Permit GraphShortlistSan Francisco building permits since 2000

Truebeck Construction

Contractor license
903798
State license record
Based in
San Mateo
On San Francisco permits
Jun 2008 to Sep 2026
Last 24 months
40 permits filed

609 permits since 2000: 463 completed, 26 in progress, 79 never finaled, 41 expired or cancelled.

Of the 79 never-finaled permits, 3 are 3 to 5 years old, 31 are 5 to 10 years old, 45 are over 10 years old. 1 was filed but never issued.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Stairs permits

AllRoof deck 9Pergola or trellis 3Deck 3Stairs 32Kitchen remodel 9Bathroom remodel 13

32 stairs permits: 29 completed, 3 never finaled. Typically 16 days from filing to permit and 178 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 11, 2025Completed
final sign-off Mar 2026
600 Montgomery St23rd & 24th fl: interior alteration of conference rooms, storage areas, enclosed offices, pantries and lan rooms with associated mep, (structural for communicating opening for convenience stairs under separate permit. pa#2025-0424-5130)
Details
Permit
202504114225
Status
complete
Filed
Apr 11, 2025
Permit issued
Jul 8, 2025
Final sign-off
Mar 30, 2026
Declared cost
$5,500,000
Address
600 Montgomery St

23rd & 24th fl: interior alteration of conference rooms, storage areas, enclosed offices, pantries and lan rooms with associated mep, (structural for communicating opening for convenience stairs under separate permit. pa#2025-0424-5130)

Open the permit page

$5,500,000
Aug 21, 2024Completed
final sign-off Feb 2025
1450 Owens Strevision to pa#: 202012281760 addendum 3. update smoke control sequence of operation to match smoke control matrix for energizing smoke exhaust fans and stair pressurization fans
Details
Permit
202408219195
Status
complete
Filed
Aug 21, 2024
Permit issued
Sep 13, 2024
Final sign-off
Feb 28, 2025
Address
1450 Owens St

revision to pa#: 202012281760 addendum 3. update smoke control sequence of operation to match smoke control matrix for energizing smoke exhaust fans and stair pressurization fans

Open the permit page

Jun 21, 2024Completed
final sign-off Dec 2024
550 Terry A Francois Bl5th/f: interior demo only per ab017: area to be demo all inteiror non-bearing walls, doors, cabinetry, plumbing, fixtures, floor finishes, ceiling lighting, mechanical system & electrical system not serving elevators, stairs & electrical rm. t.i. under separate permit
Details
Permit
202406215017
Status
complete
Filed
Jun 21, 2024
Permit issued
Jul 10, 2024
Final sign-off
Dec 19, 2024
Declared cost
$50,000
Address
550 Terry A Francois Bl

5th/f: interior demo only per ab017: area to be demo all inteiror non-bearing walls, doors, cabinetry, plumbing, fixtures, floor finishes, ceiling lighting, mechanical system & electrical system not serving elevators, stairs & electrical rm. t.i. under separate permit

Open the permit page

$50,000
Mar 14, 2023Completed
final sign-off Sep 2023
2567 Mission Strevision to 202212168551 to memorialize (e)/proposed conditions of basement egress stair based filed conditions.
Details
Permit
202303143648
Status
complete
Filed
Mar 14, 2023
Permit issued
Mar 20, 2023
Final sign-off
Sep 14, 2023
Address
2567 Mission St

revision to 202212168551 to memorialize (e)/proposed conditions of basement egress stair based filed conditions.

Open the permit page

Oct 26, 2022Completed
final sign-off Jan 2025
550 Terry A Francois Blcut new mech shaft openings next to (e) stair and shaft, and provide framing on fl 2 roof. remove roof mech screen. demo 1st floor at workroom. new ramp on fl 2-6. mep demo.
Details
Permit
202210265236
Status
complete
Filed
Oct 26, 2022
Permit issued
Dec 27, 2022
Final sign-off
Jan 16, 2025
Declared cost
$416,000
Address
550 Terry A Francois Bl

cut new mech shaft openings next to (e) stair and shaft, and provide framing on fl 2 roof. remove roof mech screen. demo 1st floor at workroom. new ramp on fl 2-6. mep demo.

