Albert Urrutia
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Atrium Structural Engineer
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Oct 2026
846 permits since 2000 (engineer on 767 permits, architect on 61 permits, authorized agent-others on 10 permits, pmt consultant/expediter on 5 permits, designer on 3 permits): 464 completed, 160 in progress, 90 never finaled, 132 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 846.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 3330 21st St | revision to bpa: 2025.0625.9416 - new moment frame at front of garage - voluntary. ref bpa: 2026.0304.6919Details
revision to bpa: 2025.0625.9416 - new moment frame at front of garage - voluntary. ref bpa: 2026.0304.6919 | $20,000 | |
| Oct 2, 2026 | In progress issued Oct 2026 | 1970 Ocean Av | Sjk Development | new heatingDetails
new heating | $150,000 |
| Oct 1, 2026 | In progress issued Oct 2026 | 3229 Jennings St | Alvarez Construction & Tile, Inc | response to nov 202661595 to restore grade at basement and infill opening in wallDetails
response to nov 202661595 to restore grade at basement and infill opening in wall | $10,000 |
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 583 Arguello Bl | to comply with ces202429178: seismic retrofitDetails
to comply with ces202429178: seismic retrofit | $200,000 | |
| Sep 30, 2026 | In progress issued Oct 2026 | 150 Valencia St | Ewsf Inc. | non-structural demo on 1st & 2nd fl, construct 5 new restrooms on 1st & 2nd fl. upgrade existing front door, replacement in kind. no change of use. no sidewalk work.Details
non-structural demo on 1st & 2nd fl, construct 5 new restrooms on 1st & 2nd fl. upgrade existing front door, replacement in kind. no change of use. no sidewalk work. | $188,200 |
| Sep 25, 2026 | In progress issued Sep 2026 | 1306 Montgomery St | Star Waterproofing And Roofing | unit 2: response to dbi inspector request repair & replace decayed wall-notvisible from the street. ref. permit #202606123131Details
unit 2: response to dbi inspector request repair & replace decayed wall-notvisible from the street. ref. permit #202606123131 | $5,000 |
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 266 Santa Paula Av | add a new elevator shaft at rear of residence. add greenhouse at second floor rear deck to access elevator. add stairs from garage to elevator with a new slab at rear patio.Details
add a new elevator shaft at rear of residence. add greenhouse at second floor rear deck to access elevator. add stairs from garage to elevator with a new slab at rear patio. | $150,000 | |
| Sep 17, 2026 | In progress issued Sep 2026 | 233 Corbett Av | Umlaut Interiors Llc | relace dry rot rear decks in-kind, replace wood railings with new cable railingsDetails
relace dry rot rear decks in-kind, replace wood railings with new cable railings | $45,000 |
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 1970 Ocean Av | Sjk Development | voluntary lateral upgrade of west wing of building work to include adding plywood to roof, adding connectors, adding shear walls @ front of bldg behind (e) wall. no exterior changes, ada under separate permitDetails
voluntary lateral upgrade of west wing of building work to include adding plywood to roof, adding connectors, adding shear walls @ front of bldg behind (e) wall. no exterior changes, ada under separate permit | $50,000 |
| Sep 11, 2026 | In progress issued Sep 2026 | 1391 Vallejo St | Brennan Strong Hold Construction Inc | remodel units 1391/1393 addition f new bathroom. install new stair to basement connecting 1/f to unit 1931. amend 202608056148 remodel (e) kitchen/bath in both unit.Details
remodel units 1391/1393 addition f new bathroom. install new stair to basement connecting 1/f to unit 1931. amend 202608056148 remodel (e) kitchen/bath in both unit. | $80,000 |
| Sep 10, 2026 | In progress issued Sep 2026 | 1270 03rd Av | Alvarez Construction & Tile, Inc | 1/f - remodel unit throughout, new plumbing, new electrical, new kitchen, new bathrooms, create new opening, install new header per drawing. 2/f - remodel unit throughout, new plumbing, new electrical, remodel kitchen + bath. add 2 bathrooms on first floor-unit#1274 & 2nd fl unit#1272 respectivelyDetails
1/f - remodel unit throughout, new plumbing, new electrical, new kitchen, new bathrooms, create new opening, install new header per drawing. 2/f - remodel unit throughout, new plumbing, new electrical, remodel kitchen + bath. add 2 bathrooms on first floor-unit#1274 & 2nd fl unit#1272 respectively | $215,000 |
| Sep 8, 2026 | In progress issued Sep 2026 | 301 Main St | 415 Remodeling Inc | unit 32e: install new monkey bars at kids bedroom.Details
unit 32e: install new monkey bars at kids bedroom. | $20,000 |
| Sep 4, 2026 | In progress filed Sep 2026, not yet issued | 51 Commonwealth Av | C C I Commercial Construction & Improv | after fire re-build of mid-section building to match existing (like for like) with same area and building envelopeDetails
after fire re-build of mid-section building to match existing (like for like) with same area and building envelope | $235,500 |
