Contractors with roof deck permits
Ranked across every roof deck permit filed since 2000, by the share that reached final inspection, adjusted so a long clean record outranks a short one. Showing contractors with a roof deck permit in the last 5 years. Include inactive contractors
CompletedIn progressNever finaledExpired or cancelled
- 1R & D Construction Co IncLicense 825438 22 permits: 21 completed, 1 expired or cancelled. Last filed Oct 2022. Typically 322 days from permit to final inspection.
- 2Reliable Construction IncLicense 983658 9 permits: 8 completed, 1 in progress. Last filed Oct 2025. Typically 266 days from permit to final inspection.
- 3Gil Construction & Assoc Inc.License 703705 14 permits: 13 completed, 1 expired or cancelled. Last filed Aug 2024. Typically 84 days from permit to final inspection.
- 4Andrew Chekene Enterprises/ Dba Ac EnterLicense 844979 7 permits: 7 completed. Last filed Aug 2025. Typically 251 days from permit to final inspection.
- 5Cej Construction LlcLicense 1031309 6 permits: 6 completed. Last filed Aug 2022. Typically 405 days from permit to final inspection.
- 6Bay Build Design IncLicense 919931 7 permits: 6 completed, 1 in progress. Last filed Jul 2024. Typically 342 days from permit to final inspection.
- 7Wei Dang Builders Inc.License 1048344 6 permits: 6 completed. Last filed May 2025. Typically 360 days from permit to final inspection.
- 8Bbc Construction Inc.License 800744 6 permits: 6 completed. Last filed Dec 2024. Typically 299 days from permit to final inspection.
- 9Cook ConstructionLicense 903971 11 permits: 10 completed, 1 never finaled. Last filed Jan 2024. Typically 707 days from permit to final inspection.
- 10Level 8 Construction IncLicense 851171 15 permits: 13 completed, 1 never finaled, 1 expired or cancelled. Last filed Mar 2024. Typically 165 days from permit to final inspection.
- 11Fontana Construction, Inc.License 487928 6 permits: 5 completed, 1 in progress. Last filed Jul 2026. Typically 366 days from permit to final inspection.
- 12The Great Ocean General ContractorLicense 971920 5 permits: 5 completed. Last filed Jun 2022. Typically 342 days from permit to final inspection.
- 13Traube Construction CompanyLicense 974146 5 permits: 5 completed. Last filed Aug 2022. Typically 277 days from permit to final inspection.
- 14Yefa Construction IncLicense 1047719 7 permits: 5 completed, 2 in progress. Last filed Jun 2026. Typically 336 days from permit to final inspection.
- 15Arcon Construction CorpLicense 774398 5 permits: 5 completed. Last filed Apr 2026. Typically 286 days from permit to final inspection.
- 16Matarozzi/Pelsinger Builders Inc.License 747611 15 permits: 12 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Last filed Nov 2023. Typically 412 days from permit to final inspection.
- 17S F Garage Company Inc.License 684863 41 permits: 30 completed, 2 in progress, 1 never finaled, 8 expired or cancelled. Last filed Sep 2023. Typically 367 days from permit to final inspection.
- 18Eastwood Development IncorporatedLicense 959948 11 permits: 8 completed, 2 in progress, 1 never finaled. Last filed Sep 2026. Typically 236 days from permit to final inspection.
- 19Urbnbuild IncLicense 1047320 4 permits: 4 completed. Last filed Feb 2024. Typically 668 days from permit to final inspection.
- 20San Francisco Design BuildLicense 950725 5 permits: 4 completed, 1 in progress. Last filed Mar 2026. Typically 362 days from permit to final inspection.
- 21Pacific Edge Construction IncLicense 984783 4 permits: 4 completed. Last filed Sep 2023. Typically 503 days from permit to final inspection.
- 22Cardea Bldg Dba Dimension Design GroupLicense 860686 4 permits: 4 completed. Last filed Aug 2023. Typically 374 days from permit to final inspection.
- 23Custom Construction EnterprisesLicense 830244 4 permits: 4 completed. Last filed Aug 2022. Typically 426 days from permit to final inspection.
- 24Bc United Construction IncLicense 995115 5 permits: 4 completed, 1 in progress. Last filed May 2024. Typically 391 days from permit to final inspection.
- 25Nelson ContractingLicense 894609 4 permits: 4 completed. Last filed Feb 2023. Typically 22 days from permit to final inspection.
- 26Terence Mcmahon ConstructionLicense 797580 9 permits: 7 completed, 1 in progress, 1 never finaled. Last filed May 2026. Typically 175 days from permit to final inspection.
- 27K 2 Builders IncLicense 877856 8 permits: 7 completed, 1 never finaled. Last filed Jul 2025. Typically 447 days from permit to final inspection.
- 28Christopher Wells Construction Inc.License 442455 8 permits: 7 completed, 1 expired or cancelled. Last filed Jul 2023. Typically 92 days from permit to final inspection.
- 29Ggd Inc.License 913596 10 permits: 7 completed, 2 in progress, 1 never finaled. Last filed Aug 2025. Typically 448 days from permit to final inspection.
