Ian Glidden
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Ian Glidden, Architect
- Based in
- San Rafael
- On San Francisco permits
- Sep 2005 to Sep 2026
87 permits since 2000 (architect on 83 permits, engineer on 2 permits, authorized agent-others on 1 permit, designer on 1 permit): 61 completed, 4 in progress, 8 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 2079 28th Av | removal of 2 existing windows on 2nd level at rear of property and replace with new sliding glass doors in existing openings, new at grade deck & 2nd level deck with new spiral stairs to connect both deck levels. replacement of siding with stucco finishes at rearDetails
removal of 2 existing windows on 2nd level at rear of property and replace with new sliding glass doors in existing openings, new at grade deck & 2nd level deck with new spiral stairs to connect both deck levels. replacement of siding with stucco finishes at rear | $30,000 | |
| Dec 10, 2025 | In progress issued Dec 2025 | 1116 Mason St | revision to pa #2025-0908-4735: additional scope to include voluntary structural strengthening of (e) conditions found during demolition.Details
revision to pa #2025-0908-4735: additional scope to include voluntary structural strengthening of (e) conditions found during demolition. | $8,000 | |
| Sep 8, 2025 | In progress issued Sep 2025 | 1116 Mason St | unit 1116- remodel of bathroom in kind and remodel and relocate kitchenDetails
unit 1116- remodel of bathroom in kind and remodel and relocate kitchen | $30,000 | |
| Dec 16, 2024 | In progress filed Dec 2024, not yet issued | 264 29th St | remove portion of (e) concrete platform & install whhelchair lift. install wood rampDetails
remove portion of (e) concrete platform & install whhelchair lift. install wood ramp | $12,000 | |
| Mar 22, 2024 | Completed final sign-off Feb 2025 | 15 Magellan Av | D M Ravano Construction | remodel (e) master suite on lower level. adding sliding door in guest bedroom in place of (e) window opening located at rear of house. adding (n) half bath at upper level. enlarging (e) entry foyer . replace rear deck in kind.Details
remodel (e) master suite on lower level. adding sliding door in guest bedroom in place of (e) window opening located at rear of house. adding (n) half bath at upper level. enlarging (e) entry foyer . replace rear deck in kind. | $125,000 |
| Dec 14, 2023 | Completed final sign-off May 2024 | 130 Ulloa St | D M Ravano Construction | remodel of extg single family dwelling within extg footprint. remodel of extg ktichen. add walk in closet to 1st level. reconfigure laundry room. add 1-hour rated walls and ceiling at garage.Details
remodel of extg single family dwelling within extg footprint. remodel of extg ktichen. add walk in closet to 1st level. reconfigure laundry room. add 1-hour rated walls and ceiling at garage. | $150,000 |
| Mar 21, 2023 | Completed final sign-off Sep 2024 | 2550 Ulloa St | Carroll Construction | 1st fl: new adu. convert 168 sqft of garage to adu, remodel (e) bathrm & add kitchen, 2 new egress windows at bedrm, widen (e) entry door. 2nd fl: remodel (e) kitchen & bathrm in kind, add 1 full bathrm, remove (e) door to rear deck, patch stucco to match adjacent wall, remove (e) rear deck.Details
1st fl: new adu. convert 168 sqft of garage to adu, remodel (e) bathrm & add kitchen, 2 new egress windows at bedrm, widen (e) entry door. 2nd fl: remodel (e) kitchen & bathrm in kind, add 1 full bathrm, remove (e) door to rear deck, patch stucco to match adjacent wall, remove (e) rear deck. | $150,000 |
| Nov 28, 2022 | Completed final sign-off Jan 2024 | 3623 19th St | San Francisco Design Build | replace 2 (e) windows in (e) openings. remove decorative shutters. replace wood balconies with metal guardrails. misc stucco repair & painting. wood aluminum clad windows with sdls.Details
replace 2 (e) windows in (e) openings. remove decorative shutters. replace wood balconies with metal guardrails. misc stucco repair & painting. wood aluminum clad windows with sdls. | $12,500 |
| Nov 28, 2022 | Completed final sign-off Jan 2024 | 3625 19th St | San Francisco Design Build | replace 2 (e) windows in (e) openings. remove decorative shutters. replace wood balconies with metal guardrails. misc stucco repair & painting. wood aluminum clad windows with sdl'sDetails
replace 2 (e) windows in (e) openings. remove decorative shutters. replace wood balconies with metal guardrails. misc stucco repair & painting. wood aluminum clad windows with sdl's | $12,500 |
| Oct 26, 2022 | Completed final sign-off Aug 2023 | 461 Pacheco St | Hakewill Construction Co. Inc. | remove portion of interior nonstructural wall to open kitchen to living, convert (e) half bath to full bath, relocate laundry machines.Details
remove portion of interior nonstructural wall to open kitchen to living, convert (e) half bath to full bath, relocate laundry machines. | $45,000 |
| Apr 1, 2022 | Never finaled issued Apr 2022, no final | 1602 York St | replace existing door and window on rear of building with new sliding glass door to match others. replace guardrail at top level of existing stair openingsDetails