| Sep 4, 2026 | In progress issued Sep 2026 | 130 Montalvo Av | widening garage door opening by 2 ft.Details
widening garage door opening by 2 ft. | $10,000 | |
| Sep 3, 2026 | In progress issued Sep 2026 | 1240 Broadway | Daniele Construction | front building: removal and replacement of flood damaged terrazo stairs front of building in kind. new stairs shall be concrete construction. new reinforce stairs and landing.Details
front building: removal and replacement of flood damaged terrazo stairs front of building in kind. new stairs shall be concrete construction. new reinforce stairs and landing. | $16,500 |
| Sep 3, 2026 | In progress filed Sep 2026, not yet issued | 129 Saturn St | new two story adu within existing building envelope of a duplex residenceDetails
new two story adu within existing building envelope of a duplex residence | $195,000 | |
| Sep 3, 2026 | In progress issued Sep 2026 | 1970 Ocean Av | Sjk Development | voluntary lateral upgrade of east wing building. work to include adding plywood to roof, adding wall to roof & floor connectors, adding concrete shear walls @ front of building behind (e) wall. no exterior changes, ada under separate permit.Details
voluntary lateral upgrade of east wing building. work to include adding plywood to roof, adding wall to roof & floor connectors, adding concrete shear walls @ front of building behind (e) wall. no exterior changes, ada under separate permit. | $52,500 |
| Aug 28, 2026 | In progress issued Sep 2026 | 856 Baker St | Hand Hammer Dev Llc | top unit: 2nd fl bathroom remodel and powder room addition. new dormer on 2nd fl. replacing skylights i kind. new electrical and lighting in both 2nd fl bathrooms. insulate (e) attic space. remove and cap (e) fireplace.Details
top unit: 2nd fl bathroom remodel and powder room addition. new dormer on 2nd fl. replacing skylights i kind. new electrical and lighting in both 2nd fl bathrooms. insulate (e) attic space. remove and cap (e) fireplace. | $80,000 |
| Aug 25, 2026 | In progress issued Sep 2026 | 1090 Hampshire St | Current Construction | revision to permit 202512222425 to include foundation layout changes due to discovery of existing framing direction b/w lines 1 and 2. revised beam size at 2/f at line b b/t 5.2 and 6.Details
revision to permit 202512222425 to include foundation layout changes due to discovery of existing framing direction b/w lines 1 and 2. revised beam size at 2/f at line b b/t 5.2 and 6. | $10,000 |
| Aug 7, 2026 | In progress issued Aug 2026 | 209 San Marcos Av | replace rotten (e) deck support with (n) footings, grade beams, steel beams & columns. no change to deck layout.Details
replace rotten (e) deck support with (n) footings, grade beams, steel beams & columns. no change to deck layout. | $70,000 | |
| Aug 5, 2026 | In progress issued Aug 2026 | 4 Presidio Tr | Broad Oaks Construction Inc | kitchen remodel to remove wall between kitchen and dining room. new cabinets, countertops, fixtures, appliances, and wood floor. meps under seperate permitDetails
kitchen remodel to remove wall between kitchen and dining room. new cabinets, countertops, fixtures, appliances, and wood floor. meps under seperate permit | $250,000 |
| Aug 4, 2026 | In progress issued Aug 2026 | 1970 Ocean Av | Sjk Development | revision to permit 2026-0707-4647 to include infill (e) duct opening at 1st & 2nd floors and construct new non bearing partitions. 8/7/2026Details
revision to permit 2026-0707-4647 to include infill (e) duct opening at 1st & 2nd floors and construct new non bearing partitions. 8/7/2026 | $8,000 |
| Aug 3, 2026 | In progress issued Aug 2026 | 825 Francisco St | Thompson Suskind L P | temporary vertical shoring of existing building to perform work permitted under 202510066774 and revision 202607014402Details
temporary vertical shoring of existing building to perform work permitted under 202510066774 and revision 202607014402 | |
| Jul 27, 2026 | Completed final sign-off Sep 2026 | 3239 Mission St | Lyne Construction | unit 8: replacement of header + door to 2nd floor rear deck. header @ 3rd floor framing.Details
unit 8: replacement of header + door to 2nd floor rear deck. header @ 3rd floor framing. | $1,200 |
| Jul 26, 2026 | In progress filed Jul 2026, not yet issued | 575 Kansas St | state adu program by converting the ground level unconditioned space within the building envelopeDetails
state adu program by converting the ground level unconditioned space within the building envelope | $150,000 | |
| Jul 24, 2026 | In progress issued Jul 2026 | 2622 Greenwich St | Rwr Construction Inc | permit to address nov 201995131 on 2628 greenwich property. work to filll e gap between foundations. shared plans with pa# 202607134939.Details
permit to address nov 201995131 on 2628 greenwich property. work to filll e gap between foundations. shared plans with pa# 202607134939. | |
| Jul 13, 2026 | In progress issued Jul 2026 | 130 Montalvo Av | remodel (e) ktichen, bathrooms, laundry room, (n) built interior service stair connecting lower and main level. structural modifications for (n) beam for ktichen remodel to replace (e) load beraing wall. (n) steal beam at garage ceiling to relocate postsDetails
