Steve Suzuki
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Asian Neighborhood Design
- Based in
- San Francisco
- On San Francisco permits
- Mar 2001 to Oct 2022
52 permits since 2000 (architect on 45 permits, authorized agent-others on 6 permits, engineer on 1 permit): 36 completed, 9 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 31, 2022 | Completed final sign-off Jul 2024 | 3133 Taraval St | L C Builders Inc. | revision to bpa#201905231498-r1 for install on 176 sq. ft. warming kitchen @ g/f shell space. kitchen for warming/prep/serving purposes only for preprepared senior meal service, electric appliance only. revision to exterior front entry to re-level for accessible entryDetails
revision to bpa#201905231498-r1 for install on 176 sq. ft. warming kitchen @ g/f shell space. kitchen for warming/prep/serving purposes only for preprepared senior meal service, electric appliance only. revision to exterior front entry to re-level for accessible entry | $35,000 |
| Jul 15, 2022 | Expired or cancelled cancelled Jan 2026 | 534 Precita Av | install new inclined stair life @ (e) gym to (e) rear multi-purpose room. 4'0" vertical rise. work deferred under 2012 1210 5852.Details
install new inclined stair life @ (e) gym to (e) rear multi-purpose room. 4'0" vertical rise. work deferred under 2012 1210 5852. | $35,000 | |
| Mar 29, 2022 | Expired or cancelled expired Feb 2025 | 1928 Mission St | Deleon Builders Inc | revision to pa# 201608195522, 201910225196. additional mechanical grille at facade transom.Details
revision to pa# 201608195522, 201910225196. additional mechanical grille at facade transom. | |
| Feb 11, 2022 | Never finaled filed Feb 2022, never issued | 2060 Ofarrell St | barrier removal at building entry-paath of travel. provide new ada compliant ramp/walkway from sidewalk to main entry; powered door opener/actuator at entry door.Details
barrier removal at building entry-paath of travel. provide new ada compliant ramp/walkway from sidewalk to main entry; powered door opener/actuator at entry door. | $45,000 | |
| Feb 11, 2022 | Never finaled filed Feb 2022, never issued | 2040 O'farrell St | barrier removal at building entry-path of travel. provide new ada compliant ramp/walkway from sidewalk to main entry; powered door opener/actuator at entry door.Details
barrier removal at building entry-path of travel. provide new ada compliant ramp/walkway from sidewalk to main entry; powered door opener/actuator at entry door. | $45,000 | |
| Feb 17, 2021 | Completed final sign-off May 2022 | 671 China Basin St | Amone Corp | t.i. build out for a childcare center in a 100% affordable housing project(bpa#201804196818)for 4,428 sq childcare center for 45 children. interior spaces:pre-school,toddler & infant classrooms w/ children's restrooms,central space,food warming/prep room,family & staff resources offices.Details
t.i. build out for a childcare center in a 100% affordable housing project(bpa#201804196818)for 4,428 sq childcare center for 45 children. interior spaces:pre-school,toddler & infant classrooms w/ children's restrooms,central space,food warming/prep room,family & staff resources offices. | $1,125,000 |
| Jan 11, 2021 | Never finaled issued May 2021, no final | 1221 Oakdale Av | documentation of window replacement. to: dario jones, senior planner zoning compliance div. dcp. work completed without permit.Details
documentation of window replacement. to: dario jones, senior planner zoning compliance div. dcp. work completed without permit. | $4,000 | |
| Sep 12, 2020 | Completed final sign-off Apr 2022 | 1400 Judah St | Remodeling Heroes Inc. | in-kind replacement of plumbing and light fixtures, appliances, cabinets, and finishes at existing kitchen and restrooms. in-kind replacement of existing exhaust/hood/fire suppression system previouslu installed under pa #2008-1006-3459. scope of work is in-kind only.Details