replace existing door and window on rear of building with new sliding glass door to match others. replace guardrail at top level of existing stair openings | $7,500 | |
| Mar 31, 2022 | Completed final sign-off Sep 2022 | 546 Utah St | replace doors & windows at rear. new wood landing <30" above grade at rear. misc interior modifications on lower level. replace (e) furnace. relocate washer / dryer.Details
replace doors & windows at rear. new wood landing <30" above grade at rear. misc interior modifications on lower level. replace (e) furnace. relocate washer / dryer. | $60,000 | |
| Sep 27, 2021 | Expired or cancelled withdrawn Oct 2024 | 3529 Divisadero St | interior remodel in-kind remodel of ktichen & bathrooms, additions of one new bathroom & relocation of laundry room, misc improvement such as paint.Details
interior remodel in-kind remodel of ktichen & bathrooms, additions of one new bathroom & relocation of laundry room, misc improvement such as paint. | $175,000 | |
| Sep 9, 2021 | Completed final sign-off Jan 2023 | 1844 Union St | Martin Heagney | 2nd fl t.i. including renovation of (e) bathroom & break area. reeplace finishes including capret, paint & tile. new led lighy fixtures. replace existing windows in existing openings. front windows to be double hung wood, rear and side windows to be double hung aluminum clad wood.Details
2nd fl t.i. including renovation of (e) bathroom & break area. reeplace finishes including capret, paint & tile. new led lighy fixtures. replace existing windows in existing openings. front windows to be double hung wood, rear and side windows to be double hung aluminum clad wood. | $45,000 |
| Aug 12, 2021 | Completed final sign-off Oct 2022 | 3531 Divisadero St | Hakewill Construction Co. Inc. | replace 7 windows in kind on rear and side of building. remodel kitchen and bath in kind. add 1 new baths. 3 new skylights relocate roof access hatchDetails
replace 7 windows in kind on rear and side of building. remodel kitchen and bath in kind. add 1 new baths. 3 new skylights relocate roof access hatch | $350,000 |
| Jul 8, 2021 | Completed final sign-off Dec 2021 | 2751 Buchanan St | Np Construction | topo level - remodeling (e) master bathroom & master bedroom closet. replace (e) lighting for led and replace (e) plumbing to new california codeDetails
topo level - remodeling (e) master bathroom & master bedroom closet. replace (e) lighting for led and replace (e) plumbing to new california code | $50,000 |
| Jun 10, 2021 | Completed final sign-off Dec 2022 | 1 Daniel Burnham Ct | Rossi Builders Inc. | unit 170c:rev to pa202009194540-changes to interior finish selections - carpet, tile, paint colors, etc.new hard lid, gypsum, ceiling above reception area, new light fixtures selection.no revision to layout or number or rooms.(e) automatic fire sprinklers and life safety devices to remain.Details
unit 170c:rev to pa202009194540-changes to interior finish selections - carpet, tile, paint colors, etc.new hard lid, gypsum, ceiling above reception area, new light fixtures selection.no revision to layout or number or rooms.(e) automatic fire sprinklers and life safety devices to remain. | |
| Nov 8, 2016 | Never finaled issued Nov 2016, no final | 650 Bush St | Finbarr Collins Construction Inc. | revision to 2012-0727-5923 change to da checklistDetails
revision to 2012-0727-5923 change to da checklist | |
| Oct 4, 2016 | Completed final sign-off Jan 2018 | 576 Clipper St | amend extg accessory structure to comply with city of sf allowances for maximum area and maximum height. nov #201632527Details
amend extg accessory structure to comply with city of sf allowances for maximum area and maximum height. nov #201632527 | $2,000 | |
| Jun 21, 2016 | Completed final sign-off Aug 2016 | 292 Ivy St | G M M Construction Co | renovate (e) restrooms a break area on 3rd floor. all areas to remain fully accessible. no exterior work. no structural work.Details
renovate (e) restrooms a break area on 3rd floor. all areas to remain fully accessible. no exterior work. no structural work. | $60,000 |
| Jun 7, 2016 | Never finaled issued Aug 2016, no final | 1040 Battery St | Pop Construction A Parnership | renovate 2 (e) restrooms to include new tiles, sinks, toilets, faucets, & ceiling tiles and doors. location of toilets, urinal, sinks & doors stay in (e) locations. no structural work & no proposed change in sq footage. maher naDetails
renovate 2 (e) restrooms to include new tiles, sinks, toilets, faucets, & ceiling tiles and doors. location of toilets, urinal, sinks & doors stay in (e) locations. no structural work & no proposed change in sq footage. maher na | $30,000 |
| May 6, 2016 | Completed final sign-off May 2016 | 274 Shotwell St | delineate accessory use area within exisitng space. aggregate of accessory use spaces to be less than 10% of total floor area. n/a maher ordinanceDetails
delineate accessory use area within exisitng space. aggregate of accessory use spaces to be less than 10% of total floor area. n/a maher ordinance | ||
