Back to kitchen remodel contractors
E. Grelli Construction
- Based in
- Millbrae
- On San Francisco permits
- Jul 2001 to Aug 2024
- Last 24 months
- 0 permits filed
63 permits since 2000: 52 completed, 4 never finaled, 7 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
20 kitchen remodel permits: 20 completed. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 9, 2024 | Completed final sign-off Mar 2025 | 419 Felton St | install new floor and paint walls and ceiling. paint cabinet, install new countertops and appliances. not a full kitchen remodel. countertops and sink onlyDetails
install new floor and paint walls and ceiling. paint cabinet, install new countertops and appliances. not a full kitchen remodel. countertops and sink only | $4,000 |
| Jun 28, 2018 | Completed final sign-off Apr 2019 | 56 San Jacinto Wy | remodel the kitchen and 2 bathrooms on the 2nd floor. the laundry room on the 1st floor will be remodeled. extg windows will be replaced in kind. new window will be added to the sides and rear of bldgDetails
remodel the kitchen and 2 bathrooms on the 2nd floor. the laundry room on the 1st floor will be remodeled. extg windows will be replaced in kind. new window will be added to the sides and rear of bldg | $115,000 |
| Mar 23, 2016 | Completed final sign-off Nov 2016 | 201 Goettingen St | kitchen remodel: replace cabinets counter top, sink, faucet. bathroom remodel: replace wall & floor tiles, tub, toilet, sink, faucet, fan. dry rot repair, appr. 80 sq ft. replace stucco over 1x6 sheating with new, 3/4 plywood double paper stucco and framing where needed. work is not visible from strDetails
kitchen remodel: replace cabinets counter top, sink, faucet. bathroom remodel: replace wall & floor tiles, tub, toilet, sink, faucet, fan. dry rot repair, appr. 80 sq ft. replace stucco over 1x6 sheating with new, 3/4 plywood double paper stucco and framing where needed. work is not visible from str | $18,000 |
| Oct 8, 2015 | Completed final sign-off Mar 2016 | 2018 Greenwich St | remodel an extg kitchen and 2 bathrooms, a washer and dryer will be relocated. an extg partition will be removed. all work is interior. no structural work.Details
remodel an extg kitchen and 2 bathrooms, a washer and dryer will be relocated. an extg partition will be removed. all work is interior. no structural work. | $30,000 |
| Aug 22, 2014 | Completed final sign-off Apr 2017 | 23 Peralta Av | construction of roof deck & master bedroom deck. removal of 3rd fl kitchen, raise dormers in the back of the house to the height of the dormers in the front of the house. addition of master closet & master bath.Details
construction of roof deck & master bedroom deck. removal of 3rd fl kitchen, raise dormers in the back of the house to the height of the dormers in the front of the house. addition of master closet & master bath. | $350,000 |
| Oct 30, 2013 | Completed final sign-off Dec 2013 | 180 Mallorca Wy | remove kitchen cabinets, install new electrical circuits, install new kitchen cabinets and counter tops, paint and install existing appliances. no hvac work will be doneDetails
remove kitchen cabinets, install new electrical circuits, install new kitchen cabinets and counter tops, paint and install existing appliances. no hvac work will be done | $9,500 |
| Jun 19, 2013 | Completed final sign-off Mar 2014 | 216 Ellsworth St | kitchen and bath renovation. install internal stair from kitchen to garage. add 1 exterior door and replace 2 extg windows. not visible to street. install new drop ceiling at rear bedroom. new furnace in garage.Details
kitchen and bath renovation. install internal stair from kitchen to garage. add 1 exterior door and replace 2 extg windows. not visible to street. install new drop ceiling at rear bedroom. new furnace in garage. | $50,000 |
| Mar 6, 2013 | Completed final sign-off Apr 2017 | 23 Peralta Av | remodel of & 70 sq ft addition to the ground fl unit, remodel (e) kitchen & bath, replace portions of (e) slab foundation. interior remodel of owner's unit at middle floor, relocate (e) kitchen & bath. no work on 3rd upper floor.Details
remodel of & 70 sq ft addition to the ground fl unit, remodel (e) kitchen & bath, replace portions of (e) slab foundation. interior remodel of owner's unit at middle floor, relocate (e) kitchen & bath. no work on 3rd upper floor. | $75,000 |
| Jan 2, 2013 | Completed final sign-off Feb 2013 | 180 Mallorca Wy | unit #206: demo old kitchen cabinets, install counter plugs and plug for the dw & ref. move gas shut off into a cabinet & adjust the water line to be under the sink, install drywall tape and paint install new cabinets, counters and existing appliancesDetails
unit #206: demo old kitchen cabinets, install counter plugs and plug for the dw & ref. move gas shut off into a cabinet & adjust the water line to be under the sink, install drywall tape and paint install new cabinets, counters and existing appliances | $8,000 |
| Apr 5, 2012 | Completed final sign-off Aug 2012 | 1200 California St | #5a: remodel bathroom - demo tub & tub surround & vanity top, install new tub & mixer valve, install new tub surround/vanity top & shower door in glass. build new office area near kitchen & new sub zero refrigerator, paint bathroom & kitchen, new light fixtures bathroom.Details
#5a: remodel bathroom - demo tub & tub surround & vanity top, install new tub & mixer valve, install new tub surround/vanity top & shower door in glass. build new office area near kitchen & new sub zero refrigerator, paint bathroom & kitchen, new light fixtures bathroom. | $18,000 |
