Truebeck Construction
- Based in
- San Mateo
- On San Francisco permits
- Jun 2008 to Sep 2026
- Last 24 months
- 40 permits filed
609 permits since 2000: 463 completed, 26 in progress, 79 never finaled, 41 expired or cancelled.
Of the 79 never-finaled permits, 3 are 3 to 5 years old, 31 are 5 to 10 years old, 45 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
32 stairs permits: 29 completed, 3 never finaled. Typically 16 days from filing to permit and 178 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 11, 2025 | Completed final sign-off Mar 2026 | 600 Montgomery St | 23rd & 24th fl: interior alteration of conference rooms, storage areas, enclosed offices, pantries and lan rooms with associated mep, (structural for communicating opening for convenience stairs under separate permit. pa#2025-0424-5130)Details
23rd & 24th fl: interior alteration of conference rooms, storage areas, enclosed offices, pantries and lan rooms with associated mep, (structural for communicating opening for convenience stairs under separate permit. pa#2025-0424-5130) | $5,500,000 |
| Aug 21, 2024 | Completed final sign-off Feb 2025 | 1450 Owens St | revision to pa#: 202012281760 addendum 3. update smoke control sequence of operation to match smoke control matrix for energizing smoke exhaust fans and stair pressurization fansDetails
revision to pa#: 202012281760 addendum 3. update smoke control sequence of operation to match smoke control matrix for energizing smoke exhaust fans and stair pressurization fans | |
| Jun 21, 2024 | Completed final sign-off Dec 2024 | 550 Terry A Francois Bl | 5th/f: interior demo only per ab017: area to be demo all inteiror non-bearing walls, doors, cabinetry, plumbing, fixtures, floor finishes, ceiling lighting, mechanical system & electrical system not serving elevators, stairs & electrical rm. t.i. under separate permitDetails
5th/f: interior demo only per ab017: area to be demo all inteiror non-bearing walls, doors, cabinetry, plumbing, fixtures, floor finishes, ceiling lighting, mechanical system & electrical system not serving elevators, stairs & electrical rm. t.i. under separate permit | $50,000 |
| Mar 14, 2023 | Completed final sign-off Sep 2023 | 2567 Mission St | revision to 202212168551 to memorialize (e)/proposed conditions of basement egress stair based filed conditions.Details
revision to 202212168551 to memorialize (e)/proposed conditions of basement egress stair based filed conditions. | |
| Oct 26, 2022 | Completed final sign-off Jan 2025 | 550 Terry A Francois Bl | cut new mech shaft openings next to (e) stair and shaft, and provide framing on fl 2 roof. remove roof mech screen. demo 1st floor at workroom. new ramp on fl 2-6. mep demo.Details
cut new mech shaft openings next to (e) stair and shaft, and provide framing on fl 2 roof. remove roof mech screen. demo 1st floor at workroom. new ramp on fl 2-6. mep demo. | $416,000 |
| May 24, 2019 | Completed final sign-off Feb 2020 | 1470 Owens St | installation of metal stairs associated with app#201806010826. n/a for maherDetails
installation of metal stairs associated with app#201806010826. n/a for maher | |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 2415 03rd St | suite 270: revision to permit #201808308730. add additional steel support to stair landing.Details
suite 270: revision to permit #201808308730. add additional steel support to stair landing. | $5,000 |
| Sep 14, 2017 | Completed final sign-off Jun 2018 | 101 02nd St | demo curtain wall system and install nana wall system. new guardrail and wooden deck pavers on new occupiable roof deck and multipurpose room, (n) elevator lobby s-doors configuration and (n) panic hardware on exit stairs. mp room ref pa 201709138056 ** maher: n/a **Details
demo curtain wall system and install nana wall system. new guardrail and wooden deck pavers on new occupiable roof deck and multipurpose room, (n) elevator lobby s-doors configuration and (n) panic hardware on exit stairs. mp room ref pa 201709138056 ** maher: n/a ** | $120,450 |
| Sep 13, 2017 | Completed final sign-off Aug 2018 | 101 02nd St | 12th fl - demo partitions, new stairs, ramp, kitchenette tieing into existing meps for renovation. all new interior finishes. roof deck, curtain wall, fire alarm, and sprinklers on separate submittals.Details
12th fl - demo partitions, new stairs, ramp, kitchenette tieing into existing meps for renovation. all new interior finishes. roof deck, curtain wall, fire alarm, and sprinklers on separate submittals. | $425,050 |
| Apr 26, 2016 | Never finaled issued May 2016, no final | 865 Market St | ste 136: revision/add to pa 2016-0216-9602, steel stair and railing drawings. maher naDetails
ste 136: revision/add to pa 2016-0216-9602, steel stair and railing drawings. maher na | |
| Feb 16, 2016 | Completed final sign-off Apr 2016 | 865 Market St | suite 136:demolition of non-structural,non rated walls,demo of wood framed stair & landing,reclaim wood floor,removal of sheetrock for future rough-in(ti application) work will not affect the design of oepration of (e)smoke control system,demo will be performed per sfab-017; maher n/aDetails
