97 permits since 2000 (engineer on 85 permits, architect on 5 permits, authorized agent-others on 5 permits, designer on 2 permits): 73 completed, 2 in progress, 9 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 18, 2025 | In progress filed Nov 2025, not yet issued | 101 Gough St | rehabilitation of 21 (e) units & provide 2 new dwelling units including new bathrooms & kitchens.provide new accessible entry and lobby, new finishes throughout, new hvac, plumbing system, electrical system and structural upgrades.Details
rehabilitation of 21 (e) units & provide 2 new dwelling units including new bathrooms & kitchens.provide new accessible entry and lobby, new finishes throughout, new hvac, plumbing system, electrical system and structural upgrades. | $9,300,000 | |
| Feb 25, 2025 | In progress filed Feb 2025, not yet issued | 190 Park St | voluntary basement seismic retrofit at front building per cebc appendix ch a4Details
voluntary basement seismic retrofit at front building per cebc appendix ch a4 | $65,000 | |
| Feb 24, 2025 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | revision to pa 202404190348 to add wall ties to remaining half of 2nd fl. structural revision onlyDetails
revision to pa 202404190348 to add wall ties to remaining half of 2nd fl. structural revision only | $25,000 |
| Aug 9, 2024 | Completed final sign-off Feb 2026 | 593 Banks St | R C Construction | retain (e) foundation & concrete slab & add (n) short cross wall foundation @ (n) garage door grade beam & 2 (n) shear wall. above (e) garage utility rm & middle bedrm add 2nd story include (n) stair to 2nd story, 2 bedrms,1 bath & 2 decks.covert gas to electrical: ev charger, cooktop,hp hvac.Details
retain (e) foundation & concrete slab & add (n) short cross wall foundation @ (n) garage door grade beam & 2 (n) shear wall. above (e) garage utility rm & middle bedrm add 2nd story include (n) stair to 2nd story, 2 bedrms,1 bath & 2 decks.covert gas to electrical: ev charger, cooktop,hp hvac. | $200,000 |
| Jul 26, 2024 | Completed final sign-off Sep 2026 | 85 Mirabel Av | Planart Construction Corp | revision to bpa# 202303103513: remove the new stair connection north of gird line a from the scope of work. the rest of the project is as proposed per original project.Details
revision to bpa# 202303103513: remove the new stair connection north of gird line a from the scope of work. the rest of the project is as proposed per original project. | |
| Apr 19, 2024 | Completed final sign-off Nov 2025 | 657 Clay St | Amone Corp | scope:repair & normal maintenance for in kind replacement of appliances & finishes, providing a utility sink, insulating extg hot water laterals, mech. repairs & hallway ventilation, in kind lighting fixutres & receptacles, new flooring, interior painting, in kind window replacement,Details
scope:repair & normal maintenance for in kind replacement of appliances & finishes, providing a utility sink, insulating extg hot water laterals, mech. repairs & hallway ventilation, in kind lighting fixutres & receptacles, new flooring, interior painting, in kind window replacement, | $2,500,000 |
| Jan 24, 2024 | Expired or cancelled expired Sep 2026 | 2852 22nd St | Olexo Construction Company | lower garge level slab 12" replace perimeter foundation (81') 50% partial voluntary seismic strengtheningDetails
lower garge level slab 12" replace perimeter foundation (81') 50% partial voluntary seismic strengthening | $40,000 |
| Aug 15, 2023 | Completed final sign-off Mar 2024 | 1056 Palou Av | Mulhall Construction Inc. | 1064-1068 palou/10-unit building: mandatory soft story retrofit, foundation/basement level based on calif (e) building code appendix a-4. crawl space/basement level only.Details
1064-1068 palou/10-unit building: mandatory soft story retrofit, foundation/basement level based on calif (e) building code appendix a-4. crawl space/basement level only. | $75,000 |
| Aug 15, 2023 | Completed final sign-off Feb 2024 | 734 Kirkwood Av | Mulhall Construction Inc. | 742-752 kirkwood/10-unit building: mandatory soft story retrofit, foundation/basement level based on calif (e) building code appendix a-4. crawl space/basement level only.Details
742-752 kirkwood/10-unit building: mandatory soft story retrofit, foundation/basement level based on calif (e) building code appendix a-4. crawl space/basement level only. | $75,000 |
| Aug 11, 2023 | Completed final sign-off Mar 2024 | 1163 Oakdale Av | Mulhall Construction Inc. | work is only for 10-unit building (1163-1167 oakdale): mandatory soft-story retrofit to foundation/ basement level. ca bldg code appendix a-4. work limit to crawl space/basement level onlyDetails
work is only for 10-unit building (1163-1167 oakdale): mandatory soft-story retrofit to foundation/ basement level. ca bldg code appendix a-4. work limit to crawl space/basement level only | $75,000 |
| Aug 11, 2023 | Completed final sign-off Apr 2024 | 1013 Oakdale Av | Mulhall Construction Inc. | work is in 10-unit building at 1013-1017 oakdale. mandatory soft-story retrofit to the foundation/basement level. based on the california existing building code appendix a-4. work limited to the crawl space/basement level only.Details
