Truebeck Construction
- Based in
- San Mateo
- On San Francisco permits
- Jun 2008 to Sep 2026
- Last 24 months
- 40 permits filed
609 permits since 2000: 463 completed, 26 in progress, 79 never finaled, 41 expired or cancelled.
Of the 79 never-finaled permits, 3 are 3 to 5 years old, 31 are 5 to 10 years old, 45 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 90 days from filing to permit and 676 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 26, 2013 | Completed final sign-off Aug 2014 | 1355 Market St | revision to exterior openings w/ structural work per a-3.1 & s-1. new exterior deck & ground floor. revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space. compliance with ordinance no. 155-13 not required.Details
revision to exterior openings w/ structural work per a-3.1 & s-1. new exterior deck & ground floor. revision to pa #201211214719 and pa #201307121775. this work under ab-017 for unoccupied space. compliance with ordinance no. 155-13 not required. | $50,000 |
| Feb 7, 2012 | Completed final sign-off Mar 2014 | 1355 Market St | at 9th floor, new const of hardscape outdoor deck and roof garden, new glazed window wall in existing wall, modified stair tower and new mechanical room. (actual mechanical equipment under seperate permit.)Details
at 9th floor, new const of hardscape outdoor deck and roof garden, new glazed window wall in existing wall, modified stair tower and new mechanical room. (actual mechanical equipment under seperate permit.) | $785,000 |
| Feb 1, 2012 | Completed final sign-off Mar 2014 | 1301 Market St | addition of 213 sf to existing shipping/receiving/stockroom. new 1 hr rated demising partition, raised concrete structural deck to match existing walgreens floor elevation. w/in (e) bldg. lighting and finishes to match walgreens standards. mep under separate permit. exterior work under sep permit.Details
addition of 213 sf to existing shipping/receiving/stockroom. new 1 hr rated demising partition, raised concrete structural deck to match existing walgreens floor elevation. w/in (e) bldg. lighting and finishes to match walgreens standards. mep under separate permit. exterior work under sep permit. | $35,000 |