Open the permit page

$416,000
May 24, 2019Completed
final sign-off Feb 2020
1470 Owens Stinstallation of metal stairs associated with app#201806010826. n/a for maher
Details
Permit
201905241647
Status
complete
Filed
May 24, 2019
Permit issued
Jun 17, 2019
Final sign-off
Feb 14, 2020
Address
1470 Owens St

installation of metal stairs associated with app#201806010826. n/a for maher

Open the permit page

Sep 20, 2018Completed
final sign-off Jan 2020
2415 03rd Stsuite 270: revision to permit #201808308730. add additional steel support to stair landing.
Details
Permit
201809200869
Status
complete
Filed
Sep 20, 2018
Permit issued
Sep 20, 2018
Final sign-off
Jan 15, 2020
Declared cost
$5,000
Address
2415 03rd St

suite 270: revision to permit #201808308730. add additional steel support to stair landing.

Open the permit page

$5,000
Sep 14, 2017Completed
final sign-off Jun 2018
101 02nd Stdemo curtain wall system and install nana wall system. new guardrail and wooden deck pavers on new occupiable roof deck and multipurpose room, (n) elevator lobby s-doors configuration and (n) panic hardware on exit stairs. mp room ref pa 201709138056 ** maher: n/a **
Details
Permit
201709148263
Status
complete
Filed
Sep 14, 2017
Permit issued
Feb 2, 2018
Final sign-off
Jun 8, 2018
Declared cost
$120,450
Address
101 02nd St

demo curtain wall system and install nana wall system. new guardrail and wooden deck pavers on new occupiable roof deck and multipurpose room, (n) elevator lobby s-doors configuration and (n) panic hardware on exit stairs. mp room ref pa 201709138056 ** maher: n/a **

Open the permit page

$120,450
Sep 13, 2017Completed
final sign-off Aug 2018
101 02nd St12th fl - demo partitions, new stairs, ramp, kitchenette tieing into existing meps for renovation. all new interior finishes. roof deck, curtain wall, fire alarm, and sprinklers on separate submittals.
Details
Permit
201709138056
Status
complete
Filed
Sep 13, 2017
Permit issued
Sep 20, 2017
Final sign-off
Aug 7, 2018
Declared cost
$425,050
Address
101 02nd St

12th fl - demo partitions, new stairs, ramp, kitchenette tieing into existing meps for renovation. all new interior finishes. roof deck, curtain wall, fire alarm, and sprinklers on separate submittals.

Open the permit page

$425,050
Apr 26, 2016Never finaled
issued May 2016, no final
865 Market Stste 136: revision/add to pa 2016-0216-9602, steel stair and railing drawings. maher na
Details
Permit
201604265760
Status
issued
Filed
Apr 26, 2016
Permit issued
May 11, 2016
Address
865 Market St

ste 136: revision/add to pa 2016-0216-9602, steel stair and railing drawings. maher na

Open the permit page

Feb 16, 2016Completed
final sign-off Apr 2016
865 Market Stsuite 136:demolition of non-structural,non rated walls,demo of wood framed stair & landing,reclaim wood floor,removal of sheetrock for future rough-in(ti application) work will not affect the design of oepration of (e)smoke control system,demo will be performed per sfab-017; maher n/a
Details
Permit
201602169640
Status
complete
Filed
Feb 16, 2016
Permit issued
Feb 17, 2016
Final sign-off
Apr 15, 2016
Declared cost
$13,000
Address
865 Market St

suite 136:demolition of non-structural,non rated walls,demo of wood framed stair & landing,reclaim wood floor,removal of sheetrock for future rough-in(ti application) work will not affect the design of oepration of (e)smoke control system,demo will be performed per sfab-017; maher n/a

Open the permit page

$13,000
Mar 18, 2015Completed
final sign-off Apr 2015
1940 Cesar Chavez Strevision to 201412123617. door widening, office layout revision at entry.reduce width of stairs, maher n/a
Details
Permit
201503181217
Status
complete
Filed
Mar 18, 2015
Permit issued
Mar 26, 2015
Final sign-off
Apr 28, 2015
Address
1940 Cesar Chavez St

revision to 201412123617. door widening, office layout revision at entry.reduce width of stairs, maher n/a

Open the permit page

Oct 24, 2014Completed
final sign-off Apr 2015
1940 Cesar Chavez Stinterior remodel including new stair, non structural paritions, ada restroom and shower.cost of construction for mep and sprinkler not included in this permit. n/a for maher ordinance
Details
Permit
201410249877
Status
complete
Filed
Oct 24, 2014
Permit issued
Nov 10, 2014
Final sign-off
Apr 28, 2015
Declared cost
$50,000
Address
1940 Cesar Chavez St

interior remodel including new stair, non structural paritions, ada restroom and shower.cost of construction for mep and sprinkler not included in this permit. n/a for maher ordinance

