Clahan Roofing
- Based in
- Berkeley
- On San Francisco permits
- Sep 2010 to Mar 2011
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2011 | Completed final sign-off Jun 2011 | 1166 Howard St | revision to pa# 2010-0920-1166 including relocate sink in womens room, revise & relocate ramp with curb & guard rails, revise opening in wall between 2 portions of studio, change set back of exit alcove from 2'-2" to 3'-0", incorporate sf plan check notes.Details
revision to pa# 2010-0920-1166 including relocate sink in womens room, revise & relocate ramp with curb & guard rails, revise opening in wall between 2 portions of studio, change set back of exit alcove from 2'-2" to 3'-0", incorporate sf plan check notes. | |
| Sep 20, 2010 | Completed final sign-off Jun 2011 | 1166 Howard St | change of use from previously unoccupied ground floor space (retail) within (e) bldg to expand the (e) jiu jitsu studio new opening between the two spaces.Details
change of use from previously unoccupied ground floor space (retail) within (e) bldg to expand the (e) jiu jitsu studio new opening between the two spaces. | $8,000 |