work is in 10-unit building at 1013-1017 oakdale. mandatory soft-story retrofit to the foundation/basement level. based on the california existing building code appendix a-4. work limited to the crawl space/basement level only. | $75,000 |
| Jun 29, 2023 | Completed final sign-off Mar 2024 | 1001 Powell St | Amone Corp | owner improvement of 1001 powell includes replacing e restroom with accessible single occupancy restroom,replacement of wall and floor finishes,replacement e light fixtures,power at laundromat,mech rm, storage. accessible entrance provided under 202202228422Details
owner improvement of 1001 powell includes replacing e restroom with accessible single occupancy restroom,replacement of wall and floor finishes,replacement e light fixtures,power at laundromat,mech rm, storage. accessible entrance provided under 202202228422 | $170,000 |
| Jun 29, 2023 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | add a residential laundry room, adjacent to lounge, for sro tenants of the building on the upper floors of the 5-story building. lounge was permitted under pa# 202204142240.Details
add a residential laundry room, adjacent to lounge, for sro tenants of the building on the upper floors of the 5-story building. lounge was permitted under pa# 202204142240. | $129,500 |
| Apr 13, 2023 | Never finaled issued Apr 2023, no final | 121 Randall St | Mrcc | revision to pa 2022-1228-9224 to voluntarily add shearwall on line a6 and d at garage level; change rear stair foundation detailDetails
revision to pa 2022-1228-9224 to voluntarily add shearwall on line a6 and d at garage level; change rear stair foundation detail | $200 |
| Mar 10, 2023 | Completed final sign-off Sep 2026 | 85 Mirabel Av | Planart Construction Corp | addition consists of bay windows over sidewalk. widened garage door, new entry, roof deck on 3rd flr facing rear yard. new firewall @ new stair & deck. new hardscape deck @ rear. new stair connection to rear yard terraces & stairs.Details
addition consists of bay windows over sidewalk. widened garage door, new entry, roof deck on 3rd flr facing rear yard. new firewall @ new stair & deck. new hardscape deck @ rear. new stair connection to rear yard terraces & stairs. | $600,000 |
| Oct 13, 2022 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | partial replacement of footings to correct conditions found during construction under permit #202204142240Details
partial replacement of footings to correct conditions found during construction under permit #202204142240 | $10,000 |
| Jul 25, 2022 | Completed final sign-off Jun 2024 | 681 12th Av | Hammerhouse Construction | revision to bpa# 202110291470. incorporating structural sketches based on existing conditions; foundation cap, stairs support, rear wall ties.Details
revision to bpa# 202110291470. incorporating structural sketches based on existing conditions; foundation cap, stairs support, rear wall ties. | $20,000 |
| Apr 14, 2022 | Completed final sign-off Mar 2024 | 1005 Powell St | Amone Corp | to comply with nov#201803424.replace entries.former residential lobby will become sro manager office.reconfigure entry.warp sidewalk to provide landing.add ramp in the office for accessibility.modify(e)storage areas to a trash room, lounge & restroom.mep improvements.infill vault&cover at sidewalkDetails
to comply with nov#201803424.replace entries.former residential lobby will become sro manager office.reconfigure entry.warp sidewalk to provide landing.add ramp in the office for accessibility.modify(e)storage areas to a trash room, lounge & restroom.mep improvements.infill vault&cover at sidewalk | $150,000 |
| Feb 25, 2022 | Completed final sign-off Jan 2024 | 1900 Green St | Cook Construction | exterior: replace vinyl windows with wood. front yard landscaping + fence. interior: convert garage to laundry. remove walls in kitchen. remodel basement, 1st fl & partial 2nd fl. remove brick fireplaces.Details
exterior: replace vinyl windows with wood. front yard landscaping + fence. interior: convert garage to laundry. remove walls in kitchen. remodel basement, 1st fl & partial 2nd fl. remove brick fireplaces. | $1,200,000 |
| Feb 25, 2022 | Completed final sign-off Feb 2024 | 768 Jerrold Av | Mulhall Construction Inc. | soft story retrofit per sfebc chapter 4d engineering criteria cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d engineering criteria cebc appendix a-4. | $75,000 |
| Feb 22, 2022 | Completed final sign-off Apr 2024 | 123 Edgewood Av | The G B Group Inc. | replacement of retaining wall in front yard in same location and height 3'6" max retained height. revision to add bin pad next to garage with 4'9" max retained height with braced walls.Details
replacement of retaining wall in front yard in same location and height 3'6" max retained height. revision to add bin pad next to garage with 4'9" max retained height with braced walls. | $20,000 |
| Feb 11, 2022 | Never finaled filed Feb 2022, never issued | 2040 O'farrell St | barrier removal at building entry-path of travel. provide new ada compliant ramp/walkway from sidewalk to main entry; powered door opener/actuator at entry door.Details
