Mark Horton
- Listed as
- architect, authorized agent-others
- Firm
- Mark Horton Architecture
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Aug 2026
122 permits since 2000 (architect on 121 permits, authorized agent-others on 4 permits): 84 completed, 8 in progress, 14 never finaled, 16 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 122.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 26, 2026 | In progress issued Aug 2026 | 510 Union St | replace in-kind, an (e) incline platform lift which has worn out.Details
replace in-kind, an (e) incline platform lift which has worn out. | $40,000 | |
| Aug 19, 2026 | In progress issued Aug 2026 | 48 Stockton St | A Mc Carthy Engineering Inc | an existing vacant 5th fl. is to be built out as an office floor. existing services and acess to the floor including restrooms, elevators and exit stairs, will all remain in place. a break area will be provided. an existing communcating stair to the sixth floor will remain in placeDetails
an existing vacant 5th fl. is to be built out as an office floor. existing services and acess to the floor including restrooms, elevators and exit stairs, will all remain in place. a break area will be provided. an existing communcating stair to the sixth floor will remain in place | $1,800,000 |
| Aug 7, 2026 | In progress filed Aug 2026, not yet issued | 48 Stockton St | 3rd floor: an existing vacant 3rd floor to be built-out as a multi-tenant office floor. existing serving and access for the floor including restrooms, elevators and exit stairs will all remain in place, break areas will be provided in each tenant space.Details
3rd floor: an existing vacant 3rd floor to be built-out as a multi-tenant office floor. existing serving and access for the floor including restrooms, elevators and exit stairs will all remain in place, break areas will be provided in each tenant space. | $2,000,000 | |
| Jul 31, 2026 | In progress issued Aug 2026 | 48 Stockton St | A Mc Carthy Engineering Inc | 6th floor: build out for offices. existing services and access for the floor, including restrooms, elevators, and exit stairs will all remain in place. 2 break areas will be provided in the space.Details
6th floor: build out for offices. existing services and access for the floor, including restrooms, elevators, and exit stairs will all remain in place. 2 break areas will be provided in the space. | $2,200,000 |
| Feb 26, 2026 | In progress issued Mar 2026 | 2998 Pacific Av | Reichert Building Solutions Inc | (3) bathrooms renovation including fixtures, finishes and lighting. existing walls and windows will remain in place. work will include minor relocation of non-bearing interior walls.Details
(3) bathrooms renovation including fixtures, finishes and lighting. existing walls and windows will remain in place. work will include minor relocation of non-bearing interior walls. | $50,000 |
| Apr 23, 2025 | In progress issued Sep 2025 | 298 Alabama St | 2nd floor. change in planning designation for portion of 2nd floor from (e) job training use with accessary office per planning code 204.3 no change to e(e) entertainment arts and recreation use. no constructon under this permitDetails
2nd floor. change in planning designation for portion of 2nd floor from (e) job training use with accessary office per planning code 204.3 no change to e(e) entertainment arts and recreation use. no constructon under this permit | ||
| Mar 10, 2025 | Expired or cancelled withdrawn Jul 2025 | 765 Market St | revision to pa 2022-01719-8846 show miscellaneous changes to the fl plan which were made during constructionDetails
revision to pa 2022-01719-8846 show miscellaneous changes to the fl plan which were made during construction | ||
| Sep 24, 2024 | In progress issued Oct 2024 | 25 Ford St | revision to permit 202207269343. this revision is to expand the size of the deck at the rear yard.Details
revision to permit 202207269343. this revision is to expand the size of the deck at the rear yard. | $20,000 | |
| May 22, 2024 | Completed final sign-off Oct 2024 | 346 Lake St | repair of (e) street facade at single family home in kind 5 windows r& r. approx 700 sq ft stuccoDetails
repair of (e) street facade at single family home in kind 5 windows r& r. approx 700 sq ft stucco | $50,000 | |
| Feb 26, 2024 | In progress issued Apr 2024 | 25 Ford St | revision to pa# 202207269343: is allow for the new re-framing of the (e) extension of the building at the rear of the house, instead of remodeling it in place, due to sub-code (e) conditions exposed during demolition. otherwise, the project remains the same.Details
revision to pa# 202207269343: is allow for the new re-framing of the (e) extension of the building at the rear of the house, instead of remodeling it in place, due to sub-code (e) conditions exposed during demolition. otherwise, the project remains the same. | ||
| Oct 17, 2023 | Completed final sign-off Nov 2023 | 2506 Leavenworth St | Fma Builders | revision to permit # 202112174639 to correct the address to 2506a leavenworth st.Details
revision to permit # 202112174639 to correct the address to 2506a leavenworth st. | |
| May 3, 2023 | Completed final sign-off Nov 2023 | 2506 Leavenworth St | Fma Builders | on the west and east walls of the rear yard light well, the exterior stucco is to be prepared/replaced in kind. 530 sq ft maxDetails
on the west and east walls of the rear yard light well, the exterior stucco is to be prepared/replaced in kind. 530 sq ft max | $20,000 |
| Apr 12, 2023 | Completed final sign-off Nov 2023 | 2506 Leavenworth St | Fma Builders | an existing fence is to be altered to allow for a higher pop elevation along the two side property lins. in the rear yard of an existing home. the new height of the fence is to apprroximately aligh with the height of the existing fences on both neighoring propertiesDetails
