Back to bathroom remodel contractors
E. Grelli Construction
- Based in
- Millbrae
- On San Francisco permits
- Jul 2001 to Aug 2024
- Last 24 months
- 0 permits filed
63 permits since 2000: 52 completed, 4 never finaled, 7 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 22 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 28, 2018 | Completed final sign-off Apr 2019 | 56 San Jacinto Wy | remodel the kitchen and 2 bathrooms on the 2nd floor. the laundry room on the 1st floor will be remodeled. extg windows will be replaced in kind. new window will be added to the sides and rear of bldgDetails
remodel the kitchen and 2 bathrooms on the 2nd floor. the laundry room on the 1st floor will be remodeled. extg windows will be replaced in kind. new window will be added to the sides and rear of bldg | $115,000 |
| Mar 23, 2016 | Completed final sign-off Nov 2016 | 201 Goettingen St | kitchen remodel: replace cabinets counter top, sink, faucet. bathroom remodel: replace wall & floor tiles, tub, toilet, sink, faucet, fan. dry rot repair, appr. 80 sq ft. replace stucco over 1x6 sheating with new, 3/4 plywood double paper stucco and framing where needed. work is not visible from strDetails
kitchen remodel: replace cabinets counter top, sink, faucet. bathroom remodel: replace wall & floor tiles, tub, toilet, sink, faucet, fan. dry rot repair, appr. 80 sq ft. replace stucco over 1x6 sheating with new, 3/4 plywood double paper stucco and framing where needed. work is not visible from str | $18,000 |
| Oct 8, 2015 | Completed final sign-off Mar 2016 | 2018 Greenwich St | remodel an extg kitchen and 2 bathrooms, a washer and dryer will be relocated. an extg partition will be removed. all work is interior. no structural work.Details
remodel an extg kitchen and 2 bathrooms, a washer and dryer will be relocated. an extg partition will be removed. all work is interior. no structural work. | $30,000 |
| Aug 22, 2014 | Completed final sign-off Apr 2017 | 23 Peralta Av | construction of roof deck & master bedroom deck. removal of 3rd fl kitchen, raise dormers in the back of the house to the height of the dormers in the front of the house. addition of master closet & master bath.Details
construction of roof deck & master bedroom deck. removal of 3rd fl kitchen, raise dormers in the back of the house to the height of the dormers in the front of the house. addition of master closet & master bath. | $350,000 |
| Jun 13, 2014 | Expired or cancelled expired Nov 2019 | 225 Holly Park Cr | vertical & horizontal addition & remodel of an existing 1-story over basement, 2 bedroom/1 bath house of 1642 sq ft usable area. a 2203 sq ft addition will create a single family home with a total of 3672 sq ft usable area & a 3-car garage. the house will have 4 bedroom/ 4.5 bath.Details
vertical & horizontal addition & remodel of an existing 1-story over basement, 2 bedroom/1 bath house of 1642 sq ft usable area. a 2203 sq ft addition will create a single family home with a total of 3672 sq ft usable area & a 3-car garage. the house will have 4 bedroom/ 4.5 bath. | $500,000 |
| May 6, 2014 | Completed final sign-off Jul 2014 | 55 Hill St | remodel one bathroom. install net bathtub/water closet and vanity. install new window. install new lights and fan and one plug. install sheetrock tub surround and paintDetails
remodel one bathroom. install net bathtub/water closet and vanity. install new window. install new lights and fan and one plug. install sheetrock tub surround and paint | $9,000 |
| Jun 19, 2013 | Completed final sign-off Mar 2014 | 216 Ellsworth St | kitchen and bath renovation. install internal stair from kitchen to garage. add 1 exterior door and replace 2 extg windows. not visible to street. install new drop ceiling at rear bedroom. new furnace in garage.Details
kitchen and bath renovation. install internal stair from kitchen to garage. add 1 exterior door and replace 2 extg windows. not visible to street. install new drop ceiling at rear bedroom. new furnace in garage. | $50,000 |
| Mar 6, 2013 | Completed final sign-off Apr 2017 | 23 Peralta Av | remodel of & 70 sq ft addition to the ground fl unit, remodel (e) kitchen & bath, replace portions of (e) slab foundation. interior remodel of owner's unit at middle floor, relocate (e) kitchen & bath. no work on 3rd upper floor.Details
