rd fl elevation french door, new garage door. decorative motif to put back. all interior wall reframe 100%.3rd fl partial reframe.rev pa# 201807235286 & pa# 201808076710Details
comply with nov #2018289.front stucco to be complete redone. front window on 1st & 2nd fl to be put back to match (e) removed. 3rd fl elevation french door, new garage door. decorative motif to put back. all interior wall reframe 100%.3rd fl partial reframe.rev pa# 201807235286 & pa# 201808076710 | $80,000 |
| Oct 24, 2018 | Never finaled issued Jul 2019, no final | 2427 Bay St | Green City Construction Inc | horizontal extension on the 1st flr, stepped horizontal extension on the 2nd flr w/ 5 ft. rear facing deck over 1st flr. fill in (e) deck on 2nd flr on right side. 3rd flr extension incline with neighbor (2415) to right. a roofdeck of 464 sq ft with clr glassrail 42" high.Details
horizontal extension on the 1st flr, stepped horizontal extension on the 2nd flr w/ 5 ft. rear facing deck over 1st flr. fill in (e) deck on 2nd flr on right side. 3rd flr extension incline with neighbor (2415) to right. a roofdeck of 464 sq ft with clr glassrail 42" high. | $162,000 |
| Jul 10, 2018 | Never finaled issued Nov 2018, no final | 3529 Clement St | Polytec Construction Company Inc | proposed new deck with 2 new french door & stair a 2nd floor with stair permit only. ( no other work ). maher n/a.Details
proposed new deck with 2 new french door & stair a 2nd floor with stair permit only. ( no other work ). maher n/a. | $21,000 |
| Mar 27, 2018 | Expired or cancelled cancelled Jul 2024 | 1990 Lombard St | convert upper (2) flrs of (e) office bldg to residential apartments; (3) units on each floor; ground floor (e) restaurant to remain.Details
convert upper (2) flrs of (e) office bldg to residential apartments; (3) units on each floor; ground floor (e) restaurant to remain. | $780,000 | |
| Aug 11, 2016 | Completed final sign-off Aug 2016 | 4490 Mission St | administrative permit to document the legal use and occupancy of this bldg as a 2 story structure with ground floor commercial and 1 residential unit on 2nd foor per review of city records & site visitDetails
administrative permit to document the legal use and occupancy of this bldg as a 2 story structure with ground floor commercial and 1 residential unit on 2nd foor per review of city records & site visit | ||
| Sep 3, 2014 | Never finaled issued Dec 2014, no final | 458 04th Av | add new bathroom; remodel kitchen and one bathroom, change lighting.Details
add new bathroom; remodel kitchen and one bathroom, change lighting. | $88,000 | |
| Jun 9, 2014 | Completed final sign-off Dec 2015 | 121 Junipero Serra Bl | Green City Construction Inc | 2nd floor:interior remodel and alteration. 1st floor interior remodel & alteration to lower down extg floor to have new minimum height 8'-o". remodel extg rear courtyard, new exterior stair at left side of the bldg, new & replacement of windows. see plans & elevations. voluntary strenghthening.Details
2nd floor:interior remodel and alteration. 1st floor interior remodel & alteration to lower down extg floor to have new minimum height 8'-o". remodel extg rear courtyard, new exterior stair at left side of the bldg, new & replacement of windows. see plans & elevations. voluntary strenghthening. | $280,000 |
| May 17, 2013 | Expired or cancelled cancelled Jul 2019 | 1915 Diamond St | comply with n.o.v.#200225295. adding bedroom above garage (e) on street level (256 sqft) & horizontal addition at rear on street level(305 sqft) interior remodel.Details
comply with n.o.v.#200225295. adding bedroom above garage (e) on street level (256 sqft) & horizontal addition at rear on street level(305 sqft) interior remodel. | $110,000 | |
| May 11, 2009 | Completed final sign-off May 2009 | 2830 Buchanan St | renew pa# 2003/06/27/8325 to obtain final inspection. all work has been completed.Details
renew pa# 2003/06/27/8325 to obtain final inspection. all work has been completed. | ||
| May 11, 2009 | Completed final sign-off May 2009 | 2830 Buchanan St | renew pa# 2005/06/28/6208 to obtain final inspection. all work has been completed.Details
renew pa# 2005/06/28/6208 to obtain final inspection. all work has been completed. | ||
| May 11, 2009 | Completed final sign-off May 2009 | 2830 Buchanan St | renew pa# 2003/12/04/1633 to obtain final inspection. all work has been completed.Details
renew pa# 2003/12/04/1633 to obtain final inspection. all work has been completed. | ||
| May 5, 2009 | Completed final sign-off Mar 2010 | 524 Baker St | Eignor Construction Inc. | new master bathroom & enlarge opening at kitchen & dining room. also to comply with nov# 200857297 & add 2 new skylights.Details
new master bathroom & enlarge opening at kitchen & dining room. also to comply with nov# 200857297 & add 2 new skylights. | $8,000 |