Megan Ackerley
- Listed as
- architect, authorized agent-others, designer
- Firm
- Lionakis
- Based in
- Sf
- On San Francisco permits
- Mar 2009 to Mar 2016
28 permits since 2000 (architect on 25 permits, designer on 2 permits, authorized agent-others on 1 permit): 20 completed, 5 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 30, 2016 | Completed final sign-off Apr 2016 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | revision pa#201509217532; no changes of use & no exterior work. removal of plumbing fixtures from (1) restroom. convert back to storage.Details
revision pa#201509217532; no changes of use & no exterior work. removal of plumbing fixtures from (1) restroom. convert back to storage. | $650,000 |
| Jan 6, 2016 | Completed final sign-off Aug 2016 | 100 Bush St | Team Commercial Construction Inc. | tenant improvement of 3338 sf office space including new floor, paint, lighting, partitions, mech, fans, plumbing rough inDetails
tenant improvement of 3338 sf office space including new floor, paint, lighting, partitions, mech, fans, plumbing rough in | $365,644 |
| Dec 11, 2015 | Completed final sign-off May 2016 | 185 Berry St | Rossi Builders Inc. | suite 200 & 210 level 2 & 3 expansion of existing space by 14,000sf including int walls, doors, frames ceiling & int windows. t.i. novation to 3000 sf of office @ suite 300 including replacement of (e) reception desk, demo ceiling & walls & replacement/relocated doors & walls & ceiling.Details
suite 200 & 210 level 2 & 3 expansion of existing space by 14,000sf including int walls, doors, frames ceiling & int windows. t.i. novation to 3000 sf of office @ suite 300 including replacement of (e) reception desk, demo ceiling & walls & replacement/relocated doors & walls & ceiling. | $1,090,000 |
| Nov 18, 2015 | Expired or cancelled cancelled Jan 2026 | 100 Bush St | 22nd flr- construct new men's & womens restrooms (accessible). demising of (e) suite into (2) suites. work includes (2) extended pipe to feed new suites, (1) new urinal, 3) toilets,(4) restroom lavatories. relcoate (e) lighting & add wall sconce lighting at restroom. new exhaust & supply duct & fansDetails
22nd flr- construct new men's & womens restrooms (accessible). demising of (e) suite into (2) suites. work includes (2) extended pipe to feed new suites, (1) new urinal, 3) toilets,(4) restroom lavatories. relcoate (e) lighting & add wall sconce lighting at restroom. new exhaust & supply duct & fans | $200,000 | |
| Sep 21, 2015 | Completed final sign-off Sep 2016 | 4131 Geary Bl | Kaiser Foundation Health Plan Inc | 1st floor: 3000 sq ft of t.i. renovation. one new toilet room, modification to extg mechanical, electrical, plumbing, fire alarm and fire sprinklers.Details
1st floor: 3000 sq ft of t.i. renovation. one new toilet room, modification to extg mechanical, electrical, plumbing, fire alarm and fire sprinklers. | $650,000 |
| Aug 27, 2015 | Completed final sign-off May 2016 | 185 Berry St | Rossi Builders Inc. | 2nd floor: ti- combine office space 200/220 - final area 14,150 sq ft maher naDetails
2nd floor: ti- combine office space 200/220 - final area 14,150 sq ft maher na | $1,090,166 |
| Aug 4, 2015 | Never finaled issued Oct 2015, no final | 185 Berry St | Dfi Construction Company | suite 300 -scope to install walls, doors, exit lighting as required for 2 new doors to separate lobby from office space. relocate of light fixture. separate permits for mep, and fire safetyDetails
suite 300 -scope to install walls, doors, exit lighting as required for 2 new doors to separate lobby from office space. relocate of light fixture. separate permits for mep, and fire safety | $7,700 |
| Jun 25, 2015 | Completed final sign-off Jul 2016 | 185 Berry St | Dfi Construction Company | suite #1050 ground floor - consist of partial demo work & construction of new walls & doors of (e) wharfside building in china basin. demo consists of door & partial ceiling removal. new construction consists of new doors & partitions & lighting & electrical. n/a maher ord. life safety deferredDetails
suite #1050 ground floor - consist of partial demo work & construction of new walls & doors of (e) wharfside building in china basin. demo consists of door & partial ceiling removal. new construction consists of new doors & partitions & lighting & electrical. n/a maher ord. life safety deferred | $120,000 |
| Jun 11, 2015 | Expired or cancelled cancelled Jan 2026 | 185 Berry St | ~kf21&partial demo and construction of new demising walls o the 2nd fl within the existing berry building in china basin. demo consists of removal of doors, walls, finishes, fixtures, partial ceiling. new constructino consists of new corridor walls and 1 demising partitionDetails
~kf21&partial demo and construction of new demising walls o the 2nd fl within the existing berry building in china basin. demo consists of removal of doors, walls, finishes, fixtures, partial ceiling. new constructino consists of new corridor walls and 1 demising partition | $45,500 | |