barrier removal at building entry-path of travel. provide new ada compliant ramp/walkway from sidewalk to main entry; powered door opener/actuator at entry door. | $45,000 | |
| Feb 11, 2022 | Never finaled filed Feb 2022, never issued | 2060 Ofarrell St | barrier removal at building entry-paath of travel. provide new ada compliant ramp/walkway from sidewalk to main entry; powered door opener/actuator at entry door.Details
barrier removal at building entry-paath of travel. provide new ada compliant ramp/walkway from sidewalk to main entry; powered door opener/actuator at entry door. | $45,000 | |
| Sep 30, 2021 | Completed final sign-off Nov 2023 | 937 Clay St | Amone Corp | add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferredDetails
add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferred | $400,000 |
| Aug 13, 2021 | Completed final sign-off May 2024 | 834 Jones St | Forney Construction | new roof deck (500 sf)Details
new roof deck (500 sf) | $55,000 |
| Jul 2, 2021 | Never finaled issued Jul 2021, no final | 1785 San Jose Av | Unicon Construction Solutions Llc | revision to pa 2019-0205-2082 s1 - add hot tub @ deck, widen stair from deck to grade and add gas heaters @ deckDetails
revision to pa 2019-0205-2082 s1 - add hot tub @ deck, widen stair from deck to grade and add gas heaters @ deck | $4,500 |
| Jan 13, 2021 | Never finaled issued Feb 2022, no final | 121 Randall St | removal of (e) interior walls, doors & fixtures to accommodate an in-kind kitchen remodel. exterior stair & landing connecting 1st fl to rear yard, expansion of (e) window opening to create doorway at rear facade & west side sunroom. revised window openings at west lightwell & 1st fl rear facade.Details
removal of (e) interior walls, doors & fixtures to accommodate an in-kind kitchen remodel. exterior stair & landing connecting 1st fl to rear yard, expansion of (e) window opening to create doorway at rear facade & west side sunroom. revised window openings at west lightwell & 1st fl rear facade. | $75,000 | |
| Oct 19, 2020 | Completed final sign-off Feb 2022 | 800 Clement St | Amone Corp | voluntary lateral strengthening and associated repairs to floor in area of seismic work. also accessibility per 20% rule.Details
voluntary lateral strengthening and associated repairs to floor in area of seismic work. also accessibility per 20% rule. | $25,000 |
| May 11, 2020 | Completed final sign-off Oct 2021 | 1535 Jackson St | Amone Corp | revision to permit application number 2019-1114-7307 for mandatory soft story retrofit using cebc appendix a-4. revision includes changes based field conditions and eliminates two shear lines for value engineering.Details
revision to permit application number 2019-1114-7307 for mandatory soft story retrofit using cebc appendix a-4. revision includes changes based field conditions and eliminates two shear lines for value engineering. | |
| Feb 25, 2020 | Expired or cancelled expired Oct 2022 | 1201 Powell St | Amone Corp | mandatory soft story retrofit of gr fl and basement based on 2019 cebc appendix ch a4. includes accesibility improvments to commercial entry. automatic door. comply with nov 201803426Details
mandatory soft story retrofit of gr fl and basement based on 2019 cebc appendix ch a4. includes accesibility improvments to commercial entry. automatic door. comply with nov 201803426 | $40,000 |
| Feb 25, 2020 | Completed final sign-off Oct 2022 | 1201 Powell St | Amone Corp | mandatory soft story retrofit of gr fl basement based on 2019 cebc appendix chapter a4. comply with nov 201803429Details
mandatory soft story retrofit of gr fl basement based on 2019 cebc appendix chapter a4. comply with nov 201803429 | $200,000 |
| Oct 25, 2019 | Completed final sign-off Sep 2024 | 665 Clay St | install grd.flr.concrete moment frame on rear wall(commercial)to complete mandatory unreinforced masonry bldg.retrofit under pa2005-0127-4099 & associated connections. design per sfbc 4a&4b.correct bolts w/irregularities,& acessibility upgrade.Details
install grd.flr.concrete moment frame on rear wall(commercial)to complete mandatory unreinforced masonry bldg.retrofit under pa2005-0127-4099 & associated connections. design per sfbc 4a&4b.correct bolts w/irregularities,& acessibility upgrade. | $25,000 | |
| Sep 9, 2019 | Expired or cancelled cancelled Jan 2026 | 255 Mullen Av | Handy Construction Team Inc | rebuild existing rear roof deck in kindDetails
rebuild existing rear roof deck in kind | $20,000 |
| Jun 7, 2019 | Completed final sign-off Sep 2019 | 925 Guerrero St | Singha Construction Inc | revision to app#201611021725 for soft story retrofit. this revision reverts to the extg rear window configuration and changes one shearwall to consolidate the sorage, plus incorporating minor repairs and conditions uncovered during construction.Details
revision to app#201611021725 for soft story retrofit. this revision reverts to the extg rear window configuration and changes one shearwall to consolidate the sorage, plus incorporating minor repairs and conditions uncovered during construction. | |