suite 136:demolition of non-structural,non rated walls,demo of wood framed stair & landing,reclaim wood floor,removal of sheetrock for future rough-in(ti application) work will not affect the design of oepration of (e)smoke control system,demo will be performed per sfab-017; maher n/a | $13,000 |
| Mar 18, 2015 | Completed final sign-off Apr 2015 | 1940 Cesar Chavez St | revision to 201412123617. door widening, office layout revision at entry.reduce width of stairs, maher n/aDetails
revision to 201412123617. door widening, office layout revision at entry.reduce width of stairs, maher n/a | |
| Oct 24, 2014 | Completed final sign-off Apr 2015 | 1940 Cesar Chavez St | interior remodel including new stair, non structural paritions, ada restroom and shower.cost of construction for mep and sprinkler not included in this permit. n/a for maher ordinanceDetails
interior remodel including new stair, non structural paritions, ada restroom and shower.cost of construction for mep and sprinkler not included in this permit. n/a for maher ordinance | $50,000 |
| Sep 11, 2014 | Completed final sign-off Dec 2014 | 499 Illinois St | deferred submiittal of pa 201403241536 to install handrail for stairs. provide design and structural calcs. handrails will be built w/ accordance with relevant requirementsDetails
deferred submiittal of pa 201403241536 to install handrail for stairs. provide design and structural calcs. handrails will be built w/ accordance with relevant requirements | $50,000 |
| Sep 9, 2014 | Completed final sign-off Dec 2014 | 499 Illinois St | glazing partitions at stairs for permit 201312204739 as a deffered submittal.Details
glazing partitions at stairs for permit 201312204739 as a deffered submittal. | |
| Sep 9, 2014 | Completed final sign-off Dec 2014 | 499 Illinois St | 1st and 2nd flr: design build stairs for permit 201403241536 as a deffered submittal.Details
1st and 2nd flr: design build stairs for permit 201403241536 as a deffered submittal. | |
| Mar 24, 2014 | Completed final sign-off Jan 2015 | 499 Illinois St | (1st & 2nd floors) ti on levels 1 & 2, new lobby stairs, cafe, dining area, kitchen, training and fitness center and building common areas new restroom on level 2Details
(1st & 2nd floors) ti on levels 1 & 2, new lobby stairs, cafe, dining area, kitchen, training and fitness center and building common areas new restroom on level 2 | $7,500,000 |
| Jun 24, 2013 | Completed final sign-off Mar 2014 | 1355 Market St | construct new vestibule including new vestbule partitions, new doors and finishes. accessiblity documents is deferred per ab-056. reference permit # 201304194956 & 201302150343 for stair #2 work.Details
construct new vestibule including new vestbule partitions, new doors and finishes. accessiblity documents is deferred per ab-056. reference permit # 201304194956 & 201302150343 for stair #2 work. | $45,000 |
| Jun 18, 2013 | Completed final sign-off Mar 2014 | 1355 Market St | revision to appl #2012.11.08.3877 - 1 story steel stair & concrete & intermediate landing including structural framing shop, not an exit stair. ada accessibility deferred under ab-056.Details
revision to appl #2012.11.08.3877 - 1 story steel stair & concrete & intermediate landing including structural framing shop, not an exit stair. ada accessibility deferred under ab-056. | $20,000 |
| Apr 19, 2013 | Completed final sign-off Apr 2014 | 1355 Market St | revision to appl #2013.0215.0343 - modification to egress stair #2 to exit to corridor at ground floor.Details
revision to appl #2013.0215.0343 - modification to egress stair #2 to exit to corridor at ground floor. | $4,000 |
| Feb 15, 2013 | Never finaled issued Mar 2013, no final | 1355 Market St | reconfigure exit stair 2 at ground level to exit directly through the historic lobby. includes cutting exiting concrete core wall for new opening from stair, new steel stringer and concrete pan stair extension, new 2 hr rated stair shaft and vestibule enclosure. eletrical and fire sprinkler, life saDetails
reconfigure exit stair 2 at ground level to exit directly through the historic lobby. includes cutting exiting concrete core wall for new opening from stair, new steel stringer and concrete pan stair extension, new 2 hr rated stair shaft and vestibule enclosure. eletrical and fire sprinkler, life sa | $45,000 |
| Nov 20, 2012 | Completed final sign-off May 2014 | 1155 Market St | base building accessibiltiy work ab-056 floor 1-5. floor 7-9, and basement floor. in addition to providing showers and bike storage at the basement level. ab-o56: parking, path of travel, entry doors, stairs ramps, lifts elevators rest room floors.Details
base building accessibiltiy work ab-056 floor 1-5. floor 7-9, and basement floor. in addition to providing showers and bike storage at the basement level. ab-o56: parking, path of travel, entry doors, stairs ramps, lifts elevators rest room floors. | $500,000 |
