David Sternberg
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Sternberg Benjamin Architects
- Based in
- San Francisco
- On San Francisco permits
- Feb 2002 to Sep 2026
118 permits since 2000 (architect on 110 permits, authorized agent-others on 4 permits, engineer on 3 permits, designer on 1 permit, pmt consultant/expediter on 1 permit): 73 completed, 3 in progress, 24 never finaled, 18 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 118.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 2670 Pierce St | installation of new 3- stop elevator.Details
installation of new 3- stop elevator. | $190,000 | |
| Sep 14, 2026 | In progress filed Sep 2026, not yet issued | 166 Yerba Buena Av | exterior work only: expansion of (e) patio, install new cooking & barbecue area with cabinet & seatingDetails
exterior work only: expansion of (e) patio, install new cooking & barbecue area with cabinet & seating | $10,000 | |
| Sep 14, 2026 | In progress filed Sep 2026, not yet issued | 160 Yerba Buena Av | exterior work only: expansion of (e) patio, install new cooking & barbecue area with cabinet & seating. no change to plumbing fixtures.Details
exterior work only: expansion of (e) patio, install new cooking & barbecue area with cabinet & seating. no change to plumbing fixtures. | $10,000 | |
| Aug 8, 2024 | Completed final sign-off May 2025 | 267 States St | Brendan Waters Construction Inc | alteration of (e) r-3 residence to remove (e) non conforming fire escape enclosed (e) court and install (n) 2- stop elevatorDetails
alteration of (e) r-3 residence to remove (e) non conforming fire escape enclosed (e) court and install (n) 2- stop elevator | $150,000 |
| Apr 12, 2024 | Completed final sign-off Oct 2024 | 29 San Leandro Wy | Brendan Waters Construction Inc | revision to permit 202402296794 (remodel one bathroom in kind). interior remodel - 1/f: removal of foyer, dining, powder room and bathroom, (e) laundry and reconfiguration of stairs. 2/f: alteration of bedrooms and bathrooms, addition of primary suite, replacement of relocation of furnace & laundry.Details
revision to permit 202402296794 (remodel one bathroom in kind). interior remodel - 1/f: removal of foyer, dining, powder room and bathroom, (e) laundry and reconfiguration of stairs. 2/f: alteration of bedrooms and bathrooms, addition of primary suite, replacement of relocation of furnace & laundry. | $180,000 |
| Nov 27, 2023 | Completed final sign-off Feb 2024 | 168 Kenwood Wy | 2nd fl: remodel (e) master bath to replace (e) water closet, lavatories, bathtub, shower enclosure, and wall & floor tile in place. remove (e) whirlpool bath, tile surround, wood flooring & floor drawin in adjacent room from master bedroom. replace flooring with wood. refinish with gyp. remove (e)Details
2nd fl: remodel (e) master bath to replace (e) water closet, lavatories, bathtub, shower enclosure, and wall & floor tile in place. remove (e) whirlpool bath, tile surround, wood flooring & floor drawin in adjacent room from master bedroom. replace flooring with wood. refinish with gyp. remove (e) | $30,000 | |
| Nov 22, 2022 | Completed final sign-off Jan 2025 | 45 Santa Paula Av | Srr General Engineering Constructors Inc | rev to pa 202001151989 convert portion of crawl space to storage, provide shoring methodsDetails
rev to pa 202001151989 convert portion of crawl space to storage, provide shoring methods | $30,000 |
| Sep 1, 2022 | Completed final sign-off Feb 2024 | 361 08th St | Buena Vista Builders Inc | relocate main entry from 8th st to heron street. demo int nonstructural walls, bring (e) nonconforming stairs to code/add new 2nd stair. remodel (e) restrooms, add employee lounge/kitchen w/outdoor patio, upgrade structural elements/fire rated assemblies as necessary, new roof &Details
relocate main entry from 8th st to heron street. demo int nonstructural walls, bring (e) nonconforming stairs to code/add new 2nd stair. remodel (e) restrooms, add employee lounge/kitchen w/outdoor patio, upgrade structural elements/fire rated assemblies as necessary, new roof & | $190,000 |
| Aug 10, 2022 | Completed final sign-off Nov 2023 | 1556 Great Hy | A B C Building & Restoration Inc | non structural remodel including the following: unit 102: relocate kitchen, add bedroom, closet and bathroom. unit 202: relocate kitchen, add bedroom, closet and bathroom. unit 203: relocate kitchen, add bedroom, closet and bathroom. replace one window at unit 203Details