| May 14, 2015 | Completed final sign-off Jun 2015 | 185 Berry St | Skyline Construction | #3800- revision to pa#201406279897 to add 3 phone rooms. n/a ordinance #155-13Details
#3800- revision to pa#201406279897 to add 3 phone rooms. n/a ordinance #155-13 | |
| Apr 24, 2015 | Completed final sign-off Jun 2015 | 555 Mission St | Rudolph Commercial Interiors Inc, Rci | remove doors between non rated corridors and work areas to allow for free passage between work areas. add card reader at elevator lobby door to secure the tenant suite from the public elevator lobby. add lock-release device per city of sf req's. maher naDetails
remove doors between non rated corridors and work areas to allow for free passage between work areas. add card reader at elevator lobby door to secure the tenant suite from the public elevator lobby. add lock-release device per city of sf req's. maher na | $8,625 |
| Jan 22, 2015 | Completed final sign-off Sep 2015 | 185 Berry St | Hathaway Dinwiddie Co. | 3/f - demolition of non-compliant auxiliary restrooms and construc of 2 new accessible rooms. mep separate deferred submittals.Details
3/f - demolition of non-compliant auxiliary restrooms and construc of 2 new accessible rooms. mep separate deferred submittals. | $32,700 |
| Jul 10, 2014 | Completed final sign-off Feb 2015 | 185 Berry St | Skyline Construction | voluntary disabled access barrier removal in wharfside. bldg lobby 3 3rd floor. the extg restrooms will have minor alterations to make them compliant with the current code cycle. there will be no mechanical,electrical, or plumbing work involved.Details
voluntary disabled access barrier removal in wharfside. bldg lobby 3 3rd floor. the extg restrooms will have minor alterations to make them compliant with the current code cycle. there will be no mechanical,electrical, or plumbing work involved. | $30,000 |
| Jun 27, 2014 | Completed final sign-off Jun 2015 | 185 Berry St | Skyline Construction | 3rd floor: office t. i. of an extg office bldg. it is a multi-tenant floor. consists of an expansion of extg office space with demo of extg demising walls and construction of new interior walls. adjustment to extg mechanical and electrical, adjustment to extg life safty.Details
3rd floor: office t. i. of an extg office bldg. it is a multi-tenant floor. consists of an expansion of extg office space with demo of extg demising walls and construction of new interior walls. adjustment to extg mechanical and electrical, adjustment to extg life safty. | $600,000 |
| May 22, 2014 | Completed final sign-off Sep 2014 | 180 Sansome St | Dettaglio Construction Inc Dba Dci Const | disabled access barrier removal on the 11th floor of 180 sansome. demolition of current non-compliant restroom and construction of 2 new single-occupancy restrooms one mens and one womens. n/a for the maher ordinance #155-133Details
disabled access barrier removal on the 11th floor of 180 sansome. demolition of current non-compliant restroom and construction of 2 new single-occupancy restrooms one mens and one womens. n/a for the maher ordinance #155-133 | $90,000 |
| Apr 1, 2014 | Never finaled issued Apr 2014, no final | 185 Berry St | Dfi Construction Company | 5th floor ste 5425/5475/5501 - consists of infilling (3) existing door openings to create (3) separate suites.Details
5th floor ste 5425/5475/5501 - consists of infilling (3) existing door openings to create (3) separate suites. | $7,500 |
| Mar 18, 2014 | Never finaled issued Mar 2014, no final | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | revision to appl #2013.0710.1467 & #2013.1113.1832 includes: revision #6 - removal of revision #5 it equipment racks & hvac split system & back to doctor's office. compliance with ordinance #155-13 not required.Details
revision to appl #2013.0710.1467 & #2013.1113.1832 includes: revision #6 - removal of revision #5 it equipment racks & hvac split system & back to doctor's office. compliance with ordinance #155-13 not required. | |
| Feb 3, 2014 | Never finaled issued Mar 2014, no final | 185 Berry St | Dfi Construction Company | suite #3400, 3450 & 3500- demolition work per ab-17, space to remain vacant.Details
suite #3400, 3450 & 3500- demolition work per ab-17, space to remain vacant. | $40,000 |
| Nov 4, 2013 | Completed final sign-off Dec 2013 | 200 Sansome St | Rossi Builders Inc. | tenant improvement on 8th floor single-tenant floor. the suite is a "b" occ. office space and scope of work includes construction of new paritions. doors, millwork, finishes, and installation of new electrical / data oulets and light fixtures. m.e.p. fire sprinkler & alarm under separate permit.Details
tenant improvement on 8th floor single-tenant floor. the suite is a "b" occ. office space and scope of work includes construction of new paritions. doors, millwork, finishes, and installation of new electrical / data oulets and light fixtures. m.e.p. fire sprinkler & alarm under separate permit. | $90,000 |