| Feb 29, 2016 | Expired or cancelled withdrawn Jun 2016 | 361 Lombard St | demo (e) 1-hr parapet wall & replace (e) skylight with new fire rated skylight,Details
demo (e) 1-hr parapet wall & replace (e) skylight with new fire rated skylight, | $15,000 | |
| Feb 22, 2016 | Completed final sign-off Feb 2018 | 292 Ivy St | G M M Construction Co | renovation extg storage space into shell retail space. install new steel and glass store front into extg opening. work to include new fully accessible toilet. n/a for maher.Details
renovation extg storage space into shell retail space. install new steel and glass store front into extg opening. work to include new fully accessible toilet. n/a for maher. | $70,000 |
| Oct 26, 2015 | Expired or cancelled withdrawn Jun 2016 | 407 Sansome St | Camello Inc. | revision to approved pa# 2015/03/31/2461 to include removal of non-historic 12 x 12 tile from 411 sansome street facade. clean, repair or replace historic brick behind. clean paint from brick on sacramento street facade. ** maher: compliance with ordinance no# 155-13 not required **Details
revision to approved pa# 2015/03/31/2461 to include removal of non-historic 12 x 12 tile from 411 sansome street facade. clean, repair or replace historic brick behind. clean paint from brick on sacramento street facade. ** maher: compliance with ordinance no# 155-13 not required ** | $4,000 |
| Sep 28, 2015 | Expired or cancelled withdrawn Jun 2016 | 407 Sansome St | awning signageDetails
awning signage | $500 | |
| Sep 28, 2015 | Expired or cancelled withdrawn Jun 2016 | 407 Sansome St | replace existing awnings with new. 3 awnings total. ** maher: compliance with ordinance no# 155-13 not required **Details
replace existing awnings with new. 3 awnings total. ** maher: compliance with ordinance no# 155-13 not required ** | $5,500 | |
| Sep 25, 2015 | Completed final sign-off Dec 2019 | 1030 Washington St | add non-structural 1 hour wall. add kitchen at ground level. add new doors in extg window openings at rear face of bldg. remodel top level bathroom and relocate kitchen (4th floor). add accessory dwelling unitDetails
add non-structural 1 hour wall. add kitchen at ground level. add new doors in extg window openings at rear face of bldg. remodel top level bathroom and relocate kitchen (4th floor). add accessory dwelling unit | $15,000 | |
| Apr 30, 2015 | Completed final sign-off Aug 2016 | 407 Sansome St | Camello Inc. | t.i. to extg office space on fourth floor. including construction of non-bearing partition walls. n/a for maherDetails
t.i. to extg office space on fourth floor. including construction of non-bearing partition walls. n/a for maher | $7,500 |
| Apr 2, 2015 | Expired or cancelled expired Mar 2021 | 246 Chenery St | D3 Construction | remodel (e) single family dwelling include excavation of crawlspace @ basement. remodel of kitchen, new bath. new 2nd floor addition with roof deck.Details
remodel (e) single family dwelling include excavation of crawlspace @ basement. remodel of kitchen, new bath. new 2nd floor addition with roof deck. | $375,000 |
| Mar 31, 2015 | Completed final sign-off Aug 2016 | 407 Sansome St | Camello Inc. | replacement of non-historic storefront system @ the sansome street lobby entrance within (e) opening. removal of non-historic 12x12 tiles @ storefront area. historic brick behind to be cleaned, repaired or replaced. ** maher: compliance with ordinance no# 155-13 not required **Details
replacement of non-historic storefront system @ the sansome street lobby entrance within (e) opening. removal of non-historic 12x12 tiles @ storefront area. historic brick behind to be cleaned, repaired or replaced. ** maher: compliance with ordinance no# 155-13 not required ** | $10,000 |
| Mar 26, 2015 | Completed final sign-off Nov 2016 | 2230 Bush St | The Fine European Construction/Uwb Dober, Hakewill Construction Co. Inc. | proposed work is to add a bedroom & bathroom @ the roof level & to add a rear roof deck. not visible from public right of way. no change to number of dwelling unit. no change to maximum height. ** maher: compliance with ordinance no# 155-13 not required **Details
proposed work is to add a bedroom & bathroom @ the roof level & to add a rear roof deck. not visible from public right of way. no change to number of dwelling unit. no change to maximum height. ** maher: compliance with ordinance no# 155-13 not required ** | $90,000 |
| Feb 4, 2015 | Completed final sign-off Feb 2015 | 742 14th St | Finbarr Collins Construction Inc. | revision to permit 201412264527; revised electrical plan with addition of exit and emergency egress lighting.Details
revision to permit 201412264527; revised electrical plan with addition of exit and emergency egress lighting. | |
| Dec 30, 2014 | Completed final sign-off Mar 2015 | 1200 Gough St | B Y U Construction Inc. | #8a -revision to pa #201410290238 & 201410179243: wall locations to reflect revised layout. revise kitchen appliance layout & new pony wall @ island. revise bedroom closet layout. relocate laundry doors.Details