Open the permit page

$50,000
Sep 11, 2014Completed
final sign-off Dec 2014
499 Illinois Stdeferred submiittal of pa 201403241536 to install handrail for stairs. provide design and structural calcs. handrails will be built w/ accordance with relevant requirements
Details
Permit
201409116115
Status
complete
Filed
Sep 11, 2014
Permit issued
Sep 12, 2014
Final sign-off
Dec 18, 2014
Declared cost
$50,000
Address
499 Illinois St

deferred submiittal of pa 201403241536 to install handrail for stairs. provide design and structural calcs. handrails will be built w/ accordance with relevant requirements

Open the permit page

$50,000
Sep 9, 2014Completed
final sign-off Dec 2014
499 Illinois Stglazing partitions at stairs for permit 201312204739 as a deffered submittal.
Details
Permit
201409095890
Status
complete
Filed
Sep 9, 2014
Permit issued
Sep 11, 2014
Final sign-off
Dec 18, 2014
Address
499 Illinois St

glazing partitions at stairs for permit 201312204739 as a deffered submittal.

Open the permit page

Sep 9, 2014Completed
final sign-off Dec 2014
499 Illinois St1st and 2nd flr: design build stairs for permit 201403241536 as a deffered submittal.
Details
Permit
201409095885
Status
complete
Filed
Sep 9, 2014
Permit issued
Sep 11, 2014
Final sign-off
Dec 18, 2014
Address
499 Illinois St

1st and 2nd flr: design build stairs for permit 201403241536 as a deffered submittal.

Open the permit page

Mar 24, 2014Completed
final sign-off Jan 2015
499 Illinois St(1st & 2nd floors) ti on levels 1 & 2, new lobby stairs, cafe, dining area, kitchen, training and fitness center and building common areas new restroom on level 2
Details
Permit
201403241536
Status
complete
Filed
Mar 24, 2014
Permit issued
Jul 28, 2014
Final sign-off
Jan 9, 2015
Declared cost
$7,500,000
Address
499 Illinois St

(1st & 2nd floors) ti on levels 1 & 2, new lobby stairs, cafe, dining area, kitchen, training and fitness center and building common areas new restroom on level 2

Open the permit page

$7,500,000
Jun 24, 2013Completed
final sign-off Mar 2014
1355 Market Stconstruct new vestibule including new vestbule partitions, new doors and finishes. accessiblity documents is deferred per ab-056. reference permit # 201304194956 & 201302150343 for stair #2 work.
Details
Permit
201306240317
Status
complete
Filed
Jun 24, 2013
Permit issued
Jul 12, 2013
Final sign-off
Mar 14, 2014
Declared cost
$45,000
Address
1355 Market St

construct new vestibule including new vestbule partitions, new doors and finishes. accessiblity documents is deferred per ab-056. reference permit # 201304194956 & 201302150343 for stair #2 work.

Open the permit page

$45,000
Jun 18, 2013Completed
final sign-off Mar 2014
1355 Market Strevision to appl #2012.11.08.3877 - 1 story steel stair & concrete & intermediate landing including structural framing shop, not an exit stair. ada accessibility deferred under ab-056.
Details
Permit
201306189826
Status
complete
Filed
Jun 18, 2013
Permit issued
Jun 25, 2013
Final sign-off
Mar 14, 2014
Declared cost
$20,000
Address
1355 Market St

revision to appl #2012.11.08.3877 - 1 story steel stair & concrete & intermediate landing including structural framing shop, not an exit stair. ada accessibility deferred under ab-056.

Open the permit page

$20,000
Apr 19, 2013Completed
final sign-off Apr 2014
1355 Market Strevision to appl #2013.0215.0343 - modification to egress stair #2 to exit to corridor at ground floor.
Details
Permit
201304194956
Status
complete
Filed
Apr 19, 2013
Permit issued
May 1, 2013
Final sign-off
Apr 4, 2014
Declared cost
$4,000
Address
1355 Market St

revision to appl #2013.0215.0343 - modification to egress stair #2 to exit to corridor at ground floor.