non structural remodel including the following: unit 102: relocate kitchen, add bedroom, closet and bathroom. unit 202: relocate kitchen, add bedroom, closet and bathroom. unit 203: relocate kitchen, add bedroom, closet and bathroom. replace one window at unit 203 | $80,000 |
| Sep 15, 2021 | Never finaled issued Jul 2023, no final | 3821 Noriega St | K 2 Builders Inc | alteration of ground floor commercial building of type v construction with the addition of 3 stories of r-2 residential type v-a construction above. the proposed addition will provide 1 residential unit per floor with a private terrace at the second floor rear yard and a common area roof deck.Details
alteration of ground floor commercial building of type v construction with the addition of 3 stories of r-2 residential type v-a construction above. the proposed addition will provide 1 residential unit per floor with a private terrace at the second floor rear yard and a common area roof deck. | $1,700,000 |
| Sep 7, 2021 | Completed final sign-off Sep 2022 | 34 Sola Av | Bethel Construction Inc Dba Aaa Construc | 1st & 2nd fl: remodel bathroom 1: replace w/c, lav, shower, tub, & add lav, new finishes, new door. remodel bath 2: replace w/c, lav & shower, new finishes. remove 1/2 bath: w/c & lav.Details
1st & 2nd fl: remodel bathroom 1: replace w/c, lav, shower, tub, & add lav, new finishes, new door. remodel bath 2: replace w/c, lav & shower, new finishes. remove 1/2 bath: w/c & lav. | $35,000 |
| Jun 14, 2021 | Completed final sign-off Dec 2023 | 3533 Sacramento St | Ewsf Inc. | voluntary seismic upgrade. interior remodel, demo of less than 75% of interior walls, replace windows @ rear.Details
voluntary seismic upgrade. interior remodel, demo of less than 75% of interior walls, replace windows @ rear. | $738,000 |
| May 18, 2021 | Never finaled filed May 2021, never issued | 2955 Mission St | construct 6-story w/ 1 basement, 18-unit, mixed-use buildingDetails
construct 6-story w/ 1 basement, 18-unit, mixed-use building | $5,000,000 | |
| May 11, 2021 | Never finaled filed May 2021, never issued | 2955 Mission St | demo 2-story buildingDetails
demo 2-story building | $30,000 | |
| Nov 10, 2020 | Completed final sign-off Apr 2021 | 3701 Noriega St | Henry J Rabbitt & Sons Inc | revision to addenda #4 - arch/mep approved under pa 2016 0715 2516 s4. work include various fire/life safety updates. to memorialize sffd review comments in later addendum.Details
revision to addenda #4 - arch/mep approved under pa 2016 0715 2516 s4. work include various fire/life safety updates. to memorialize sffd review comments in later addendum. | |
| Sep 12, 2020 | Completed final sign-off Aug 2021 | 99 Mississippi St | Bellcore Construction Inc | wokr on 1st floor only. new entry on 17th st., relace existing windows and doors. refurbish and repaint interior and exterior of building. voluntary lateral force upgrade. existing building 21,287 sq ft, type vb, not sprinklered.Details
wokr on 1st floor only. new entry on 17th st., relace existing windows and doors. refurbish and repaint interior and exterior of building. voluntary lateral force upgrade. existing building 21,287 sq ft, type vb, not sprinklered. | $200,000 |
| Mar 4, 2020 | Completed final sign-off Oct 2021 | 77 Federal St | Ewsf Inc. | elevator hoistway access panel. revision to pa# 201306200082Details
elevator hoistway access panel. revision to pa# 201306200082 | $500 |
| Mar 4, 2020 | Completed final sign-off Jun 2020 | 540 De Haro St | Ewsf Inc. | elevator hoistway access panel. revision to 201502107867Details
elevator hoistway access panel. revision to 201502107867 | $500 |
| Feb 10, 2020 | Completed final sign-off Aug 2021 | 99 Mississippi St | Bellcore Construction Inc | 1st fl work only. demolition of non-structural items and paint interior. space remains vacant. ab-017 applies.Details
1st fl work only. demolition of non-structural items and paint interior. space remains vacant. ab-017 applies. | $2,000 |
| Jan 15, 2020 | Completed final sign-off Jan 2025 | 45 Santa Paula Av | Twin Pinnacles Construction | horizontal and vertical addition. (n) 2nd flr including (2) bedrooms. rear addition @ 1st flr.Details
horizontal and vertical addition. (n) 2nd flr including (2) bedrooms. rear addition @ 1st flr. | $90,000 |
| Dec 16, 2019 | Never finaled filed Dec 2019, never issued | 755 Brannan St | to erect 5 stories, no basement, type iii-a, 57 multi-family unit bldg. **maher n/a**Details
to erect 5 stories, no basement, type iii-a, 57 multi-family unit bldg. **maher n/a** | $14,000,000 | |