#8a -revision to pa #201410290238 & 201410179243: wall locations to reflect revised layout. revise kitchen appliance layout & new pony wall @ island. revise bedroom closet layout. relocate laundry doors. | $2,000 |
| Dec 26, 2014 | Completed final sign-off Feb 2015 | 742 14th St | Finbarr Collins Construction Inc. | ti within 742 office space only. limited to non load bearing painted partiton walls, e mech system and ducts to remain. new plugs in wallsDetails
ti within 742 office space only. limited to non load bearing painted partiton walls, e mech system and ducts to remain. new plugs in walls | $5,000 |
| Oct 31, 2014 | Completed final sign-off Mar 2015 | 407 Sansome St | Camello Inc. | 4th flr: tenant improvements for office space on 4th flr including construction of non bearing partition walls, replace finishes throughout. new mechanical equipment including ductwork and new electrical including lights & receptacles; maher n/aDetails
4th flr: tenant improvements for office space on 4th flr including construction of non bearing partition walls, replace finishes throughout. new mechanical equipment including ductwork and new electrical including lights & receptacles; maher n/a | $95,000 |
| Oct 29, 2014 | Completed final sign-off Mar 2015 | 1200 Gough St | B Y U Construction Inc. | revision to permit number 201410179243; relocate non load bearing walls at bedroom #1 closet, remove non load bearing walls at kitchen.Details
revision to permit number 201410179243; relocate non load bearing walls at bedroom #1 closet, remove non load bearing walls at kitchen. | $7,500 |
| Oct 3, 2014 | Completed final sign-off Apr 2015 | 407 Sansome St | Camello Inc. | replacement of non-historic aluminum windows, three windows, 3 windows total with new custom wood windows to match historic wood windows adjacent. n/a for the maherDetails
replacement of non-historic aluminum windows, three windows, 3 windows total with new custom wood windows to match historic wood windows adjacent. n/a for the maher | $12,000 |
| Sep 30, 2014 | Completed final sign-off Oct 2017 | 407 Sansome St | Camello Inc. | revision to 201407292433. revised electrical and lighting to comply with title 24 requirements. n/a ordinance #155-13.Details
revision to 201407292433. revised electrical and lighting to comply with title 24 requirements. n/a ordinance #155-13. | $4,000 |
| Aug 21, 2014 | Completed final sign-off Feb 2015 | 407 Sansome St | Camello Inc. | 3rd flr: tenant improvements for office space including construction of non-bearing partition walls. replace finishes throughout; new mechanical equipment including ductwork & new electrical including lights & receptacles; maher n/aDetails
3rd flr: tenant improvements for office space including construction of non-bearing partition walls. replace finishes throughout; new mechanical equipment including ductwork & new electrical including lights & receptacles; maher n/a | $95,000 |
| Jul 29, 2014 | Completed final sign-off Feb 2015 | 407 Sansome St | Camello Inc. | t.i. for office space at 2nd floor including construction of non-bearing partition walls. replace finishes throughout. new mechanical equipment including ductwork and new electrical including lights and receptacles. n/a for the maher ordinance #155-13Details
t.i. for office space at 2nd floor including construction of non-bearing partition walls. replace finishes throughout. new mechanical equipment including ductwork and new electrical including lights and receptacles. n/a for the maher ordinance #155-13 | $95,000 |
| Jul 11, 2014 | Expired or cancelled cancelled Jan 2026 | 292 Ivy St | new full height wall with door. replace door at existing bathroom. 3rd fl res unit. cover existing upper level window with furred wall at bathroomDetails
new full height wall with door. replace door at existing bathroom. 3rd fl res unit. cover existing upper level window with furred wall at bathroom | $7,500 | |
| Jun 19, 2014 | Completed final sign-off Aug 2014 | 246 Stillings Av | Hakewill Construction Co. Inc. | voluntary seismic upgrade at 1st levelDetails
voluntary seismic upgrade at 1st level | $12,000 |
| Jun 13, 2014 | Completed final sign-off Aug 2014 | 246 Stillings Av | Hakewill Construction Co. Inc. | remodel of 1st flr bedroom, minor changes to the bedroom to add door & closetDetails
remodel of 1st flr bedroom, minor changes to the bedroom to add door & closet | $3,500 |
| May 30, 2014 | Completed final sign-off Oct 2017 | 407 Sansome St | Camello Inc. | remodel of (e) lobby space, replace (e) wall & floor finishes, replace (e) lighting, no exterior work. compliance with maher ordinance no 155-13 not required.Details
remodel of (e) lobby space, replace (e) wall & floor finishes, replace (e) lighting, no exterior work. compliance with maher ordinance no 155-13 not required. | $15,000 |
