E. Grelli Construction
- Based in
- Millbrae
- On San Francisco permits
- Jul 2001 to Aug 2024
- Last 24 months
- 0 permits filed
63 permits since 2000: 52 completed, 4 never finaled, 7 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 6, 2024 | Expired or cancelled expired May 2026 | 95 Nordhoff St | revision to pa# 201811145858, structural upgrades necessary for rebuilding existing front exterior stairs. rebuild in-kind. install new pre-manufactured metal & glass awning over front door.Details
revision to pa# 201811145858, structural upgrades necessary for rebuilding existing front exterior stairs. rebuild in-kind. install new pre-manufactured metal & glass awning over front door. | $15,000 |
| Feb 9, 2024 | Completed final sign-off Mar 2025 | 419 Felton St | install new floor and paint walls and ceiling. paint cabinet, install new countertops and appliances. not a full kitchen remodel. countertops and sink onlyDetails
install new floor and paint walls and ceiling. paint cabinet, install new countertops and appliances. not a full kitchen remodel. countertops and sink only | $4,000 |
| Sep 4, 2019 | Expired or cancelled cancelled Jan 2026 | 3143 Fillmore St | comply with accessible business program, remove floor matt, replace entry door with ada auto door. level out concrete and entry and install auto lift to let on the landing and install 1/2" high at entranceDetails
comply with accessible business program, remove floor matt, replace entry door with ada auto door. level out concrete and entry and install auto lift to let on the landing and install 1/2" high at entrance | $9,800 |
| Nov 14, 2018 | Completed final sign-off May 2026 | 95 Nordhoff St | renovation of entire sing family dwelling, travel w/ 201811145856s & 201811145851s.Details
renovation of entire sing family dwelling, travel w/ 201811145856s & 201811145851s. | $250,000 |
| Nov 14, 2018 | Never finaled issued Apr 2021, no final | 89 Nordhoff St | erect a 3 stories 1 basement type v sonstruction single family dwelling, travel w/ 201811145858s & 201811145851s.Details
erect a 3 stories 1 basement type v sonstruction single family dwelling, travel w/ 201811145858s & 201811145851s. | $450,000 |
| Jun 28, 2018 | Completed final sign-off Apr 2019 | 56 San Jacinto Wy | remodel the kitchen and 2 bathrooms on the 2nd floor. the laundry room on the 1st floor will be remodeled. extg windows will be replaced in kind. new window will be added to the sides and rear of bldgDetails
remodel the kitchen and 2 bathrooms on the 2nd floor. the laundry room on the 1st floor will be remodeled. extg windows will be replaced in kind. new window will be added to the sides and rear of bldg | $115,000 |
| Mar 3, 2017 | Completed final sign-off Oct 2017 | 2000 Greenwich St | soft story upgrades to the 1st fl of a 12 unit apt bldg. seismic upgrade all work is interior per iebc app a4Details
soft story upgrades to the 1st fl of a 12 unit apt bldg. seismic upgrade all work is interior per iebc app a4 | $68,000 |
| Mar 23, 2016 | Completed final sign-off Nov 2016 | 201 Goettingen St | kitchen remodel: replace cabinets counter top, sink, faucet. bathroom remodel: replace wall & floor tiles, tub, toilet, sink, faucet, fan. dry rot repair, appr. 80 sq ft. replace stucco over 1x6 sheating with new, 3/4 plywood double paper stucco and framing where needed. work is not visible from strDetails
kitchen remodel: replace cabinets counter top, sink, faucet. bathroom remodel: replace wall & floor tiles, tub, toilet, sink, faucet, fan. dry rot repair, appr. 80 sq ft. replace stucco over 1x6 sheating with new, 3/4 plywood double paper stucco and framing where needed. work is not visible from str | $18,000 |
| Jan 21, 2016 | Completed final sign-off Jul 2018 | 1625 Chestnut St | soft story retrofit" mandatory for apartment bld. 2012 iebc appx a4Details
soft story retrofit" mandatory for apartment bld. 2012 iebc appx a4 | $30,000 |
| Nov 24, 2015 | Expired or cancelled expired Nov 2019 | 225 Holly Park Cr | revision to previously approvement building permit #201406138354-s1. additional removal of (e) side & rear walls, floor framing due to dry rot. add basement laundry room.Details
revision to previously approvement building permit #201406138354-s1. additional removal of (e) side & rear walls, floor framing due to dry rot. add basement laundry room. | $10,000 |
| Oct 8, 2015 | Completed final sign-off Mar 2016 | 2018 Greenwich St | remodel an extg kitchen and 2 bathrooms, a washer and dryer will be relocated. an extg partition will be removed. all work is interior. no structural work.Details
