Permit GraphShortlistSan Francisco building permits since 2000

Bahman Ghassemzadeh

License
C75941
Look the license up with the state
Listed as
architect, attorney, authorized agent-others, designer, engineer, pmt consultant/expediter
Firm
Bahman Ghassenmzadeh
Based in
Hillsborough
On San Francisco permits
May 2000 to Jan 2024

223 permits since 2000 (engineer on 162 permits, architect on 46 permits, designer on 10 permits, authorized agent-others on 4 permits, attorney on 1 permit, pmt consultant/expediter on 1 permit): 153 completed, 4 in progress, 43 never finaled, 23 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

Showing the 100 most recent of 223.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Jan 31, 2024Completed
final sign-off Nov 2024
75 07th AvVelero Increvision to pa 202212309559 minor change to north footing. (e) chimney to remain. increase to thickness & depth of portion of north footing near bathroom
Details
Permit
202401314969
Status
complete
Filed
Jan 31, 2024
Permit issued
Feb 5, 2024
Final sign-off
Nov 21, 2024
Address
75 07th Av

revision to pa 202212309559 minor change to north footing. (e) chimney to remain. increase to thickness & depth of portion of north footing near bathroom

Open the permit page

Apr 20, 2022Completed
final sign-off Feb 2025
547 Hayes Stproposed addition of fire rated door to restpre 4 residental unit layout, and kitchen remodel in restored unit. addition of 1 bathroom at 3rd fl.. no change to (e) building envelope.
Details
Permit
202204202614
Status
complete
Filed
Apr 20, 2022
Permit issued
May 2, 2022
Final sign-off
Feb 12, 2025
Declared cost
$20,000
Address
547 Hayes St

proposed addition of fire rated door to restpre 4 residental unit layout, and kitchen remodel in restored unit. addition of 1 bathroom at 3rd fl.. no change to (e) building envelope.

Open the permit page

$20,000
Apr 8, 2022Expired or cancelled
withdrawn Jan 2024
1204 Egbert Avfire rating of existing external wall and relocation of 2 windows to accomodate future lot split.
Details
Permit
202204081901
Status
withdrawn
Filed
Apr 8, 2022
Declared cost
$10,000
Address
1204 Egbert Av

fire rating of existing external wall and relocation of 2 windows to accomodate future lot split.

Open the permit page

$10,000
Feb 28, 2022In progress
issued May 2024
2231 Powell StTip Managers Increconstruction of (e)fire damaged units @ 2nd & 3rd fls with modification to floor plans.all work to be performed withing(e)boundary of the bldg.removal of(e)metal fire escapes.partially addressed nov#202047402.conversion of 4 carpots to one adu(under separate permit)
Details
Permit
202202288805
Status
issued
Filed
Feb 28, 2022
Permit issued
May 7, 2024
Declared cost
$1,500,000
Address
2231 Powell St

reconstruction of (e)fire damaged units @ 2nd & 3rd fls with modification to floor plans.all work to be performed withing(e)boundary of the bldg.removal of(e)metal fire escapes.partially addressed nov#202047402.conversion of 4 carpots to one adu(under separate permit)

Open the permit page

$1,500,000
Feb 14, 2022In progress
issued Sep 2026
1200 Egbert Avto erect a detached, type 5, 2-story, two residential unit building with one state adu unit per government code sect65852.2. (e) front building to remain.
Details
Permit
202202147891
Status
issued
Filed
Feb 14, 2022
Permit issued
Sep 22, 2026
Declared cost
$600,000
Address
1200 Egbert Av

to erect a detached, type 5, 2-story, two residential unit building with one state adu unit per government code sect65852.2. (e) front building to remain.

Open the permit page

$600,000
Dec 22, 2021Completed
final sign-off May 2024
4314 17th StO Donoghue Construction Inc.repair of existing retaining wall to comply with nov #202173588.
Details
Permit
202112224872
Status
complete
Filed
Dec 22, 2021
Permit issued
Nov 28, 2023
Final sign-off
May 2, 2024
Declared cost
$150,000
Address
4314 17th St

repair of existing retaining wall to comply with nov #202173588.

Open the permit page

$150,000
Nov 16, 2021Never finaled
filed Nov 2021, never issued
1204 Egbert Avproposed reduction of building envelope of existing single family home and interior remodel to add one bathroom & partial foundation replacement. adu at ground floor under separate permit.
Details
Permit
202111162509
Status
filed
Filed
Nov 16, 2021
Declared cost
$80,000
Address
1204 Egbert Av

proposed reduction of building envelope of existing single family home and interior remodel to add one bathroom & partial foundation replacement. adu at ground floor under separate permit.

Open the permit page

$80,000
Aug 20, 2021Expired or cancelled
withdrawn Jun 2024
2820 Greenwich Stremoval of bearing wall to convert (e)bedroom to dining room. sprinkler under sep permit, if applicable.
Details
Permit
202108206846
Status
withdrawn
Filed
Aug 20, 2021
Declared cost
$40,000
Address
2820 Greenwich St

removal of bearing wall to convert (e)bedroom to dining room. sprinkler under sep permit, if applicable.

Open the permit page

$40,000
May 26, 2021Never finaled
issued Jan 2022, no final
2233 Powell StNbay Construction And Remodeling Inc, O Donoghue Construction Inc.emergency repair of fire damaged building to (partially) comply with nov 202047402. maher not req
Details
Permit
202105261116
Status
issued
Filed
May 26, 2021
Permit issued
Jan 26, 2022
Declared cost
$30,000
Address
2233 Powell St

emergency repair of fire damaged building to (partially) comply with nov 202047402. maher not req

Open the permit page

$30,000
Feb 26, 2021Expired or cancelled
withdrawn Dec 2023
1926 42nd Avproposed addition of roof shade structure over existing deck
Details
Permit
202102265439
Status
withdrawn
Filed
Feb 26, 2021
Declared cost
$10,000
Address
1926 42nd Av

proposed addition of roof shade structure over existing deck

Open the permit page

$10,000
Feb 12, 2021Expired or cancelled
cancelled Jan 2026
145 Hyde Stproposed t.i. at ground floor of extg restaurant(limited), all work within the building boundry and no exterior modification proposed.
Details
Permit
202102124607
Status
cancelled
Filed
Feb 12, 2021
Declared cost
$25,000
Address
145 Hyde St

proposed t.i. at ground floor of extg restaurant(limited), all work within the building boundry and no exterior modification proposed.

Open the permit page

$25,000
Feb 6, 2021Completed
final sign-off Dec 2022
500 Larkin StSuccess Construction ***See Notes***tenant improvement to (n) limited grocery. modify (e) front facade (larkin st) facade to accomodate handicap accessible entrance, modify (e) bathroom, add counters. all work within (e) building boundary
Details
Permit
202102064177
Status
complete
Filed
Feb 6, 2021
Permit issued
Jan 19, 2022
Final sign-off
Dec 2, 2022
Declared cost
$50,000
Address
500 Larkin St

tenant improvement to (n) limited grocery. modify (e) front facade (larkin st) facade to accomodate handicap accessible entrance, modify (e) bathroom, add counters. all work within (e) building boundary

Open the permit page

$50,000
Jan 12, 2021Completed
final sign-off Nov 2021
2049 San Jose AvAmpex Engineering & Coproposed conversion of existing first floor to new accessory dwelling unit all within the building boundary.
Details
Permit
202101122510
Status
complete
Filed
Jan 12, 2021
Permit issued
Jul 13, 2021
Final sign-off
Nov 15, 2021
Declared cost
$10,000
Address
2049 San Jose Av

proposed conversion of existing first floor to new accessory dwelling unit all within the building boundary.