- 30Sasso Construction Inc.License 911044 8 permits: 7 completed, 1 expired or cancelled. Last filed Dec 2022. Typically 184 days from permit to final inspection.
- 31Achill Beg Construction IncLicense 709622 9 permits: 7 completed, 1 in progress, 1 never finaled. Last filed Nov 2023. Typically 429 days from permit to final inspection.
- 32C H Burnham IncLicense 965331 9 permits: 7 completed, 1 in progress, 1 expired or cancelled. Last filed Jul 2026. Typically 410 days from permit to final inspection.
- 33Truebeck ConstructionLicense 903798 9 permits: 7 completed, 1 in progress, 1 never finaled. Last filed May 2026. Typically 298 days from permit to final inspection.
- 34Sf Twin Boys Corp. Dba Master BuildersLicense 850407 21 permits: 16 completed, 4 never finaled, 1 expired or cancelled. Last filed Oct 2021. Typically 702 days from permit to final inspection.
- 35Green City Construction IncLicense 951276 15 permits: 11 completed, 1 in progress, 3 never finaled. Last filed Jul 2026. Typically 472 days from permit to final inspection.
- 36Mueller Nicholls IncLicense 588872 7 permits: 6 completed, 1 expired or cancelled. Last filed Jul 2023. Typically 656 days from permit to final inspection.
- 37Vonnegut Thoreau ConstructionLicense 970787 7 permits: 6 completed, 1 expired or cancelled. Last filed Aug 2024. Typically 374 days from permit to final inspection.
- 38Devlin/Mcnally ConstructionLicense 896044 9 permits: 6 completed, 2 in progress, 1 expired or cancelled. Last filed Feb 2026. Typically 298 days from permit to final inspection.
- 39Bay C T Construction Inc.License 922224 7 permits: 6 completed, 1 never finaled. Last filed Jul 2025. Typically 629 days from permit to final inspection.
- 40Lindquist Custom Construction IncLicense 929014 7 permits: 6 completed, 1 expired or cancelled. Last filed Jun 2023. Typically 249 days from permit to final inspection.
Most recent roof deck permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress | 465 Harkness Av | fill in side yard for new baths & closet @ ground floor.new perimiter footings,new roof deck over to be incombustible material.open wall to expand media room,add beam cols,ftgs as needed.enclosed(e)garage.general mech,elec, & plumb upgrades. | $80,000 | |
| Oct 1, 2026 | In progress | 738 North Point St | at unit #738 north point st - replace in kind the existing less then 500 sqft roof deck, legalize 48" railing. | $10,000 | |
| Oct 1, 2026 | In progress | 36 College Av | 1st floor:comply with nov#202430475,adu including 2 beds,two full baths,living room & kitchen.2nd floor: new roof deck & rear stairs. | $80,000 | |
| Oct 1, 2026 | In progress | 4307 17th St | merging the window and door to the 3rd floor roof deck into a bi-part door, no change to existing continuous header | $10,000 | |
| Sep 30, 2026 | In progress | 1736 Larkin St | vertical addition:add 3 bedrooms, 1 gym, 3 bathrooms, 1 powder rm, 1 laundry, 1 roof deck on 4th flr. emodel kitchen, dining rm, and add pantry, 1 bath & 1 powder rm on 3rd flr unit 1738.relocate & provide code compaint exterior front main entry landing, redesing interior stair to provide access... | $500,000 | |
| Sep 30, 2026 | In progress | 1263 Mission St | add exterior steps to existing roof deck, at existing gate, add fire escape signage. ref pa# 2013-1017-9622. | $2,800 | |
| Sep 30, 2026 | In progress | 341 Park St | revision to pa #202512051094. proposed roof deck on existing one story rear addition. proposed outswing door french door pair in existing wall opening. | $40,000 | |
| Sep 30, 2026 | In progress | 2756 Greenwich St | Precise Roofing Inc | roof deck replacement like for like on 4/f deck. r/r decking and waterproofing. install new tpo waterproofing membrane and floating deck system. no changes to (e) footprint, railings or structural support system. | $20,000 |
| Sep 29, 2026 | In progress | 1715 22nd St | C D R Construction | exterior renovation of side and rear of bldg at 1st flr only, including new windows on east and south elevation and new walls, roof, and roof deck. new kitchen and bath at 1st flr, new enlarged bath at 2nd flr. new finishes. reconfigure space allocated to each duplex and rated separation as require | $250,000 |
| Sep 25, 2026 | In progress | 1049 Clay St | replace in kind (e) roof deck with timbertech decking and viewrail cable guardrail system. | $70,000 | |
| Sep 24, 2026 | In progress | 451 Pacific Av | exterior scope for this core + shell project. the sow is reflective of the approval certificate of apprioatenss and includes replacement of an existing non-historical glass storefront with glass doors in the courtyard, and replacment of an existing roof deck with guard rails and parcel, (2)access | $250,000 | |