remodel an extg kitchen and 2 bathrooms, a washer and dryer will be relocated. an extg partition will be removed. all work is interior. no structural work. | $30,000 |
| Jun 18, 2015 | Completed final sign-off Apr 2021 | 217 Holly Park Cr | underpinning foundation at 217-219 t allow for the construction of a new basement at 225 holly circle park.Details
underpinning foundation at 217-219 t allow for the construction of a new basement at 225 holly circle park. | $5,000 |
| Aug 22, 2014 | Completed final sign-off Apr 2017 | 23 Peralta Av | construction of roof deck & master bedroom deck. removal of 3rd fl kitchen, raise dormers in the back of the house to the height of the dormers in the front of the house. addition of master closet & master bath.Details
construction of roof deck & master bedroom deck. removal of 3rd fl kitchen, raise dormers in the back of the house to the height of the dormers in the front of the house. addition of master closet & master bath. | $350,000 |
| Jun 13, 2014 | Expired or cancelled expired Nov 2019 | 225 Holly Park Cr | vertical & horizontal addition & remodel of an existing 1-story over basement, 2 bedroom/1 bath house of 1642 sq ft usable area. a 2203 sq ft addition will create a single family home with a total of 3672 sq ft usable area & a 3-car garage. the house will have 4 bedroom/ 4.5 bath.Details
vertical & horizontal addition & remodel of an existing 1-story over basement, 2 bedroom/1 bath house of 1642 sq ft usable area. a 2203 sq ft addition will create a single family home with a total of 3672 sq ft usable area & a 3-car garage. the house will have 4 bedroom/ 4.5 bath. | $500,000 |
| May 6, 2014 | Completed final sign-off Jul 2014 | 55 Hill St | remodel one bathroom. install net bathtub/water closet and vanity. install new window. install new lights and fan and one plug. install sheetrock tub surround and paintDetails
remodel one bathroom. install net bathtub/water closet and vanity. install new window. install new lights and fan and one plug. install sheetrock tub surround and paint | $9,000 |
| Jan 29, 2014 | Completed final sign-off Oct 2014 | 253 25th Av | revision to 201207245561s. relocate and detail concrete stairs on grade at the rear yard. also a side yard concrete walkway is detailed per inspector's request. 3ft tall concrete retaining wall at rear yard will be included.Details
revision to 201207245561s. relocate and detail concrete stairs on grade at the rear yard. also a side yard concrete walkway is detailed per inspector's request. 3ft tall concrete retaining wall at rear yard will be included. | |
| Oct 30, 2013 | Completed final sign-off Dec 2013 | 180 Mallorca Wy | remove kitchen cabinets, install new electrical circuits, install new kitchen cabinets and counter tops, paint and install existing appliances. no hvac work will be doneDetails
remove kitchen cabinets, install new electrical circuits, install new kitchen cabinets and counter tops, paint and install existing appliances. no hvac work will be done | $9,500 |
| Jul 3, 2013 | Never finaled issued Jul 2013, no final | 216 Ellsworth St | to obtain final inspection for work approved under pa 201007096255; all work is completeDetails
to obtain final inspection for work approved under pa 201007096255; all work is complete | |
| Jun 19, 2013 | Completed final sign-off Mar 2014 | 216 Ellsworth St | kitchen and bath renovation. install internal stair from kitchen to garage. add 1 exterior door and replace 2 extg windows. not visible to street. install new drop ceiling at rear bedroom. new furnace in garage.Details
kitchen and bath renovation. install internal stair from kitchen to garage. add 1 exterior door and replace 2 extg windows. not visible to street. install new drop ceiling at rear bedroom. new furnace in garage. | $50,000 |
| Mar 6, 2013 | Completed final sign-off Apr 2017 | 23 Peralta Av | remodel of & 70 sq ft addition to the ground fl unit, remodel (e) kitchen & bath, replace portions of (e) slab foundation. interior remodel of owner's unit at middle floor, relocate (e) kitchen & bath. no work on 3rd upper floor.Details
remodel of & 70 sq ft addition to the ground fl unit, remodel (e) kitchen & bath, replace portions of (e) slab foundation. interior remodel of owner's unit at middle floor, relocate (e) kitchen & bath. no work on 3rd upper floor. | $75,000 |