| Apr 2, 2014 | Completed final sign-off Oct 2017 | 407 Sansome St | Camello Inc. | 2nd and 3rd floor only: provide cold shell office space. remove select interior walls and floor finishes, remove any mech. equipment and duct work. remove and safe off extg electrical. t.i. under separate permit.Details
2nd and 3rd floor only: provide cold shell office space. remove select interior walls and floor finishes, remove any mech. equipment and duct work. remove and safe off extg electrical. t.i. under separate permit. | $14,000 |
| Jan 10, 2014 | Completed final sign-off Oct 2017 | 407 Sansome St | Camello Inc. | demolition of interior finishes on the 4th fl only. provide cold shell office space. remvoe select interior walls and floor finishes. remove any mech equipment and ductwork. remove and safe off existing electricalDetails
demolition of interior finishes on the 4th fl only. provide cold shell office space. remvoe select interior walls and floor finishes. remove any mech equipment and ductwork. remove and safe off existing electrical | $7,500 |
| Oct 2, 2013 | Expired or cancelled cancelled Feb 2019 | 2615 Larkin St | remodel of existing 2nd floor kitchen, powder room & master bathroom, replace roofing, new roof deck. new cooktop at lower unit.Details
remodel of existing 2nd floor kitchen, powder room & master bathroom, replace roofing, new roof deck. new cooktop at lower unit. | $75,000 | |
| Sep 23, 2013 | Completed final sign-off Mar 2014 | 2629 Pierce St | Jeff King And Company Inc | new wall at rear of garage and remodel of existing bathroom. interior remodel. no additional square footage. only exterior work is to enlarge on existing window. new window to match existing. window to be altered does not face the street.Details
new wall at rear of garage and remodel of existing bathroom. interior remodel. no additional square footage. only exterior work is to enlarge on existing window. new window to match existing. window to be altered does not face the street. | $55,000 |
| Dec 14, 2012 | Completed final sign-off Mar 2013 | 871 De Haro St | Hakewill Construction Co. Inc. | replace window in (e) opneing at rear of building. u-factor of new window 0.40 max. no part of proposed work is visible from the street or any other public right of wayDetails
replace window in (e) opneing at rear of building. u-factor of new window 0.40 max. no part of proposed work is visible from the street or any other public right of way | $9,000 |
| Dec 4, 2012 | Completed final sign-off Apr 2013 | 3949 Washington St | Daniel Miller | interior renovation to englarge (e) ground floor bedroom. adding opening in wall to adjacent room. new header & foundation piers. legalize existing ground floor bathroom#4. no work visible from street or public right of way.Details
interior renovation to englarge (e) ground floor bedroom. adding opening in wall to adjacent room. new header & foundation piers. legalize existing ground floor bathroom#4. no work visible from street or public right of way. | $25,000 |
| Sep 24, 2012 | Completed final sign-off Mar 2013 | 2751 Buchanan St | Plath & Company Inc | proposed 35 sq feet addition at 3rd level to be used as laundry. new metal railing and gate at front property line, max ht 72".Details
proposed 35 sq feet addition at 3rd level to be used as laundry. new metal railing and gate at front property line, max ht 72". | $35,000 |
| Sep 14, 2012 | Completed final sign-off Jan 2013 | 333 Grant Av | Cedar House Construction/Brian White | mechanical and electrical upgrades to existing roof deck area. installing natural gas fueled barbecue and fire pit. no work visible from the street is proposed.Details
mechanical and electrical upgrades to existing roof deck area. installing natural gas fueled barbecue and fire pit. no work visible from the street is proposed. | $20,000 |
| Sep 13, 2012 | Completed final sign-off Mar 2013 | 2751 Buchanan St | Plath & Company Inc | renovation of 2nd & 3rd levels of existing sfr. remodel of kitchen, powder room & two bathrooms. new window in (e) opening located on the rear of bldg. no proposed work visible from sidewalk or public way.Details
renovation of 2nd & 3rd levels of existing sfr. remodel of kitchen, powder room & two bathrooms. new window in (e) opening located on the rear of bldg. no proposed work visible from sidewalk or public way. | $175,000 |
| Aug 30, 2012 | Never finaled issued Sep 2012, no final | 2808 Laguna St | Paul Ryan Associates | metal stairs, landing and railings for roof deck on separate permitDetails
metal stairs, landing and railings for roof deck on separate permit | $15,000 |
| Jul 27, 2012 | Never finaled issued Apr 2013, no final | 650 Bush St | Swinerton Builders | renovate (e) bar area. raise portion of floor to align with entry level. no changes. not visible from street.Details
renovate (e) bar area. raise portion of floor to align with entry level. no changes. not visible from street. | $150,000 |
| Jun 6, 2012 | Completed final sign-off Nov 2012 | 1985 08th Av | Ravano & Cooney Const Co Inc | interior remodel of existing bathroom. addition of 1 bedroom, wholly within interior of e building. no additional square footage. replace door in e opening, replace window in e opening. new door in e window opening. not visible from streetDetails