| Sep 6, 2013 | Completed final sign-off Mar 2014 | 555 Mission St | Marketone Builders Inc | 4th,10th, 11th, 12th, 14th floors:t.i. on multiple single tenent floors:restroom at 4 & 14/f to bring to compliance. 4th fl: addition/reconfiguration of electrified work stations, new elect/data whips. 10th fl: same as 4th fl, but add walmount monitors. 11/f:same as 4/f but also adding partitions.Details
4th,10th, 11th, 12th, 14th floors:t.i. on multiple single tenent floors:restroom at 4 & 14/f to bring to compliance. 4th fl: addition/reconfiguration of electrified work stations, new elect/data whips. 10th fl: same as 4th fl, but add walmount monitors. 11/f:same as 4/f but also adding partitions. | $481,982 |
| Jul 24, 2013 | Expired or cancelled expired May 2015 | 1700 California St | Ralls Construction | #530- remove approx. 20' of undergrid walls, rebuild walls at new location using (e) doors, remove part of (e) kitchen counter & install owner's combo washer/dryer, reconfigure electric switching for relocated walls, patch flooring at removed walls.Details
#530- remove approx. 20' of undergrid walls, rebuild walls at new location using (e) doors, remove part of (e) kitchen counter & install owner's combo washer/dryer, reconfigure electric switching for relocated walls, patch flooring at removed walls. | $25,000 |
| May 30, 2013 | Completed final sign-off Sep 2013 | 1700 California St | Arcon Construction Corp | 4th floor-interior office t.i consist of the re-configuration of & installation of new interior partitions, relocation of light fixtures & installation of electrical outlets. reference to bpa# 201305298072. f/a and sprinkler under seperate permit.Details
4th floor-interior office t.i consist of the re-configuration of & installation of new interior partitions, relocation of light fixtures & installation of electrical outlets. reference to bpa# 201305298072. f/a and sprinkler under seperate permit. | $27,000 |
| May 29, 2013 | Never finaled issued May 2013, no final | 350 Saint Josephs Av | Kaiser Foundation Health Plan Inc | revision to 3 shaft wall construction to jog corridor wall to maintain fire protection. revision to 201302019305Details
revision to 3 shaft wall construction to jog corridor wall to maintain fire protection. revision to 201302019305 | $10,000 |
| Feb 8, 2013 | Completed final sign-off Apr 2013 | 185 Berry St | Cci Com'l Constr & Improv**See 985808*** | the consists only demolition work to be performed in suite 3150, a vacant space on 3rd fl of existing wharfside building. demo work to be performed consists of removal of interior doors, partitions, suspended ceiling, finishes, light fixtures, other suite elements. scope work will not include anyDetails
the consists only demolition work to be performed in suite 3150, a vacant space on 3rd fl of existing wharfside building. demo work to be performed consists of removal of interior doors, partitions, suspended ceiling, finishes, light fixtures, other suite elements. scope work will not include any | $8,000 |
| Feb 8, 2013 | Completed final sign-off Apr 2013 | 185 Berry St | Cci Com'l Constr & Improv**See 985808*** | the project consists only demolition work to be performed in suite 4800, a vacant space on 4th fl of (e) wharfside building. demo work to be performed consists of removal of interior doors, partitions, suspended ceiling, finishes, light fixtures, other suite elements. scope work will not include anyDetails
the project consists only demolition work to be performed in suite 4800, a vacant space on 4th fl of (e) wharfside building. demo work to be performed consists of removal of interior doors, partitions, suspended ceiling, finishes, light fixtures, other suite elements. scope work will not include any | $46,000 |
| Aug 14, 2012 | Completed final sign-off Oct 2012 | 500 03rd St | Rossi Builders Inc. | suite 110 ti - demolition of partition walls & carpet. build new walls, install new doors/frames/hardware, install interior glazing, t-bar ceiling, mech, elec, hvac split sytem & fire sprinkler under separate permit.Details
suite 110 ti - demolition of partition walls & carpet. build new walls, install new doors/frames/hardware, install interior glazing, t-bar ceiling, mech, elec, hvac split sytem & fire sprinkler under separate permit. | $200,000 |
| Jun 25, 2012 | Completed final sign-off May 2014 | 350 St Josephs Av | Kaiser Foundation Health Plan Inc | demolition of non-structural components with a 3400 sf area of the first floor. the proposed work will include new partitions, strengthening of (e) floor to accomodate laboratories, grossing areas, staining areas, support spaces & offices.Details
demolition of non-structural components with a 3400 sf area of the first floor. the proposed work will include new partitions, strengthening of (e) floor to accomodate laboratories, grossing areas, staining areas, support spaces & offices. | $1,523,029 |
| Mar 26, 2009 | Completed final sign-off Apr 2009 | 185 Berry St | Skyline Construction | 1 new dismising wall and 1 millwork @ 1st floor.Details
1 new dismising wall and 1 millwork @ 1st floor. | $6,200 |