Open the permit page

$10,000
Jan 9, 2020Completed
final sign-off Jul 2021
2408 Moraga StBlue Birds Construction Inccomply w/ nov #201955731: proposed addition rear of building at first floor & interior remodel of the existing single family house. upgrade part of facade to wood siding finish
Details
Permit
202001091585
Status
complete
Filed
Jan 9, 2020
Permit issued
Feb 14, 2020
Final sign-off
Jul 13, 2021
Declared cost
$150,000
Address
2408 Moraga St

comply w/ nov #201955731: proposed addition rear of building at first floor & interior remodel of the existing single family house. upgrade part of facade to wood siding finish

Open the permit page

$150,000
Jan 3, 2020Completed
final sign-off Mar 2021
78 Tehama Strev to pa# 201705187039 & 201901100082 drawing for correction to d.a. check list and removal of drinking fountain
Details
Permit
202001031191
Status
complete
Filed
Jan 3, 2020
Permit issued
Aug 28, 2020
Final sign-off
Mar 18, 2021
Address
78 Tehama St

rev to pa# 201705187039 & 201901100082 drawing for correction to d.a. check list and removal of drinking fountain

Open the permit page

Dec 20, 2019Completed
final sign-off Oct 2024
2420 03rd Strevision to pa 2014-0508-5278 foundation & framing to replace the prefabricated simpson frame with conventional built on site moment frame
Details
Permit
201912200119
Status
complete
Filed
Dec 20, 2019
Permit issued
Jan 21, 2022
Final sign-off
Oct 2, 2024
Address
2420 03rd St

revision to pa 2014-0508-5278 foundation & framing to replace the prefabricated simpson frame with conventional built on site moment frame

Open the permit page

Aug 21, 2019Expired or cancelled
expired Feb 2026
27 Brompton Avpropose interior remodeling of (e) single family have & add (n) roof deck w/ no stair penthouse. excavation to add one adu unit per ordinance 95-17.
Details
Permit
201908219441
Status
expired
Filed
Aug 21, 2019
Permit issued
Jan 21, 2022
Declared cost
$450,000
Address
27 Brompton Av

propose interior remodeling of (e) single family have & add (n) roof deck w/ no stair penthouse. excavation to add one adu unit per ordinance 95-17.

Open the permit page

$450,000
Aug 8, 2019In progress
issued Feb 2024
231 Onondaga AvB & J General Constructionlegalize (1) illegal unit @ ground fl per adu ordinance #162-16. legalization of the other unit will be under separate permit
Details
Permit
201908088326
Status
issued
Filed
Aug 8, 2019
Permit issued
Feb 26, 2024
Declared cost
$150,000
Address
231 Onondaga Av

legalize (1) illegal unit @ ground fl per adu ordinance #162-16. legalization of the other unit will be under separate permit

Open the permit page

$150,000
Aug 8, 2019Completed
final sign-off Jul 2022
955 Wisconsin Stproposed conversion of (e) garage to addition (2) dwelling units per ordinance #162-16.
Details
Permit
201908088343
Status
complete
Filed
Aug 8, 2019
Permit issued
Dec 23, 2020
Final sign-off
Jul 11, 2022
Declared cost
$150,000
Address
955 Wisconsin St

proposed conversion of (e) garage to addition (2) dwelling units per ordinance #162-16.

Open the permit page

$150,000
Aug 8, 2019Completed
final sign-off Dec 2019
372 Hearst Avvoluntary existing foundation anchorage
Details
Permit
201908088350
Status
complete
Filed
Aug 8, 2019
Permit issued
Aug 16, 2019
Final sign-off
Dec 20, 2019
Declared cost
$2,500
Address
372 Hearst Av

voluntary existing foundation anchorage

Open the permit page

$2,500
Aug 8, 2019In progress
issued Feb 2024
231 Onondaga AvB & J General Constructionlegalize (1) illegal unit @ ground fl per ordinance #43-14. legalization of the other unit per adu ordinance under separate
Details
Permit
201908088315
Status
issued
Filed
Aug 8, 2019
Permit issued
Feb 26, 2024
Declared cost
$150,000
Address
231 Onondaga Av

legalize (1) illegal unit @ ground fl per ordinance #43-14. legalization of the other unit per adu ordinance under separate

Open the permit page

$150,000
Aug 5, 2019Completed
final sign-off Sep 2022
3830 24th StLoughran Construction Inc.remove excess concrete at property line
Details
Permit
201908057849
Status
complete
Filed
Aug 5, 2019
Permit issued
Aug 5, 2019
Final sign-off
Sep 12, 2022
Declared cost
$1,000
Address
3830 24th St

remove excess concrete at property line

Open the permit page

$1,000
Aug 5, 2019Completed
final sign-off Sep 2022
3822 24th StLoughran Construction Inc.remove excess concrete at property line
Details
Permit
201908057847
Status
complete
Filed
Aug 5, 2019
Permit issued
Aug 5, 2019
Final sign-off
Sep 12, 2022
Declared cost
$1,000
Address
3822 24th St

remove excess concrete at property line

Open the permit page

$1,000
Jun 17, 2019Completed
final sign-off May 2023
319 Moultrie StPaul K Vou
Details
Permit
201906173642
Status
complete
Filed
Jun 17, 2019
Permit issued
Apr 2, 2021
Final sign-off
May 16, 2023
Declared cost
$2,000
Address
319 Moultrie St

Open the permit page

$2,000
Jun 10, 2019Completed
final sign-off Oct 2019
1006 Hollister AvArea Development Inc.to comply w/ n.o.v 201960091. install 7 windows, add full bath, convert half bath to full, change layout, new hvac w/ ductwork. no expansion of footprint of building.
Details
Permit
201906103027
Status
complete
Filed
Jun 10, 2019
Permit issued
Jun 13, 2019
Final sign-off
Oct 4, 2019
Declared cost
$30,000
Address
1006 Hollister Av

to comply w/ n.o.v 201960091. install 7 windows, add full bath, convert half bath to full, change layout, new hvac w/ ductwork. no expansion of footprint of building.