remodel (e) ktichen, bathrooms, laundry room, (n) built interior service stair connecting lower and main level. structural modifications for (n) beam for ktichen remodel to replace (e) load beraing wall. (n) steal beam at garage ceiling to relocate posts | $150,000 | |
| Jul 13, 2026 | In progress issued Jul 2026 | 2628 Greenwich St | Rwr Construction Inc | to abate nov 201995131 to fill (e) gap between foundation and allow 2622 foundation to support laterally 2626-2630 greenwich foundations. shared plans with pa#202607245500.Details
to abate nov 201995131 to fill (e) gap between foundation and allow 2622 foundation to support laterally 2626-2630 greenwich foundations. shared plans with pa#202607245500. | $20,000 |
| Jul 9, 2026 | In progress issued Jul 2026 | 2218 Clay St | Ashbury Gen Constructing & Eng | revision to previous approved, no plans permit# 202605271990. work to included removal of 2 walls at kitchen area, addition of 3 new beams, addition of condensation shear wall at 1st & 2nd floors. no exterior work.Details
revision to previous approved, no plans permit# 202605271990. work to included removal of 2 walls at kitchen area, addition of 3 new beams, addition of condensation shear wall at 1st & 2nd floors. no exterior work. | $100,000 |
| Jul 8, 2026 | In progress issued Jul 2026 | 1314 22nd Av | A L V Construction Inc | repair of e) roof trusses by reinforcing bottom citors & adding column & foundation at denter of truss, no exteiror workDetails
repair of e) roof trusses by reinforcing bottom citors & adding column & foundation at denter of truss, no exteiror work | $50,000 |
| Jun 29, 2026 | In progress issued Jul 2026 | 300 Nevada St | We Do Construction Inc. | stucco repair and dryrot repair in kind at eastern and southern facades. all existing doors and windows removed during repair will be reused and placed back in existing openings in kind.Details
stucco repair and dryrot repair in kind at eastern and southern facades. all existing doors and windows removed during repair will be reused and placed back in existing openings in kind. | $20,000 |
| Jun 23, 2026 | Completed final sign-off Jul 2026 | 1204 Treat Av | at ground floor interior work only no structural. relocate (e) bedroom to becomen den. no plumbing, mech, or electrical. relocate (e)bedroom to (e) excercise/sitting room at rear.Details
at ground floor interior work only no structural. relocate (e) bedroom to becomen den. no plumbing, mech, or electrical. relocate (e)bedroom to (e) excercise/sitting room at rear. | $1,000 | |
| Jun 17, 2026 | In progress filed Jun 2026, not yet issued | 845 Francisco St | Thompson Suskind L P | dig temporary shoring pit for temporary relocation building due to work under pa#: 202605121069 and removal of 7 trees. temporay shoring will not affect adjacent property.Details
dig temporary shoring pit for temporary relocation building due to work under pa#: 202605121069 and removal of 7 trees. temporay shoring will not affect adjacent property. | |
| Jun 17, 2026 | Completed final sign-off Aug 2026 | 2330 17th St | Kells Construction Inc. | to comply w/ nov 202544849. replace e) damaged garage header & post in kind, replace 100 sf stucco, patch & repair in kind, install 3 new garage doors in kind. work not in public right of wayDetails
to comply w/ nov 202544849. replace e) damaged garage header & post in kind, replace 100 sf stucco, patch & repair in kind, install 3 new garage doors in kind. work not in public right of way | $30,000 |
| Jun 17, 2026 | Expired or cancelled withdrawn Aug 2026 | 825 Francisco St | Thompson Suskind L P | temporary vertical shoring and temporary move of (e) building to adjacent lot ot perform work permitted under pa#: 202605121069Details
temporary vertical shoring and temporary move of (e) building to adjacent lot ot perform work permitted under pa#: 202605121069 | |
| Jun 12, 2026 | In progress issued Jul 2026 | 260 22nd Av | new interior stair and roof access skylight for new 436sq.ft. roof deck at unit 260 22nd ave. upgrade existing entry and stair to 1-hr corridor at all floors.Details
new interior stair and roof access skylight for new 436sq.ft. roof deck at unit 260 22nd ave. upgrade existing entry and stair to 1-hr corridor at all floors. | $75,000 | |
| Jun 11, 2026 | In progress issued Jun 2026 | 15 Westgate Dr | J Construction Solutions | revision to permit 202507281716 to add deck over portion of 2nd floor. revise kitchen layout and revise special inspection.Details
revision to permit 202507281716 to add deck over portion of 2nd floor. revise kitchen layout and revise special inspection. | $25,000 |
| Jun 9, 2026 | In progress issued Jun 2026 | 1244 Broadway | Daniele Construction | replacement of brick foundation to (n) concrete foundation and slab. complete remodel of bathroom, addition of laundry room, removal of wall furnace and installation of new forced air furnace, remove tank water heater and replace with tank . flood damaged walls and floors, repair flood damagedDetails
