Block 0288, lot 025
250 Kearny St
- City’s use
- Commercial Hotel
- Built
- 1908
- Stories
- 6
- Units
- 146
- Rooms
- 82 bathrooms
- Building
- 61,192 sq ft
- Lot
- 9,478 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
51 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 5, 2025 | Completed final sign-off Apr 2025 | 250 Kearny St | Occidental Express | unit #505: comply w/ nov# 202533568: minor fire damage repair. no structural damages.Details
unit #505: comply w/ nov# 202533568: minor fire damage repair. no structural damages. | $1,500 |
| Jan 3, 2023 | Expired or cancelled cancelled Jan 2026 | 375 Bush St | to erect non-electrical wall sign.Details
to erect non-electrical wall sign. | $1,000 | |
| Dec 14, 2022 | Expired or cancelled cancelled Jan 2026 | 375 Bush St | print on awning: 88 very thaiDetails
print on awning: 88 very thai | $7,550 | |
| Dec 14, 2022 | Expired or cancelled cancelled Jan 2026 | 375 Bush St | International Commercial Awning, Inc. | installation of canvas awnings over store frontDetails
installation of canvas awnings over store front | $7,550 |
| Mar 10, 2022 | Never finaled issued Nov 2022, no final | 250 Kearny St | L G Castle Builders Construction | emergency evacuation maps/signs (29) for fire only permit.Details
emergency evacuation maps/signs (29) for fire only permit. | $11,406 |
| Feb 10, 2017 | Never finaled issued Feb 2017, no final | 246 Kearny St | That's Women's Work Construction | voluntary installation of (59) non-accessible proivate bathrooms @ non-accessible units,installation: (1) 48" grab bar @ tub back/(1) 24" gb @ tub control;(1) 24" gb @ toilet rear/(1) 42" gb @ toilet side. grab bars =1-1/4" dia, 25016 load capacity. assist bars @ units: 211,212,214,218,219,220,221,Details
voluntary installation of (59) non-accessible proivate bathrooms @ non-accessible units,installation: (1) 48" grab bar @ tub back/(1) 24" gb @ tub control;(1) 24" gb @ toilet rear/(1) 42" gb @ toilet side. grab bars =1-1/4" dia, 25016 load capacity. assist bars @ units: 211,212,214,218,219,220,221, | $10,000 |
| Feb 12, 2016 | Never finaled issued Feb 2016, no final | 246 Kearny St | t.i. to expand exisitng bar/tavern into adjacent space previously a restaurant in the same bldg; application to increase the permitted a-occupancy load per (e) place of assembly permit due to expanded area, ground floor, fully sprinklered.Details
t.i. to expand exisitng bar/tavern into adjacent space previously a restaurant in the same bldg; application to increase the permitted a-occupancy load per (e) place of assembly permit due to expanded area, ground floor, fully sprinklered. | $2,000 | |
| Dec 4, 2015 | Completed final sign-off Apr 2016 | 250 Kearny St | Taico Builder Inc | pafor public health review, job card applicatoin #201511303771. repair existing kitchen floor to meet dph requirement. add 2(n) floor drains per dph. add 2 (n) floor sinks per dph.Details
pafor public health review, job card applicatoin #201511303771. repair existing kitchen floor to meet dph requirement. add 2(n) floor drains per dph. add 2 (n) floor sinks per dph. | |
| Nov 30, 2015 | Completed final sign-off Apr 2016 | 250 Kearny St | Taico Builder Inc | 88 hardie pl: repair kitchen floor finishes approx 900sf to meet dph requirement. and add 2 new floor drains & 2 floor sinks.Details
88 hardie pl: repair kitchen floor finishes approx 900sf to meet dph requirement. and add 2 new floor drains & 2 floor sinks. | $31,000 |
| May 1, 2015 | Expired or cancelled cancelled Apr 2016 | 375 Bush St | Jjb Development Inc | soft exploratory demo of ceiling & drywall from water damage. above plumbing/previous leak from residential hotel above. aprrox 10'x10' drywall to be replaced/fire resistance rated assemblies to be maintained.Details