| Dec 16, 2019 | Never finaled filed Dec 2019, never issued | 755 Brannan St | to demolish 2 stories, office building. ** maher: n/a **Details
to demolish 2 stories, office building. ** maher: n/a ** | $35,000 | |
| Aug 2, 2019 | Expired or cancelled withdrawn Aug 2019 | 1431 Polk St | rev to pa 201807053743 & 201902011896new roof as requireed by s.f. health departmentDetails
rev to pa 201807053743 & 201902011896new roof as requireed by s.f. health department | $5,000 | |
| Apr 9, 2019 | Never finaled issued Apr 2019, no final | 2320 Sutter St | install (5) 1-hour window openings in existing exit stairs. sprinklers under seperate permit.Details
install (5) 1-hour window openings in existing exit stairs. sprinklers under seperate permit. | $5,000 | |
| Mar 29, 2019 | Never finaled issued Apr 2019, no final | 901 Tennessee St | Achill Beg Construction Inc | rev to pa201604285990: add elevator lobby 2-hr rated with 90min. rated door & removal of hoistway smoke door. reconfiguration of f/a alarm control room. adding 2-hr rated assembly.Details
rev to pa201604285990: add elevator lobby 2-hr rated with 90min. rated door & removal of hoistway smoke door. reconfiguration of f/a alarm control room. adding 2-hr rated assembly. | $5,000 |
| Feb 13, 2019 | Never finaled issued Feb 2019, no final | 58 Dorland St | Ewsf Inc. | install unoccupied living roof & maintenace rail above garage. not visible from stret.Details
install unoccupied living roof & maintenace rail above garage. not visible from stret. | $5,800 |
| Feb 1, 2019 | Completed final sign-off Sep 2019 | 1431 Polk St | Evan Palmer | revise pa# 201807053743; re-build rear portion of buildingDetails
revise pa# 201807053743; re-build rear portion of building | $20,000 |
| Jan 28, 2019 | Completed final sign-off Jun 2020 | 540 De Haro St | Ewsf Inc. | stormwater drainage onlyDetails
stormwater drainage only | |
| Jan 25, 2019 | Completed final sign-off Apr 2021 | 3701 Noriega St | Henry J Rabbitt & Sons Inc | administrative permit for pid review of stormwater control system design. **maher n/a**Details
administrative permit for pid review of stormwater control system design. **maher n/a** | |
| Dec 5, 2018 | Completed final sign-off Mar 2019 | 3935 24th St | Ewsf Inc. | revision to pa 2018-0620-2451 revise seismic to reflect existing framing. revise accessibility, hvac & lighting to reflect ti and add partitions. no exterior work. ref pa 2018-1127-6740Details
revision to pa 2018-0620-2451 revise seismic to reflect existing framing. revise accessibility, hvac & lighting to reflect ti and add partitions. no exterior work. ref pa 2018-1127-6740 | $205,000 |
| Nov 29, 2018 | Expired or cancelled cancelled Jan 2026 | 58 Dorland St | Ewsf Inc. | add new roof deck in buildable area.Details
add new roof deck in buildable area. | $27,000 |
| Mar 23, 2018 | Completed final sign-off Apr 2021 | 3701 Noriega St | Ace Drilling & Excavation | demolish 1-story canopy for gas station. (ref pa #2018-0223-2134 for gas station) ** maher: n/a **Details
demolish 1-story canopy for gas station. (ref pa #2018-0223-2134 for gas station) ** maher: n/a ** | $10,000 |
| Mar 7, 2018 | Never finaled filed Mar 2018, never issued | 2985 21st St | west side bldg - demolish 1 story, type 5, office bldg.Details
west side bldg - demolish 1 story, type 5, office bldg. | $10,000 | |
| Mar 7, 2018 | Never finaled filed Mar 2018, never issued | 2985 21st St | east side bldg - erect 4 stories, type 5-a, 3 dwelling units building. (new address will be 2999 21st st corner building)Details
east side bldg - erect 4 stories, type 5-a, 3 dwelling units building. (new address will be 2999 21st st corner building) | $1,300,000 | |
| Mar 7, 2018 | Never finaled filed Mar 2018, never issued | 2985 21st St | west side bldg - erect 4 stories, type 5-a, 3 dwelling units building. (new address will be 2997 21st st)Details
west side bldg - erect 4 stories, type 5-a, 3 dwelling units building. (new address will be 2997 21st st) | $1,300,000 | |
| Mar 7, 2018 | Never finaled filed Mar 2018, never issued | 2507 Folsom St | east side corner bldg - demolish 1 story, type 5, commercial, laundromat.Details
east side corner bldg - demolish 1 story, type 5, commercial, laundromat. | $10,000 | |
| Feb 26, 2018 | Completed final sign-off May 2018 | 580 Hayes St | Casement Construction | provide final connection of gas appliances at common area roof deck. ref pa 2013-1209-3685. new constructionDetails
provide final connection of gas appliances at common area roof deck. ref pa 2013-1209-3685. new construction | $2,000 |