replacement of brick foundation to (n) concrete foundation and slab. complete remodel of bathroom, addition of laundry room, removal of wall furnace and installation of new forced air furnace, remove tank water heater and replace with tank . flood damaged walls and floors, repair flood damaged | $88,500 |
| Jun 9, 2026 | In progress issued Aug 2026 | 619 Cayuga Av | Daaron Builders | remodel kitchen + full bath. replace windows and doors at 2nd story rear wall & central courtyard. reroof. 2 replaced skylights. replaced electrical panel at garage. see structural for window and door headers.Details
remodel kitchen + full bath. replace windows and doors at 2nd story rear wall & central courtyard. reroof. 2 replaced skylights. replaced electrical panel at garage. see structural for window and door headers. | $75,000 |
| Jun 5, 2026 | In progress issued Jun 2026 | 761 Noe St | Dziurzynski Mariusz | voluntary roof structural strengthening. lightwell infill at north property line. dryrot replace, bathroom skylight relocation, kitchen skylight replacement, infill bathroom window, new bathroom pocket door, roof torch down touchups (for sklyights only) ref: 202604219832 and 202604219787Details
voluntary roof structural strengthening. lightwell infill at north property line. dryrot replace, bathroom skylight relocation, kitchen skylight replacement, infill bathroom window, new bathroom pocket door, roof torch down touchups (for sklyights only) ref: 202604219832 and 202604219787 | $5,000 |
| May 27, 2026 | In progress filed May 2026, not yet issued | 245 Dorantes Av | adu at 1/f, replace (e) garage with (n) living area, install (n) kitchen and (n) half-bathroom and mech equipment for adu, replace (e) furnaces for house, replace (e) water heater, install (n) wood and glass doors at front and back of adu.Details
adu at 1/f, replace (e) garage with (n) living area, install (n) kitchen and (n) half-bathroom and mech equipment for adu, replace (e) furnaces for house, replace (e) water heater, install (n) wood and glass doors at front and back of adu. | $150,000 | |
| May 26, 2026 | In progress issued May 2026 | 1139 Lake St | lightwell infill at 3rd fl, different lightwell from permit #202603177751Details
lightwell infill at 3rd fl, different lightwell from permit #202603177751 | $33,000 | |
| May 26, 2026 | In progress issued Aug 2026 | 2156 Bryant St | Almac Construction | proposed interior renovation of an existing upper unit in a 2-unit apartment. work includes - moving kitchen, removal bathroom and adding 4 skylights. removal of chimney & firebox. infill floor & roof. revision to 202604159516Details
proposed interior renovation of an existing upper unit in a 2-unit apartment. work includes - moving kitchen, removal bathroom and adding 4 skylights. removal of chimney & firebox. infill floor & roof. revision to 202604159516 | $30,000 |
| May 19, 2026 | In progress issued May 2026 | 1945 Pacific Av | Matthew Kelly Construction Inc, Lei's Construction Company | dry rot repair at balcony on the 4th floorDetails
dry rot repair at balcony on the 4th floor | $5,000 |
| May 13, 2026 | Completed final sign-off Sep 2026 | 219 Los Palmos Dr | A L Martin Construction | replace existing skylight in tunnel entrance way new roof structure and 3 new skylights. add fire rated wall at property line to support new skylights and roof structure. provide new r11 rated non-slip ceramic tile over existing concrete floor.Details
replace existing skylight in tunnel entrance way new roof structure and 3 new skylights. add fire rated wall at property line to support new skylights and roof structure. provide new r11 rated non-slip ceramic tile over existing concrete floor. | $30,000 |
| May 12, 2026 | In progress issued May 2026 | 11 Mars St | Umlaut Interiors Llc | revision to permit 202502180547 at existing 3rd floor balcony. add new tempered glass guard rail and ancillary wood rail.Details
revision to permit 202502180547 at existing 3rd floor balcony. add new tempered glass guard rail and ancillary wood rail. | $3,000 |
| May 11, 2026 | In progress issued May 2026 | 87 Hernandez Av | Doran Construction & Design | revision to pa# 202502190589: remove existing front exterior stair. provide new layout for new stair. new framing of existing exterior walls and new stucco finish at front and north side due to dryrot. replace (e) windows at front and north/south facades w/ (n) windows in (e) openings. move locationDetails
revision to pa# 202502190589: remove existing front exterior stair. provide new layout for new stair. new framing of existing exterior walls and new stucco finish at front and north side due to dryrot. replace (e) windows at front and north/south facades w/ (n) windows in (e) openings. move location | $50,000 |
| May 6, 2026 | Completed final sign-off Jun 2026 | 77 Federal St | Ewsf Inc. | 1/f and basement: revision to 202602035133. add (1) office room, (2) phone room and (1) idf room on level 1. new soffit and (2) closets at break area l1. bottle filler devices added to break area 4 and basement.Details
1/f and basement: revision to 202602035133. add (1) office room, (2) phone room and (1) idf room on level 1. new soffit and (2) closets at break area l1. bottle filler devices added to break area 4 and basement. | $6,000 |