in-kind replacement of plumbing and light fixtures, appliances, cabinets, and finishes at existing kitchen and restrooms. in-kind replacement of existing exhaust/hood/fire suppression system previouslu installed under pa #2008-1006-3459. scope of work is in-kind only. | $100,000 |
| Dec 30, 2019 | Completed final sign-off Jan 2022 | 72 Belcher St | revision to permit #201807275815/201812289318. to delete removal of (e) rear addition from scope. (existing structure to remain) for rear structure 72b & 72c belcher st.Details
revision to permit #201807275815/201812289318. to delete removal of (e) rear addition from scope. (existing structure to remain) for rear structure 72b & 72c belcher st. | ||
| Oct 29, 2019 | Completed final sign-off Feb 2020 | 462 Green St | F D C Construction Inc | revision to pa 2019-0319-5622 - adjust window size @ front facade to match field condition; add furring @ adu to maintain 8% exposure requirement ; extend wall @ kitchen/main room & add door for gass range sep req; modify entry to accomodate gas line; remove door @ laundry; add window; 201(e)Details
revision to pa 2019-0319-5622 - adjust window size @ front facade to match field condition; add furring @ adu to maintain 8% exposure requirement ; extend wall @ kitchen/main room & add door for gass range sep req; modify entry to accomodate gas line; remove door @ laundry; add window; 201(e) | $1,000 |
| Mar 19, 2019 | Completed final sign-off Feb 2020 | 462 Green St | F D C Construction Inc | new 380 sf adu in (e) basement per 162-16. new tenant trashroom in (e) basement. new tenant laundry.Details
new 380 sf adu in (e) basement per 162-16. new tenant trashroom in (e) basement. new tenant laundry. | $200,000 |
| Dec 28, 2018 | Completed final sign-off Oct 2019 | 72 Belcher St | S M Construction And Assoc | (rear) 72b-72c belcher st:preparation/repairs in construction w/seismic soft story work under sep permit. removal on non compliant rear shed addition at back bld, patio, roofing repairs, unit 72b & 72cDetails
(rear) 72b-72c belcher st:preparation/repairs in construction w/seismic soft story work under sep permit. removal on non compliant rear shed addition at back bld, patio, roofing repairs, unit 72b & 72c | $40,000 |
| Sep 13, 2018 | Completed final sign-off May 2019 | 5016 Mission St | Arana Group, Inc. | administrative rev to pa201704073503: revision to layout/configuration of front buiding facade, retain (e) facace wall. revt to (n) storefront system layout including structural revision sheets s1-s7Details
administrative rev to pa201704073503: revision to layout/configuration of front buiding facade, retain (e) facace wall. revt to (n) storefront system layout including structural revision sheets s1-s7 | |
| Jul 27, 2018 | Completed final sign-off Jan 2022 | 70 Belcher St | S M Construction And Assoc | preparation/repairs in construction w/seismic soft story work under sep permit. removal on non-compliant rear shed addition at back bld, patio, roofing repairs, commmunication unit improvements at fron bld unit 72aDetails
preparation/repairs in construction w/seismic soft story work under sep permit. removal on non-compliant rear shed addition at back bld, patio, roofing repairs, commmunication unit improvements at fron bld unit 72a | $40,000 |
| Jun 28, 2018 | Completed final sign-off Jun 2019 | 722 South Van Ness Av | Bill Wong Construction | alt of (e) 2 story (e) childcare to convert 2/f (e) rear rooms to a single new class.convert (e) 2/f adult bathroom to a child restroom.add a 1/2 adult bathroom on 2/f. all new toilets wil be tank toilets.convert 2 basement floor valve toilets to tank tiolets and 1/f floor powder room...Details