| Feb 23, 2018 | Completed final sign-off Apr 2021 | 3701 Noriega St | Ace Drilling & Excavation | demolish 1-story gas station. (ref pa #2018-0323-4152 for canopy) ** maher: n/a **Details
demolish 1-story gas station. (ref pa #2018-0323-4152 for canopy) ** maher: n/a ** | $50,000 |
| Dec 15, 2017 | Expired or cancelled cancelled Nov 2022 | 2322 Lombard St | rev previous pa201412173954.interior alteration of ground floor,converting parking (17 spaces) to 14 new guest rooms. increase guestroom count from 60 to 74. also new floor opening on 2/f, 3/f, 4/f floors. maher n/a.Details
rev previous pa201412173954.interior alteration of ground floor,converting parking (17 spaces) to 14 new guest rooms. increase guestroom count from 60 to 74. also new floor opening on 2/f, 3/f, 4/f floors. maher n/a. | $200,000 | |
| Sep 15, 2017 | Completed final sign-off Mar 2018 | 3420 18th St | Cullinane Plastering | revision to pa#201311041054. removal of smoke guards. include radio test. add accessible hatch detail. back-up battery under separate addendum provide accessible hatch for elevator penthouse. maher naDetails
revision to pa#201311041054. removal of smoke guards. include radio test. add accessible hatch detail. back-up battery under separate addendum provide accessible hatch for elevator penthouse. maher na | $10,000 |
| Jun 27, 2017 | Completed final sign-off Sep 2020 | 901 Tennessee St | Achill Beg Construction Inc | to erect 4 stories, 1 basement, type v-a, 40 residential unit building (r-2,s-2). ** maher: disturbance of at least 50 cu.yd of soil; route to dph **Details
to erect 4 stories, 1 basement, type v-a, 40 residential unit building (r-2,s-2). ** maher: disturbance of at least 50 cu.yd of soil; route to dph ** | $7,780,000 |
| Oct 24, 2016 | Completed final sign-off May 2018 | 580 Hayes St | Casement Construction | revision to pa #201312093685 - permit modification for design revisions to the ground floor retail storefronts.Details
revision to pa #201312093685 - permit modification for design revisions to the ground floor retail storefronts. | |
| Jul 15, 2016 | Completed final sign-off Apr 2021 | 3701 Noriega St | Henry J Rabbitt & Sons Inc | to erect 3-story, 2 basement, 12 units condo, type ia, retail, parking building. ** maher: disturbance of at least 50 cu.yd.of soil; route to dph **Details
to erect 3-story, 2 basement, 12 units condo, type ia, retail, parking building. ** maher: disturbance of at least 50 cu.yd.of soil; route to dph ** | $2,500,000 |
| Jul 14, 2016 | Completed final sign-off Jun 2020 | 3620 Cesar Chavez St | to erect 6 story, 1 basement, type iii-a / i, 24 units residential with commercial mix use building.Details
to erect 6 story, 1 basement, type iii-a / i, 24 units residential with commercial mix use building. | $4,700,000 | |
| Feb 18, 2016 | Never finaled issued Mar 2016, no final | 2645 Leavenworth St | K 2 Builders Inc | remodel 2nd flr unit only: add one bathroom,one powder room,remodel kitchen, existing bathroom & hallway. no exterior work on additional floor area; maher n/aDetails
remodel 2nd flr unit only: add one bathroom,one powder room,remodel kitchen, existing bathroom & hallway. no exterior work on additional floor area; maher n/a | $100,000 |
| Dec 14, 2015 | Completed final sign-off Feb 2016 | 2530 California St | provide aluflam 1-hr rated window and cancel proposed sprinkler head from property line window. previously approved under 2015-1022-0513Details
provide aluflam 1-hr rated window and cancel proposed sprinkler head from property line window. previously approved under 2015-1022-0513 | ||
| Nov 20, 2015 | Completed final sign-off Dec 2022 | 1145 Polk St | Landmark Construction Inc. | to erect 6 stories, 1 basement, type i-a / iii-a, 54 units residential, retail with parking building.Details
to erect 6 stories, 1 basement, type i-a / iii-a, 54 units residential, retail with parking building. | $8,500,000 |
| Oct 22, 2015 | Completed final sign-off Feb 2016 | 2530 California St | replacing and adding some windows and doors and skylights. all not visible from street. n/a for maher 1 property line window w/ ab009 on plans . sprinklers will be required for window.Details
replacing and adding some windows and doors and skylights. all not visible from street. n/a for maher 1 property line window w/ ab009 on plans . sprinklers will be required for window. | $5,000 | |
| Jul 28, 2015 | Completed final sign-off Aug 2018 | 1 Stanyan St | Ace Drilling & Excavation | to demolish 1 storey gas station rpair garage & mini mart. ** maher: compliance with ordinance no# 155-13 not required **Details