Open the permit page

$30,000
May 31, 2019Completed
final sign-off Apr 2022
915 Cayuga AvArea Development Inc.to demolish 2 story, industrial building. ** maher: n/a **
Details
Permit
201905312199
Status
complete
Filed
May 31, 2019
Permit issued
Aug 2, 2019
Final sign-off
Apr 13, 2022
Declared cost
$100,000
Address
915 Cayuga Av

to demolish 2 story, industrial building. ** maher: n/a **

Open the permit page

$100,000
May 29, 2019Never finaled
filed May 2019, never issued
2891 San Bruno Avcomply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270763 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitor
Details
Permit
201905291888
Status
reinstated
Filed
May 29, 2019
Declared cost
$250,000
Address
2891 San Bruno Av

comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270763 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitor

Open the permit page

$250,000
May 29, 2019Never finaled
filed May 2019, never issued
2883 San Bruno Avcomply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270764 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitor
Details
Permit
201905291900
Status
reinstated
Filed
May 29, 2019
Declared cost
$250,000
Address
2883 San Bruno Av

comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270764 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitor

Open the permit page

$250,000
May 29, 2019Never finaled
filed May 2019, never issued
2875 San Bruno Avcomply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270765 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitor
Details
Permit
201905291901
Status
reinstated
Filed
May 29, 2019
Declared cost
$250,000
Address
2875 San Bruno Av

comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270765 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitor

Open the permit page

$250,000
May 29, 2019Never finaled
filed May 2019, never issued
2867 San Bruno Avcomply enf#2017008719-00,02,03&04enf,dbi novs,legalize 2 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270766 to accomondate 4 unit,facade modify to match as built conditions per zoning adminitor
Details
Permit
201905291902
Status
reinstated
Filed
May 29, 2019
Declared cost
$250,000
Address
2867 San Bruno Av

comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 2 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270766 to accomondate 4 unit,facade modify to match as built conditions per zoning adminitor

Open the permit page

$250,000
May 29, 2019Never finaled
filed May 2019, never issued
2899 San Bruno Avcomply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270758 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitor
Details
Permit
201905291899
Status
reinstated
Filed
May 29, 2019
Declared cost
$250,000
Address
2899 San Bruno Av

comply enf#2017008719-00,02,03&04enf,dbi novs,legalize 3 unit,provide 2nd egress for 4th fl units by install permanent hot dipped galvanized steell fire escape stairs,interior adjustment of approved pa#201209270758 to accomondate 5 unit,facade modify to match as built conditions per zoning adminitor

Open the permit page

$250,000
May 20, 2019Completed
final sign-off Mar 2023
165 Crescent AvMajestic Landscapevertical & horizontal additoin; interior remodel single family house to convert crawl space to basement living space and addition of 1 bedroom and 2 bathrooms.
Details
Permit
201905201178
Status
complete
Filed
May 20, 2019
Permit issued
Jan 27, 2021
Final sign-off
Mar 20, 2023
Declared cost
$250,000
Address
165 Crescent Av

vertical & horizontal additoin; interior remodel single family house to convert crawl space to basement living space and addition of 1 bedroom and 2 bathrooms.

Open the permit page

$250,000
May 1, 2019Completed
final sign-off Jun 2023
3169 Sacramento StTritec Construction Co Inc--See Notes, Daly Builders Groupinteiror remodel. convert basement storage to master bed. 1st flr remodel -relocate laundry, relocate closet, add bath.
Details
Permit
201905019415
Status
complete
Filed
May 1, 2019
Permit issued
Feb 24, 2021
Final sign-off
Jun 8, 2023
Declared cost
$40,000
Address
3169 Sacramento St

inteiror remodel. convert basement storage to master bed. 1st flr remodel -relocate laundry, relocate closet, add bath.

Open the permit page

$40,000
May 1, 2019Completed
final sign-off Oct 2020
250 10th AvDesign Line Constructionconversion 1st flr garage & storage to 2 dwelling units. remodel 2nd & 3rd flrs. add bath, add laundry, relocating kitchen. remove curb cut.
Details
Permit
201905019423
Status
complete
Filed
May 1, 2019
Permit issued
Sep 24, 2019
Final sign-off
Oct 23, 2020
Declared cost
$95,000
Address
250 10th Av

conversion 1st flr garage & storage to 2 dwelling units. remodel 2nd & 3rd flrs. add bath, add laundry, relocating kitchen. remove curb cut.

Open the permit page

$95,000
Mar 27, 2019Completed
final sign-off Jan 2020
1749 Cayuga Avinterior remodeling of (e) single family house in order to add adu unit @ garage level per ordinance 95-17.
Details
Permit
201903276450
Status
complete
Filed
Mar 27, 2019
Permit issued
Aug 7, 2019
Final sign-off
Jan 31, 2020
Declared cost
$40,000
Address
1749 Cayuga Av

interior remodeling of (e) single family house in order to add adu unit @ garage level per ordinance 95-17.

Open the permit page

$40,000
Feb 21, 2019Completed
final sign-off Aug 2019
988 Oak StSft Construction Corprev to pa 201710232003 & 201801128607; proposed soft story retrofit for 988-998 oak st. per 1ebc2012 appendix a4, revision to the approvd permit (commercial portion)
Details
Permit
201902213533
Status
complete
Filed
Feb 21, 2019
Permit issued
Feb 28, 2019
Final sign-off
Aug 13, 2019
Address
988 Oak St

rev to pa 201710232003 & 201801128607; proposed soft story retrofit for 988-998 oak st. per 1ebc2012 appendix a4, revision to the approvd permit (commercial portion)

Open the permit page

Jan 30, 2019Completed
final sign-off Mar 2021
3005 San Bruno Avproposed addition of (1)res unit to (e)(2)units. convert com'l unit to res'l for total (3)res'l. convert com'l space to (n)(1)bdrm, (2)bath dwelling unit, conversion of (e)storage space to (1)bdrm dwelling unit, all work within e building boundary. ref #201903124993
Details
Permit
201901301669
Status
complete
Filed
Jan 30, 2019
Permit issued
May 4, 2020
Final sign-off
Mar 17, 2021
Declared cost
$300,000
Address
3005 San Bruno Av

proposed addition of (1)res unit to (e)(2)units. convert com'l unit to res'l for total (3)res'l. convert com'l space to (n)(1)bdrm, (2)bath dwelling unit, conversion of (e)storage space to (1)bdrm dwelling unit, all work within e building boundary. ref #201903124993

Open the permit page

$300,000
Jan 15, 2019Completed
final sign-off Mar 2025
4822 19th StS F Garage Company Inc., Harty Developmentto erect 3 stories over basement, type v-b, single family home.
Details
Permit
201901150455
Status
complete
Filed
Jan 15, 2019
Permit issued
Jan 3, 2022
Final sign-off
Mar 13, 2025
Declared cost
$600,000
Address
4822 19th St

to erect 3 stories over basement, type v-b, single family home.

Open the permit page

$600,000
Dec 12, 2018Completed
final sign-off Sep 2019
3933 Mission Stsecond and 3rd floor remodel: lightwell infill. adu under seperate permit #2018-0313-3575. structural work under soft story permit # 2018-1011-2968
Details
Permit
201812128170
Status
complete
Filed
Dec 12, 2018
Permit issued
Jan 14, 2019
Final sign-off
Sep 6, 2019
Declared cost
$200,000
Address
3933 Mission St

second and 3rd floor remodel: lightwell infill. adu under seperate permit #2018-0313-3575. structural work under soft story permit # 2018-1011-2968

Open the permit page

$200,000
Aug 23, 2018Completed
final sign-off Feb 2020
757 39th AvHugo Tejada/Dba Alpha & Omega Renovationinterior remodel. rearrange kitchen layout, add 1 more bedroom, 1 more bath on second floor.
Details
Permit
201808238193
Status
complete
Filed
Aug 23, 2018
Permit issued
Aug 29, 2018
Final sign-off
Feb 18, 2020
Declared cost
$30,000
Address
757 39th Av

interior remodel. rearrange kitchen layout, add 1 more bedroom, 1 more bath on second floor.