alt of (e) 2 story (e) childcare to convert 2/f (e) rear rooms to a single new class.convert (e) 2/f adult bathroom to a child restroom.add a 1/2 adult bathroom on 2/f. all new toilets wil be tank toilets.convert 2 basement floor valve toilets to tank tiolets and 1/f floor powder room... | $7,500 |
| May 31, 2018 | Expired or cancelled withdrawn Oct 2018 | 3830 Noriega St | deck remodel with ada ramp.Details
deck remodel with ada ramp. | $5,000 | |
| May 14, 2018 | Completed final sign-off May 2019 | 5016 Mission St | Arana Group, Inc. | structural improvement for app#201704073503 for t.i.Details
structural improvement for app#201704073503 for t.i. | $200,000 |
| Apr 24, 2018 | Completed final sign-off Mar 2019 | 1501 Broderick St | Community Playgrounds Inc. | playground renovation only 2415 sf (e) playground - replace playstructures install new surfacing, furnishing, maintenance shed, new hose bibb. located in (e) publically funded housing developmentDetails
playground renovation only 2415 sf (e) playground - replace playstructures install new surfacing, furnishing, maintenance shed, new hose bibb. located in (e) publically funded housing development | $50,000 |
| Apr 19, 2018 | Completed final sign-off Aug 2019 | 462 Green St | F D C Construction Inc | units 3,4,5,6,7,8. renovate all (e)kitchens w/ new cabinets, sink, appliances. exterior repair unit 3-kitchen adaptable unit.renovate all (e)bathrooms. unit 5-new communication unit. maher n/a.Details
units 3,4,5,6,7,8. renovate all (e)kitchens w/ new cabinets, sink, appliances. exterior repair unit 3-kitchen adaptable unit.renovate all (e)bathrooms. unit 5-new communication unit. maher n/a. | $200,000 |
| Jan 12, 2018 | Completed final sign-off Feb 2020 | 4439 03rd St | Arana Group, Inc. | combining 2 (e) ground level office spaces into 1 space. by partially demoing a dividing wass & installing sliding doors creating (3) new offices inc power, data & lighing, new electrified strike at main entry for a door buzzer. providing ada upgrades in the bathroomsDetails
combining 2 (e) ground level office spaces into 1 space. by partially demoing a dividing wass & installing sliding doors creating (3) new offices inc power, data & lighing, new electrified strike at main entry for a door buzzer. providing ada upgrades in the bathrooms | $68,000 |
| Oct 16, 2017 | Expired or cancelled cancelled Dec 2024 | 1928 Mission St | new sheet metal awning store front facade. t.i. pa#201608195522Details
new sheet metal awning store front facade. t.i. pa#201608195522 | $500 | |
| May 30, 2017 | Completed final sign-off Jul 2017 | 741 30th Av | renew for final 2014f10088397. all work completeDetails
renew for final 2014f10088397. all work complete | ||
| Apr 7, 2017 | Completed final sign-off May 2019 | 5016 Mission St | 1st & (n)2nd flrl ti - remodel of (e) mezz, replace w/1134 st (gross) 2nd flr: new pre-k and unisex restrooms. front & rear facade work, insulate the roof, re-roof. new stucco. structural & mep/sprinkler under separate permitDetails
1st & (n)2nd flrl ti - remodel of (e) mezz, replace w/1134 st (gross) 2nd flr: new pre-k and unisex restrooms. front & rear facade work, insulate the roof, re-roof. new stucco. structural & mep/sprinkler under separate permit | $1,000,000 | |
| Feb 24, 2017 | Never finaled issued Mar 2017, no final | 741 30th Av | Treaty Construction | revision to pa#201410088397, administrative only, revisions consisting of deleted stair work and (e) slope documenetationDetails
revision to pa#201410088397, administrative only, revisions consisting of deleted stair work and (e) slope documenetation | |
| Dec 22, 2016 | Completed final sign-off Oct 2018 | 420 Eddy St | Amone Corp | modification to existing basement space to provide ancillary residential dining room, warming kitchen, restroom, rated stair/exit passageway and corridor enclosure. arch, mech, ele, plumbing. fire sprinkler modifications.Details