| May 5, 2026 | In progress issued May 2026 | 1327 20th Av | Mcguinness Mccann Group | revision to previously approved permit 2026-0317-7706 to include widening stairs to match original configuration-add new footings under side walls.Details
revision to previously approved permit 2026-0317-7706 to include widening stairs to match original configuration-add new footings under side walls. | $4,000 |
| Apr 30, 2026 | In progress issued May 2026 | 2043 15th St | revision to bpa's: 202512010661 and 202603248198 -replace foundation at line 2 between lines a abd b.7, replace foundation at line a, between 1 and 2.Details
revision to bpa's: 202512010661 and 202603248198 -replace foundation at line 2 between lines a abd b.7, replace foundation at line a, between 1 and 2. | $8,000 | |
| Apr 24, 2026 | Completed final sign-off Jun 2026 | 539 Greenwich St | Bull Construction | replacing of failing portion of (e) retaining wall along property line.Details
replacing of failing portion of (e) retaining wall along property line. | $10,000 |
| Apr 16, 2026 | In progress issued May 2026 | 2831 Ortega St | Arpol Inc | interior remodel at 1st and 2nd floors, including adding one bathroom each on 1st and 2nd floors.Details
interior remodel at 1st and 2nd floors, including adding one bathroom each on 1st and 2nd floors. | $65,000 |
| Apr 9, 2026 | In progress issued Apr 2026 | 20 San Felipe Av | rear foundation underpinning and addition of a sump.Details
rear foundation underpinning and addition of a sump. | $8,000 | |
| Apr 6, 2026 | In progress issued Apr 2026 | 1024 Chestnut St | Krueger Bros Builders Inc. | replace existing fire damaged joists and stud walls like in like kindDetails
replace existing fire damaged joists and stud walls like in like kind | $10,500 |
| Mar 26, 2026 | In progress filed Mar 2026, not yet issued | 195 02nd Av | provide new laundry closet accessible from the 1st floor entry hallway.Details
provide new laundry closet accessible from the 1st floor entry hallway. | $6,000 | |
| Mar 25, 2026 | In progress filed Mar 2026, not yet issued | 2336 Lake St | revision to bpa: 202504144335 - (partial foundation replacement add northeast corner of foundation replacement)Details
revision to bpa: 202504144335 - (partial foundation replacement add northeast corner of foundation replacement) | $5,000 | |
| Mar 25, 2026 | In progress issued Apr 2026 | 988 Market St | Swinerton Builders | revision 202503273203- floors 9-10 for demo of portion of concrete floor and steel reinforcing for opening. hvac ducting will go through from floors.Details
revision 202503273203- floors 9-10 for demo of portion of concrete floor and steel reinforcing for opening. hvac ducting will go through from floors. | $14,580 |
| Mar 24, 2026 | In progress issued Mar 2026 | 2043 15th St | revision to previously approved pa#202512010661 to replace (e)property line foundation along east side in alternating sections.Details
revision to previously approved pa#202512010661 to replace (e)property line foundation along east side in alternating sections. | $10,000 | |
| Mar 23, 2026 | In progress issued Apr 2026 | 1035 Haight St | O'kane Construction Llc | structural work only to include sistering exterior brick wall with new concrete wall, new foundations for bearing wall and real wall, shear (e) rear wall, repair framing as req'd. kitchen and bathroom under permit 202406285493.Details
structural work only to include sistering exterior brick wall with new concrete wall, new foundations for bearing wall and real wall, shear (e) rear wall, repair framing as req'd. kitchen and bathroom under permit 202406285493. | $65,000 |
| Mar 19, 2026 | In progress issued Mar 2026 | 1327 20th Av | Mcguinness Mccann Group | work at rear cottage only to include: lower floor framing to achieve 9'-0" ceiling ht. replace entry door & windows. replace entry steps & railing.Details
work at rear cottage only to include: lower floor framing to achieve 9'-0" ceiling ht. replace entry door & windows. replace entry steps & railing. | $10,000 |
| Mar 17, 2026 | In progress issued Mar 2026 | 1327 20th Av | Mcguinness Mccann Group | replace (e) front stairs, sidewalls design change to match previous configurationDetails
replace (e) front stairs, sidewalls design change to match previous configuration | $25,000 |
| Mar 17, 2026 | In progress issued Mar 2026 | 1139 Lake St | lightwell infill w/ four story elevator to improve building accessibility. no increase to bldg height. new common stair & vestibule serving all 3 dwelling units. new stair (interior) at upper most unit.Details
lightwell infill w/ four story elevator to improve building accessibility. no increase to bldg height. new common stair & vestibule serving all 3 dwelling units. new stair (interior) at upper most unit. | $300,000 | |
| Mar 9, 2026 | In progress issued Mar 2026 | 2667 22nd Av | revision to permit 202506128524 to include underpinning of north foundation in sections and revise details to remove curb at slab.Details
revision to permit 202506128524 to include underpinning of north foundation in sections and revise details to remove curb at slab. | ||