| Jun 5, 2019 | Completed final sign-off Feb 2020 | 462 Green St | F D C Construction Inc | structural alterations associaged with new adu unit (submitted under sep permit) including lowering slab 6" raise stair landing for headroom, provide framing for larger window, provide subsurface drainage, (adu/soft story sep permit)Details
structural alterations associaged with new adu unit (submitted under sep permit) including lowering slab 6" raise stair landing for headroom, provide framing for larger window, provide subsurface drainage, (adu/soft story sep permit) | $15,000 |
| Dec 28, 2018 | Completed final sign-off Oct 2019 | 72 Belcher St | S M Construction And Assoc | (rear) 72b-72c belcher st:preparation/repairs in construction w/seismic soft story work under sep permit. removal on non compliant rear shed addition at back bld, patio, roofing repairs, unit 72b & 72cDetails
(rear) 72b-72c belcher st:preparation/repairs in construction w/seismic soft story work under sep permit. removal on non compliant rear shed addition at back bld, patio, roofing repairs, unit 72b & 72c | $40,000 |
| Nov 5, 2018 | Completed final sign-off Jul 2019 | 534 Broadway | Amone Corp | foundation cap at north west side to correct wood near or below grade (180')Details
foundation cap at north west side to correct wood near or below grade (180') | $45,000 |
| Sep 6, 2018 | Completed final sign-off Aug 2020 | 1785 San Jose Av | Alpha Construction Co *Stop Issusing* | interior remodel and legalizing of first flr bedroom, master bath and walk-in closets, voluntary seismic retrofit at first flrDetails
interior remodel and legalizing of first flr bedroom, master bath and walk-in closets, voluntary seismic retrofit at first flr | $97,000 |
| Jul 27, 2018 | Completed final sign-off Jan 2022 | 70 Belcher St | S M Construction And Assoc | preparation/repairs in construction w/seismic soft story work under sep permit. removal on non-compliant rear shed addition at back bld, patio, roofing repairs, commmunication unit improvements at fron bld unit 72aDetails
preparation/repairs in construction w/seismic soft story work under sep permit. removal on non-compliant rear shed addition at back bld, patio, roofing repairs, commmunication unit improvements at fron bld unit 72a | $40,000 |
| Dec 13, 2017 | Completed final sign-off Jan 2020 | 18 Saturn St | replacement in kind of front stairs & railing. stairs are primary entrance to house. install fence in front yard. (e) deck & supports to remain.Details
replacement in kind of front stairs & railing. stairs are primary entrance to house. install fence in front yard. (e) deck & supports to remain. | $15,000 | |
| Nov 2, 2017 | Expired or cancelled expired Feb 2023 | 568 Natoma St | Arana Group, Inc. | mandatory soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maherDetails
mandatory soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. n/a for maher | $75,000 |
| Dec 30, 2016 | Completed final sign-off Jul 2018 | 568 Natoma St | Arana Group, Inc. | repair improvements to grnd flr bld and ada improvements to unit and path of travel at grnd flr. roof replacement, exterior repairs, repair/in-kind replacement of fixtures & cabintry at upper units, minor mep as neccessary- under sep permit maher naDetails
repair improvements to grnd flr bld and ada improvements to unit and path of travel at grnd flr. roof replacement, exterior repairs, repair/in-kind replacement of fixtures & cabintry at upper units, minor mep as neccessary- under sep permit maher na | $160,000 |
| Dec 30, 2016 | Completed final sign-off Dec 2019 | 1370 California St | Ncr Construction Inc | minor revisions to app. 2016-0914-7740, soft story retrofit to coordinate with proposed architectural changes. plywood shearwalls instead of strong wall panels in 3 lines & added shear walls. see also 2017-0113-7196.Details
minor revisions to app. 2016-0914-7740, soft story retrofit to coordinate with proposed architectural changes. plywood shearwalls instead of strong wall panels in 3 lines & added shear walls. see also 2017-0113-7196. | $1,000 |
| Dec 14, 2016 | Expired or cancelled cancelled Feb 2020 | 925 Guerrero St | adv program in mandatory seismic retrofit bldg per ord. 162-16. propose 2 add'l dwg units on basement level at rear of bldg. replace (e)windows at rear of bldg, add bathroom & kitchens, remodel of doors & finishesDetails
adv program in mandatory seismic retrofit bldg per ord. 162-16. propose 2 add'l dwg units on basement level at rear of bldg. replace (e)windows at rear of bldg, add bathroom & kitchens, remodel of doors & finishes | $40,000 | |
| Nov 15, 2016 | Never finaled issued Nov 2016, no final | 4026 Mission St | Associated Builders | revision to pa 2016-0504-6562 - replace posts with damaged footings under rear porch with new 2x6 wall on new t-footing per sk1 & sk2Details
revision to pa 2016-0504-6562 - replace posts with damaged footings under rear porch with new 2x6 wall on new t-footing per sk1 & sk2 | $6,100 |
| Nov 2, 2016 | Completed final sign-off Sep 2019 | 925 Guerrero St | Singha Construction Inc | mandatory soft story per sfbc 34b using 2012 iebc app a4Details
mandatory soft story per sfbc 34b using 2012 iebc app a4 | $150,000 |