remodel of & 70 sq ft addition to the ground fl unit, remodel (e) kitchen & bath, replace portions of (e) slab foundation. interior remodel of owner's unit at middle floor, relocate (e) kitchen & bath. no work on 3rd upper floor. | $75,000 |
| Jul 30, 2012 | Completed final sign-off Oct 2013 | 64 Lafayette St | correct violation to comply with notice of violation 200796115, dated 4/30/2007. convert rooms to storage, legalize 1/2 bath & utility rom. w/ sink.Details
correct violation to comply with notice of violation 200796115, dated 4/30/2007. convert rooms to storage, legalize 1/2 bath & utility rom. w/ sink. | $4,000 |
| Apr 5, 2012 | Completed final sign-off Aug 2012 | 1200 California St | #5a: remodel bathroom - demo tub & tub surround & vanity top, install new tub & mixer valve, install new tub surround/vanity top & shower door in glass. build new office area near kitchen & new sub zero refrigerator, paint bathroom & kitchen, new light fixtures bathroom.Details
#5a: remodel bathroom - demo tub & tub surround & vanity top, install new tub & mixer valve, install new tub surround/vanity top & shower door in glass. build new office area near kitchen & new sub zero refrigerator, paint bathroom & kitchen, new light fixtures bathroom. | $18,000 |
| Apr 1, 2011 | Completed final sign-off Apr 2011 | 2963 23rd Av | replace window in bathroom 2'-0"x3'-0", patch stucco & drywall. not visible from the street, u-factorDetails
replace window in bathroom 2'-0"x3'-0", patch stucco & drywall. not visible from the street, u-factor | $500 |
| Jul 9, 2010 | Never finaled issued Sep 2010, no final | 216 Ellsworth St | partition walls on top floor (attic) to be removed for new full bathroom, and one (e) bedroom to be divided into separate bedroom and office. skylight to be added in bathroom not visible from street, no changes/work to garage floor.Details
partition walls on top floor (attic) to be removed for new full bathroom, and one (e) bedroom to be divided into separate bedroom and office. skylight to be added in bathroom not visible from street, no changes/work to garage floor. | $40,000 |
| Jun 8, 2010 | Completed final sign-off Aug 2010 | 2701 Green St | unit# 11:demo kitchen & bathroom. install (n) plumbing & electrical. install insulation & drywall. tile bathroom, walls & floor. install kitchen cabinets & countertops. paint all work.Details
unit# 11:demo kitchen & bathroom. install (n) plumbing & electrical. install insulation & drywall. tile bathroom, walls & floor. install kitchen cabinets & countertops. paint all work. | $20,000 |
| May 10, 2010 | Completed final sign-off Aug 2010 | 2701 Green St | demo kitchen & bathroom. install (n) electrical and plumbing. install drywall & insulation. install (n) tub, lavatory & tile tub walls & floor. install kitchen cabinets, countertop and new flr. paint wall of (n) construction.Details
demo kitchen & bathroom. install (n) electrical and plumbing. install drywall & insulation. install (n) tub, lavatory & tile tub walls & floor. install kitchen cabinets, countertop and new flr. paint wall of (n) construction. | $20,000 |
| Feb 25, 2010 | Completed final sign-off Aug 2010 | 2701 Green St | unit#10 top floor.remodel kitchen and bath. remove old cabinets and plaster. install additional plugs.,5/8 type x drywall and new cabs. remove old tub sink and toilet, tile plaster. install new 5/8 type x drywall and tile. new plumbing fixtures. no wall removal and structural work.Details
unit#10 top floor.remodel kitchen and bath. remove old cabinets and plaster. install additional plugs.,5/8 type x drywall and new cabs. remove old tub sink and toilet, tile plaster. install new 5/8 type x drywall and tile. new plumbing fixtures. no wall removal and structural work. | $20,000 |
| Aug 26, 2009 | Completed final sign-off Nov 2009 | 1200 California St | remove kitchen & storage closet; install (n) cabinet & counter tops. install existing appliances, upgrade electrical outlets & install recess lights. install (n) sink & faucet (bathroom) install new tiles, new shower valves & faucet & (n) vanity top & cabinets.Details
remove kitchen & storage closet; install (n) cabinet & counter tops. install existing appliances, upgrade electrical outlets & install recess lights. install (n) sink & faucet (bathroom) install new tiles, new shower valves & faucet & (n) vanity top & cabinets. | $37,000 |