Open the permit page

$30,000
Aug 1, 2018Completed
final sign-off Nov 2019
2112 Bryant StR & D Construction Co Increvision to approved app#201801269702 to reconfigure 4th floor master bedroom. repair, replace and reinforce damage rear and side wall membrane on 2nd and 3rd floor.
Details
Permit
201808016189
Status
complete
Filed
Aug 1, 2018
Permit issued
Aug 13, 2018
Final sign-off
Nov 25, 2019
Declared cost
$15,000
Address
2112 Bryant St

revision to approved app#201801269702 to reconfigure 4th floor master bedroom. repair, replace and reinforce damage rear and side wall membrane on 2nd and 3rd floor.

Open the permit page

$15,000
Jul 31, 2018Completed
final sign-off Apr 2021
25 Rutledge StAmpex Engineering & Coconstruction of a new stairway as part of sidewalk improvement plan.
Details
Permit
201807316065
Status
complete
Filed
Jul 31, 2018
Permit issued
Jan 30, 2019
Final sign-off
Apr 28, 2021
Declared cost
$25,000
Address
25 Rutledge St

construction of a new stairway as part of sidewalk improvement plan.

Open the permit page

$25,000
Jun 26, 2018Never finaled
issued Nov 2018, no final
127 Edgehill WyA B J Constructionstructural revision to approved permit #201405296982, construction of a new single family home.
Details
Permit
201806263024
Status
issued
Filed
Jun 26, 2018
Permit issued
Nov 14, 2018
Address
127 Edgehill Wy

structural revision to approved permit #201405296982, construction of a new single family home.

Open the permit page

Jun 21, 2018Never finaled
issued Jul 2018, no final
3240 Lyon StJ.W.D. Constructionrev to pa# 201509106564; adding a new bedroom, family room, office & bathroom at ground level, kitchen and bathroom wall modification at 2nd fl, relocating a bathroom at 3rd fl.
Details
Permit
201806212614
Status
issued
Filed
Jun 21, 2018
Permit issued
Jul 24, 2018
Address
3240 Lyon St

rev to pa# 201509106564; adding a new bedroom, family room, office & bathroom at ground level, kitchen and bathroom wall modification at 2nd fl, relocating a bathroom at 3rd fl.

Open the permit page

Jun 8, 2018Never finaled
filed Jun 2018, never issued
519 Ellis Stto erect 8 stories, 1 basement, type i-b, 21 units residential with mix use bldg. (r-2,m)
Details
Permit
201806081421
Status
filed
Filed
Jun 8, 2018
Declared cost
$2,000,000
Address
519 Ellis St

to erect 8 stories, 1 basement, type i-b, 21 units residential with mix use bldg. (r-2,m)

Open the permit page

$2,000,000
Jun 1, 2018Expired or cancelled
cancelled Jan 2026
524 Kansas Strev pa#201404163414: to modify the approved basement and 1st fl- relocation of w.h. gas meter cabinet
Details
Permit
201806010814
Status
cancelled
Filed
Jun 1, 2018
Address
524 Kansas St

rev pa#201404163414: to modify the approved basement and 1st fl- relocation of w.h. gas meter cabinet

Open the permit page

May 17, 2018Completed
final sign-off Jan 2025
66 Mountain Spring AvTransatlantic Construction Companyto erect 3 stories, no basement, type v-b construction single family dwelling. sprinkler under separate permit.
Details
Permit
201805179469
Status
complete
Filed
May 17, 2018
Permit issued
Mar 17, 2021
Final sign-off
Jan 7, 2025
Declared cost
$1,150,000
Address
66 Mountain Spring Av

to erect 3 stories, no basement, type v-b construction single family dwelling. sprinkler under separate permit.

Open the permit page

$1,150,000
May 16, 2018Completed
final sign-off Jan 2023
556 Sanchez StRohan Wallace & Aherne Incproposed (n) add unit in the (e) storage arra @ 1st fl. interior modification of (e) units @ 2nd & 3rd fl. lightwell infill on north & south property line wall per ord 162-16.
Details
Permit
201805169334
Status
complete
Filed
May 16, 2018
Permit issued
Jul 1, 2019
Final sign-off
Jan 12, 2023
Declared cost
$476,000
Address
556 Sanchez St

proposed (n) add unit in the (e) storage arra @ 1st fl. interior modification of (e) units @ 2nd & 3rd fl. lightwell infill on north & south property line wall per ord 162-16.

Open the permit page

$476,000
May 10, 2018Never finaled
issued Jun 2018, no final
680 Illinois StTransatlantic Construction Companyrevision to 201612296253. scope includes add 1 storage 1 freezer addition ot e commercial space. addition of 5 class 1 bicycle parking space to e garage. change bathroom and seating layout. change door/window locatoin at street front maher not req
Details
Permit
201805108833
Status
issued
Filed
May 10, 2018
Permit issued
Jun 7, 2018
Declared cost
$25,000
Address
680 Illinois St

revision to 201612296253. scope includes add 1 storage 1 freezer addition ot e commercial space. addition of 5 class 1 bicycle parking space to e garage. change bathroom and seating layout. change door/window locatoin at street front maher not req

Open the permit page

$25,000
May 4, 2018Never finaled
filed May 2018, never issued
527 Stevenson Stproposed new construction of seven story commercial building.
Details
Permit
201805048238
Status
filed
Filed
May 4, 2018
Declared cost
$6,000,000
Address
527 Stevenson St

proposed new construction of seven story commercial building.

Open the permit page

$6,000,000
May 4, 2018Never finaled
filed May 2018, never issued
527 Stevenson Stto demolish a type v-b, 1-story office.
Details
Permit
201805048237
Status
filed
Filed
May 4, 2018
Declared cost
$25,000
Address
527 Stevenson St

to demolish a type v-b, 1-story office.

Open the permit page

$25,000
Apr 20, 2018Never finaled
issued Jan 2020, no final
7 Lake Forest Ctproposed vertical addition to (e) single family home, adding a new floor. interior remodel to 1st & 2nd floors, adding one new bathroom & one new half bathroom.
Details
Permit
201804206996
Status
issued
Filed
Apr 20, 2018
Permit issued
Jan 6, 2020
Declared cost
$20,000
Address
7 Lake Forest Ct

proposed vertical addition to (e) single family home, adding a new floor. interior remodel to 1st & 2nd floors, adding one new bathroom & one new half bathroom.

Open the permit page

$20,000
Apr 11, 2018Never finaled
issued May 2018, no final
127 Edgehill WyA B J Constructionmodification to the approved plan #2014-0529-6982 to modify temporary shoring system per plans. no change or modification to the approved boundary and architecture of the new building. the final revision to the original building permit will be submitted under separate building application
Details
Permit
201804116070
Status
issued
Filed
Apr 11, 2018
Permit issued
May 7, 2018
Declared cost
$10,000
Address
127 Edgehill Wy

modification to the approved plan #2014-0529-6982 to modify temporary shoring system per plans. no change or modification to the approved boundary and architecture of the new building. the final revision to the original building permit will be submitted under separate building application

Open the permit page

$10,000
Apr 4, 2018Completed
final sign-off Apr 2021
2779 Folsom StTransatlantic Construction Companyconvert (e) 2-story industrial space into an (n) 4-story mixed use with 6-unit residential over community facility & parking at ground floor.
Details
Permit
201804045541
Status
complete
Filed
Apr 4, 2018
Permit issued
Dec 12, 2019
Final sign-off
Apr 26, 2021
Declared cost
$3,500,000
Address
2779 Folsom St

convert (e) 2-story industrial space into an (n) 4-story mixed use with 6-unit residential over community facility & parking at ground floor.