| Feb 27, 2026 | Completed final sign-off May 2026 | 1000 Dolores St | Robert Hauser Construction | comply with nov #202545593, item 2 - repair of concrete entry stairway.Details
comply with nov #202545593, item 2 - repair of concrete entry stairway. | $25,000 |
| Feb 27, 2026 | In progress issued Feb 2026 | 1139 Lake St | revision to pa #2025-1110-9244: add one 1/2 bath on the 3rd fl. resheet rock walls and ceilings in 3 rooms.Details
revision to pa #2025-1110-9244: add one 1/2 bath on the 3rd fl. resheet rock walls and ceilings in 3 rooms. | $30,000 | |
| Feb 25, 2026 | In progress filed Feb 2026, not yet issued | 282 Chattanooga St | remodel bathrooms and kitchen. convert unconditioned greenhouse space at the rear to conditioned space.Details
remodel bathrooms and kitchen. convert unconditioned greenhouse space at the rear to conditioned space. | $200,000 | |
| Feb 24, 2026 | In progress issued Mar 2026 | 1245 Willard St | new elevator stopping at garage, 1st and 2nd floors, located where a closet used to be. relocating wall in garage.Details
new elevator stopping at garage, 1st and 2nd floors, located where a closet used to be. relocating wall in garage. | $30,000 | |
| Feb 23, 2026 | Completed final sign-off May 2026 | 1141 Howard St | rebuild concrete wall at rear of the building. reference pa # 2026-0126-4518 associated with the demolition of the property line wall.Details
rebuild concrete wall at rear of the building. reference pa # 2026-0126-4518 associated with the demolition of the property line wall. | $75,000 | |
| Feb 19, 2026 | In progress issued Feb 2026 | 4819 Anza St | G&C Construction Services Inc. | revision to pa 202511240326 alteration to (e) single family home. conversion of existing garge to living area; relocate kitchen to 1st fl; add 1 full bath first floor; reconfigure 2nd floorDetails
revision to pa 202511240326 alteration to (e) single family home. conversion of existing garge to living area; relocate kitchen to 1st fl; add 1 full bath first floor; reconfigure 2nd floor | $150,000 |
| Feb 19, 2026 | In progress issued Mar 2026 | 2030 Fell St | Mcguinness Mccann Group | 4th fl - unit 5: kitchen remodel. remove 2 bearing walls and replace with beams. post align down to foundation. changing dining room to bedroom.Details
4th fl - unit 5: kitchen remodel. remove 2 bearing walls and replace with beams. post align down to foundation. changing dining room to bedroom. | $30,000 |
| Feb 13, 2026 | In progress issued Feb 2026 | 12 Hoffman Av | E & E General Construction Inc | partial foundation replacement and approximately 500 sqft of wall dry rot repair.Details
partial foundation replacement and approximately 500 sqft of wall dry rot repair. | $40,000 |
| Feb 12, 2026 | In progress filed Feb 2026, not yet issued | 785 Columbus Av | Alpha Construction Co *Stop Issusing* | to obtain final inspection for work approved under 202311019917. all work is completeDetails
to obtain final inspection for work approved under 202311019917. all work is complete | |
| Feb 11, 2026 | Completed final sign-off Apr 2026 | 783 11th Av | Szeto Construction | to abate nov 202650561- auto damage repair to include replace corner post repair interior plaster cracks, paint @ 2nd floor, replace stucco in kind at entry wall and face of building. replace garage door and enlarge entry doorDetails
to abate nov 202650561- auto damage repair to include replace corner post repair interior plaster cracks, paint @ 2nd floor, replace stucco in kind at entry wall and face of building. replace garage door and enlarge entry door | $60,000 |
| Feb 11, 2026 | Completed final sign-off Apr 2026 | 787 11th Av | Szeto Construction | to abate nov 202650561- auto damage repair to include replace corner post repair interior plaster cracks, paint @ 2nd floor, replace stucco in kind at entry wall and face of buildling.Details
to abate nov 202650561- auto damage repair to include replace corner post repair interior plaster cracks, paint @ 2nd floor, replace stucco in kind at entry wall and face of buildling. | $30,000 |
| Feb 6, 2026 | In progress filed Feb 2026, not yet issued | 2946 California St | Astorga Construction Inc | addition of 182 sqft private roof deck, spiral stair in 47sqft private penthouse addition & a solar panel system. all envelope expansion is above existing roof. structural engineering for all components in scope provided besides stair which will be issued as deferred submittal. no plumb or elec workDetails
addition of 182 sqft private roof deck, spiral stair in 47sqft private penthouse addition & a solar panel system. all envelope expansion is above existing roof. structural engineering for all components in scope provided besides stair which will be issued as deferred submittal. no plumb or elec work | $115,000 |
| Feb 5, 2026 | In progress issued Apr 2026 | 190 28th Av | Lcy Contruciton Inc | new side yard exterior spiral stair to (e) rear deck. new deck flooring & guardrail at (e) rear deck; open 1/f kitchen & dining. new 1/f bathroom. (e) 2/f primary bathroom. (e) 2/f bathroom, select new windows.Details
