Block 3727, lot 130
1121 Mission St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 2
- Rooms
- 2 bathrooms
- Building
- 4,000 sq ft
- Lot
- 2,125 sq ft
- Zoning
- SLR
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 25, 2025 | In progress issued Jul 2025 | 1121 Mission St | (n) roll down gate in front of buildingDetails
(n) roll down gate in front of building | $5,000 | |
| Dec 15, 2014 | Never finaled issued Dec 2014, no final | 1121 Mission St | street spaceDetails
street space | ||
| Jun 29, 2009 | Completed final sign-off Jul 2009 | 1119 Mission St | San Francisco Fire Protection | obtain final inspection for work approved under pa# 2008-0811-8895, all work has been completedDetails
obtain final inspection for work approved under pa# 2008-0811-8895, all work has been completed | |
| May 12, 2009 | Completed final sign-off Aug 2009 | 1119 Mission St | Amone Corp | revision to pa# 2009-0113-0099-additional structural engineering drawings/calcs for concrete sidewalk. administrative revision only-no change in scopeDetails
revision to pa# 2009-0113-0099-additional structural engineering drawings/calcs for concrete sidewalk. administrative revision only-no change in scope | $500 |
| Jan 13, 2009 | Completed final sign-off Jul 2009 | 1119 Mission St | ground only - revision to 200704249562. existing pg&e drip loop termination can to remain. this impacts main entry door-relocating over by 1'0" from original permit location to accomodate (e) pg&e can. no changes to accessibility.Details
ground only - revision to 200704249562. existing pg&e drip loop termination can to remain. this impacts main entry door-relocating over by 1'0" from original permit location to accomodate (e) pg&e can. no changes to accessibility. | ||
| Aug 11, 2008 | Completed final sign-off Aug 2009 | 1119 Mission St | San Francisco Fire Protection | install 1 facp, 13 smoke detectors, 1 neat detector, 5 mp, 9 point modules, 10 horn/strobes, 3 arms, 8 strobes, and 3 door holders.Details
install 1 facp, 13 smoke detectors, 1 neat detector, 5 mp, 9 point modules, 10 horn/strobes, 3 arms, 8 strobes, and 3 door holders. | $9,200 |
| Jun 9, 2008 | Completed final sign-off Jul 2009 | 1119 Mission St | Chen's Plumbing Inc | revision for ground floor & 2nd floor per architectural revisions pa#200704249562 & fire sprinkler dwg pa #200804159694 - move pipe to accommodate to the change of arch dwg.Details
revision for ground floor & 2nd floor per architectural revisions pa#200704249562 & fire sprinkler dwg pa #200804159694 - move pipe to accommodate to the change of arch dwg. | |
| May 21, 2008 | Completed final sign-off Jul 2009 | 1119 Mission St | revision to 200704249562.relocate both approved toilet rooms on 1st and 2nd floor so they are closer to the entry at the ground floor (1st floor) to the main conference room (2nd fl). add fixed glass at basement rooms for more visibility. mech/elec revisionsDetails
revision to 200704249562.relocate both approved toilet rooms on 1st and 2nd floor so they are closer to the entry at the ground floor (1st floor) to the main conference room (2nd fl). add fixed glass at basement rooms for more visibility. mech/elec revisions | $2,000 | |
| Apr 15, 2008 | Completed final sign-off Jul 2009 | 1119 Mission St | Chen's Plumbing Inc | rough in and install fire sprinkler for basement, ground floor & second floor including second floor attic space. total heads 71. new 2" fire meter reuqired.Details
rough in and install fire sprinkler for basement, ground floor & second floor including second floor attic space. total heads 71. new 2" fire meter reuqired. | $25,000 |
| Apr 24, 2007 | Completed final sign-off Aug 2009 | 1119 Mission St | front facade renovation and existing second floor rear addition, interior t.i. additional upgrades consisting of (n) 2nd exit stair additions,new elevator , new restrooms, this permit to include mechan, elec.improvements & structral(sprinkller, life safety drawings to be submitted under seperateDetails
front facade renovation and existing second floor rear addition, interior t.i. additional upgrades consisting of (n) 2nd exit stair additions,new elevator , new restrooms, this permit to include mechan, elec.improvements & structral(sprinkller, life safety drawings to be submitted under seperate | $450,000 | |
| Dec 20, 2005 | Completed final sign-off Aug 2009 | 1121 Mission St | revision to 200309265927-r1 redesign of moment frame 9in accordance with bolts plus procedure.Details
revision to 200309265927-r1 redesign of moment frame 9in accordance with bolts plus procedure. | ||
| Sep 26, 2003 | Completed final sign-off Aug 2009 | 1119 Mission St | seismic upgrade to be performed in accordance w/ special procedures, umb retrofitDetails
seismic upgrade to be performed in accordance w/ special procedures, umb retrofit | $60,000 | |
| Aug 15, 2002 | Completed final sign-off Mar 2003 | 1119 Mission St | Associated Builders | reroofingDetails
reroofing | $8,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Chen's Plumbing Inc (2), San Francisco Fire Protection (2), Amone Corp, Associated Builders
- Architects
- Harry Wong (2), Asian Neighborhood Design, Steven Suzuki
- Engineers
- Anthony Paulos Donald David
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.