Open the permit page

$3,500,000
Apr 3, 2018Completed
final sign-off Oct 2024
350 San Jose AvTransatlantic Construction Companyaddition of 8 units & 1 adu to an (e) 4 dwelling unit bldg: 5 one-bedrm units & 8 two-bedrm units (13 total); addition will consist of: horizontal addition to 45% setback line; one story vertical addition to (e) 2-story bldg; excavation of (e) garage to add basement level and open space.
Details
Permit
201804035430
Status
complete
Filed
Apr 3, 2018
Permit issued
Jun 13, 2022
Final sign-off
Oct 3, 2024
Declared cost
$3,556,000
Address
350 San Jose Av

addition of 8 units & 1 adu to an (e) 4 dwelling unit bldg: 5 one-bedrm units & 8 two-bedrm units (13 total); addition will consist of: horizontal addition to 45% setback line; one story vertical addition to (e) 2-story bldg; excavation of (e) garage to add basement level and open space.

Open the permit page

$3,556,000
Mar 13, 2018Completed
final sign-off Sep 2019
3933 Mission Stadding two dwelling units at ground fl. per ordinace 162-16.
Details
Permit
201803133575
Status
complete
Filed
Mar 13, 2018
Permit issued
Apr 17, 2019
Final sign-off
Sep 11, 2019
Declared cost
$350,000
Address
3933 Mission St

adding two dwelling units at ground fl. per ordinace 162-16.

Open the permit page

$350,000
Mar 7, 2018Completed
final sign-off Sep 2019
3933 Mission Stproposed seismic streghtening volunteerly. lightwell infill is being processed under bpa# 2018-0313-3575.
Details
Permit
201803073126
Status
complete
Filed
Mar 7, 2018
Permit issued
Aug 22, 2018
Final sign-off
Sep 6, 2019
Declared cost
$150,000
Address
3933 Mission St

proposed seismic streghtening volunteerly. lightwell infill is being processed under bpa# 2018-0313-3575.

Open the permit page

$150,000
Feb 15, 2018Completed
final sign-off Mar 2020
2857 Folsom Staddition of one dwelling unit to (e) 2 units building within the boundary of the bldg. total conversion non habitable to habitable. attic to become 4th story. ref to pa# 2017-1114-3972.
Details
Permit
201802151457
Status
complete
Filed
Feb 15, 2018
Permit issued
Dec 3, 2018
Final sign-off
Mar 16, 2020
Declared cost
$375,000
Address
2857 Folsom St

addition of one dwelling unit to (e) 2 units building within the boundary of the bldg. total conversion non habitable to habitable. attic to become 4th story. ref to pa# 2017-1114-3972.

Open the permit page

$375,000
Feb 15, 2018Completed
final sign-off Mar 2020
2861 Folsom Staddition of one dwelling unit to (e) 2 unit building within the boundary of the bldg. total conversion non-habitable to habitable. ref to pa# 2017-1114-3972
Details
Permit
201802151458
Status
complete
Filed
Feb 15, 2018
Permit issued
Sep 12, 2018
Final sign-off
Mar 16, 2020
Declared cost
$375,000
Address
2861 Folsom St

addition of one dwelling unit to (e) 2 unit building within the boundary of the bldg. total conversion non-habitable to habitable. ref to pa# 2017-1114-3972

Open the permit page

$375,000
Feb 14, 2018Completed
final sign-off Sep 2018
6 Bonview StTransatlantic Construction Companyrevision to pa 2017/0925/9510 & 2015/0572/6076s2 provide easement through adjacent lot 5613-064 (2 bonview) as per easement agreement. as built for minor interior changes. additional walls for furnace space on basement & 2nd floor. rebuild stairs (2nd to 3rd stair)
Details
Permit
201802141325
Status
complete
Filed
Feb 14, 2018
Permit issued
May 7, 2018
Final sign-off
Sep 24, 2018
Address
6 Bonview St

revision to pa 2017/0925/9510 & 2015/0572/6076s2 provide easement through adjacent lot 5613-064 (2 bonview) as per easement agreement. as built for minor interior changes. additional walls for furnace space on basement & 2nd floor. rebuild stairs (2nd to 3rd stair)

Open the permit page

Feb 7, 2018Expired or cancelled
withdrawn Aug 2018
468 Valley Stconvert (e) 2 story, 1 unit dwelling into (n) 4 story, 2 unit dwelling with 4th fl set back 26'-4" from front property line
Details
Permit
201802070698
Status
withdrawn
Filed
Feb 7, 2018
Declared cost
$550,000
Address
468 Valley St

convert (e) 2 story, 1 unit dwelling into (n) 4 story, 2 unit dwelling with 4th fl set back 26'-4" from front property line

Open the permit page

$550,000
Jan 31, 2018Completed
final sign-off Feb 2018
2877 Folsom Strevision to app#201412012688 to comply with pre-final correction notice to raise floor level behind the egress windows to bring the bedroom egress in the compliance. no change to approved boundry to the bldg.
Details
Permit
201801310014
Status
complete
Filed
Jan 31, 2018
Permit issued
Feb 1, 2018
Final sign-off
Feb 2, 2018
Address
2877 Folsom St

revision to app#201412012688 to comply with pre-final correction notice to raise floor level behind the egress windows to bring the bedroom egress in the compliance. no change to approved boundry to the bldg.

Open the permit page

Jan 31, 2018Completed
final sign-off Feb 2018
50 Lucky Strevision to app#201412012693 to comply with pre-final correction notice to raise floor level behind the egress windows to bring the bedroom egress in the compliance. no change to approved boundry to the bldg. reconfiguration of kitchen layout.
Details
Permit
201801310012
Status
complete
Filed
Jan 31, 2018
Permit issued
Feb 1, 2018
Final sign-off
Feb 2, 2018
Address
50 Lucky St

revision to app#201412012693 to comply with pre-final correction notice to raise floor level behind the egress windows to bring the bedroom egress in the compliance. no change to approved boundry to the bldg. reconfiguration of kitchen layout.

Open the permit page

Jan 26, 2018Completed
final sign-off Nov 2019
2112 Bryant Stinterior at 1st, 2nd, 3rd and attic. enlarge both units. foundation replacement and structural upgrade. remove (e) rear stairs. create (n) master bedroom, family room and 1.5 bath on 1st floor; 2nd fl - create (n) bathroom and layout change; 3rd fl - add (n) bathroom. add 4 new dormers
Details
Permit
201801269702
Status
complete
Filed
Jan 26, 2018
Permit issued
Apr 24, 2018
Final sign-off
Nov 25, 2019
Declared cost
$450,000
Address
2112 Bryant St

interior at 1st, 2nd, 3rd and attic. enlarge both units. foundation replacement and structural upgrade. remove (e) rear stairs. create (n) master bedroom, family room and 1.5 bath on 1st floor; 2nd fl - create (n) bathroom and layout change; 3rd fl - add (n) bathroom. add 4 new dormers

Open the permit page

$450,000
Jan 19, 2018Never finaled
issued Dec 2020, no final
332 Bradford StNassif A Ayyadto erect 2 stories, 1 basement, type v-b, sigle family dwelling.
Details
Permit
201801199105
Status
issued
Filed
Jan 19, 2018
Permit issued
Dec 18, 2020
Declared cost
$450,000
Address
332 Bradford St

to erect 2 stories, 1 basement, type v-b, sigle family dwelling.