modification to existing basement space to provide ancillary residential dining room, warming kitchen, restroom, rated stair/exit passageway and corridor enclosure. arch, mech, ele, plumbing. fire sprinkler modifications. | $80,000 |
| Nov 2, 2016 | Completed final sign-off Sep 2019 | 920 Sacramento St | Arana Group, Inc. | repair all existing wood windows to remain; replace glazing with insulated glass, clean & re-surface existing roof membrane, new flashing, make water tight, repair damaged roof cornice trim, new flashing.Details
repair all existing wood windows to remain; replace glazing with insulated glass, clean & re-surface existing roof membrane, new flashing, make water tight, repair damaged roof cornice trim, new flashing. | $100,000 |
| Aug 19, 2016 | Expired or cancelled expired Feb 2025 | 1928 Mission St | change of use. interior t.i. to(e)grd fl retail/rest space.install(n) comm'l elec kitchen,ventless hood,food prep/serv area for non-profit org, provide on-site soup kitchen serv.improv to be classified for'large institution'planning use (social service.)Details
change of use. interior t.i. to(e)grd fl retail/rest space.install(n) comm'l elec kitchen,ventless hood,food prep/serv area for non-profit org, provide on-site soup kitchen serv.improv to be classified for'large institution'planning use (social service.) | $80,000 | |
| Jun 21, 2016 | Never finaled issued May 2017, no final | 401 Duboce Av | Hauser Construction | change of swing doors to horzontal sliding at 2nd floor courtyard; modifications to existing 2nd floor reception & office spaces. fire alarm work under separate submittal.Details
change of swing doors to horzontal sliding at 2nd floor courtyard; modifications to existing 2nd floor reception & office spaces. fire alarm work under separate submittal. | $36,900 |
| Dec 8, 2015 | Completed final sign-off Dec 2016 | 575 Moscow St | Castle Construction | exterior facade patching & painting as required to comply w/n.o.v. #201571861 - replacement of (e) decorative shutters, replacement of garage door & reconfiguration of garage entry for new service door.Details
exterior facade patching & painting as required to comply w/n.o.v. #201571861 - replacement of (e) decorative shutters, replacement of garage door & reconfiguration of garage entry for new service door. | $5,000 |
| Mar 30, 2015 | Completed final sign-off Sep 2017 | 722 South Van Ness Av | Bill Wong Construction | alteration of (e) 2 story residential sfd to new child care center. property owned by adjacent church. renovation of interior spaces. accessible path of travel including lula, restrooms. conditional use approved change# 2013.1656c. dated june 12, 2014.Details
alteration of (e) 2 story residential sfd to new child care center. property owned by adjacent church. renovation of interior spaces. accessible path of travel including lula, restrooms. conditional use approved change# 2013.1656c. dated june 12, 2014. | $80,000 |
| Mar 27, 2015 | Completed final sign-off Nov 2015 | 250 Kearny St | Avalon Construction Co | install (n) office enclosure (+9'-0"ht) within (e) ground floor lobby. install (n) toilet fixture & finishes (in kind replacement) @ (e) toilet space on 4th floorDetails
install (n) office enclosure (+9'-0"ht) within (e) ground floor lobby. install (n) toilet fixture & finishes (in kind replacement) @ (e) toilet space on 4th floor | $6,000 |
| Mar 27, 2015 | Completed final sign-off May 2015 | 2012 Pine St | Amone Corp | revision to ref pa# 2015 0313 0847. change the mezzanine stair locatiom on 3rd floor.Details
revision to ref pa# 2015 0313 0847. change the mezzanine stair locatiom on 3rd floor. | |
| Mar 13, 2015 | Completed final sign-off May 2015 | 2012 Pine St | Amone Corp | remove e platform in e 3rd fl exercise room to be replaced with enclosed stoarage and mezzanine aboveDetails