to demolish 1 storey gas station rpair garage & mini mart. ** maher: compliance with ordinance no# 155-13 not required ** | $10,000 |
| Jul 28, 2015 | Completed final sign-off Aug 2018 | 1 Stanyan St | to demolish 1 story gas station canopy. ** maher: compliance with ordinance no# 155-13 not required **Details
to demolish 1 story gas station canopy. ** maher: compliance with ordinance no# 155-13 not required ** | $5,000 | |
| May 18, 2015 | Never finaled issued Oct 2015, no final | 131 Missouri St | to demolish 1 storey of warehouseDetails
to demolish 1 storey of warehouse | $5,000 | |
| May 1, 2015 | Never finaled issued Feb 2020, no final | 1870 Market St | to erect 8 stories, no basement, type i-b, 9 residential units & retail building.Details
to erect 8 stories, no basement, type i-b, 9 residential units & retail building. | $3,200,000 | |
| Mar 30, 2015 | Expired or cancelled cancelled Mar 2020 | 50 Santa Monica Wy | remodel of (e) single family dwelling with 566 s.f rear horizontal addition. work to include addition of 3 (n) bathrooms & remodel of (e) kitchen & master suite. n/a for maher ordinance.Details
remodel of (e) single family dwelling with 566 s.f rear horizontal addition. work to include addition of 3 (n) bathrooms & remodel of (e) kitchen & master suite. n/a for maher ordinance. | $250,000 | |
| Feb 10, 2015 | Completed final sign-off Jun 2020 | 540 De Haro St | Ewsf Inc. | erect 5-story residential building of 16 units, .Details
erect 5-story residential building of 16 units, . | $4,000,000 |
| Dec 17, 2014 | Expired or cancelled expired Apr 2026 | 2322 Lombard St | S F Garage Company Inc. | remodel of (e) tourist motel to bring use to conforming tourist hotel. interior alteration to (e) ground floor. 2nd & 3rd floor to update circulation & add new guestrooms. addition of 4th floor to add add'l guest room & occupied roof terraces. guest room count from 36 to 60.Details
remodel of (e) tourist motel to bring use to conforming tourist hotel. interior alteration to (e) ground floor. 2nd & 3rd floor to update circulation & add new guestrooms. addition of 4th floor to add add'l guest room & occupied roof terraces. guest room count from 36 to 60. | $150,000 |
| Oct 9, 2014 | Expired or cancelled withdrawn May 2017 | 5739 Mission St | demolish 2-unit apartmentDetails
demolish 2-unit apartment | $20,000 | |
| Aug 11, 2014 | Completed final sign-off Mar 2022 | 198 Valencia St | Granite Excavation & Demolition Inc | to demolish one story auto service building. ** maher: compliance with ordinance is required **Details
to demolish one story auto service building. ** maher: compliance with ordinance is required ** | $20,000 |
| Aug 5, 2014 | Completed final sign-off Sep 2022 | 198 Valencia St | Crime Watch Security Sys Llc, Js Sullivan Construction Inc | to erect 5 stories, no basement, type 5-a, 28 units residential condo and commercial building. (r-2,m) ** maher: compliance with ordinance is required **Details
to erect 5 stories, no basement, type 5-a, 28 units residential condo and commercial building. (r-2,m) ** maher: compliance with ordinance is required ** | $3,000,000 |
| Jun 17, 2014 | Never finaled issued Sep 2014, no final | 2121 03rd St | Build Group Inc. | unit# 110 only. construct private deck & guardrail in lieu of stairs & stoop as approved under pa# 2011/11/17/9162's'.Details
unit# 110 only. construct private deck & guardrail in lieu of stairs & stoop as approved under pa# 2011/11/17/9162's'. | $1,000 |
| Jun 4, 2014 | Never finaled issued Jun 2014, no final | 735 Fell St | Buena Vista Builders Inc | rev. to pa#201308164574 remove "elevator back up generator". n/a ordinance #155-13. this was a requirement on permit #201308164574Details
rev. to pa#201308164574 remove "elevator back up generator". n/a ordinance #155-13. this was a requirement on permit #201308164574 | |
| May 2, 2014 | Completed final sign-off Oct 2017 | 2536 Clay St | Ewsf Inc. | horizontal addition. remove brick foundation. full seismic upgrade & horizontal addition & basement accoriding to plans drawn by david sternberg dated 5/1/2014.Details
horizontal addition. remove brick foundation. full seismic upgrade & horizontal addition & basement accoriding to plans drawn by david sternberg dated 5/1/2014. | $680,000 |
| Apr 1, 2014 | Completed final sign-off Jul 2019 | 160 Germania St | Block Nine Llc | rear building. erect a 3 stories, no basement, type 5, single family dwelling.Details
rear building. erect a 3 stories, no basement, type 5, single family dwelling. | $500,000 |