| Jun 8, 2010 | Completed final sign-off Aug 2010 | 2701 Green St | unit# 11:demo kitchen & bathroom. install (n) plumbing & electrical. install insulation & drywall. tile bathroom, walls & floor. install kitchen cabinets & countertops. paint all work.Details
unit# 11:demo kitchen & bathroom. install (n) plumbing & electrical. install insulation & drywall. tile bathroom, walls & floor. install kitchen cabinets & countertops. paint all work. | $20,000 |
| May 10, 2010 | Completed final sign-off Aug 2010 | 2701 Green St | demo kitchen & bathroom. install (n) electrical and plumbing. install drywall & insulation. install (n) tub, lavatory & tile tub walls & floor. install kitchen cabinets, countertop and new flr. paint wall of (n) construction.Details
demo kitchen & bathroom. install (n) electrical and plumbing. install drywall & insulation. install (n) tub, lavatory & tile tub walls & floor. install kitchen cabinets, countertop and new flr. paint wall of (n) construction. | $20,000 |
| Feb 25, 2010 | Completed final sign-off Aug 2010 | 2701 Green St | unit#10 top floor.remodel kitchen and bath. remove old cabinets and plaster. install additional plugs.,5/8 type x drywall and new cabs. remove old tub sink and toilet, tile plaster. install new 5/8 type x drywall and tile. new plumbing fixtures. no wall removal and structural work.Details
unit#10 top floor.remodel kitchen and bath. remove old cabinets and plaster. install additional plugs.,5/8 type x drywall and new cabs. remove old tub sink and toilet, tile plaster. install new 5/8 type x drywall and tile. new plumbing fixtures. no wall removal and structural work. | $20,000 |
| Aug 26, 2009 | Completed final sign-off Nov 2009 | 1200 California St | remove kitchen & storage closet; install (n) cabinet & counter tops. install existing appliances, upgrade electrical outlets & install recess lights. install (n) sink & faucet (bathroom) install new tiles, new shower valves & faucet & (n) vanity top & cabinets.Details
remove kitchen & storage closet; install (n) cabinet & counter tops. install existing appliances, upgrade electrical outlets & install recess lights. install (n) sink & faucet (bathroom) install new tiles, new shower valves & faucet & (n) vanity top & cabinets. | $37,000 |
| Apr 28, 2009 | Completed final sign-off Jun 2009 | 840 Waller St | work @ unit# 12 only. remodel kitchen. install new cabinets & counter tops. new appliances. update electrical. bathroom remodel. install new fixtures & tile & update plumbing.Details
work @ unit# 12 only. remodel kitchen. install new cabinets & counter tops. new appliances. update electrical. bathroom remodel. install new fixtures & tile & update plumbing. | $27,000 |
| Apr 7, 2009 | Completed final sign-off Jul 2009 | 840 Waller St | unit 4 - remodel kitchen.install new cabinets and counter tops.new appliances.new circuits and receptacles in kitchen and bathroom. new gas line for stove.install new fixtures and tile.Details
unit 4 - remodel kitchen.install new cabinets and counter tops.new appliances.new circuits and receptacles in kitchen and bathroom. new gas line for stove.install new fixtures and tile. | $27,000 |
| Nov 25, 2008 | Completed final sign-off Apr 2009 | 2433 Polk St | work@ unit#3. remodel kitchen. new drywall, cabinets flooring. remodel bathroom- new drywall , fixtures. lights plug and switches in kitchen and bathroom to be install after demo. check plumbing and relocate drainss r-13 insulation for wall, r-19 min ceiling.Details
work@ unit#3. remodel kitchen. new drywall, cabinets flooring. remodel bathroom- new drywall , fixtures. lights plug and switches in kitchen and bathroom to be install after demo. check plumbing and relocate drainss r-13 insulation for wall, r-19 min ceiling. | $28,000 |
| Jul 8, 2008 | Completed final sign-off Oct 2008 | 1693 Hayes St | the project will remodel an (e) kitchen & bathroom.new partitions will be built.an engineered opening will enlarge an (e) doorway. the work is interior and does not enlarge the building envelope.(e) single-pane windows will be replaced with new double pane all wood units, same type, size, & locationDetails
the project will remodel an (e) kitchen & bathroom.new partitions will be built.an engineered opening will enlarge an (e) doorway. the work is interior and does not enlarge the building envelope.(e) single-pane windows will be replaced with new double pane all wood units, same type, size, & location | $80,000 |
| May 1, 2008 | Completed final sign-off Nov 2008 | 182 26th Av | remodel kitchen. remodel 1 bathroom. new furnace. new water heater. re-route gas line. re-route drain lines in bathroom. re-routh water lines. new tub, new toilet. new kitchen sink, new sheet rock & install kitchen cabinets & counter top.Details
remodel kitchen. remodel 1 bathroom. new furnace. new water heater. re-route gas line. re-route drain lines in bathroom. re-routh water lines. new tub, new toilet. new kitchen sink, new sheet rock & install kitchen cabinets & counter top. | $28,000 |
| Apr 7, 2008 | Completed final sign-off May 2008 | 63 Princeton St | remodel kitchen. remove cabinets & counter & install new cabinets & counter. run electrical plugg for appliances for counter. relocate drain & water lines. install gas line to new range.Details
remodel kitchen. remove cabinets & counter & install new cabinets & counter. run electrical plugg for appliances for counter. relocate drain & water lines. install gas line to new range. | $10,000 |