Open the permit page

$4,000
Feb 15, 2013Never finaled
issued Mar 2013, no final
1355 Market Streconfigure exit stair 2 at ground level to exit directly through the historic lobby. includes cutting exiting concrete core wall for new opening from stair, new steel stringer and concrete pan stair extension, new 2 hr rated stair shaft and vestibule enclosure. eletrical and fire sprinkler, life sa
Details
Permit
201302150343
Status
issued
Filed
Feb 15, 2013
Permit issued
Mar 13, 2013
Declared cost
$45,000
Address
1355 Market St

reconfigure exit stair 2 at ground level to exit directly through the historic lobby. includes cutting exiting concrete core wall for new opening from stair, new steel stringer and concrete pan stair extension, new 2 hr rated stair shaft and vestibule enclosure. eletrical and fire sprinkler, life sa

Open the permit page

$45,000
Nov 20, 2012Completed
final sign-off May 2014
1155 Market Stbase building accessibiltiy work ab-056 floor 1-5. floor 7-9, and basement floor. in addition to providing showers and bike storage at the basement level. ab-o56: parking, path of travel, entry doors, stairs ramps, lifts elevators rest room floors.
Details
Permit
201211204569
Status
complete
Filed
Nov 20, 2012
Permit issued
Nov 30, 2012
Final sign-off
May 5, 2014
Declared cost
$500,000
Address
1155 Market St

base building accessibiltiy work ab-056 floor 1-5. floor 7-9, and basement floor. in addition to providing showers and bike storage at the basement level. ab-o56: parking, path of travel, entry doors, stairs ramps, lifts elevators rest room floors.

Open the permit page

$500,000
Nov 8, 2012Never finaled
issued Jun 2013, no final
1355 Market Stdemo of ground fl to 2nd fl masonry boiler flue & demo of 2nd fl slab for (n)egress stair. (n)work incl (n)egress stair, (n)ground & 2nd fl toping slabs, (n)glass guardrails @ 2nd fl, (n)glass partition walls @ 2nd fl, (n)ground fl restrms (incl ada) (n) steel retail portals, motorized 2nd fl elev
Details
Permit
201211083877
Status
issued
Filed
Nov 8, 2012
Permit issued
Jun 10, 2013
Declared cost
$2,400,000
Address
1355 Market St

demo of ground fl to 2nd fl masonry boiler flue & demo of 2nd fl slab for (n)egress stair. (n)work incl (n)egress stair, (n)ground & 2nd fl toping slabs, (n)glass guardrails @ 2nd fl, (n)glass partition walls @ 2nd fl, (n)ground fl restrms (incl ada) (n) steel retail portals, motorized 2nd fl elev

Open the permit page

$2,400,000
Oct 29, 2012Completed
final sign-off Sep 2013
201 03rd St4th & 5th floors-revision to pa# 2012-1010-1699, 2012.0216.4323 & 2012.0222.4583 - adding a communication stair between 4th & 5th floors. mechanical for the 4th fl included in this permit. structural included.
Details
Permit
201210292983
Status
complete
Filed
Oct 29, 2012
Permit issued
Nov 6, 2012
Final sign-off
Sep 12, 2013
Declared cost
$100,000
Address
201 03rd St

4th & 5th floors-revision to pa# 2012-1010-1699, 2012.0216.4323 & 2012.0222.4583 - adding a communication stair between 4th & 5th floors. mechanical for the 4th fl included in this permit. structural included.

Open the permit page

$100,000
Oct 10, 2012Completed
final sign-off Mar 2013
201 03rd St5th floor:full flor, single t.i. includes. selective demo and construction of new partition walls, finishes ceiling, mec, electrical, plmg included in this permit. new communication stair under seperate permit. fire life safety and sprinkler upgrade under seperate permited as needed.
Details
Permit
201210101699
Status
complete
Filed
Oct 10, 2012
Permit issued
Oct 26, 2012
Final sign-off
Mar 5, 2013
Declared cost
$1,825,000
Address
201 03rd St

5th floor:full flor, single t.i. includes. selective demo and construction of new partition walls, finishes ceiling, mec, electrical, plmg included in this permit. new communication stair under seperate permit. fire life safety and sprinkler upgrade under seperate permited as needed.