interior remodel of existing bathroom. addition of 1 bedroom, wholly within interior of e building. no additional square footage. replace door in e opening, replace window in e opening. new door in e window opening. not visible from street | $20,000 |
| Apr 5, 2012 | Completed final sign-off Aug 2012 | 1200 California St | E. Grelli Construction | #5a: remodel bathroom - demo tub & tub surround & vanity top, install new tub & mixer valve, install new tub surround/vanity top & shower door in glass. build new office area near kitchen & new sub zero refrigerator, paint bathroom & kitchen, new light fixtures bathroom.Details
#5a: remodel bathroom - demo tub & tub surround & vanity top, install new tub & mixer valve, install new tub surround/vanity top & shower door in glass. build new office area near kitchen & new sub zero refrigerator, paint bathroom & kitchen, new light fixtures bathroom. | $18,000 |
| Mar 13, 2012 | Completed final sign-off Mar 2015 | 2775 Van Ness Av | Overland Contracting Inc | wireless facility modif: proj involves removal & replacemt of 6 panel antenas to be replaced w/6(n)panel antenas. be wall mounted. (3) (e) equipment cabinet be remove & replace with(2) (n) equip cabinets. (n) antena coax transmisn lines to be run inside (e) cable tray. (e) 100 amp svc to be used.Details
wireless facility modif: proj involves removal & replacemt of 6 panel antenas to be replaced w/6(n)panel antenas. be wall mounted. (3) (e) equipment cabinet be remove & replace with(2) (n) equip cabinets. (n) antena coax transmisn lines to be run inside (e) cable tray. (e) 100 amp svc to be used. | $45,000 |
| Oct 28, 2011 | Never finaled issued Jan 2012, no final | 545 Powell St | Overland Contracting Inc | modify wireless facility: remove & replace (4)(e) sprint panel antennas w/ (4)(n)panel antennas (2) per sector mounted to (e) penthouse. install(4)(n) rru units below antennas.remove & replace (4)(e)equip cabinets w/ (2) (n) equip cabinets. run (n)transmisn lines & utilize (e) 200 amp svcDetails
modify wireless facility: remove & replace (4)(e) sprint panel antennas w/ (4)(n)panel antennas (2) per sector mounted to (e) penthouse. install(4)(n) rru units below antennas.remove & replace (4)(e)equip cabinets w/ (2) (n) equip cabinets. run (n)transmisn lines & utilize (e) 200 amp svc | $45,000 |
| Oct 13, 2011 | Completed final sign-off Jul 2015 | 55 04th St | Overland Contracting Inc, Progress Wireless | modify wireless facility:this proj involves 2(e)panal antennas to be removed & replace with 3 new panel antennas to be mounted to (e)tri-pods on the 4/fl. 1 (e) equip cabinet to be removed& replaced w/1 new equip cabinet.new coax transmission lines to be run & (e) 200 amp service to remain.Details
modify wireless facility:this proj involves 2(e)panal antennas to be removed & replace with 3 new panel antennas to be mounted to (e)tri-pods on the 4/fl. 1 (e) equip cabinet to be removed& replaced w/1 new equip cabinet.new coax transmission lines to be run & (e) 200 amp service to remain. | $45,000 |
| Sep 29, 2011 | Completed final sign-off Jan 2012 | 118 Liberty St | Ravano & Cooney Const Co Inc | revision to appl #201107261088 - install archway headers @ first floor rear unit & 2nd floor unit. all work @ #118.Details
revision to appl #201107261088 - install archway headers @ first floor rear unit & 2nd floor unit. all work @ #118. | $1,000 |
| Sep 21, 2011 | Never finaled issued Nov 2011, no final | 1455 Market St | Overland Contracting Inc | wireless site modification: replace 6 antennas with 9 new panel antennas. replace 2 (e) equipment cabinets with 4 new equipment cabinets.Details
wireless site modification: replace 6 antennas with 9 new panel antennas. replace 2 (e) equipment cabinets with 4 new equipment cabinets. | $45,000 |
| Sep 14, 2011 | Completed final sign-off Apr 2015 | 420 Taylor St | Overland Contracting Inc | wireless facility modification: replace 4 panel antennas w/ 4 (n) panel antennas on (e) bldg; replace 3 (e) equipment cabinets w/ 2 (n) equipment cabinets w/in rm of (e) bldg; run coxial lines from equipment to antennas.replace 1 gps antennaDetails
wireless facility modification: replace 4 panel antennas w/ 4 (n) panel antennas on (e) bldg; replace 3 (e) equipment cabinets w/ 2 (n) equipment cabinets w/in rm of (e) bldg; run coxial lines from equipment to antennas.replace 1 gps antenna | $45,000 |
| Aug 31, 2011 | Completed final sign-off Oct 2015 | 401 Sansome St | Overland Contracting Inc | wireless facility modification: replace 3 panel antennas with 6 new panel antennas. replace 3 (e) equipment cabinets with 3 new equipment cabinets. run coaxial lines from equipment to antennas.Details
wireless facility modification: replace 3 panel antennas with 6 new panel antennas. replace 3 (e) equipment cabinets with 3 new equipment cabinets. run coaxial lines from equipment to antennas. | $45,000 |