Open the permit page

$450,000
Jan 16, 2018Completed
final sign-off Sep 2023
1220 Hayes StJ P F Constructionto add two accessory dwelling units (adu) at ground floor per ord no. 162-16.
Details
Permit
201801168754
Status
complete
Filed
Jan 16, 2018
Permit issued
Jul 12, 2019
Final sign-off
Sep 11, 2023
Declared cost
$60,000
Address
1220 Hayes St

to add two accessory dwelling units (adu) at ground floor per ord no. 162-16.

Open the permit page

$60,000
Jan 16, 2018Completed
final sign-off Jul 2021
310 Montcalm StO'pro Construction Inc.compliance with notice of violation: planning complaint# 2011-002370enf. dbi compliant# 2017.87861 & 2017.65203 & 2016.10071. to bring the proposed remodeling into compliance. expansion of previously approval dormers pa# 2016/07/14/2394 & pa# 2016/04/11/4470, reduction of rear massing.
Details
Permit
201801168744
Status
complete
Filed
Jan 16, 2018
Permit issued
Mar 28, 2019
Final sign-off
Jul 28, 2021
Declared cost
$250,000
Address
310 Montcalm St

compliance with notice of violation: planning complaint# 2011-002370enf. dbi compliant# 2017.87861 & 2017.65203 & 2016.10071. to bring the proposed remodeling into compliance. expansion of previously approval dormers pa# 2016/07/14/2394 & pa# 2016/04/11/4470, reduction of rear massing.

Open the permit page

$250,000
Jan 16, 2018Completed
final sign-off Dec 2020
4068 Folsom StR & D Construction Co Increvision to approved pa# 2017/03/09/1099 to comply with planning enforcement case# 2017-007370enf. to add a roof deck with no stair penthhouse.
Details
Permit
201801168745
Status
complete
Filed
Jan 16, 2018
Permit issued
Jan 14, 2019
Final sign-off
Dec 31, 2020
Declared cost
$350,000
Address
4068 Folsom St

revision to approved pa# 2017/03/09/1099 to comply with planning enforcement case# 2017-007370enf. to add a roof deck with no stair penthhouse.

Open the permit page

$350,000
Jan 12, 2018Expired or cancelled
expired May 2022
1200 Indiana Stto comply with nov 201650011 and & 201758221 - return current use of event space (assembly group a) to warehouse (storage group s) maherna
Details
Permit
201801128605
Status
expired
Filed
Jan 12, 2018
Permit issued
Sep 6, 2018
Declared cost
$30,000
Address
1200 Indiana St

to comply with nov 201650011 and & 201758221 - return current use of event space (assembly group a) to warehouse (storage group s) maherna

Open the permit page

$30,000
Jan 12, 2018Completed
final sign-off Aug 2019
998 Oak StSft Construction Corpsoft story retrofit for 988-998 oak street per cebc 2016 appendix a-4. (commercial portion)
Details
Permit
201801128607
Status
complete
Filed
Jan 12, 2018
Permit issued
Sep 10, 2018
Final sign-off
Aug 13, 2019
Declared cost
$50,000
Address
998 Oak St

soft story retrofit for 988-998 oak street per cebc 2016 appendix a-4. (commercial portion)

Open the permit page

$50,000
Jan 5, 2018Completed
final sign-off Apr 2019
1350 Howard Stproposed interior remodel of (e) unoccupied commercial space, proposed 1 new bathroom, 2 new accessory offices, 2 new mezzanines, no change of use proposed, unveil (e) windows, install new glass in (e) steel windows. in kind replacement of (e) front door - for planning purposes (e) use is motor;
Details
Permit
201801057981
Status
complete
Filed
Jan 5, 2018
Permit issued
Mar 8, 2018
Final sign-off
Apr 12, 2019
Declared cost
$30,000
Address
1350 Howard St

proposed interior remodel of (e) unoccupied commercial space, proposed 1 new bathroom, 2 new accessory offices, 2 new mezzanines, no change of use proposed, unveil (e) windows, install new glass in (e) steel windows. in kind replacement of (e) front door - for planning purposes (e) use is motor;

Open the permit page

$30,000
Dec 18, 2017Completed
final sign-off Jan 2019
244 Ashton AvAlbcoto add an accessory dwelling unit (adu)at ground fl. per ordinance 95-17. (studio unit)
Details
Permit
201712186766
Status
complete
Filed
Dec 18, 2017
Permit issued
Mar 21, 2018
Final sign-off
Jan 8, 2019
Declared cost
$60,000
Address
244 Ashton Av

to add an accessory dwelling unit (adu)at ground fl. per ordinance 95-17. (studio unit)

Open the permit page

$60,000
Dec 1, 2017Completed
final sign-off Mar 2024
674 Capp StS M Construction And Assochorizontal & vertical addition, interior remodel of (e)bldg. adding (n)1st fl with 2 new beds & 1 bath. add 2 new beds & 2 baths on 2nd fl. relocating dining & living room to 3rd fl and add new roof deck. one new unit portion on side of (e) bldg with 3 beds, 3 baths and roof deck. total add 2 units.
Details
Permit
201712015271
Status
complete
Filed
Dec 1, 2017
Permit issued
Jan 16, 2019
Final sign-off
Mar 15, 2024
Declared cost
$850,000
Address
674 Capp St

horizontal & vertical addition, interior remodel of (e)bldg. adding (n)1st fl with 2 new beds & 1 bath. add 2 new beds & 2 baths on 2nd fl. relocating dining & living room to 3rd fl and add new roof deck. one new unit portion on side of (e) bldg with 3 beds, 3 baths and roof deck. total add 2 units.

Open the permit page

$850,000
Dec 1, 2017Expired or cancelled
cancelled Aug 2019
676 Capp Stadding (n) unit at rear of (e) blg(storage) with 2 beds, 1 kitchen, 1 living, 1 dining at basement, 3 baths and roof deck (rear bldg)
Details
Permit
201712015274
Status
cancelled
Filed
Dec 1, 2017
Permit issued
Aug 10, 2018
Declared cost
$450,000
Address
676 Capp St

adding (n) unit at rear of (e) blg(storage) with 2 beds, 1 kitchen, 1 living, 1 dining at basement, 3 baths and roof deck (rear bldg)

Open the permit page

$450,000
Nov 14, 2017Completed
final sign-off Mar 2020
2857 Folsom Strevision to 201703091134, removal of rear wood stair. full sprinkler building on separate permit
Details
Permit
201711143972
Status
complete
Filed
Nov 14, 2017
Permit issued
Nov 21, 2017
Final sign-off
Mar 16, 2020
Declared cost
$15,000
Address
2857 Folsom St

revision to 201703091134, removal of rear wood stair. full sprinkler building on separate permit

Open the permit page

$15,000
Oct 23, 2017Completed
final sign-off Aug 2019
988 Oak StSft Construction Corpproposed soft story retrofit for residential 988-998 oak st per iebc 2012 app a4. commercial on pa# 2018/01/12/8607.
Details
Permit
201710232003
Status
complete
Filed
Oct 23, 2017
Permit issued
Sep 10, 2018
Final sign-off
Aug 13, 2019
Declared cost
$250,000
Address
988 Oak St

proposed soft story retrofit for residential 988-998 oak st per iebc 2012 app a4. commercial on pa# 2018/01/12/8607.