| Jan 31, 2013 | Completed final sign-off Dec 2013 | 354 Arguello Bl | dryrot repair. remove stucco where dryrot occurs above and around windows and trim. replace wall sheating where necessary and patch stucco. install new trim where needed and paint the front of the bldg.Details
dryrot repair. remove stucco where dryrot occurs above and around windows and trim. replace wall sheating where necessary and patch stucco. install new trim where needed and paint the front of the bldg. | $9,500 |
| Jan 2, 2013 | Completed final sign-off Feb 2013 | 180 Mallorca Wy | unit #206: demo old kitchen cabinets, install counter plugs and plug for the dw & ref. move gas shut off into a cabinet & adjust the water line to be under the sink, install drywall tape and paint install new cabinets, counters and existing appliancesDetails
unit #206: demo old kitchen cabinets, install counter plugs and plug for the dw & ref. move gas shut off into a cabinet & adjust the water line to be under the sink, install drywall tape and paint install new cabinets, counters and existing appliances | $8,000 |
| Jul 30, 2012 | Completed final sign-off Oct 2013 | 64 Lafayette St | correct violation to comply with notice of violation 200796115, dated 4/30/2007. convert rooms to storage, legalize 1/2 bath & utility rom. w/ sink.Details
correct violation to comply with notice of violation 200796115, dated 4/30/2007. convert rooms to storage, legalize 1/2 bath & utility rom. w/ sink. | $4,000 |
| Jul 24, 2012 | Completed final sign-off Oct 2014 | 253 25th Av | expand (e) 2 stories home to the rear.the addition will include a partial third floor set back from the street. the garage door will be widned to 10'-0". finally. a roof deck will be added at the addition. a new interior stairs will connect all floors.Details
expand (e) 2 stories home to the rear.the addition will include a partial third floor set back from the street. the garage door will be widned to 10'-0". finally. a roof deck will be added at the addition. a new interior stairs will connect all floors. | $325,000 |
| Apr 5, 2012 | Completed final sign-off Aug 2012 | 1200 California St | #5a: remodel bathroom - demo tub & tub surround & vanity top, install new tub & mixer valve, install new tub surround/vanity top & shower door in glass. build new office area near kitchen & new sub zero refrigerator, paint bathroom & kitchen, new light fixtures bathroom.Details
#5a: remodel bathroom - demo tub & tub surround & vanity top, install new tub & mixer valve, install new tub surround/vanity top & shower door in glass. build new office area near kitchen & new sub zero refrigerator, paint bathroom & kitchen, new light fixtures bathroom. | $18,000 |
| Apr 2, 2012 | Completed final sign-off Oct 2012 | 1200 California St | remove under counter lights and appliances. reface upper and lower cabinets. install new under led lights and led ceiling lights. install existing appliances.Details
remove under counter lights and appliances. reface upper and lower cabinets. install new under led lights and led ceiling lights. install existing appliances. | $9,000 |
| Aug 4, 2011 | Completed final sign-off Jan 2012 | 1463 Funston Av | revison to pa# 201107291296. remove damaged wood siding at rear of the building. install new plywood siding and trim. remove damaged 1/2" wood cdx sheeting, 10d @6", 12" in field section awd. replace with new plywood sheeting. install vinyle windows, instead of wood windows, not visible from streDetails
revison to pa# 201107291296. remove damaged wood siding at rear of the building. install new plywood siding and trim. remove damaged 1/2" wood cdx sheeting, 10d @6", 12" in field section awd. replace with new plywood sheeting. install vinyle windows, instead of wood windows, not visible from stre | $4,900 |
| Jul 29, 2011 | Completed final sign-off Jan 2012 | 1463 Funston Av | remove (e) wood windows in the rear of the home and install new wood windows. repair siding and install new trim on the interior side of the window.Details
remove (e) wood windows in the rear of the home and install new wood windows. repair siding and install new trim on the interior side of the window. | $5,200 |
| Jul 29, 2011 | Completed final sign-off Apr 2012 | 1200 California St | reduce scope of work on application # 201106218613. will not install washer and dryer.Details
reduce scope of work on application # 201106218613. will not install washer and dryer. | |
| Jun 21, 2011 | Completed final sign-off Apr 2012 | 1200 California St | unit #7a: remove old appliances, install additional power for new appliances, install drain for washer and dryer combo unit, adjust cabinet openings, install new appliancesDetails