new side yard exterior spiral stair to (e) rear deck. new deck flooring & guardrail at (e) rear deck; open 1/f kitchen & dining. new 1/f bathroom. (e) 2/f primary bathroom. (e) 2/f bathroom, select new windows. | $313,000 |
| Feb 3, 2026 | In progress filed Feb 2026, not yet issued | 3328 21st St | replace existing rear stairs with new going up to 3rd floor.Details
replace existing rear stairs with new going up to 3rd floor. | $20,000 | |
| Feb 3, 2026 | Completed final sign-off Jun 2026 | 77 Federal St | Ewsf Inc. | 1st fl & basement improvement: new non structural walls & partitions. new interior finishes, two new bathrooms, one new mother's room with sink, two new sink counters. mep modification. change of use from retail space (gym) to business service b. no exterior, structural or demo work.Details
1st fl & basement improvement: new non structural walls & partitions. new interior finishes, two new bathrooms, one new mother's room with sink, two new sink counters. mep modification. change of use from retail space (gym) to business service b. no exterior, structural or demo work. | $300,000 |
| Jan 28, 2026 | In progress issued Jan 2026 | 650 Laguna Honda Bl | Custom Construction Enterprises | struc'l eng: atrium struc'l eng. revision to 202512051071; remove & replace (e) foundation & concrete slab except in the area of the garage. remove & replace the (e) window @ 1st fl office @ front & south side facades; provide (n) patio door & exterior steps to rear yard from 1st fl family room; (n)Details
struc'l eng: atrium struc'l eng. revision to 202512051071; remove & replace (e) foundation & concrete slab except in the area of the garage. remove & replace the (e) window @ 1st fl office @ front & south side facades; provide (n) patio door & exterior steps to rear yard from 1st fl family room; (n) | $70,000 |
| Jan 28, 2026 | Completed final sign-off Oct 2026 | 32 West Portal Av | Gartan Construction | revision to pa 202509094918 changes include (n) janitor closet location; (n) wall 2 floral prep & (n) door to floral cooler; (n) pass thru @ kitchen, (n) guardrail detail * no struct. above entry, (n) sneeze guard awningDetails
revision to pa 202509094918 changes include (n) janitor closet location; (n) wall 2 floral prep & (n) door to floral cooler; (n) pass thru @ kitchen, (n) guardrail detail * no struct. above entry, (n) sneeze guard awning | |
| Jan 20, 2026 | Completed final sign-off Feb 2026 | 785 Columbus Av | Alpha Construction Co *Stop Issusing* | revision to pa 202311019917 (commercial soft story) to remove mep deferral requirementDetails
revision to pa 202311019917 (commercial soft story) to remove mep deferral requirement | |
| Jan 7, 2026 | In progress issued Jun 2026 | 1090 Hampshire St | Current Construction | legalize (1) (e) non-permitted unit @ ground level (nsr filed under 2021-001218prj /canceled permit).add (1) new adu @ ground level. removes (4) garages, garage doors, & associated curb cuts.new windows & doors @ exterior. structural / seismic upgrade.project contains (2) kitchens,(2 1/2) baths...Details
legalize (1) (e) non-permitted unit @ ground level (nsr filed under 2021-001218prj /canceled permit).add (1) new adu @ ground level. removes (4) garages, garage doors, & associated curb cuts.new windows & doors @ exterior. structural / seismic upgrade.project contains (2) kitchens,(2 1/2) baths... | $275,000 |
| Dec 18, 2025 | Completed final sign-off Sep 2026 | 2180 Folsom St | interior build out on an industrial warehouse space after fire repair. fire repair permit has been closed out. work includes new; non-structural partitions, plumbing distribution, electrical, mechanical, lighting replacement, insulated penthouse assembly, pedesal rooftop mechanical deck.Details
interior build out on an industrial warehouse space after fire repair. fire repair permit has been closed out. work includes new; non-structural partitions, plumbing distribution, electrical, mechanical, lighting replacement, insulated penthouse assembly, pedesal rooftop mechanical deck. | $150,000 | |
| Dec 16, 2025 | In progress issued Apr 2026 | 1486 Jackson St | E B W Builders Inc | unit 1486 - 2nd fl: demo all (e) construction back to framing, add bedroom, new kitchen, additional bathroom, all new mech system & structural upgrades. no bldg envelope changes, no sq ft added.Details
unit 1486 - 2nd fl: demo all (e) construction back to framing, add bedroom, new kitchen, additional bathroom, all new mech system & structural upgrades. no bldg envelope changes, no sq ft added. | $262,052 |
| Dec 10, 2025 | In progress issued Jan 2026 | 30 Quickstep Ln | Sederap's Drywall Inc. | fire repair 2 rear decks, replace sheet rock, 2 baths, 1 kitchen. address complaints 202535175Details
fire repair 2 rear decks, replace sheet rock, 2 baths, 1 kitchen. address complaints 202535175 | $45,000 |
| Dec 9, 2025 | Completed final sign-off Sep 2026 | 35 Apollo St | replacement of existing property line retaining wall on 2 sides in the rear yard.Details
replacement of existing property line retaining wall on 2 sides in the rear yard. | $40,000 | |
| Dec 1, 2025 | In progress issued Dec 2025 | 2043 15th St | structure (b) addition - storage/garage: new steel beam to replace existing line of support, new shear wall.Details