Open the permit page

$250,000
Oct 18, 2017Expired or cancelled
withdrawn Feb 2020
449 09th Stsoft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 (bakery) n/a for maher
Details
Permit
201710181612
Status
withdrawn
Filed
Oct 18, 2017
Address
449 09th St

soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 (bakery) n/a for maher

Open the permit page

Oct 17, 2017Completed
final sign-off May 2019
661 Page Stadd roof deck with no stair penthouse. interior remodel & adjustment of floor plans @ unit# 661 & 663. rear extension at 1st and 2nd floor not ot exceed 25% setback line. eliminate wood stair to 2nd floor. add a unit @ basement level & 1st floor is revisionto permit 201706139268
Details
Permit
201710171484
Status
complete
Filed
Oct 17, 2017
Permit issued
Oct 24, 2018
Final sign-off
May 16, 2019
Declared cost
$120,000
Address
661 Page St

add roof deck with no stair penthouse. interior remodel & adjustment of floor plans @ unit# 661 & 663. rear extension at 1st and 2nd floor not ot exceed 25% setback line. eliminate wood stair to 2nd floor. add a unit @ basement level & 1st floor is revisionto permit 201706139268

Open the permit page

$120,000
Oct 12, 2017Expired or cancelled
expired Nov 2019
53 States Strevised temp shoring at 53 states to extend the shoring to cover the 51 states rear portion to comply with nov 201707772 and 201797352.
Details
Permit
201710121063
Status
expired
Filed
Oct 12, 2017
Permit issued
Oct 19, 2017
Declared cost
$3,000
Address
53 States St

revised temp shoring at 53 states to extend the shoring to cover the 51 states rear portion to comply with nov 201707772 and 201797352.

Open the permit page

$3,000
Oct 12, 2017Completed
final sign-off Mar 2018
51 States StGeo Grout Ground Modifications Spec Inc.drill and fill voids under foundation with portland cement slurry type i & 11 low viscosity grout. work at west property line foundation only. work being performed will not affect neighboring property
Details
Permit
201710121060
Status
complete
Filed
Oct 12, 2017
Permit issued
Feb 6, 2018
Final sign-off
Mar 12, 2018
Declared cost
$10,000
Address
51 States St

drill and fill voids under foundation with portland cement slurry type i & 11 low viscosity grout. work at west property line foundation only. work being performed will not affect neighboring property

Open the permit page

$10,000
Sep 25, 2017Completed
final sign-off Sep 2018
6 Bonview StTransatlantic Construction Companyrevisionto 201505126076 add a roof deck. scope change is all within the proved boundry of the building. add stair to roof deck. no stairpenthouse.
Details
Permit
201709259510
Status
complete
Filed
Sep 25, 2017
Permit issued
Jan 24, 2018
Final sign-off
Sep 24, 2018
Declared cost
$15,000
Address
6 Bonview St

revisionto 201505126076 add a roof deck. scope change is all within the proved boundry of the building. add stair to roof deck. no stairpenthouse.

Open the permit page

$15,000
Sep 25, 2017Completed
final sign-off Jan 2020
363 21st AvMaan Global Developmentrevision to 201306210141 to add an additional unit at gr fl to previously approved new 4 story, 3 unit bldg. reprograming previously approved floor plans on upper 3 floor.
Details
Permit
201709259512
Status
complete
Filed
Sep 25, 2017
Permit issued
Apr 26, 2018
Final sign-off
Jan 17, 2020
Declared cost
$110,000
Address
363 21st Av

revision to 201306210141 to add an additional unit at gr fl to previously approved new 4 story, 3 unit bldg. reprograming previously approved floor plans on upper 3 floor.

Open the permit page

$110,000
Sep 25, 2017Completed
final sign-off Sep 2018
2 Bonview StTransatlantic Construction Companyrevisionto 201505126084 add a roof deck. scope change is all within the proved boundry of the building. add stair to roof deck. no stair penthouse.
Details
Permit
201709259508
Status
complete
Filed
Sep 25, 2017
Permit issued
Jan 24, 2018
Final sign-off
Sep 24, 2018
Declared cost
$15,000
Address
2 Bonview St

revisionto 201505126084 add a roof deck. scope change is all within the proved boundry of the building. add stair to roof deck. no stair penthouse.

Open the permit page

$15,000
Sep 18, 2017Never finaled
issued Sep 2017, no final
708 Buchanan StYerba Buena Engineering & Constructionexcavation, installation of new sewerline, backfill, concrete, ac paving. plan to install a new sewer line. adding alterations to permit app#201607273540.
Details
Permit
201709188871
Status
issued
Filed
Sep 18, 2017
Permit issued
Sep 20, 2017
Declared cost
$20,000
Address
708 Buchanan St

excavation, installation of new sewerline, backfill, concrete, ac paving. plan to install a new sewer line. adding alterations to permit app#201607273540.

Open the permit page

$20,000
Sep 14, 2017Completed
final sign-off Feb 2019
1034 Divisadero StHing Wah Construction Incproposed seismic strenghtening to comply w/ san francisco soft story ordinance sfbc ch. 34b. all work with (e) boundary of bldg. 2016 cebc appendix a-4.
Details
Permit
201709148335
Status
complete
Filed
Sep 14, 2017
Permit issued
Jul 31, 2018
Final sign-off
Feb 1, 2019
Declared cost
$150,000
Address
1034 Divisadero St

proposed seismic strenghtening to comply w/ san francisco soft story ordinance sfbc ch. 34b. all work with (e) boundary of bldg. 2016 cebc appendix a-4.

Open the permit page

$150,000
Sep 7, 2017Completed
final sign-off Oct 2022
1368 46th AvPinnacle Remodeling Constructionhorizontal additon at rear of (e) single family home at each flr, adding (n) bedrooms, bathroom, kitchen, dining & living room. proposed sprinkler system (nfpa-13r) under separate permit.
Details
Permit
201709077186
Status
complete
Filed
Sep 7, 2017
Permit issued
May 17, 2019
Final sign-off
Oct 12, 2022
Declared cost
$350,000
Address
1368 46th Av

horizontal additon at rear of (e) single family home at each flr, adding (n) bedrooms, bathroom, kitchen, dining & living room. proposed sprinkler system (nfpa-13r) under separate permit.

Open the permit page

$350,000
Aug 31, 2017Expired or cancelled
cancelled Feb 2020
600 Vermont Stsoft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4
Details
Permit
201708316629
Status
cancelled
Filed
Aug 31, 2017
Declared cost
$175,000
Address
600 Vermont St

soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4

Open the permit page

$175,000
Aug 28, 2017Completed
final sign-off Jun 2018
1266 Hampshire StTransatlantic Construction Companyreplacement of old foundation with new foundation in kind.
Details
Permit
201708286168
Status
complete
Filed
Aug 28, 2017
Permit issued
Sep 7, 2017
Final sign-off
Jun 21, 2018
Declared cost
$60,000
Address
1266 Hampshire St

replacement of old foundation with new foundation in kind.