| Oct 3, 2013 | Completed final sign-off Aug 2015 | 2320 Sutter St | Thompson Suskind L P | to erect 3 stories, no basement, medical office. (rear bldg).Details
to erect 3 stories, no basement, medical office. (rear bldg). | $600,000 |
| Sep 30, 2013 | Never finaled issued Oct 2015, no final | 1375 Evans Av | erect 2-story, type 5, workshop commercial and 1 dwelling unit building. n/a for maher ordinance no. 155-13.Details
erect 2-story, type 5, workshop commercial and 1 dwelling unit building. n/a for maher ordinance no. 155-13. | $550,000 | |
| Aug 16, 2013 | Never finaled issued Oct 2013, no final | 735 Fell St | Cullinane Plastering | accessibility upgrade to existing 3 story school. includes reposition main entry to grade level. excavation of portion of basement crawl space to provide new lobby. addition of new elevator to serve existing stories. additon of new ramp at rear of bldg. new water fountainsDetails
accessibility upgrade to existing 3 story school. includes reposition main entry to grade level. excavation of portion of basement crawl space to provide new lobby. addition of new elevator to serve existing stories. additon of new ramp at rear of bldg. new water fountains | $200,000 |
| Jun 19, 2013 | Completed final sign-off Aug 2017 | 131 Missouri St | Ewsf Inc. | to erect 4 stories, no basement, 9 units residential residence with garage.Details
to erect 4 stories, no basement, 9 units residential residence with garage. | $3,000,000 |
| Jun 5, 2013 | Completed final sign-off Jan 2014 | 275 09th St | J C Construction Co | remove non-fire rated wall, door on 2nd flr. remove non-fire rated wall & doors,(exit enclosure), base cabinets, sink & counter at 3rd flr. build new non-fire rated wall storefront w/full lite alum door and sidelite door frame,guardrail/handrail new base cabinets on 3rd floor. all work is not structDetails
remove non-fire rated wall, door on 2nd flr. remove non-fire rated wall & doors,(exit enclosure), base cabinets, sink & counter at 3rd flr. build new non-fire rated wall storefront w/full lite alum door and sidelite door frame,guardrail/handrail new base cabinets on 3rd floor. all work is not struct | $30,000 |
| May 17, 2013 | Expired or cancelled cancelled Jan 2020 | 376 Castro St | demolish 1-story, gas station building.Details
demolish 1-story, gas station building. | $5,000 | |
| May 17, 2013 | Expired or cancelled cancelled Jan 2020 | 376 Castro St | to erect 6-story, 24 units w/ garage, commercial & parking building.Details
to erect 6-story, 24 units w/ garage, commercial & parking building. | $5,000,000 | |
| Feb 21, 2013 | Completed final sign-off Jun 2015 | 39 San Carlos St | erect 4 story 3 family dwelling units.Details
erect 4 story 3 family dwelling units. | $650,000 | |
| Nov 30, 2012 | Expired or cancelled withdrawn Dec 2012 | 3500 19th St | revision to pa#2006-0501-0369 s3 r-2. remodel of area of refuge area on a2.02 & a2.04 of approved architectural plans dated 11-7-2017. building will be fully sprinklered.Details
revision to pa#2006-0501-0369 s3 r-2. remodel of area of refuge area on a2.02 & a2.04 of approved architectural plans dated 11-7-2017. building will be fully sprinklered. | ||
| Jun 12, 2012 | Completed final sign-off Aug 2013 | 1340 Natoma St | erect 4 story, 3 dwelling units, type 5, residential building.Details
erect 4 story, 3 dwelling units, type 5, residential building. | $500,000 | |
| Jun 12, 2012 | Completed final sign-off Sep 2013 | 1340 Natoma St | demolish 2 stories, 1 dwelling unit, residential building.Details
demolish 2 stories, 1 dwelling unit, residential building. | $20,000 | |
| Jun 11, 2012 | Completed final sign-off Oct 2014 | 2526 California St | demolish 1-story commercial bldg.Details
demolish 1-story commercial bldg. | $20,000 | |
| Jun 11, 2012 | Completed final sign-off Nov 2015 | 2526 California St | erect 4 stories, no basement, 2 units residential building.Details
erect 4 stories, no basement, 2 units residential building. | $400,000 | |
| Jun 11, 2012 | Completed final sign-off Nov 2015 | 33 Perine Pl | to erect 4 stories, no basement, 2 unit residential building.Details
to erect 4 stories, no basement, 2 unit residential building. | $400,000 | |
| Mar 23, 2012 | Completed final sign-off May 2014 | 60 Gates St | K 2 Builders Inc | existing spaces shall be completely remodeled with all new finishes, kitchen & bathroom cabinets fixtures, etc. new bathroom and replace concrete slab on 1st floor.Details