| Sep 14, 2016 | Completed final sign-off Dec 2019 | 1370 California St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $300,000 | |
| Sep 2, 2016 | Completed final sign-off Nov 2017 | 3808 Clay St | Hennessy Construciton | replace front concrete steps on grade with similar stepss but woth reduced rise that meets current code. install handrail done in conjuction with book-matched house at 3806 clay.Details
replace front concrete steps on grade with similar stepss but woth reduced rise that meets current code. install handrail done in conjuction with book-matched house at 3806 clay. | $2,500 |
| Sep 2, 2016 | Completed final sign-off Nov 2017 | 3806 Clay St | Hennessy Construciton | replace front concrete steps on grade with similar stepss but with reduced rise that meets current code. install handrail done in conjuction with book-matched house at 3808 clayDetails
replace front concrete steps on grade with similar stepss but with reduced rise that meets current code. install handrail done in conjuction with book-matched house at 3808 clay | $2,500 |
| Aug 9, 2016 | Completed final sign-off Dec 2016 | 17 Godeus St | revision to app#201606200410 for field conditions, adding footing where none extg in garage, deleting shear meters, lengthening shearwall to preserve extg footing, revision of collector details. soft story retrofit using 2012 iebc appendix a-4.Details
revision to app#201606200410 for field conditions, adding footing where none extg in garage, deleting shear meters, lengthening shearwall to preserve extg footing, revision of collector details. soft story retrofit using 2012 iebc appendix a-4. | $1,000 | |
| Jun 20, 2016 | Completed final sign-off Dec 2016 | 17 Godeus St | soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4 | $75,000 | |
| May 4, 2016 | Never finaled issued May 2016, no final | 4026 Mission St | Associated Builders | replace rear stairs from both units due to rot. new configuration designed for current code and extends 18" further back into rear yard. lower stair will reduce landing but not extende beyond extg. guardrails & handrails will be brought up to code. replace front stairs in kind & concrete steps withDetails
replace rear stairs from both units due to rot. new configuration designed for current code and extends 18" further back into rear yard. lower stair will reduce landing but not extende beyond extg. guardrails & handrails will be brought up to code. replace front stairs in kind & concrete steps with | $20,000 |
| Sep 24, 2015 | Completed final sign-off Jan 2016 | 200 Central Av | replace deteriorated window sashes (53 total sashes) in kind: custom made wood sashes installed in (e) frames. new sashes with 1/4" laminated glass. new window guards including egress guard ( 3 sashes total); replace 2 garage doors & person door, widening person door from 2'-6" to 3'-0".Details
replace deteriorated window sashes (53 total sashes) in kind: custom made wood sashes installed in (e) frames. new sashes with 1/4" laminated glass. new window guards including egress guard ( 3 sashes total); replace 2 garage doors & person door, widening person door from 2'-6" to 3'-0". | $30,000 | |
| Sep 1, 2015 | Completed final sign-off May 2016 | 149 Duboce Av | reconstruction in kind of exterior 3rd flr stair landing of rear (side) stairs, new x-brace frame as limited voluntary seismic strengthening, capping of 25' of foundation correct earth-wood separation.Details
reconstruction in kind of exterior 3rd flr stair landing of rear (side) stairs, new x-brace frame as limited voluntary seismic strengthening, capping of 25' of foundation correct earth-wood separation. | $30,000 | |
| Jun 1, 2015 | Expired or cancelled cancelled Mar 2021 | 731 Commercial St | Castle Construction | revision to 201005051750, reinstated 12-29-11. add convenience steps between 731/735 commercialDetails
revision to 201005051750, reinstated 12-29-11. add convenience steps between 731/735 commercial | $1,000 |
| Mar 11, 2015 | Completed final sign-off Jul 2015 | 680 Congo St | minor structural alterations to kitchen/dining area including removing non-structural partition & structural posts, adding a new beam, raising (e) beam to be flush framed, adding skylight and reframing kitchen ceiling. ref bpa#201412244450Details
minor structural alterations to kitchen/dining area including removing non-structural partition & structural posts, adding a new beam, raising (e) beam to be flush framed, adding skylight and reframing kitchen ceiling. ref bpa#201412244450 | $5,000 | |
| Sep 30, 2014 | Expired or cancelled cancelled May 2015 | 731 Commercial St | Castle Construction | add 4 risers stair between 731 and 731 and provide improved entrance accessiblity to 731. new doors to match wood existing and to include power door assist.Details
add 4 risers stair between 731 and 731 and provide improved entrance accessiblity to 731. new doors to match wood existing and to include power door assist. | $9,000 |
| Sep 5, 2014 | Expired or cancelled withdrawn Mar 2016 | 220 Anderson St | to comply with 201487601. revision to pa# 2014-0312-0568 to change work in rear from repairs to reconstruction of the rear 8'. the new roof springs from the same high corner as the e roof but has lower slope & a consistent curb elevation, resulting in portions being higher. bldg sag is corrected.Details