remove e platform in e 3rd fl exercise room to be replaced with enclosed stoarage and mezzanine above | $36,000 |
| Jun 27, 2014 | Completed final sign-off Sep 2015 | 3543 18th St | Castle Construction | kitchen remodel at existing kitchen at 2nd fl. maher 155-13 not requiredDetails
kitchen remodel at existing kitchen at 2nd fl. maher 155-13 not required | $125,000 |
| Dec 9, 2013 | Completed final sign-off Sep 2014 | 737 Washington St | R & R Construction | install automatic door closer/door opener, install ada push button door opener. install ada approved signs on door. replace water closet with ada approved unit and reverse swing of extg door and paint.Details
install automatic door closer/door opener, install ada push button door opener. install ada approved signs on door. replace water closet with ada approved unit and reverse swing of extg door and paint. | $15,000 |
| May 20, 2013 | Completed final sign-off Sep 2013 | 934 Howard St | Remodel 4 Less | relocation of office functions to ground floor and necessary work to comply with ground floor b occupancy. they include enclosing the stairs, enclosing the freight elevator, provide ada handrails & signage.Details
relocation of office functions to ground floor and necessary work to comply with ground floor b occupancy. they include enclosing the stairs, enclosing the freight elevator, provide ada handrails & signage. | $8,000 |
| May 1, 2013 | Never finaled filed May 2013, never issued | 2345 Harrison St | comply with nov# 200563078-revisions to pa# 2004-0505-3139 & 2013-0501-5933- change of classroom to 4 offices.Details
comply with nov# 200563078-revisions to pa# 2004-0505-3139 & 2013-0501-5933- change of classroom to 4 offices. | $3,000 | |
| May 1, 2013 | Never finaled issued May 2013, no final | 2345 Harrison St | obtain final inspection for work approved under pa# 2004-0505-3139. all work is completeDetails
obtain final inspection for work approved under pa# 2004-0505-3139. all work is complete | ||
| Apr 16, 2013 | Never finaled issued Apr 2013, no final | 934 Howard St | demolition (interior). existing vacant building. reconfigure non-accessible bathrooms installation of showers. full access compliance will be provided at future tenant improvement permit per sfbc ab-017.Details
demolition (interior). existing vacant building. reconfigure non-accessible bathrooms installation of showers. full access compliance will be provided at future tenant improvement permit per sfbc ab-017. | $28,000 | |
| Jul 18, 2012 | Never finaled issued Apr 2013, no final | 3048 16th St | scope of work is structural and surface repair of e sidewalk. sidewalk surface has been cited by dpw. no work inside of buildingDetails
scope of work is structural and surface repair of e sidewalk. sidewalk surface has been cited by dpw. no work inside of building | $350,000 | |
| Jul 12, 2012 | Completed final sign-off Nov 2012 | 1131 Stockton St | remove (e) roll-down security door at entrance & replace w/ (n) double-door glass storefront system w/automatic door opener, remove (e) non-functioning door at the side of entrance & replace w/(n) glazing. awning & t.i. (interior) work are on separate permit by others.Details
remove (e) roll-down security door at entrance & replace w/ (n) double-door glass storefront system w/automatic door opener, remove (e) non-functioning door at the side of entrance & replace w/(n) glazing. awning & t.i. (interior) work are on separate permit by others. | $15,000 | |
| May 11, 2012 | Completed final sign-off Aug 2012 | 1825 Mission St | Amone Corp | revision to pa# 2010-0708-6182 for relocation of (e) fire alarms & providing replacement fire rated entry doors & frames at units #112, 113, 114 living rooms/entries. fire alarm under seperate permit.Details