existing spaces shall be completely remodeled with all new finishes, kitchen & bathroom cabinets fixtures, etc. new bathroom and replace concrete slab on 1st floor. | $40,000 |
| Nov 17, 2011 | Completed final sign-off Jul 2012 | 2121 03rd St | demolish 1 story, office building (front building).Details
demolish 1 story, office building (front building). | $25,000 | |
| Nov 17, 2011 | Completed final sign-off Jul 2012 | 2121 03rd St | demolish 1 story, storage building (rear building).Details
demolish 1 story, storage building (rear building). | $25,000 | |
| Nov 17, 2011 | Completed final sign-off Nov 2014 | 2121 03rd St | erect 105 dwelling units, 7 stories, residential/parking building.Details
erect 105 dwelling units, 7 stories, residential/parking building. | $17,800,000 | |
| Sep 14, 2011 | Completed final sign-off Feb 2012 | 745 Panorama Dr | grd floor-create a new family room, 2 bedrooms, 1 bathroom, modifications to door, replace gas furnace & ductwork. 2nd floor-remodel kitchen, modify walls at stairs, replace light fixtures & plumbing fixtures in bathroom, new lighting. replace all windows with double pane nonmetal windowsDetails
grd floor-create a new family room, 2 bedrooms, 1 bathroom, modifications to door, replace gas furnace & ductwork. 2nd floor-remodel kitchen, modify walls at stairs, replace light fixtures & plumbing fixtures in bathroom, new lighting. replace all windows with double pane nonmetal windows | $25,000 | |
| Mar 30, 2011 | Completed final sign-off Jun 2011 | 1166 Howard St | Clahan Roofing | revision to pa# 2010-0920-1166 including relocate sink in womens room, revise & relocate ramp with curb & guard rails, revise opening in wall between 2 portions of studio, change set back of exit alcove from 2'-2" to 3'-0", incorporate sf plan check notes.Details
revision to pa# 2010-0920-1166 including relocate sink in womens room, revise & relocate ramp with curb & guard rails, revise opening in wall between 2 portions of studio, change set back of exit alcove from 2'-2" to 3'-0", incorporate sf plan check notes. | |
| Sep 20, 2010 | Completed final sign-off Jun 2011 | 1166 Howard St | Clahan Roofing | change of use from previously unoccupied ground floor space (retail) within (e) bldg to expand the (e) jiu jitsu studio new opening between the two spaces.Details
change of use from previously unoccupied ground floor space (retail) within (e) bldg to expand the (e) jiu jitsu studio new opening between the two spaces. | $8,000 |
| Sep 10, 2010 | Completed final sign-off Jan 2011 | 2645 Leavenworth St | K 2 Builders Inc | revision & modify previsously pa #200811146545 to include structural framing revisions & minor revisions on 2nd floor at new stairs & remove proposed windows.Details
revision & modify previsously pa #200811146545 to include structural framing revisions & minor revisions on 2nd floor at new stairs & remove proposed windows. | |
| May 12, 2010 | Completed final sign-off Feb 2011 | 990 Bay St | Econoquality Inc | unit #305: interior renovation, remodel kitchen, relocate walls (non-structural, non-bearing & not plywood shear wall). replace all windows in kind, visible from street. convert existing dining room to bedroom.Details
unit #305: interior renovation, remodel kitchen, relocate walls (non-structural, non-bearing & not plywood shear wall). replace all windows in kind, visible from street. convert existing dining room to bedroom. | $28,000 |
| May 12, 2010 | Completed final sign-off Jul 2010 | 1355 Pacific Av | convert unoccupied roof areas to individually occupied roof terraces 401, 402, 403, 404, 405 & 406, install (n) metal railings to separate (n) individual roof terraces & protect (e) skylights, install (n) walkable roof surfaces @ the (n) individual roof terraces.Details
convert unoccupied roof areas to individually occupied roof terraces 401, 402, 403, 404, 405 & 406, install (n) metal railings to separate (n) individual roof terraces & protect (e) skylights, install (n) walkable roof surfaces @ the (n) individual roof terraces. | $15,000 | |
| Apr 8, 2010 | Completed final sign-off Jul 2010 | 231 Franklin St | information and locations of evacuation signs for new building at 231-235 franklin w/ p.a.#200611157793.Details
information and locations of evacuation signs for new building at 231-235 franklin w/ p.a.#200611157793. | $480 | |
| Jul 8, 2009 | Completed final sign-off Dec 2009 | 75 Roosevelt Wy | K 2 Builders Inc | install 3 new windows, one at side wall & two in lightwellDetails
install 3 new windows, one at side wall & two in lightwell | $5,000 |
