Block 3774, lot 444
77 Federal St
- City’s use
- Commercial Office
- Built
- 2020
- Stories
- 5
- Rooms
- 12 bathrooms
- Building
- 89,074 sq ft
- Lot
- 16,069 sq ft
- Zoning
- MUO
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 11, 2026 | Completed final sign-off Jun 2026 | 77 Federal St | Best Care Fire Protection | provide as-built plans for basement & 1st/f fire sprinkler, ref to 202602115716Details
provide as-built plans for basement & 1st/f fire sprinkler, ref to 202602115716 | |
| May 6, 2026 | Completed final sign-off Jun 2026 | 77 Federal St | Ewsf Inc. | 1/f and basement: revision to 202602035133. add (1) office room, (2) phone room and (1) idf room on level 1. new soffit and (2) closets at break area l1. bottle filler devices added to break area 4 and basement.Details
1/f and basement: revision to 202602035133. add (1) office room, (2) phone room and (1) idf room on level 1. new soffit and (2) closets at break area l1. bottle filler devices added to break area 4 and basement. | $6,000 |
| Feb 11, 2026 | Completed final sign-off Jun 2026 | 77 Federal St | Best Care Fire Protection | install (87) new fire sprinklers in basement and first floor at new drop ceilings per nfpa #13. ref bpa: 202602035133Details
install (87) new fire sprinklers in basement and first floor at new drop ceilings per nfpa #13. ref bpa: 202602035133 | $20,000 |
| Feb 4, 2026 | Completed final sign-off Jun 2026 | 77 Federal St | Rf Fire Alarm Pro Inc | upgrade (e) fire alarm on level 1 to supoosrt the ti, add 6 horn strobes and 3 strobesDetails
upgrade (e) fire alarm on level 1 to supoosrt the ti, add 6 horn strobes and 3 strobes | $5,000 |
| Feb 3, 2026 | Completed final sign-off Jun 2026 | 77 Federal St | Ewsf Inc. | 1st fl & basement improvement: new non structural walls & partitions. new interior finishes, two new bathrooms, one new mother's room with sink, two new sink counters. mep modification. change of use from retail space (gym) to business service b. no exterior, structural or demo work.Details
1st fl & basement improvement: new non structural walls & partitions. new interior finishes, two new bathrooms, one new mother's room with sink, two new sink counters. mep modification. change of use from retail space (gym) to business service b. no exterior, structural or demo work. | $300,000 |
| Jun 24, 2025 | Completed final sign-off Aug 2025 | 77 Federal St | Ewsf Inc. | new wood grille ceiling 17" x 16"-1" to be installed at lobby. no mep work. no demo. no structural workDetails
new wood grille ceiling 17" x 16"-1" to be installed at lobby. no mep work. no demo. no structural work | $3,500 |
| Apr 25, 2025 | Completed final sign-off Aug 2025 | 77 Federal St | Best Care Fire Protection | relocate and add sprinklers per tenant improvements 4th and 5th floors. total 108 ref 202503313393Details
relocate and add sprinklers per tenant improvements 4th and 5th floors. total 108 ref 202503313393 | $67,068 |
| Mar 31, 2025 | Completed final sign-off Aug 2025 | 77 Federal St | Ewsf Inc. | floor 4 and 5: office t.i (10,524 sf) each floor. demo of (e) non-bearing partition walls, new walls for meeting room and offices, new finishes (flooring, ceiling, lighting). modify mechanical and electrical design based on new layout. t-24 compliance. no plumbing. no change of use.Details
floor 4 and 5: office t.i (10,524 sf) each floor. demo of (e) non-bearing partition walls, new walls for meeting room and offices, new finishes (flooring, ceiling, lighting). modify mechanical and electrical design based on new layout. t-24 compliance. no plumbing. no change of use. | $420,000 |
| Jul 16, 2024 | Completed final sign-off Jun 2025 | 77 Federal St | Best Care Fire Protection | ref pa # 2024-0507-1594 fire sprinkler ti. add 17 and relocate 67 new heads to new t-bar ceiling & madrid wood grille/plank on 2nd fl. total 85 headsDetails
ref pa # 2024-0507-1594 fire sprinkler ti. add 17 and relocate 67 new heads to new t-bar ceiling & madrid wood grille/plank on 2nd fl. total 85 heads | $25,000 |
| Jul 9, 2024 | Completed final sign-off Oct 2024 | 77 Federal St | Best Care Fire Protection | ref pa # 2024-0507-1594 fire sprinkler ti. add 19 and relocate 66 new heads to new t-bar & madrid wood grille/plank on 2nd fl. total 85 headsDetails
ref pa # 2024-0507-1594 fire sprinkler ti. add 19 and relocate 66 new heads to new t-bar & madrid wood grille/plank on 2nd fl. total 85 heads | $38,000 |
| Jun 10, 2024 | Completed final sign-off Oct 2024 | 77 Federal St | Rf Fire Alarm Pro Inc | upgrade existing fire alarm system on level 2 & 3 support tenant improvement ref pa #202405071594Details