revision to pa# 2010-0708-6182 for relocation of (e) fire alarms & providing replacement fire rated entry doors & frames at units #112, 113, 114 living rooms/entries. fire alarm under seperate permit. | |
| Apr 18, 2012 | Completed final sign-off Aug 2013 | 613 Faxon Av | renovate (e) vacant space to full svc rest. (e) occup b will remain the same. change of use from (e) stores to (n) rest. tenant & facade improvements incl (n) dining & cooking space, food storage & prep space, (n) accessible restrm & entrance, (n) signage & storefront glazing & renov elec,mech,plumbDetails
renovate (e) vacant space to full svc rest. (e) occup b will remain the same. change of use from (e) stores to (n) rest. tenant & facade improvements incl (n) dining & cooking space, food storage & prep space, (n) accessible restrm & entrance, (n) signage & storefront glazing & renov elec,mech,plumb | $150,000 | |
| May 12, 2009 | Completed final sign-off Aug 2009 | 1119 Mission St | Amone Corp | revision to pa# 2009-0113-0099-additional structural engineering drawings/calcs for concrete sidewalk. administrative revision only-no change in scopeDetails
revision to pa# 2009-0113-0099-additional structural engineering drawings/calcs for concrete sidewalk. administrative revision only-no change in scope | $500 |
| Dec 13, 2007 | Expired or cancelled cancelled Jan 2020 | 2525 Griffith St | new modular building for classroom, new ramp, & anchorage of new building.Details
new modular building for classroom, new ramp, & anchorage of new building. | $57,000 | |
| Sep 25, 2007 | Expired or cancelled expired Feb 2009 | 3 Embarcadero Center | inlarge server room on 24th floor mech.,elect,plumbing under this permitDetails
inlarge server room on 24th floor mech.,elect,plumbing under this permit | $10,000 | |
| Jul 20, 2007 | Completed final sign-off Oct 2007 | 1160 Battery St | 1st floor-restroom upgrade work including new partitions, plumbing, electrical and finishes.Details
1st floor-restroom upgrade work including new partitions, plumbing, electrical and finishes. | $45,000 | |
| Sep 7, 2005 | Completed final sign-off Jun 2006 | 1434 Halibut - Ti Ct | revisions to issued permit no 200411098825-delete demo of existing stairs (2) existing stairs to remain. add 4 new exterior 2nd exit metal stair.Details
revisions to issued permit no 200411098825-delete demo of existing stairs (2) existing stairs to remain. add 4 new exterior 2nd exit metal stair. | $15,000 | |
| Sep 7, 2005 | Completed final sign-off Jun 2006 | 1433 Halibut - Ti Ct | revision to issued permit#200411098826. delete demo of (e) stairs (2), (e) stairs to remain. add 4 new exterior 2nd exit metal stairs.Details
revision to issued permit#200411098826. delete demo of (e) stairs (2), (e) stairs to remain. add 4 new exterior 2nd exit metal stairs. | $15,000 | |
| Sep 7, 2005 | Completed final sign-off Jun 2006 | 1435 Halibut - Ti Ct | revision to issued permit 200411098819- delete demo of (e) stairs (2), (e) stairs to remain; add 4 new exterior 2nd exit metal stairs.Details
revision to issued permit 200411098819- delete demo of (e) stairs (2), (e) stairs to remain; add 4 new exterior 2nd exit metal stairs. | $15,000 | |
| Sep 7, 2005 | Completed final sign-off Jun 2006 | 1432 Halibut - Ti Ct | revision to issued permit 200411098827-delete demo of existing stairs (2), existing stairs to remain. add 4 new exterior 2nd exit metal stairs.Details
revision to issued permit 200411098827-delete demo of existing stairs (2), existing stairs to remain. add 4 new exterior 2nd exit metal stairs. | $15,000 | |
| Mar 23, 2001 | Completed final sign-off Sep 2004 | 230 Eddy St | renovations to (e)bldg consisting of new-replacement windows,new roof,upgrades to plmbg,etcDetails
renovations to (e)bldg consisting of new-replacement windows,new roof,upgrades to plmbg,etc | $4,000,000 |