| Mar 19, 2009 | Completed final sign-off Dec 2009 | 75 Roosevelt Wy | K 2 Builders Inc | interior work in unit #3 only top floor flat interior work : remodel 2 bathrooms layout and replacement of kitchen cabinets, appliances & finishes, also replacement of all exterior windows in kind.Details
interior work in unit #3 only top floor flat interior work : remodel 2 bathrooms layout and replacement of kitchen cabinets, appliances & finishes, also replacement of all exterior windows in kind. | $80,000 |
| Nov 14, 2008 | Completed final sign-off Jan 2011 | 2645 Leavenworth St | new roof deck, penthouse and extension of stairs and roofDetails
new roof deck, penthouse and extension of stairs and roof | $80,000 | |
| Oct 10, 2008 | Expired or cancelled expired Mar 2010 | 990 Bay St | House To Home Remodeling | #104 (2nd flr) & #203 (3rd flr) - change floor plan to convert dining rooms to bedrooms, remodel kitchens with new cabients, countertops & appliances. install new shower valves. no structural work required.Details
#104 (2nd flr) & #203 (3rd flr) - change floor plan to convert dining rooms to bedrooms, remodel kitchens with new cabients, countertops & appliances. install new shower valves. no structural work required. | $140,000 |
| Oct 7, 2008 | Completed final sign-off Jan 2009 | 767 Union St | Upscale Construction Inc. | replace extg rear wood stair with bldg code complying wood stair. repair extg rear addition walls and wndwsDetails
replace extg rear wood stair with bldg code complying wood stair. repair extg rear addition walls and wndws | $2,000 |
| Oct 3, 2008 | Completed final sign-off Dec 2009 | 75 Roosevelt Wy | #1 - to comply w/ nov h9404212, remodel ground fl unit to combining floors of one unit and existing common room into unit #1, remodel including kitchen, bathrooms, closets & adding new stair.Details
#1 - to comply w/ nov h9404212, remodel ground fl unit to combining floors of one unit and existing common room into unit #1, remodel including kitchen, bathrooms, closets & adding new stair. | $100,000 | |
| Aug 6, 2008 | Completed final sign-off Apr 2009 | 990 Bay St | House To Home Remodeling | apt 603: change floor plan to convert dining room to bedroom. remodel kitchen, combine living rm/dining rm, change shower valve, new cabinets and counters. no structural. all partition walls. bedroom window meets egress requirementsDetails
apt 603: change floor plan to convert dining room to bedroom. remodel kitchen, combine living rm/dining rm, change shower valve, new cabinets and counters. no structural. all partition walls. bedroom window meets egress requirements | $50,000 |
| May 9, 2008 | Expired or cancelled cancelled Mar 2020 | 1075 Vallejo St | new 3rd story, vertical addition to (e) 2 unit residential building, upper unit to enlargeDetails
new 3rd story, vertical addition to (e) 2 unit residential building, upper unit to enlarge | $100,000 | |
| May 1, 2008 | Completed final sign-off Sep 2008 | 2320 Sutter St | City Building Inc. | revision to pa# 2007/10/03/4403 to revise 2nd floor layout, including lighting, power and electrical. document existing structural framing for 1st and 2nd floor. revise roof structural framing.Details
revision to pa# 2007/10/03/4403 to revise 2nd floor layout, including lighting, power and electrical. document existing structural framing for 1st and 2nd floor. revise roof structural framing. | |
| Dec 14, 2007 | Completed final sign-off Aug 2018 | 1 Stanyan St | Landmark Construction Inc. | to erect 4 stories, no basement, 13 units residential with retail & parking building.Details
to erect 4 stories, no basement, 13 units residential with retail & parking building. | $3,500,000 |
| Dec 14, 2007 | Never finaled issued Jun 2008, no final | 3501 Geary Bl | demolish 1 story metal gas station.Details
demolish 1 story metal gas station. | ||
| Oct 19, 2007 | Completed final sign-off Apr 2008 | 90 San Pablo Av | Latta Construction | slight changes to approved plan during construction to be documents as per building inspector correction notice dated 07/27/07.as built basement.Details
slight changes to approved plan during construction to be documents as per building inspector correction notice dated 07/27/07.as built basement. | |
| Sep 21, 2007 | Never finaled issued Sep 2007, no final | 430 09th St | barrier removal-new main entry w/ handicap ramp, new bathrooms, new kitchenette. mep under sep. application.Details
barrier removal-new main entry w/ handicap ramp, new bathrooms, new kitchenette. mep under sep. application. | $36,000 |