to comply with 201487601. revision to pa# 2014-0312-0568 to change work in rear from repairs to reconstruction of the rear 8'. the new roof springs from the same high corner as the e roof but has lower slope & a consistent curb elevation, resulting in portions being higher. bldg sag is corrected. | $5,000 | |
| May 14, 2014 | Completed final sign-off Jun 2014 | 4022 Mission St | to comply with nov 201472101 item 1. repair footing stemwall along north east passageway, add bracket to (e) beam at rear.Details
to comply with nov 201472101 item 1. repair footing stemwall along north east passageway, add bracket to (e) beam at rear. | $20,000 | |
| Apr 28, 2014 | Never finaled issued Jan 2015, no final | 80 Turk St | Ncr Construction Inc | no change of use, commercial tenant improvements to an existing theater bldg. limited demolition, lighting and hvac upgrades, new elevator, accessible restrooms, improved fire sprinkler system (trade permit), new mezzanine at 1/f.Details
no change of use, commercial tenant improvements to an existing theater bldg. limited demolition, lighting and hvac upgrades, new elevator, accessible restrooms, improved fire sprinkler system (trade permit), new mezzanine at 1/f. | $1,200,000 |
| Mar 12, 2014 | Completed final sign-off Mar 2015 | 1051 Page St | mandatory soft story wood frame retrofit to basement level only. compliance with ordinance #155-13 not reuqired.Details
mandatory soft story wood frame retrofit to basement level only. compliance with ordinance #155-13 not reuqired. | $30,000 | |
| Dec 31, 2013 | Completed final sign-off Jul 2014 | 4022 Mission St | addition of railing around extg roof creating a roof deck at the 3rd floor. (on 2nd floor roof)Details
addition of railing around extg roof creating a roof deck at the 3rd floor. (on 2nd floor roof) | $1,000 | |
| Nov 6, 2012 | Completed final sign-off Jul 2014 | 4022 Mission St | alteration and repairs in conjunction with app 201208308664 for fire damage repair. additinal scope includes eliminatin of 3rd fl lightwell, reconfigure bath, bedrooms, living rms. replace windows,reconstruct bottom rear stairs inkind,misc repairs voluntary seismic strengthening of gr flDetails
alteration and repairs in conjunction with app 201208308664 for fire damage repair. additinal scope includes eliminatin of 3rd fl lightwell, reconfigure bath, bedrooms, living rms. replace windows,reconstruct bottom rear stairs inkind,misc repairs voluntary seismic strengthening of gr fl | $150,000 | |
| Aug 30, 2012 | Completed final sign-off Apr 2014 | 4022 Mission St | to comply w/nov #201148868 - fire repair of 875 sq ft on north side wall. not visible from street. close all windows at or 5ft within property line.Details
to comply w/nov #201148868 - fire repair of 875 sq ft on north side wall. not visible from street. close all windows at or 5ft within property line. | $25,000 | |
| Mar 15, 2011 | Expired or cancelled cancelled Jan 2026 | 120 Elsie St | Guilfoyle Construction | revision to appl #201101258993 - replace existing rotted deck at rear, no difference in size or sq ft, remodel of second bathroom, new floor tile, toilet, vanity @ intermediate level, new electrical, ceiling cans, new gas furnace, replacement in kind, wrap existing ducting, no new ducting.Details
revision to appl #201101258993 - replace existing rotted deck at rear, no difference in size or sq ft, remodel of second bathroom, new floor tile, toilet, vanity @ intermediate level, new electrical, ceiling cans, new gas furnace, replacement in kind, wrap existing ducting, no new ducting. | $8,500 |
| Jan 31, 2011 | Completed final sign-off Nov 2011 | 200 Central Av | to comply with his nov# 201058301 dated 7.20.10. install handrails at rear stairs and at central and page street entry stepsDetails
to comply with his nov# 201058301 dated 7.20.10. install handrails at rear stairs and at central and page street entry steps | $3,500 | |
| Jan 25, 2011 | Completed final sign-off Mar 2012 | 2040 O'farrell St | F D C Construction Inc | replacement in kind of stairs #3Details
replacement in kind of stairs #3 | $75,000 |
| Jan 25, 2011 | Completed final sign-off Mar 2012 | 2121 Geary Bl | F D C Construction Inc | replacement in kind of stairs #9 & #12.Details
replacement in kind of stairs #9 & #12. | $150,000 |
| Jan 25, 2011 | Completed final sign-off Mar 2012 | 1450 Divisadero St | F D C Construction Inc | replacement in kind of stairs #8Details
replacement in kind of stairs #8 | $75,000 |
| Jan 25, 2011 | Completed final sign-off Mar 2012 | 1415 Scott St | F D C Construction Inc | replacement in kind of stairs #1 & #2Details
replacement in kind of stairs #1 & #2 | $150,000 |
| Aug 12, 2010 | Completed final sign-off Aug 2011 | 518 Valencia St | Karl Marcrae Consulting | renovation of (e) main entry for ada accessibility, provide 1 new uni-sex ada accessible wc, provide fire-rated 2nd means of egress-corridor, provide fire-rated finish @ (e) walls / ceiling of new meeting room, provide new structural beams @ new meeting room. remove (e) beams @ new meeting room,Details