unit #7a: remove old appliances, install additional power for new appliances, install drain for washer and dryer combo unit, adjust cabinet openings, install new appliances | $5,000 |
| May 23, 2011 | Completed final sign-off Mar 2012 | 160 Mallorca Wy | dry rot repair on the front of the building. remove stucoo repair framing and patch stucco where damage is found. damage around bottom of windows and at the garage door openings. 100 sq feet of repair in kind.Details
dry rot repair on the front of the building. remove stucoo repair framing and patch stucco where damage is found. damage around bottom of windows and at the garage door openings. 100 sq feet of repair in kind. | $5,000 |
| Apr 1, 2011 | Completed final sign-off Apr 2011 | 2963 23rd Av | replace window in bathroom 2'-0"x3'-0", patch stucco & drywall. not visible from the street, u-factorDetails
replace window in bathroom 2'-0"x3'-0", patch stucco & drywall. not visible from the street, u-factor | $500 |
| Mar 30, 2011 | Completed final sign-off Apr 2011 | 2963 23rd Av | repair dry rot at front lower balcony, install framing and sheeting, patch stucco and sidingDetails
repair dry rot at front lower balcony, install framing and sheeting, patch stucco and siding | $5,200 |
| Mar 2, 2011 | Completed final sign-off Apr 2011 | 11 Division St | sign @ entry doors to restaurant.Details
sign @ entry doors to restaurant. | $1,000 |
| Feb 23, 2011 | Completed final sign-off Apr 2011 | 11 Division St | revision to pa# 2011.01.12.8722. qualify duct for type 1 hood as per bldg/field inspectorDetails
revision to pa# 2011.01.12.8722. qualify duct for type 1 hood as per bldg/field inspector | |
| Jan 20, 2011 | Completed final sign-off Apr 2011 | 11 Division St | revision pa# 2010-0527-3403-approved restaurant space to modify approved partition wall locations and floor plan layout. reflected ceiling plan layout. new hood for pizza oven & new exterior awningDetails
revision pa# 2010-0527-3403-approved restaurant space to modify approved partition wall locations and floor plan layout. reflected ceiling plan layout. new hood for pizza oven & new exterior awning | $15,000 |
| Jan 13, 2011 | Completed final sign-off Apr 2011 | 1748 Market St | in response to nov #201067846, proposed relocation of 2nd egress with fire-rated corridor from 2nd floor to parking lot. new drinking fountain.Details
in response to nov #201067846, proposed relocation of 2nd egress with fire-rated corridor from 2nd floor to parking lot. new drinking fountain. | $20,500 |
| Jul 9, 2010 | Never finaled issued Sep 2010, no final | 216 Ellsworth St | partition walls on top floor (attic) to be removed for new full bathroom, and one (e) bedroom to be divided into separate bedroom and office. skylight to be added in bathroom not visible from street, no changes/work to garage floor.Details
partition walls on top floor (attic) to be removed for new full bathroom, and one (e) bedroom to be divided into separate bedroom and office. skylight to be added in bathroom not visible from street, no changes/work to garage floor. | $40,000 |
| Jun 8, 2010 | Completed final sign-off Aug 2010 | 2701 Green St | unit# 11:demo kitchen & bathroom. install (n) plumbing & electrical. install insulation & drywall. tile bathroom, walls & floor. install kitchen cabinets & countertops. paint all work.Details
unit# 11:demo kitchen & bathroom. install (n) plumbing & electrical. install insulation & drywall. tile bathroom, walls & floor. install kitchen cabinets & countertops. paint all work. | $20,000 |
| May 10, 2010 | Completed final sign-off Aug 2010 | 2701 Green St | demo kitchen & bathroom. install (n) electrical and plumbing. install drywall & insulation. install (n) tub, lavatory & tile tub walls & floor. install kitchen cabinets, countertop and new flr. paint wall of (n) construction.Details
demo kitchen & bathroom. install (n) electrical and plumbing. install drywall & insulation. install (n) tub, lavatory & tile tub walls & floor. install kitchen cabinets, countertop and new flr. paint wall of (n) construction. | $20,000 |
| Feb 25, 2010 | Completed final sign-off Aug 2010 | 2701 Green St | unit#10 top floor.remodel kitchen and bath. remove old cabinets and plaster. install additional plugs.,5/8 type x drywall and new cabs. remove old tub sink and toilet, tile plaster. install new 5/8 type x drywall and tile. new plumbing fixtures. no wall removal and structural work.Details