upgrade existing fire alarm system on level 2 & 3 support tenant improvement ref pa #202405071594 | $3,000 |
| Jun 6, 2024 | In progress filed Jun 2024, not yet issued | 77 Federal St | Atc Mechanical | relocate 25 samsung cassettes for level 2 and 3. remove 3 cassettes on level 2 and 3. supply and install 2.5 ton ducted fan coil, with supply and retuen ducting for 8 offices (lvl 2&3) remove exisitng fresh air duct and reloctae it with fresh air duct that can service 2 fan coils for lvl 2&3.Details
relocate 25 samsung cassettes for level 2 and 3. remove 3 cassettes on level 2 and 3. supply and install 2.5 ton ducted fan coil, with supply and retuen ducting for 8 offices (lvl 2&3) remove exisitng fresh air duct and reloctae it with fresh air duct that can service 2 fan coils for lvl 2&3. | $80,000 |
| May 7, 2024 | Completed final sign-off Dec 2024 | 77 Federal St | Ewsf Inc. | demolision of non bearing walls, construct new office and conference rooms. install new carpet, ceiling and light fixtures. modify mechanical/elc based on new layout. title 24 complianceDetails
demolision of non bearing walls, construct new office and conference rooms. install new carpet, ceiling and light fixtures. modify mechanical/elc based on new layout. title 24 compliance | $424,000 |
| Apr 7, 2021 | Completed final sign-off May 2021 | 77 Federal St | B B J Electric, Inc | revision to previously approved building permit addendum 201306200082-s7 emergency radio response coverage system. some devices location have been changed from the approved permit plan.Details
revision to previously approved building permit addendum 201306200082-s7 emergency radio response coverage system. some devices location have been changed from the approved permit plan. | $3,000 |
| Mar 4, 2020 | Completed final sign-off Oct 2021 | 77 Federal St | Ewsf Inc. | elevator hoistway access panel. revision to pa# 201306200082Details
elevator hoistway access panel. revision to pa# 201306200082 | $500 |
| Sep 26, 2019 | Completed final sign-off Jul 2020 | 77 Federal St | Ewsf Inc. | to install tower crane foundations. to erect and operate tower crane. ref pa 2019-0926-2809Details
to install tower crane foundations. to erect and operate tower crane. ref pa 2019-0926-2809 | $20,000 |
| Jul 30, 2019 | Completed final sign-off Sep 2021 | 77 Federal St | Ewsf Inc. | stormwater control plan check by pid main project appln #201306200082Details
stormwater control plan check by pid main project appln #201306200082 | |
| Jun 3, 2019 | Completed final sign-off May 2020 | 77 Federal St | Granite Excavation & Demolition Inc | install temporary shoring along property line to allow excavation for new development at 77 federal st.Details
install temporary shoring along property line to allow excavation for new development at 77 federal st. | $200,000 |
| May 10, 2019 | Completed final sign-off Mar 2021 | 77 Federal St | Ewsf Inc. | new underground fire serviceDetails
new underground fire service | $8,000 |
| Jul 13, 2018 | Never finaled issued Jul 2018, no final | 77 Federal St | revision to pa 2013-0620-0082 change construction from 1b to 2a. no work performed on this permit application.Details
revision to pa 2013-0620-0082 change construction from 1b to 2a. no work performed on this permit application. | ||
| Jun 1, 2018 | Completed final sign-off Oct 2021 | 85 Federal St | Ewsf Inc. | demolish a 2-story office building. **maher n/a**Details
demolish a 2-story office building. **maher n/a** | $38,500 |
| Apr 6, 2018 | Completed final sign-off Oct 2021 | 77 Federal St | Ewsf Inc. | demolish 2-story office building///vif life safety (alarm and sprinklers) shall be terminated prior to demolition. **maher n/a**Details
demolish 2-story office building///vif life safety (alarm and sprinklers) shall be terminated prior to demolition. **maher n/a** | $38,500 |
| Jun 20, 2013 | Completed final sign-off Oct 2021 | 77 Federal St | Ewsf Inc. | erect 5-story, type 1b, 1 basement, parking (partial garage) and commercial (retail/office) building.Details
erect 5-story, type 1b, 1 basement, parking (partial garage) and commercial (retail/office) building. | $7,000,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ewsf Inc. (12), Best Care Fire Protection (5), Rf Fire Alarm Pro Inc (2), Atc Mechanical, B B J Electric, Inc, Granite Excavation & Demolition Inc
- Architects
- Albert Urrutia, David Sternberg
- Engineers
- Albert Urrutia (4), Dorel Anghel (3), Erwin O'toole (2)
- Authorized agent-otherss
- Emmet Ward, Fani Hansen
- Designers
- Mac Tec Construction Co (2), Jin Wong
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.