soft exploratory demo of ceiling & drywall from water damage. above plumbing/previous leak from residential hotel above. aprrox 10'x10' drywall to be replaced/fire resistance rated assemblies to be maintained. | $6,000 |
| Mar 27, 2015 | Completed final sign-off Nov 2015 | 250 Kearny St | Avalon Construction Co | install (n) office enclosure (+9'-0"ht) within (e) ground floor lobby. install (n) toilet fixture & finishes (in kind replacement) @ (e) toilet space on 4th floorDetails
install (n) office enclosure (+9'-0"ht) within (e) ground floor lobby. install (n) toilet fixture & finishes (in kind replacement) @ (e) toilet space on 4th floor | $6,000 |
| Sep 3, 2014 | Expired or cancelled cancelled Oct 2014 | 250 Kearny St | Occidental Express | restoring second elevator - eleavator repair work onlyDetails
restoring second elevator - eleavator repair work only | $4,500 |
| Jun 23, 2014 | Completed final sign-off Aug 2014 | 246 Kearny St | to renew permit #2002.0128.7853, to comply with ces nov #201396347.Details
to renew permit #2002.0128.7853, to comply with ces nov #201396347. | ||
| Jun 5, 2014 | Expired or cancelled cancelled Mar 2020 | 246 Kearny St | new entry store front to residential lobby. replace upper floor windows.Details
new entry store front to residential lobby. replace upper floor windows. | $36,000 | |
| Feb 26, 2014 | Never finaled issued Feb 2014, no final | 250 Kearny St | street spaceDetails
street space | ||
| Feb 10, 2014 | Never finaled issued Feb 2014, no final | 250 Kearny St | street space permitDetails
street space permit | ||
| Jan 6, 2014 | Completed final sign-off Apr 2016 | 4 Hardie Pl | Alpha Construction Co *Stop Issusing* | demolition (e) sidewalk & construction of (n) sidewalk including replacement of (e) steel beams to abate ntr #996343 issued by dpw.Details
demolition (e) sidewalk & construction of (n) sidewalk including replacement of (e) steel beams to abate ntr #996343 issued by dpw. | $12,500 |
| Jun 11, 2013 | Completed final sign-off Dec 2014 | 250 Kearny St | comply with ordinance 029-13 2bd floor, 1baths, 1 grab barDetails
comply with ordinance 029-13 2bd floor, 1baths, 1 grab bar | $100 | |
| Mar 1, 2012 | Expired or cancelled cancelled Feb 2013 | 250 Kearny St | Occidental Express | replacing 35 windows at rear & 24 windows facing hardie place with dual glazed fiberglass windows.Details
replacing 35 windows at rear & 24 windows facing hardie place with dual glazed fiberglass windows. | $31,600 |
| Oct 24, 2011 | Completed final sign-off Nov 2011 | 250 Kearny St | International Fire Equip | install ul300 kitchen fire systemDetails
install ul300 kitchen fire system | $2,000 |
| Sep 9, 2011 | Completed final sign-off Aug 2014 | 250 Kearny St | Innovative Technologies | installation of a new fire alarm system, sprinkler monitoring, smoke detection in hallways, heat detector laundry room and elevator recall in exisiting low rise r-1 building- no pull statioins required at exits- complete building evacuationDetails
installation of a new fire alarm system, sprinkler monitoring, smoke detection in hallways, heat detector laundry room and elevator recall in exisiting low rise r-1 building- no pull statioins required at exits- complete building evacuation | $20,000 |
| Jul 8, 2011 | Completed final sign-off Aug 2014 | 250 Kearny St | Nabi Construction & Engineering Inc | to obtain final inspection for work approved under pa # 200906039681. all work is complete.Details
to obtain final inspection for work approved under pa # 200906039681. all work is complete. | $5,000 |
| Jul 8, 2011 | Completed final sign-off Aug 2014 | 250 Kearny St | Nabi Construction & Engineering Inc | to obtain final inspection for work approved under pa # 200905118129. all work is complete.Details
to obtain final inspection for work approved under pa # 200905118129. all work is complete. | $220,000 |