unit#10 top floor.remodel kitchen and bath. remove old cabinets and plaster. install additional plugs.,5/8 type x drywall and new cabs. remove old tub sink and toilet, tile plaster. install new 5/8 type x drywall and tile. new plumbing fixtures. no wall removal and structural work. | $20,000 |
| Dec 22, 2009 | Completed final sign-off May 2010 | 791 30th Av | revision to pa# 2009-0403-5489-foundation extension to north wall approx 26'Details
revision to pa# 2009-0403-5489-foundation extension to north wall approx 26' | $4,500 |
| Aug 26, 2009 | Completed final sign-off Nov 2009 | 1200 California St | remove kitchen & storage closet; install (n) cabinet & counter tops. install existing appliances, upgrade electrical outlets & install recess lights. install (n) sink & faucet (bathroom) install new tiles, new shower valves & faucet & (n) vanity top & cabinets.Details
remove kitchen & storage closet; install (n) cabinet & counter tops. install existing appliances, upgrade electrical outlets & install recess lights. install (n) sink & faucet (bathroom) install new tiles, new shower valves & faucet & (n) vanity top & cabinets. | $37,000 |
| Apr 28, 2009 | Completed final sign-off Jun 2009 | 840 Waller St | work @ unit# 12 only. remodel kitchen. install new cabinets & counter tops. new appliances. update electrical. bathroom remodel. install new fixtures & tile & update plumbing.Details
work @ unit# 12 only. remodel kitchen. install new cabinets & counter tops. new appliances. update electrical. bathroom remodel. install new fixtures & tile & update plumbing. | $27,000 |
| Apr 7, 2009 | Completed final sign-off Jul 2009 | 840 Waller St | unit 4 - remodel kitchen.install new cabinets and counter tops.new appliances.new circuits and receptacles in kitchen and bathroom. new gas line for stove.install new fixtures and tile.Details
unit 4 - remodel kitchen.install new cabinets and counter tops.new appliances.new circuits and receptacles in kitchen and bathroom. new gas line for stove.install new fixtures and tile. | $27,000 |
| Apr 7, 2009 | Completed final sign-off Apr 2009 | 1200 California St | to botain final inspection for work approved under pa 200805202427. all work complete.Details
to botain final inspection for work approved under pa 200805202427. all work complete. | |
| Apr 3, 2009 | Completed final sign-off May 2010 | 791 30th Av | legalize ground floor space, add 2 new bedrooms, bathroom, storage & entry, in fill existing light well w/ new parapet wall, roof & skylights.(flat)Details
legalize ground floor space, add 2 new bedrooms, bathroom, storage & entry, in fill existing light well w/ new parapet wall, roof & skylights.(flat) | $40,000 |
| Nov 25, 2008 | Completed final sign-off Apr 2009 | 2433 Polk St | work@ unit#3. remodel kitchen. new drywall, cabinets flooring. remodel bathroom- new drywall , fixtures. lights plug and switches in kitchen and bathroom to be install after demo. check plumbing and relocate drainss r-13 insulation for wall, r-19 min ceiling.Details
work@ unit#3. remodel kitchen. new drywall, cabinets flooring. remodel bathroom- new drywall , fixtures. lights plug and switches in kitchen and bathroom to be install after demo. check plumbing and relocate drainss r-13 insulation for wall, r-19 min ceiling. | $28,000 |
| Sep 15, 2008 | Completed final sign-off Feb 2009 | 369 Los Palmos Dr | remodel bathroom. install new tub with valve new vanity & sink. new toilet, new shower valve. install new sheetrock & tile & paint on existing walls.Details
remodel bathroom. install new tub with valve new vanity & sink. new toilet, new shower valve. install new sheetrock & tile & paint on existing walls. | $16,000 |
| Jul 8, 2008 | Completed final sign-off Oct 2008 | 1693 Hayes St | the project will remodel an (e) kitchen & bathroom.new partitions will be built.an engineered opening will enlarge an (e) doorway. the work is interior and does not enlarge the building envelope.(e) single-pane windows will be replaced with new double pane all wood units, same type, size, & locationDetails
the project will remodel an (e) kitchen & bathroom.new partitions will be built.an engineered opening will enlarge an (e) doorway. the work is interior and does not enlarge the building envelope.(e) single-pane windows will be replaced with new double pane all wood units, same type, size, & location | $80,000 |
| May 20, 2008 | Expired or cancelled expired Apr 2009 | 1200 California St | unit #7a: remodel 2 bathrooms, install 2 toilets, 2 vanities with sink and faucets, 1 tub. repair (50%) and paint drywall, move & rebuild one wall 6' lengh, tile floor and walls over tub, install 4 lights and paint both bathrooms.Details