| Nov 8, 2012 | Never finaled issued Jun 2013, no final | 1355 Market St | demo of ground fl to 2nd fl masonry boiler flue & demo of 2nd fl slab for (n)egress stair. (n)work incl (n)egress stair, (n)ground & 2nd fl toping slabs, (n)glass guardrails @ 2nd fl, (n)glass partition walls @ 2nd fl, (n)ground fl restrms (incl ada) (n) steel retail portals, motorized 2nd fl elevDetails
demo of ground fl to 2nd fl masonry boiler flue & demo of 2nd fl slab for (n)egress stair. (n)work incl (n)egress stair, (n)ground & 2nd fl toping slabs, (n)glass guardrails @ 2nd fl, (n)glass partition walls @ 2nd fl, (n)ground fl restrms (incl ada) (n) steel retail portals, motorized 2nd fl elev | $2,400,000 |
| Oct 29, 2012 | Completed final sign-off Sep 2013 | 201 03rd St | 4th & 5th floors-revision to pa# 2012-1010-1699, 2012.0216.4323 & 2012.0222.4583 - adding a communication stair between 4th & 5th floors. mechanical for the 4th fl included in this permit. structural included.Details
4th & 5th floors-revision to pa# 2012-1010-1699, 2012.0216.4323 & 2012.0222.4583 - adding a communication stair between 4th & 5th floors. mechanical for the 4th fl included in this permit. structural included. | $100,000 |
| Oct 10, 2012 | Completed final sign-off Mar 2013 | 201 03rd St | 5th floor:full flor, single t.i. includes. selective demo and construction of new partition walls, finishes ceiling, mec, electrical, plmg included in this permit. new communication stair under seperate permit. fire life safety and sprinkler upgrade under seperate permited as needed.Details
5th floor:full flor, single t.i. includes. selective demo and construction of new partition walls, finishes ceiling, mec, electrical, plmg included in this permit. new communication stair under seperate permit. fire life safety and sprinkler upgrade under seperate permited as needed. | $1,825,000 |
| Jul 16, 2012 | Completed final sign-off Sep 2013 | 275 Brannan St | core and shell renovation of existing office building. facade work and interior upgrades. new egress stairs to roof. new roof deck. sprinklers, standpipe, fire alarm permits separateDetails
core and shell renovation of existing office building. facade work and interior upgrades. new egress stairs to roof. new roof deck. sprinklers, standpipe, fire alarm permits separate | $2,500,000 |
| Jul 3, 2012 | Completed final sign-off May 2013 | 370 03rd St | ground flr: interior demo of exist. loby wall to be replaced with glass wall, remove wood veneer to be replaced by back-painted glass. constrcution of new ceiling elements incl. (n) lighting and new wood slat ceiling, (n) carpet extension of back stair venstibule, 90min. doors in both stairDetails
ground flr: interior demo of exist. loby wall to be replaced with glass wall, remove wood veneer to be replaced by back-painted glass. constrcution of new ceiling elements incl. (n) lighting and new wood slat ceiling, (n) carpet extension of back stair venstibule, 90min. doors in both stair | $390,450 |
| Jun 26, 2012 | Completed final sign-off Jan 2013 | 540 09th St | t.i. for extg retail space on 2nd floors and basement. work includes new partitions, finishes, ada upgrades new exterior work. new structural framing stairs, elevator. mep and fire protection under seperate permit.Details
t.i. for extg retail space on 2nd floors and basement. work includes new partitions, finishes, ada upgrades new exterior work. new structural framing stairs, elevator. mep and fire protection under seperate permit. | $735,000 |
| Feb 7, 2012 | Completed final sign-off Mar 2014 | 1355 Market St | at 9th floor, new const of hardscape outdoor deck and roof garden, new glazed window wall in existing wall, modified stair tower and new mechanical room. (actual mechanical equipment under seperate permit.)Details
at 9th floor, new const of hardscape outdoor deck and roof garden, new glazed window wall in existing wall, modified stair tower and new mechanical room. (actual mechanical equipment under seperate permit.) | $785,000 |
| Jan 5, 2012 | Completed final sign-off Oct 2013 | 1355 Market St | revision to appl #201107190532 work complies with ab-017 for unoccupied areas. addition of exit door & stair at rooftop mechanical room.Details
revision to appl #201107190532 work complies with ab-017 for unoccupied areas. addition of exit door & stair at rooftop mechanical room. | $35,000 |
| Nov 5, 2009 | Completed final sign-off May 2010 | 1090 Bryant St | minor non structural t.i. including interior demo. new dry wall, partitions, stairs & finishes. upgraade of restrooms to meet title 24. chang of use from warehouse to warehouse w/ sales area. mep under separate permit.Details
minor non structural t.i. including interior demo. new dry wall, partitions, stairs & finishes. upgraade of restrooms to meet title 24. chang of use from warehouse to warehouse w/ sales area. mep under separate permit. | $150,000 |
| Aug 6, 2009 | Completed final sign-off Nov 2009 | 455 Mission Bay Blvd South | revision to appl #200704279921, installation of design build stairs #1 and #2.Details
revision to appl #200704279921, installation of design build stairs #1 and #2. | $75,000 |