Block 3071, lot 021
29 San Leandro Way
- City’s use
- Single Family Residential
- Built
- 1922
- Stories
- 2
- Units
- 1
- Rooms
- 3 bathrooms
- Building
- 3,409 sq ft
- Lot
- 13,721 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 9, 2025 | Completed final sign-off Jan 2026 | 29 San Leandro Wy | C F Y Construction Inc | reroofing: removing tar & gravel on flat roof areas and installing new inkind self-adhesive modified bitumen throughout flat roof (no hot works). existing tile willremain in place.Details
reroofing: removing tar & gravel on flat roof areas and installing new inkind self-adhesive modified bitumen throughout flat roof (no hot works). existing tile willremain in place. | $42,650 |
| Apr 12, 2024 | Completed final sign-off Oct 2024 | 29 San Leandro Wy | Brendan Waters Construction Inc | revision to permit 202402296794 (remodel one bathroom in kind). interior remodel - 1/f: removal of foyer, dining, powder room and bathroom, (e) laundry and reconfiguration of stairs. 2/f: alteration of bedrooms and bathrooms, addition of primary suite, replacement of relocation of furnace & laundry.Details
revision to permit 202402296794 (remodel one bathroom in kind). interior remodel - 1/f: removal of foyer, dining, powder room and bathroom, (e) laundry and reconfiguration of stairs. 2/f: alteration of bedrooms and bathrooms, addition of primary suite, replacement of relocation of furnace & laundry. | $180,000 |
| Feb 29, 2024 | Completed final sign-off Oct 2024 | 29 San Leandro Wy | Brendan Waters Construction Inc | remove lath and plaster from interior walls in living room, dining room, and staircase walls (for engr to access). replace with gyp board after investigation. remodel one bathroom (in kind).Details
remove lath and plaster from interior walls in living room, dining room, and staircase walls (for engr to access). replace with gyp board after investigation. remodel one bathroom (in kind). | $2,000 |
| Sep 29, 2020 | Completed final sign-off Jan 2022 | 29 San Leandro Wy | in-kind master bathroom upgrade- scope: replace tile, fixtures. in-kind kitchen upgrade - scope: replace cabinets, countertops.Details
in-kind master bathroom upgrade- scope: replace tile, fixtures. in-kind kitchen upgrade - scope: replace cabinets, countertops. | $35,000 | |
| May 4, 2006 | Completed final sign-off Nov 2006 | 29 San Leandro Wy | remodel bathroom at second floor. new cabinetry, fixtures, tile work (non structural) remove partion wall not structural.Details
remodel bathroom at second floor. new cabinetry, fixtures, tile work (non structural) remove partion wall not structural. | $19,500 | |
| Feb 6, 2002 | Completed final sign-off May 2002 | 29 San Leandro Wy | John Matthew Calvin | remodel bathroom, new drywall & tileDetails
remodel bathroom, new drywall & tile | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Brendan Waters Construction Inc (2), C F Y Construction Inc, John Matthew Calvin
- Architects
- David Sternberg, James Stavoy Aia
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.