| Sep 24, 2026 | In progress | 44 Ney St | unit will be added per planning code sec 207.2.adu @ garage floor.addition of 446 sq ft @ rear under roof deck for adu. | $110,000 | |
| Sep 23, 2026 | In progress | 1203 Stanyan St | install new roof deck guardrails. install new glass door and windows at 1st floor family room. insulate family room. install new mini-split heating at family room and kitchen. replace existing tub with shower. remodel kitchen including enw cabinets, finishes and appliances. | $49,000 | |
| Sep 23, 2026 | In progress | 362 Vallejo St | interior remodel of kitchen, living room, and dining at each unit. remodel of existing bath and water closet into one bath at each unit. addition of 490 sq ft roof deck. | $175,000 | |
| Sep 23, 2026 | In progress | 4168 26th St | basement: bathroom remodel, 1-story horizontal addition to rear. (n) deck and stairs to replce (e) 1st floor: kitchen remodel. relocate 1/2 bath. relocate interior stair from 1st floor to basement. (n) door to roof deck to replace (e) 2nd fl: remodel 2 bathrooms. 2(n) windows. (n) laundry closet. | $330,000 | |
| Sep 21, 2026 | In progress | 1156 Dolores St | Eastwood Development Incorporated | repair (e) 4/f roof deck. remove,salvate an reinstall (e) ipe decking as required for roofing and waterproofing repairs. replace damaged material and tile as necessary, not to exceed 50% replacement. no change to deck footprint. | $79,490 |
| Sep 20, 2026 | In progress | 4150 Cesar Chavez St | correct nov# 2026-50762. at unit #6 on 4th floor; 1)new roof deck, private to unit #6. 2) replace exterior door. items #2,4, and 5 removed from scope. 8/27/26 | $25,000 | |
| Sep 18, 2026 | In progress | 279 Diamond St | Centoni Restoration & Development | horizontal addition at rear 1st floor and 2nd floor, new roof deck over 1st floor, new stairs to rear yard. | $100,000 |
| Sep 18, 2026 | In progress | 280 Green St | Manzyuk Enterprises Inc | building modernization and voluntary seismic upgrade. remodel of 6 kitchens and 6 bathrooms. construction of 2 new bathrooms. replacement of all aluminium windows. rmeodel of roof deck. | $147,500 |
| Sep 16, 2026 | In progress | 2921 Wawona St | to comply with nov. 202183704 - demolish unpermitted roof cover rear roof deck. remove and replace rear roof deck tile finishes. remove and replace rear wall siding above roof deck. | $20,000 | |
| Sep 16, 2026 | In progress | 134 Cotter St | Central Roofing Co. | to cut roof deck and install 6" roof vent to existing roof. install 4 lodw profile roof/eyebrow vents. no mech or electrical per david jones. | $2,500 |
| Sep 15, 2026 | In progress | 25 Montgomery St | Bcci Construction Company | t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514; concurrent with pa202609158114. | |
| Sep 15, 2026 | In progress | 1 Montgomery St | Bcci Construction Company | t.i. to basement,1/f,2/f,mezz: addition of bars at basement and g/f levels. minor alt to exterior and roof deck. all alteration to character defining features of the landmark to be pursuant to the aproved coa per planning motion m-514. | $15,000,000 |
| Sep 14, 2026 | In progress | 730 Edinburgh St | demolition of (e) 383 s.f. bedroom of the 2nd floor of (e) residence & covert to roof deck. remodel (e) family room, bedroom, and bathroom on ground floor, & kitchen on 2nd floor of (e) residence. | $160,000 | |
| Sep 14, 2026 | In progress | 1907 Union St | to comply with nov 202541199 for prefab sauna and cold plunge on (e) roof deck | ||
| Sep 11, 2026 | In progress | 1380 Noe St | Kyle Gleason And Sons | h & v addition to (e) upper unit (1380 noe street). addition to add 1,173 sq.ft onto rear of (e) structure. addition 3 bedrooms, 2 bathrooms, laundry & roof deck. legalization of (e) 2nd floor unit (1382 noe street) as a density conforming dwelling unit within rh-2 zoning district. ab-112 | $300,000 |
| Sep 10, 2026 | In progress | 600 California St | 5th fl: improvements include the demo of non-structural partitions and building new roof deck pedestal and pavers and planters, and exit access corridor. all new or revised meps and life safety work will design build and submitted separately. (bldg is fully sprinklered) | $2,750,000 | |
| Sep 9, 2026 | In progress | 38 Portola Dr | remodel: window replacement in-kind for entire house. relocate interior staircase. remodel (e) bedroom, powder room, kitchen at 2/f and (e) bedroom & baths on 3/f. reconfig 2 (e) bedrooms into 1 new master suite at 3/f. add (n) deck and new roof deck with spiral staircase. | $125,000 | |
| Sep 4, 2026 | In progress | 2814 Clay St | add roof deck and new open exterior stair from level 3 to roof. | $49,000 | |
| Aug 31, 2026 | In progress | 3213 Folsom St | new roof deck on existing 1 story tall detached structure | $25,000 |