renovation of (e) main entry for ada accessibility, provide 1 new uni-sex ada accessible wc, provide fire-rated 2nd means of egress-corridor, provide fire-rated finish @ (e) walls / ceiling of new meeting room, provide new structural beams @ new meeting room. remove (e) beams @ new meeting room, | $78,000 |
| Nov 19, 2009 | Completed final sign-off Dec 2009 | 44 Ashbury St | Daniels Development Group Inc | addition of a steel post at ne corner of bldg at the mechanic's alley to limit additional deflection. post used to adjust trim of ocmmercial style windows above only, no structural post.Details
addition of a steel post at ne corner of bldg at the mechanic's alley to limit additional deflection. post used to adjust trim of ocmmercial style windows above only, no structural post. | $100 |
| Sep 18, 2009 | Completed final sign-off Dec 2009 | 507 Capp St | repair of front steps including reconstruction of side walls & footings, re-support of stairs, and provision of new guardrails & handrails. all work is exterior.Details
repair of front steps including reconstruction of side walls & footings, re-support of stairs, and provision of new guardrails & handrails. all work is exterior. | $10,000 | |
| Mar 25, 2009 | Completed final sign-off Jul 2009 | 350 Page St | remove e vertical ladder and plywood in attic space. install n pulldown ladder in n location. n plywood floor, collar ties, skylights, 1 new window in rear.Details
remove e vertical ladder and plywood in attic space. install n pulldown ladder in n location. n plywood floor, collar ties, skylights, 1 new window in rear. | $10,000 | |
| Mar 19, 2009 | Completed final sign-off Aug 2009 | 415 Congo St | replace e retaining wall inside garageDetails
replace e retaining wall inside garage | $15,000 | |
| Aug 29, 2008 | Completed final sign-off Dec 2008 | 283 Clinton Pk | alteration of wall between kitchen and rear enclosed porch. also removed small non-bearing partition in kitchen. revision to application 200807297892.Details
alteration of wall between kitchen and rear enclosed porch. also removed small non-bearing partition in kitchen. revision to application 200807297892. | $5,000 | |
| Apr 25, 2008 | Completed final sign-off Jun 2008 | 2141 Geary Bl | revision to appl #200708038751 - clarification of stair width, no change in work.Details
revision to appl #200708038751 - clarification of stair width, no change in work. | ||
| Apr 1, 2008 | Completed final sign-off May 2012 | 1553 Kirkwood Av | Ng's Landmark Bldg & Engineering | horizontal and vertical addition.g/f: horizontal addition & add habitable space., 2/f: horizontal addition & remodel of (e), 3/f: add bath to (e) attic, add (n) 3rd story @ (e) & (n) front of (e) bldg. is remaining architecturaly unchanged.Details
horizontal and vertical addition.g/f: horizontal addition & add habitable space., 2/f: horizontal addition & remodel of (e), 3/f: add bath to (e) attic, add (n) 3rd story @ (e) & (n) front of (e) bldg. is remaining architecturaly unchanged. | $200,000 |
| Jun 28, 2007 | Completed final sign-off Oct 2007 | 219 Saint Charles Av | revision to approved appl. 2007 0216 4331: modify footing details to accommodate existing concrete wall footings common to buildings on adjoining lots. underpin existing footing along the south property line, dowel concrete slab-on-grade into existing footing along the north property line.Details
revision to approved appl. 2007 0216 4331: modify footing details to accommodate existing concrete wall footings common to buildings on adjoining lots. underpin existing footing along the south property line, dowel concrete slab-on-grade into existing footing along the north property line. | ||
| Mar 13, 2007 | Completed final sign-off Apr 2007 | 743 Rhode Island St | H M W Development Inc | renewal of permits #200512059522 and 200601313408 for final inspectionDetails
renewal of permits #200512059522 and 200601313408 for final inspection | |
| Jan 11, 2007 | Completed final sign-off Aug 2007 | 2049 Oak St | addition of rear deck with firewall.Details
addition of rear deck with firewall. | $5,000 | |
| Dec 18, 2006 | Completed final sign-off Aug 2007 | 148 Bocana St | replace rear stairs to yard and add small deck at rear. new stairway configuration.Details
replace rear stairs to yard and add small deck at rear. new stairway configuration. | $10,000 | |
| Nov 17, 2006 | Completed final sign-off Feb 2007 | 3723 Sacramento St | Cove Construction | revise appl#200510135472 construct new rear deck @ first floor with metal spiral stair to deck @ grade. construct new 1 hr. firewall at property line at new deck.Details
revise appl#200510135472 construct new rear deck @ first floor with metal spiral stair to deck @ grade. construct new 1 hr. firewall at property line at new deck. | |
| Oct 30, 2006 | Completed final sign-off Dec 2006 | 192 Park St | foundation detail change from appl#200406095888 field investigation showed (e) footing/retaining wall is wider, deeper & in better condition than we though, therefore only surface repairs are needed. (patch & parge) south & west sides of rear cottage.Details