| Aug 26, 2011 | Never finaled issued Feb 2012, no final | 1485 Bay Shore Bl | Overland Contracting Inc | 2 (e) panel antennas to be removed & replaced. 2 new panel antannas mounted at (e) bldg rooftop tower structure. 3 (e) equipment cabinet located at 4th fl equipment room to be romoved.w/2 new. equipment cabinets to be installed at 4th floor equipment room.Details
2 (e) panel antennas to be removed & replaced. 2 new panel antannas mounted at (e) bldg rooftop tower structure. 3 (e) equipment cabinet located at 4th fl equipment room to be romoved.w/2 new. equipment cabinets to be installed at 4th floor equipment room. | $45,000 |
| Aug 26, 2011 | Expired or cancelled expired Jan 2017 | 152 Helena St | Overland Contracting Inc | 6 (n) panel antennas mounted to (e) bldg. 3 (e) panel antennas to be removed & replaced. 1 (n) equipment cabinet mounted at (e) bldg basement. 3 (e) equipment cabinets to be removed & replace w/2 new. installation of antenna coaxial transmission lines from equipment cabinets to antennas.Details
6 (n) panel antennas mounted to (e) bldg. 3 (e) panel antennas to be removed & replaced. 1 (n) equipment cabinet mounted at (e) bldg basement. 3 (e) equipment cabinets to be removed & replace w/2 new. installation of antenna coaxial transmission lines from equipment cabinets to antennas. | $45,000 |
| Aug 25, 2011 | Completed final sign-off Jan 2012 | 3781 23rd St | Jeff King And Company Inc | add new half bath on ground level including one sink & one toilet, new door.Details
add new half bath on ground level including one sink & one toilet, new door. | $10,000 |
| Jul 21, 2011 | Completed final sign-off Dec 2012 | 2808 Laguna St | Paul Ryan Associates | exterior metal spiral stair to new roof deck, new door in (e) window opening at the rear of the bldg. 2nd exterior metal spiral stair from 1st to basement level patio.Details
exterior metal spiral stair to new roof deck, new door in (e) window opening at the rear of the bldg. 2nd exterior metal spiral stair from 1st to basement level patio. | $75,000 |
| Jun 17, 2011 | Completed final sign-off Feb 2013 | 400 Fair Oaks St | Jeff King And Company Inc | addition of garage & roof top deck on (e) conc. retaining walls & slab. roof of garage to be usable. new security gate at existing sidewalk entry along 25th street.Details
addition of garage & roof top deck on (e) conc. retaining walls & slab. roof of garage to be usable. new security gate at existing sidewalk entry along 25th street. | $75,000 |
| May 20, 2011 | Expired or cancelled expired Aug 2024 | 340 Stockton St | Metropolitan Electrical Construction | installation of an e-911 panel antenna as required by fcc & department of homeland security.Details
installation of an e-911 panel antenna as required by fcc & department of homeland security. | $5,000 |
| Mar 31, 2011 | Completed final sign-off Jan 2012 | 3781 23rd St | Jeff King And Company Inc | new ramp in (e) garage, 49.5 sq ft addition at rear of the bldg, addition of elevator. remove (e) non-structural, non load-bearing wall.Details
new ramp in (e) garage, 49.5 sq ft addition at rear of the bldg, addition of elevator. remove (e) non-structural, non load-bearing wall. | $95,000 |
| Mar 28, 2011 | Expired or cancelled cancelled Jun 2013 | 20 Franklin St | installation of 6 panel antennas (3 sectors, 2 antennas per sector) & 3 equipment cabinets on building roof. 2 antenna sectors will be concealed in simulated chimney structures & 1 sector antennas will be flush-mounted to the wall of (e) penthouse. power & telephone sources in basement.Details
installation of 6 panel antennas (3 sectors, 2 antennas per sector) & 3 equipment cabinets on building roof. 2 antenna sectors will be concealed in simulated chimney structures & 1 sector antennas will be flush-mounted to the wall of (e) penthouse. power & telephone sources in basement. | $100,000 | |
| Jan 11, 2011 | Completed final sign-off Feb 2012 | 45 Sea View Tr | 25 sq. ft. addition at rear of building to enclose landing. relocate (e) door & window. reconfigure (e) stair to exterior patio.Details
25 sq. ft. addition at rear of building to enclose landing. relocate (e) door & window. reconfigure (e) stair to exterior patio. | $75,000 | |
| Nov 15, 2010 | Completed final sign-off Jan 2011 | 3345 24th St | Ravano & Cooney Const Co Inc | reslope entry to remove physical barrier. maximum slope 1:12. provide new power door operator on both side of exterior door. no work in public way. no fenestration change.Details
reslope entry to remove physical barrier. maximum slope 1:12. provide new power door operator on both side of exterior door. no work in public way. no fenestration change. | $4,000 |
| Oct 20, 2010 | Completed final sign-off Dec 2010 | 1741 Waller St | Mountain To Coast Construction | remodel/convert laundry room to (n) powder room on top floorDetails
remodel/convert laundry room to (n) powder room on top floor | $9,000 |
| Sep 7, 2010 | Completed final sign-off Apr 2011 | 79 Skyview Wy | Jeff King And Company Inc | replace exterior windows with new in existing openings. 2 new skylights. remodel kitchen & bathroom. refinish existing hardwood floors. new high efficiency lighting in kitchen & bath. path & paint. new rear deck.Details