| Jul 1, 2011 | Never finaled issued Sep 2011, no final | 250 Kearny St | Occidental Express | reconfiguring of rooms on all floors including creating of community kitchen & accessible bathrms. reducing # of rooms from 145 to 136 & increasing # of bathrms. from 110 to 131, structural work address all outstanding complaints & nov's; 200005134 & 201061908.Details
reconfiguring of rooms on all floors including creating of community kitchen & accessible bathrms. reducing # of rooms from 145 to 136 & increasing # of bathrms. from 110 to 131, structural work address all outstanding complaints & nov's; 200005134 & 201061908. | $476,000 |
| Dec 9, 2010 | Completed final sign-off Aug 2014 | 250 Kearny St | Occidental Express | comply w/ nov#201060593. repair/replace doors, windows, plumbing & electrical fixtures, heating, fire escapes, door hardware, damaged walls, handrails, alarm system, repair elevator. all his nov's & ces nov restore community kitchen next to #105 to guest room.Details
comply w/ nov#201060593. repair/replace doors, windows, plumbing & electrical fixtures, heating, fire escapes, door hardware, damaged walls, handrails, alarm system, repair elevator. all his nov's & ces nov restore community kitchen next to #105 to guest room. | $395,000 |
| Dec 2, 2010 | Never finaled issued Dec 2010, no final | 250 Kearny St | street space & parking meterDetails
street space & parking meter | ||
| Oct 1, 2010 | Never finaled issued Oct 2010, no final | 250 Kearny St | street spaceDetails
street space | ||
| Jun 25, 2010 | Never finaled issued Jun 2010, no final | 250 Kearny St | street space and mtaDetails
street space and mta | ||
| Mar 5, 2010 | Never finaled issued Mar 2010, no final | 250 Kearny St | street space permitDetails
street space permit | ||
| Dec 10, 2009 | Completed final sign-off Mar 2010 | 246 Kearny St | `change of occupancy from b to a-2. no work requiredDetails
`change of occupancy from b to a-2. no work required | $100 | |
| Nov 25, 2009 | Never finaled issued Nov 2009, no final | 250 Kearny St | street space & mtaDetails
street space & mta | ||
| Sep 24, 2009 | Completed final sign-off Jul 2011 | 246 Kearny St | work completed but not under scope of appn. 200904136150, return to planning dept to correct modifications and achieve compliance complaint ed 10375 (extend the approved facade to the entire bldg front)Details
work completed but not under scope of appn. 200904136150, return to planning dept to correct modifications and achieve compliance complaint ed 10375 (extend the approved facade to the entire bldg front) | $1,000 | |
| Aug 24, 2009 | Never finaled issued Aug 2009, no final | 250 Kearny St | street space & mta.Details
street space & mta. | ||
| Jun 3, 2009 | Completed final sign-off Aug 2014 | 250 Kearny St | Nabi Construction & Engineering Inc | revision to pa# 2002-0128-7853/r1 & 200905118129-revision of steel frames. comly with nov# 200235900 & 200901741 dated 12-13-02 & 4-14-09Details
revision to pa# 2002-0128-7853/r1 & 200905118129-revision of steel frames. comly with nov# 200235900 & 200901741 dated 12-13-02 & 4-14-09 | |
| May 20, 2009 | Completed final sign-off Jul 2009 | 246 Kearny St | Peter Lawlor Construction | sidewalk repair new topping slab.Details
sidewalk repair new topping slab. | $9,000 |
| May 14, 2009 | Never finaled issued May 2009, no final | 250 Kearny St | street space permit only.Details
street space permit only. | ||
| May 11, 2009 | Completed final sign-off Aug 2014 | 250 Kearny St | Nabi Construction & Engineering Inc | renew 200201287853/r1. to complete work and obtain final inspection for work approved under 200201287853/r1.Details
renew 200201287853/r1. to complete work and obtain final inspection for work approved under 200201287853/r1. | $220,000 |