| Apr 28, 2009 | Completed final sign-off Jun 2009 | 840 Waller St | work @ unit# 12 only. remodel kitchen. install new cabinets & counter tops. new appliances. update electrical. bathroom remodel. install new fixtures & tile & update plumbing.Details
work @ unit# 12 only. remodel kitchen. install new cabinets & counter tops. new appliances. update electrical. bathroom remodel. install new fixtures & tile & update plumbing. | $27,000 |
| Apr 7, 2009 | Completed final sign-off Jul 2009 | 840 Waller St | unit 4 - remodel kitchen.install new cabinets and counter tops.new appliances.new circuits and receptacles in kitchen and bathroom. new gas line for stove.install new fixtures and tile.Details
unit 4 - remodel kitchen.install new cabinets and counter tops.new appliances.new circuits and receptacles in kitchen and bathroom. new gas line for stove.install new fixtures and tile. | $27,000 |
| Apr 3, 2009 | Completed final sign-off May 2010 | 791 30th Av | legalize ground floor space, add 2 new bedrooms, bathroom, storage & entry, in fill existing light well w/ new parapet wall, roof & skylights.(flat)Details
legalize ground floor space, add 2 new bedrooms, bathroom, storage & entry, in fill existing light well w/ new parapet wall, roof & skylights.(flat) | $40,000 |
| Nov 25, 2008 | Completed final sign-off Apr 2009 | 2433 Polk St | work@ unit#3. remodel kitchen. new drywall, cabinets flooring. remodel bathroom- new drywall , fixtures. lights plug and switches in kitchen and bathroom to be install after demo. check plumbing and relocate drainss r-13 insulation for wall, r-19 min ceiling.Details
work@ unit#3. remodel kitchen. new drywall, cabinets flooring. remodel bathroom- new drywall , fixtures. lights plug and switches in kitchen and bathroom to be install after demo. check plumbing and relocate drainss r-13 insulation for wall, r-19 min ceiling. | $28,000 |
| Sep 15, 2008 | Completed final sign-off Feb 2009 | 369 Los Palmos Dr | remodel bathroom. install new tub with valve new vanity & sink. new toilet, new shower valve. install new sheetrock & tile & paint on existing walls.Details
remodel bathroom. install new tub with valve new vanity & sink. new toilet, new shower valve. install new sheetrock & tile & paint on existing walls. | $16,000 |
| Jul 8, 2008 | Completed final sign-off Oct 2008 | 1693 Hayes St | the project will remodel an (e) kitchen & bathroom.new partitions will be built.an engineered opening will enlarge an (e) doorway. the work is interior and does not enlarge the building envelope.(e) single-pane windows will be replaced with new double pane all wood units, same type, size, & locationDetails
the project will remodel an (e) kitchen & bathroom.new partitions will be built.an engineered opening will enlarge an (e) doorway. the work is interior and does not enlarge the building envelope.(e) single-pane windows will be replaced with new double pane all wood units, same type, size, & location | $80,000 |
| May 20, 2008 | Expired or cancelled expired Apr 2009 | 1200 California St | unit #7a: remodel 2 bathrooms, install 2 toilets, 2 vanities with sink and faucets, 1 tub. repair (50%) and paint drywall, move & rebuild one wall 6' lengh, tile floor and walls over tub, install 4 lights and paint both bathrooms.Details
unit #7a: remodel 2 bathrooms, install 2 toilets, 2 vanities with sink and faucets, 1 tub. repair (50%) and paint drywall, move & rebuild one wall 6' lengh, tile floor and walls over tub, install 4 lights and paint both bathrooms. | $25,000 |
| May 1, 2008 | Completed final sign-off Nov 2008 | 182 26th Av | remodel kitchen. remodel 1 bathroom. new furnace. new water heater. re-route gas line. re-route drain lines in bathroom. re-routh water lines. new tub, new toilet. new kitchen sink, new sheet rock & install kitchen cabinets & counter top.Details
remodel kitchen. remodel 1 bathroom. new furnace. new water heater. re-route gas line. re-route drain lines in bathroom. re-routh water lines. new tub, new toilet. new kitchen sink, new sheet rock & install kitchen cabinets & counter top. | $28,000 |
| Feb 21, 2008 | Completed final sign-off Apr 2008 | 840 Waller St | remodel (1) bathroom in apt #1-new tub, mixer valve/sink/tiles/toilet/light fixture, fan (1 bathroom)Details
remodel (1) bathroom in apt #1-new tub, mixer valve/sink/tiles/toilet/light fixture, fan (1 bathroom) | $8,000 |