unit #7a: remodel 2 bathrooms, install 2 toilets, 2 vanities with sink and faucets, 1 tub. repair (50%) and paint drywall, move & rebuild one wall 6' lengh, tile floor and walls over tub, install 4 lights and paint both bathrooms. | $25,000 |
| May 15, 2008 | Completed final sign-off May 2008 | 72 Parker Av | comply with physical inspection report 5276.Details
comply with physical inspection report 5276. | |
| May 1, 2008 | Never finaled issued May 2008, no final | 72 Parker Av | repair plaster ceiling in garage. install fire damper in heating pipes going through floor & install straps at 4'. refer 3r-5276. item# 1, 2, 3, 4.Details
repair plaster ceiling in garage. install fire damper in heating pipes going through floor & install straps at 4'. refer 3r-5276. item# 1, 2, 3, 4. | $2,000 |
| May 1, 2008 | Completed final sign-off Nov 2008 | 182 26th Av | remodel kitchen. remodel 1 bathroom. new furnace. new water heater. re-route gas line. re-route drain lines in bathroom. re-routh water lines. new tub, new toilet. new kitchen sink, new sheet rock & install kitchen cabinets & counter top.Details
remodel kitchen. remodel 1 bathroom. new furnace. new water heater. re-route gas line. re-route drain lines in bathroom. re-routh water lines. new tub, new toilet. new kitchen sink, new sheet rock & install kitchen cabinets & counter top. | $28,000 |
| Apr 7, 2008 | Completed final sign-off May 2008 | 63 Princeton St | remodel kitchen. remove cabinets & counter & install new cabinets & counter. run electrical plugg for appliances for counter. relocate drain & water lines. install gas line to new range.Details
remodel kitchen. remove cabinets & counter & install new cabinets & counter. run electrical plugg for appliances for counter. relocate drain & water lines. install gas line to new range. | $10,000 |
| Feb 21, 2008 | Completed final sign-off Apr 2008 | 840 Waller St | remodel (1) bathroom in apt #1-new tub, mixer valve/sink/tiles/toilet/light fixture, fan (1 bathroom)Details
remodel (1) bathroom in apt #1-new tub, mixer valve/sink/tiles/toilet/light fixture, fan (1 bathroom) | $8,000 |
| Aug 28, 2006 | Completed final sign-off Dec 2006 | 7 Colby St | repair dryrot at front of building at overhang under window and wall at outside stairway. less than 10%, no structuralDetails
repair dryrot at front of building at overhang under window and wall at outside stairway. less than 10%, no structural | $5,000 |
| Jun 15, 2006 | Completed final sign-off Aug 2006 | 447 Hickory St | permit to allow repair and replace in kind existing 2 story staircase and landings with. no change in configuration nor visible from street. replace existing second means of egress stairs revision to 200605181318.Details
permit to allow repair and replace in kind existing 2 story staircase and landings with. no change in configuration nor visible from street. replace existing second means of egress stairs revision to 200605181318. | $5,000 |
| May 18, 2006 | Completed final sign-off Aug 2006 | 447 Hickory St | repair rotter posts and stringers. repair decking and some steps less than 50% (if greater than 50% . building inspector may requires plans & planning dept approved.Details
repair rotter posts and stringers. repair decking and some steps less than 50% (if greater than 50% . building inspector may requires plans & planning dept approved. | $4,000 |
| Dec 14, 2005 | Completed final sign-off Dec 2005 | 1837 Oak St | repair dryrot at stairways & install handrail copy with nov# 200562289. item # 3 & # 4. less than 50%.Details
repair dryrot at stairways & install handrail copy with nov# 200562289. item # 3 & # 4. less than 50%. | $14,000 |
| Apr 14, 2005 | Completed final sign-off Jun 2005 | 35 Colby St | renew 200407239645 to construct new stdy at garage level, install shower at existing garage levelDetails
renew 200407239645 to construct new stdy at garage level, install shower at existing garage level | |
| Jul 20, 2001 | Expired or cancelled expired Jan 2002 | 22 04th St | remove wall floor to ceiling approx 25', install air supply, electrical outlets, new grid ceilingDetails
remove wall floor to ceiling approx 25', install air supply, electrical outlets, new grid ceiling | $13,000 |
| Jul 20, 2001 | Expired or cancelled expired Nov 2001 | 22 04th St | cut opening for pass throughDetails
cut opening for pass through | $1,800 |