| Apr 13, 2009 | Completed final sign-off Mar 2010 | 246 Kearny St | revision to application 2000902182293, replace (e) non-accessible entrance with accessible entrance.Details
revision to application 2000902182293, replace (e) non-accessible entrance with accessible entrance. | $2,000 | |
| Mar 30, 2009 | Never finaled issued Mar 2009, no final | 4 Hardie Pl | to verify address on the side of hardie place for block 0288 lot 025 to be (#4 hardie place)Details
to verify address on the side of hardie place for block 0288 lot 025 to be (#4 hardie place) | ||
| Feb 18, 2009 | Completed final sign-off Mar 2010 | 246 Kearny St | minor cosmetic (i) work to remove vinyl flr & refinish wood flr underneath; replace formica bar counter-tops w/ walnut & finished; remove (e) storage shelves from front bar.Details
minor cosmetic (i) work to remove vinyl flr & refinish wood flr underneath; replace formica bar counter-tops w/ walnut & finished; remove (e) storage shelves from front bar. | $2,000 | |
| Feb 3, 2009 | Never finaled issued Feb 2009, no final | 375 Bush St | Exxell Corp. Dba Exxell Fire Systems | 1st /fl.ul 300 upgrade of the fire suppression system of hood & duct at kitchen area.Details
1st /fl.ul 300 upgrade of the fire suppression system of hood & duct at kitchen area. | $3,500 |
| Jan 3, 2008 | Expired or cancelled expired Sep 2008 | 246 Kearny St | J L Constrution Co. | ren pa#200606224789 to continue work.Details
ren pa#200606224789 to continue work. | $50,000 |
| Aug 2, 2006 | Expired or cancelled expired Jul 2011 | 375 Bush St | renew pa# 200405123711 for final inspection by diabled access inspector & district building inspector, sffd final inspection required. comply with nov# 200235900 & 200669185.Details
renew pa# 200405123711 for final inspection by diabled access inspector & district building inspector, sffd final inspection required. comply with nov# 200235900 & 200669185. | ||
| Jul 5, 2006 | Completed final sign-off Aug 2006 | 250 Kearny St | renew 200308071460 for final inspection.Details
renew 200308071460 for final inspection. | ||
| Jun 22, 2006 | Expired or cancelled expired Sep 2008 | 246 Kearny St | J L Constrution Co. | roof plywood and steel frames-renew pa# 2002012878530-per inspection from umb inspector. to continue work & obtain final inspection.Details
roof plywood and steel frames-renew pa# 2002012878530-per inspection from umb inspector. to continue work & obtain final inspection. | $70,000 |
| May 19, 2004 | Completed final sign-off Oct 2004 | 250 Kearny St | Bay Alarm Company | provide fire sprinkler monitorsDetails
provide fire sprinkler monitors | $2,500 |
| May 12, 2004 | Expired or cancelled expired Dec 2007 | 375 Bush St | response to n.o.v#200006517, access at popol restaurant. revise permit app#9705472 harde place entryDetails
response to n.o.v#200006517, access at popol restaurant. revise permit app#9705472 harde place entry | $17,500 | |
| Aug 7, 2003 | Expired or cancelled expired Aug 2006 | 250 Kearny St | Tom Burke/Omega Solution | sro 170-03 sprinkler system compliance - complaint #200235900 per planDetails
sro 170-03 sprinkler system compliance - complaint #200235900 per plan | $37,000 |
| Jan 28, 2002 | Expired or cancelled expired Sep 2008 | 246 Kearny St | umb/seismic retrofit workDetails
umb/seismic retrofit work | $145,000 | |
| Dec 27, 2001 | Expired or cancelled cancelled Jul 2004 | 375 Bush St | compliance with notice of violation #200006517 only under this permitDetails
compliance with notice of violation #200006517 only under this permit | $7,900 | |
| May 25, 2000 | Expired or cancelled expired Sep 2000 | 250 Kearny St | remove existing awning per n.o.v. no plans needed per susan leongDetails
remove existing awning per n.o.v. no plans needed per susan leong | $1,000 |