replace exterior windows with new in existing openings. 2 new skylights. remodel kitchen & bathroom. refinish existing hardwood floors. new high efficiency lighting in kitchen & bath. path & paint. new rear deck. | $125,000 |
| Jul 30, 2010 | Completed final sign-off Nov 2010 | 3500 Lawton St | Hakewill Construction Co. Inc. | kitchen & bathroom remodel, interior work only, new cabinets, lighting & floor covering @ kitchen, bathroom work includes new cabinets, toilet & enlarged shower.Details
kitchen & bathroom remodel, interior work only, new cabinets, lighting & floor covering @ kitchen, bathroom work includes new cabinets, toilet & enlarged shower. | $35,000 |
| Jun 7, 2010 | Completed final sign-off Oct 2010 | 1226 Anza St | remodel of (e) bathroom on 2nd floor. replace bath tub with shower, ne wlow flow toilet, replace vanity and sinks, new light fixtures in (e) locations , relocate closet door.Details
remodel of (e) bathroom on 2nd floor. replace bath tub with shower, ne wlow flow toilet, replace vanity and sinks, new light fixtures in (e) locations , relocate closet door. | $7,500 | |
| May 19, 2009 | Expired or cancelled cancelled Jul 2015 | 3365 Clay St | remodel of lower bathrooms, new door at rear elevation. remodel of (e) kitchen cabinetry. new window at kitchen, expand stair to make code compliant. new 3rd level (bedroom, bathroom, closet, study), new & repaired decks.Details
remodel of lower bathrooms, new door at rear elevation. remodel of (e) kitchen cabinetry. new window at kitchen, expand stair to make code compliant. new 3rd level (bedroom, bathroom, closet, study), new & repaired decks. | $360,000 | |
| Feb 24, 2009 | Completed final sign-off Aug 2009 | 3365 Clay St | Richard Knight Iv Construction | interior renovations of one full bathrm & one half bath, replace one exterior dr w/ similar due to leak/water damage, replace three windows w/ double insulated units, windows are not visible from street, no change in location, size or style, work at 2nd fl only. window not visable from street.Details
interior renovations of one full bathrm & one half bath, replace one exterior dr w/ similar due to leak/water damage, replace three windows w/ double insulated units, windows are not visible from street, no change in location, size or style, work at 2nd fl only. window not visable from street. | $50,000 |
| Jul 3, 2008 | Completed final sign-off Mar 2009 | 1402 Golden Gate Av | remodel of lower level, add one bathroom, relocate laundry, interior improvements to hall and office/guestroom. update (e) 3rd floor bathroomDetails
remodel of lower level, add one bathroom, relocate laundry, interior improvements to hall and office/guestroom. update (e) 3rd floor bathroom | $65,000 | |
| Mar 12, 2008 | Expired or cancelled withdrawn Mar 2010 | 904 Rhode Island St | remodel and 2 story additon to e single family residence @ 904 rhode island. remodel to include 4 full baths, 1- 1/2 baths, 4 bedrooms, 1 family room, relocate kitchen, new elevator from garage to 4th flr. height not to exceed 40'.Details
remodel and 2 story additon to e single family residence @ 904 rhode island. remodel to include 4 full baths, 1- 1/2 baths, 4 bedrooms, 1 family room, relocate kitchen, new elevator from garage to 4th flr. height not to exceed 40'. | $900,000 | |
| Jun 5, 2006 | Completed final sign-off Jan 2007 | 2247 Bay St | Hakewill Construction Co. Inc. | all work in unit 2249 only. interior remodel of (e) building including kitchen bathroom & relocation of laundry room. replace 6 (e) windows with double insulated units. no change in size or style. install new forced air heat system.Details
all work in unit 2249 only. interior remodel of (e) building including kitchen bathroom & relocation of laundry room. replace 6 (e) windows with double insulated units. no change in size or style. install new forced air heat system. | $100,000 |
| Mar 10, 2006 | Completed final sign-off Sep 2006 | 1978 Union St | M 2 Design (Ck Id) | remodel of current space upgrade of (e) stain & (e) toilet t meet complicance new enty door & hardward relocated (e) sinksDetails
remodel of current space upgrade of (e) stain & (e) toilet t meet complicance new enty door & hardward relocated (e) sinks | $44,000 |
| Mar 9, 2006 | Completed final sign-off May 2006 | 2 Embarcadero Center | construction of new lan (computer server) closet. change in floor covering @ breakroom & training room. no exterior work, no sturctural work. (suite 1630)Details
construction of new lan (computer server) closet. change in floor covering @ breakroom & training room. no exterior work, no sturctural work. (suite 1630) | $30,000 | |
| Sep 14, 2005 | Expired or cancelled expired Mar 2009 | 1245 Ulloa St | ground floor remodel: altr existing space to be a bedrom and larger bathroom area second floor: moveDetails
ground floor remodel: altr existing space to be a bedrom and larger bathroom area second floor: move | $90,000 |