Open the permit page

$1,825,000
Jul 16, 2012Completed
final sign-off Sep 2013
275 Brannan Stcore and shell renovation of existing office building. facade work and interior upgrades. new egress stairs to roof. new roof deck. sprinklers, standpipe, fire alarm permits separate
Details
Permit
201207164925
Status
complete
Filed
Jul 16, 2012
Permit issued
Nov 19, 2012
Final sign-off
Sep 13, 2013
Declared cost
$2,500,000
Address
275 Brannan St

core and shell renovation of existing office building. facade work and interior upgrades. new egress stairs to roof. new roof deck. sprinklers, standpipe, fire alarm permits separate

Open the permit page

$2,500,000
Jul 3, 2012Completed
final sign-off May 2013
370 03rd Stground flr: interior demo of exist. loby wall to be replaced with glass wall, remove wood veneer to be replaced by back-painted glass. constrcution of new ceiling elements incl. (n) lighting and new wood slat ceiling, (n) carpet extension of back stair venstibule, 90min. doors in both stair
Details
Permit
201207034041
Status
complete
Filed
Jul 3, 2012
Permit issued
Jul 11, 2012
Final sign-off
May 2, 2013
Declared cost
$390,450
Address
370 03rd St

ground flr: interior demo of exist. loby wall to be replaced with glass wall, remove wood veneer to be replaced by back-painted glass. constrcution of new ceiling elements incl. (n) lighting and new wood slat ceiling, (n) carpet extension of back stair venstibule, 90min. doors in both stair

Open the permit page

$390,450
Jun 26, 2012Completed
final sign-off Jan 2013
540 09th Stt.i. for extg retail space on 2nd floors and basement. work includes new partitions, finishes, ada upgrades new exterior work. new structural framing stairs, elevator. mep and fire protection under seperate permit.
Details
Permit
201206263497
Status
complete
Filed
Jun 26, 2012
Permit issued
Aug 21, 2012
Final sign-off
Jan 9, 2013
Declared cost
$735,000
Address
540 09th St

t.i. for extg retail space on 2nd floors and basement. work includes new partitions, finishes, ada upgrades new exterior work. new structural framing stairs, elevator. mep and fire protection under seperate permit.

Open the permit page

$735,000
Feb 7, 2012Completed
final sign-off Mar 2014
1355 Market Stat 9th floor, new const of hardscape outdoor deck and roof garden, new glazed window wall in existing wall, modified stair tower and new mechanical room. (actual mechanical equipment under seperate permit.)
Details
Permit
201202073749
Status
complete
Filed
Feb 7, 2012
Permit issued
May 7, 2012
Final sign-off
Mar 14, 2014
Declared cost
$785,000
Address
1355 Market St

at 9th floor, new const of hardscape outdoor deck and roof garden, new glazed window wall in existing wall, modified stair tower and new mechanical room. (actual mechanical equipment under seperate permit.)

Open the permit page

$785,000
Jan 5, 2012Completed
final sign-off Oct 2013
1355 Market Strevision to appl #201107190532 work complies with ab-017 for unoccupied areas. addition of exit door & stair at rooftop mechanical room.
Details
Permit
201201051737
Status
complete
Filed
Jan 5, 2012
Permit issued
Jan 19, 2012
Final sign-off
Oct 16, 2013
Declared cost
$35,000
Address
1355 Market St

revision to appl #201107190532 work complies with ab-017 for unoccupied areas. addition of exit door & stair at rooftop mechanical room.

Open the permit page

$35,000
Nov 5, 2009Completed
final sign-off May 2010
1090 Bryant Stminor non structural t.i. including interior demo. new dry wall, partitions, stairs & finishes. upgraade of restrooms to meet title 24. chang of use from warehouse to warehouse w/ sales area. mep under separate permit.
Details
Permit
200911050655
Status
complete
Filed
Nov 5, 2009
Permit issued
Jan 22, 2010
Final sign-off
May 26, 2010
Declared cost
$150,000
Address
1090 Bryant St

minor non structural t.i. including interior demo. new dry wall, partitions, stairs & finishes. upgraade of restrooms to meet title 24. chang of use from warehouse to warehouse w/ sales area. mep under separate permit.

Open the permit page

$150,000
Aug 6, 2009Completed
final sign-off Nov 2009
455 Mission Bay Blvd Southrevision to appl #200704279921, installation of design build stairs #1 and #2.
Details
Permit
200908064230
Status
complete
Filed
Aug 6, 2009
Permit issued
Aug 14, 2009
Final sign-off
Nov 17, 2009
Declared cost
$75,000
Address
455 Mission Bay Blvd South

revision to appl #200704279921, installation of design build stairs #1 and #2.

Open the permit page

$75,000