foundation detail change from appl#200406095888 field investigation showed (e) footing/retaining wall is wider, deeper & in better condition than we though, therefore only surface repairs are needed. (patch & parge) south & west sides of rear cottage. | ||
| Aug 7, 2006 | Completed final sign-off Aug 2007 | 172 25th Av | voluntary structural improvements to g/f limited to new plywood wall with hold down @ rear of garage one interior wall and rear walls also capping short length of footingDetails
voluntary structural improvements to g/f limited to new plywood wall with hold down @ rear of garage one interior wall and rear walls also capping short length of footing | $3,000 | |
| Jul 28, 2006 | Expired or cancelled expired Jan 2007 | 477 O'farrell St | convert portion of lounge & a storage room into peroperty management offices for the apartents. accessibiliyty imporvementys ro meete 20% rule and to implrveaccessibility to front entrance, ret rooms on 1st fl. & basement,and repairs & and maintence to various existing doors on 1st fl. & basement.Details
convert portion of lounge & a storage room into peroperty management offices for the apartents. accessibiliyty imporvementys ro meete 20% rule and to implrveaccessibility to front entrance, ret rooms on 1st fl. & basement,and repairs & and maintence to various existing doors on 1st fl. & basement. | $83,379 | |
| May 23, 2006 | Completed final sign-off Jul 2008 | 2901 Mariposa St | Amone Corp | interior alter to(e)2nd & 3rd flr.incl documentation of(e)unpermitted storage mezz,install fire rated doors,new stairs,ships ladders&guardrails at mezz, structural reinforcement of mezz,fill penetrations+openings at fire rated walls.fire sprinkler wk under sep permit 200311180487.Details
interior alter to(e)2nd & 3rd flr.incl documentation of(e)unpermitted storage mezz,install fire rated doors,new stairs,ships ladders&guardrails at mezz, structural reinforcement of mezz,fill penetrations+openings at fire rated walls.fire sprinkler wk under sep permit 200311180487. | $157,000 |
| Jan 10, 2006 | Expired or cancelled expired Jun 2008 | 3723 Sacramento St | Pine Ridge Construction Inc | revision to 200509082269. add concrete cap to existing foundation to raise sill plate above grade. 60" in length per drawings by triangle engineeringDetails
revision to 200509082269. add concrete cap to existing foundation to raise sill plate above grade. 60" in length per drawings by triangle engineering | $1,000 |
| Oct 17, 2005 | Expired or cancelled expired Apr 2007 | 119 Holly Park Cr | replace dry rotted rear stair and decks repair (e) fencing roof (e) repalce stove and repair (e) cabinets and countertop at kitchen (unit 121)Details
replace dry rotted rear stair and decks repair (e) fencing roof (e) repalce stove and repair (e) cabinets and countertop at kitchen (unit 121) | $20,000 | |
| Sep 29, 2005 | Completed final sign-off Nov 2005 | 830 Broderick St | replace garage slab with re-sloping that lowers portions 8" max. curb&stem at portions along (e) ftgs &walls where slab is lowered.Details
replace garage slab with re-sloping that lowers portions 8" max. curb&stem at portions along (e) ftgs &walls where slab is lowered. | $5,000 | |
| Sep 26, 2005 | Completed final sign-off Mar 2006 | 957 Grove St | replace foundation on 3 sides of cottage building in rear yard only.Details
replace foundation on 3 sides of cottage building in rear yard only. | $10,000 | |
| Sep 8, 2005 | Expired or cancelled expired May 2006 | 3723 Sacramento St | Pine Ridge Construction Inc | install new window & sliding door at rear wall of lower unit (2nd floor). install guardrail atDetails
install new window & sliding door at rear wall of lower unit (2nd floor). install guardrail at | $8,000 |
| Aug 3, 2005 | Completed final sign-off Nov 2005 | 830 Broderick St | garage beam lateration to remove post. included beam strengtheng & new post & footing pads only.Details
garage beam lateration to remove post. included beam strengtheng & new post & footing pads only. | $10,000 | |
| Jun 3, 2005 | Completed final sign-off Apr 2006 | 3723 Sacramento St | removal of one bearing and one non bearing wall to combine kitdhen & living in one room.replacementDetails
removal of one bearing and one non bearing wall to combine kitdhen & living in one room.replacement | $30,000 | |
| Jan 6, 2005 | Completed final sign-off Sep 2005 | 81 Commonwealth Av | alter & deck addition with exterior stair reconfiguration.kitchen & bath remodelDetails
alter & deck addition with exterior stair reconfiguration.kitchen & bath remodel | $100,000 | |
| Feb 25, 2004 | Never finaled issued Feb 2004, no final | 2050 Mcallister St | replace foujndation & slab. (no other structural work at this application)Details
replace foujndation & slab. (no other structural work at this application) | $50,000 | |
| Jul 28, 2003 | Completed final sign-off Sep 2004 | 275 18th Av | horizontal addition @rear of bldg. on top of (e) story, repair work @ deck, replace windows w/doorsDetails
horizontal addition @rear of bldg. on top of (e) story, repair work @ deck, replace windows w/doors | $45,000 |