Open the permit page

$60,000
Aug 24, 2017Never finaled
issued Oct 2017, no final
1560 Dolores Strevision to pa #201410159002 - add a roof deck with new open stair.
Details
Permit
201708245798
Status
issued
Filed
Aug 24, 2017
Permit issued
Oct 6, 2017
Declared cost
$5,000
Address
1560 Dolores St

revision to pa #201410159002 - add a roof deck with new open stair.

Open the permit page

$5,000
Aug 23, 2017Completed
final sign-off Jul 2023
2342 03rd Stexploratory surface removal per elevations per dcp request: removal of flront elevation surace (not to exceed 5% of facade area). removal of left elevation surface (not to exceed 5% of elevation area). patch & replace as needed after expoloratory work. maher na
Details
Permit
201708235651
Status
complete
Filed
Aug 23, 2017
Permit issued
Aug 28, 2017
Final sign-off
Jul 26, 2023
Declared cost
$1,000
Address
2342 03rd St

exploratory surface removal per elevations per dcp request: removal of flront elevation surace (not to exceed 5% of facade area). removal of left elevation surface (not to exceed 5% of elevation area). patch & replace as needed after expoloratory work. maher na

Open the permit page

$1,000
Aug 18, 2017Completed
final sign-off Apr 2019
4334 Geary BlK J Woods Construction Increvision to pa #201410179280 - change two sides (side elevation) of building from wood siding to stucco. n/a maher ordinance
Details
Permit
201708185236
Status
complete
Filed
Aug 18, 2017
Permit issued
Aug 22, 2017
Final sign-off
Apr 19, 2019
Address
4334 Geary Bl

revision to pa #201410179280 - change two sides (side elevation) of building from wood siding to stucco. n/a maher ordinance

Open the permit page

Aug 16, 2017Completed
final sign-off Mar 2019
4565 19th StEastwood Development Incorporatedproposed temporary shoring
Details
Permit
201708165021
Status
complete
Filed
Aug 16, 2017
Permit issued
Oct 6, 2017
Final sign-off
Mar 7, 2019
Declared cost
$55,000
Address
4565 19th St

proposed temporary shoring

Open the permit page

$55,000
Aug 10, 2017Completed
final sign-off Oct 2022
1621 Diamond StMaan Global Developmenthorizontal/vertical addition to (e) single family house. add (2) (n) bath. add (2) (n) half bath.
Details
Permit
201708104463
Status
complete
Filed
Aug 10, 2017
Permit issued
Mar 25, 2019
Final sign-off
Oct 31, 2022
Declared cost
$400,000
Address
1621 Diamond St

horizontal/vertical addition to (e) single family house. add (2) (n) bath. add (2) (n) half bath.

Open the permit page

$400,000
Jul 14, 2017Completed
final sign-off Dec 2019
70 Washburn Stproposed revision to permit #201509106580. interior layout changes on 1st fl and mezzanine level. add one full bath at 1st fl. rearrangement of staircase.
Details
Permit
201707141974
Status
complete
Filed
Jul 14, 2017
Permit issued
Sep 1, 2017
Final sign-off
Dec 5, 2019
Address
70 Washburn St

proposed revision to permit #201509106580. interior layout changes on 1st fl and mezzanine level. add one full bath at 1st fl. rearrangement of staircase.

Open the permit page

Jul 6, 2017Never finaled
issued Jun 2020, no final
244 09th Stvertical & horizontal addition to an (e) bldg to accomodate five story bldg w/ (4) studio dwelling units and (5) 2-bdrm dwelling units & (1) commercial unit. new building is a covered multi-family dwelling building.
Details
Permit
201707061145
Status
issued
Filed
Jul 6, 2017
Permit issued
Jun 17, 2020
Declared cost
$3,600,000
Address
244 09th St

vertical & horizontal addition to an (e) bldg to accomodate five story bldg w/ (4) studio dwelling units and (5) 2-bdrm dwelling units & (1) commercial unit. new building is a covered multi-family dwelling building.

Open the permit page

$3,600,000
Jun 13, 2017Completed
final sign-off May 2019
661 Page StPaul Power Constructionadd unit at basement lvl & 1st flr, pvt roof deck w/no stair penthouse. new skylights, int remodel of flr plans @ (e) 2 units. eliminate wood stair, fully sprinklered bldg nfpa-13r under separate, seismic upgrade,1-hr fire rated upgraded wall assemblies. add 1-1/2 baths on unit 2 & 3.
Details
Permit
201706139268
Status
complete
Filed
Jun 13, 2017
Permit issued
Jan 2, 2018
Final sign-off
May 16, 2019
Declared cost
$600,000
Address
661 Page St

add unit at basement lvl & 1st flr, pvt roof deck w/no stair penthouse. new skylights, int remodel of flr plans @ (e) 2 units. eliminate wood stair, fully sprinklered bldg nfpa-13r under separate, seismic upgrade,1-hr fire rated upgraded wall assemblies. add 1-1/2 baths on unit 2 & 3.

Open the permit page

$600,000
Jun 7, 2017Completed
final sign-off May 2018
1867 San Jose Avproposed partial foundation replacement per plan.
Details
Permit
201706078696
Status
complete
Filed
Jun 7, 2017
Permit issued
Jun 8, 2017
Final sign-off
May 21, 2018
Declared cost
$20,000
Address
1867 San Jose Av

proposed partial foundation replacement per plan.

Open the permit page

$20,000
May 18, 2017Completed
final sign-off Mar 2021
78 Tehama Stinterior remodel e office at bsmt, 1,mezz,2nd fl no chng use,facade,windows. bsmt:rmv e stairs,add new code complnt stairs to 1st fl.1st fl:remove e spiral stairs, add new code compliant hc bath. mezz: demolish part of floor slab, 2nd fl:new code complnt hc bath
Details
Permit
201705187039
Status
complete
Filed
May 18, 2017
Permit issued
Jul 28, 2017
Final sign-off
Mar 18, 2021
Declared cost
$80,000
Address
78 Tehama St

interior remodel e office at bsmt, 1,mezz,2nd fl no chng use,facade,windows. bsmt:rmv e stairs,add new code complnt stairs to 1st fl.1st fl:remove e spiral stairs, add new code compliant hc bath. mezz: demolish part of floor slab, 2nd fl:new code complnt hc bath

Open the permit page

$80,000
May 5, 2017Never finaled
issued May 2021, no final
562 28th AvRomkon Incto erect 4 stories, 1 basement, 6 dwelling units bldg.
Details
Permit
201705055838
Status
issued
Filed
May 5, 2017
Permit issued
May 13, 2021
Declared cost
$1,800,888
Address
562 28th Av

to erect 4 stories, 1 basement, 6 dwelling units bldg.

Open the permit page

$1,800,888
May 5, 2017Never finaled
issued May 2021, no final
562 28th AvRomkon Incto demolish a three stories of a single family dwelling
Details
Permit
201705055832
Status
issued
Filed
May 5, 2017
Permit issued
May 13, 2021
Declared cost
$5,000
Address
562 28th Av

to demolish a three stories of a single family dwelling

Open the permit page

$5,000