structure (b) addition - storage/garage: new steel beam to replace existing line of support, new shear wall. | $15,000 | |
| Dec 1, 2025 | In progress issued Dec 2025 | 2043 15th St | structure (a) - residential units: remodel unit 2043 15th st. relocate kitchen and bath, new structural work - shear wall, foundation at property line.Details
structure (a) - residential units: remodel unit 2043 15th st. relocate kitchen and bath, new structural work - shear wall, foundation at property line. | $80,000 | |
| Nov 21, 2025 | In progress issued Dec 2025 | 240 Carl St | De Brus Construction Inc | revision to pa #202307111838 to include: remove framing at garage and new slab to match existing garage elevation. new steel beam to replace existing bearing line to be removed. new foundation at east property line.Details
revision to pa #202307111838 to include: remove framing at garage and new slab to match existing garage elevation. new steel beam to replace existing bearing line to be removed. new foundation at east property line. | $10,000 |
| Nov 18, 2025 | In progress issued Mar 2026 | 266 Santa Paula Av | North Dream Construction Inc, Kerley Construction Inc | new site retaining wall to address complaint 202419761. no alteration to (e) house or garage structure.Details
new site retaining wall to address complaint 202419761. no alteration to (e) house or garage structure. | $25,000 |
| Nov 10, 2025 | In progress issued Nov 2025 | 1139 Lake St | unit:1139 (3rd floor) interior wall remodel, bathroom partial remodel-two baths retile, fixtures remain, and rotted door exchange.Details
unit:1139 (3rd floor) interior wall remodel, bathroom partial remodel-two baths retile, fixtures remain, and rotted door exchange. | $125,000 | |
| Nov 7, 2025 | In progress issued Nov 2025 | 1255 Connecticut St | revision to 202508213626. lateral support for work benches, fume hoods, glove box, sem fib, waste drums, chemical cabinets. all other equipment per original.Details
revision to 202508213626. lateral support for work benches, fume hoods, glove box, sem fib, waste drums, chemical cabinets. all other equipment per original. | ||
| Nov 7, 2025 | Completed final sign-off Oct 2026 | 11 Jordan Av | K 2 Builders Inc | project proposes new 1st fl habitable space with a new bedroom, family room, laundry room, new stair to floor above. 2nd fl: new powder room proposed. the scope includes voluntary soft story lateral upgrade.Details
project proposes new 1st fl habitable space with a new bedroom, family room, laundry room, new stair to floor above. 2nd fl: new powder room proposed. the scope includes voluntary soft story lateral upgrade. | $206,000 |
| Nov 5, 2025 | In progress issued Mar 2026 | 40 Fanning Wy | O'shea Co. Home Grown Construction | 1 story horizontal rear yard addition interior remodel of the existing 1st floor level and basement levelDetails
1 story horizontal rear yard addition interior remodel of the existing 1st floor level and basement level | $250,000 |
| Oct 30, 2025 | In progress issued Nov 2025 | 16 Miraloma Dr | Matthew Kelly Construction Inc | foundation crack repair and footing replacement. replacement of existing garage door header. slab being replaced under permit 202311070361. no architectural changes.Details
foundation crack repair and footing replacement. replacement of existing garage door header. slab being replaced under permit 202311070361. no architectural changes. | $15,000 |
| Oct 27, 2025 | In progress filed Oct 2025, not yet issued | 1409 20th St | Mueller Nicholls Inc | temporary vertical shoring for remodel approved under permit 202509034488.Details
temporary vertical shoring for remodel approved under permit 202509034488. | $6,000 |
| Oct 27, 2025 | In progress issued Jan 2026 | 348 Cumberland St | Planart Construction Corp | conversion of 356 sf of (e) garage to living area. reconfiguration of (e) interior stair between first and second fls. remodel of (e) 2nd fl kitchen & bath.Details
conversion of 356 sf of (e) garage to living area. reconfiguration of (e) interior stair between first and second fls. remodel of (e) 2nd fl kitchen & bath. | $250,000 |
| Oct 20, 2025 | Completed final sign-off Jul 2026 | 515 Noriega St | Robert Bernhard Coatings/Rbc Inc | revision 202507100511 inspector requested detail for construction of enlarged passageway to kitchenDetails
revision 202507100511 inspector requested detail for construction of enlarged passageway to kitchen | $3,000 |
| Oct 15, 2025 | In progress issued Dec 2025 | 263 Oak Park Dr | E F Gomez Cement Contractor | retaining wall replacementDetails
retaining wall replacement | $25,000 |
| Oct 9, 2025 | In progress issued Jan 2026 | 100 Parque Dr | response to nov #202533381. add piers to retain (e) non permitted soldier boat terraced wall and remove exterior wood stairs and upper wood retaining walls. regrade site to original slope and contoursDetails
response to nov #202533381. add piers to retain (e) non permitted soldier boat terraced wall and remove exterior wood stairs and upper wood retaining walls. regrade site to original slope and contours | $20,000 |