an existing fence is to be altered to allow for a higher pop elevation along the two side property lins. in the rear yard of an existing home. the new height of the fence is to apprroximately aligh with the height of the existing fences on both neighoring properties | $10,000 |
| Oct 6, 2022 | Completed final sign-off Nov 2022 | 2545 16th St | Brennan Strong Hold Construction Inc | this permit is to reduce the number if orivided exits within the tenant space from 4x to 3x. the exit to be removed is not reqd by code. remove exit sign only. ref pa# 202109178700 door to remain.Details
this permit is to reduce the number if orivided exits within the tenant space from 4x to 3x. the exit to be removed is not reqd by code. remove exit sign only. ref pa# 202109178700 door to remain. | $500 |
| Jul 26, 2022 | Never finaled issued Oct 2022, no final | 25 Ford St | (e) kitchen, powder room, laundry & bathroom to be remodeled. exterior windows to be replaced in rear. exterior deck to be repaired. voluntary structural work to be included. deck replacement under separate permitDetails
(e) kitchen, powder room, laundry & bathroom to be remodeled. exterior windows to be replaced in rear. exterior deck to be repaired. voluntary structural work to be included. deck replacement under separate permit | $400,000 | |
| Jul 19, 2022 | Completed final sign-off Aug 2025 | 765 Market St | unit 30a: interior renovation including all finishes and fixtures. no work to exteiror of building, structural elements, fire life-safety or demising wll of unit.Details
unit 30a: interior renovation including all finishes and fixtures. no work to exteiror of building, structural elements, fire life-safety or demising wll of unit. | $700,000 | |
| Jun 14, 2022 | Completed final sign-off Nov 2023 | 2506 Leavenworth St | Fma Builders | revision to 202112174639. the revision is to leave the (e) walls at the (e) bathroom in place. this also reduces the requirment for structural work in this area. the kitchenette will be moved to the previous location. no other changes are proposed.Details
revision to 202112174639. the revision is to leave the (e) walls at the (e) bathroom in place. this also reduces the requirment for structural work in this area. the kitchenette will be moved to the previous location. no other changes are proposed. | |
| Apr 26, 2022 | Expired or cancelled withdrawn Mar 2023 | 2545 16th St | Brennan Strong Hold Construction Inc | revision to issued permit 202109178700. the issued permit was missing a fire inspector stamp on these sheets, and the fire dept. (only) has assessed for a resubmittal to allow these sheets to be stamped by fire only.Details
revision to issued permit 202109178700. the issued permit was missing a fire inspector stamp on these sheets, and the fire dept. (only) has assessed for a resubmittal to allow these sheets to be stamped by fire only. | |
| Apr 20, 2022 | Completed final sign-off Mar 2023 | 2545 16th St | Brennan Strong Hold Construction Inc | rev to pa# 2021-0917-8700: a communicative stair is to be added between two (e) floors of previously permitted office space, as well windows will be installed into a 1 hr rated wll between the office space and a garage areaDetails
rev to pa# 2021-0917-8700: a communicative stair is to be added between two (e) floors of previously permitted office space, as well windows will be installed into a 1 hr rated wll between the office space and a garage area | $69,000 |
| Dec 17, 2021 | Completed final sign-off Nov 2023 | 2506 Leavenworth St | (e) ground level to be renovated, new hallway to rear yard, garage to exterior rear, renovate (e) studio, new bathroom, new kitchenette, new door & windows to exteriorDetails
(e) ground level to be renovated, new hallway to rear yard, garage to exterior rear, renovate (e) studio, new bathroom, new kitchenette, new door & windows to exterior | $200,000 | |
| Dec 14, 2021 | Expired or cancelled cancelled Jan 2026 | 1835 Franklin St | Rod Heisler Construction | extg kitchen to be renovated including cabinets, countertops, & appliances. new appliances to be installed at extg location. a non bearing enclosing wall to be removed. extg bathrooms to be renovated. extg walls to be shifted to allow for wahser & dryer. nw plmg fixtures & drains to be draind intoDetails
extg kitchen to be renovated including cabinets, countertops, & appliances. new appliances to be installed at extg location. a non bearing enclosing wall to be removed. extg bathrooms to be renovated. extg walls to be shifted to allow for wahser & dryer. nw plmg fixtures & drains to be draind into | $350,000 |
| Nov 3, 2021 | Completed final sign-off Mar 2023 | 290 Division St | Brennan Strong Hold Construction Inc | remodel (e) restroom to be ada accessible. no work will occur at the exterior of the building or the means of egress affected. pa 201910094059 must be complete to final.Details
remodel (e) restroom to be ada accessible. no work will occur at the exterior of the building or the means of egress affected. pa 201910094059 must be complete to final. | $25,000 |
| Sep 28, 2021 | Completed final sign-off Feb 2022 | 290 Division St | Brennan Strong Hold Construction Inc | 3/f -(e) empty full floor (3rd flr) of a low rise office bldg is to be finished out, to include conf rms, new restrooms, any break area. plumbing, mech, any elec work will be pulled under seperate permit prior demo permit 201908199142Details
3/f -(e) empty full floor (3rd flr) of a low rise office bldg is to be finished out, to include conf rms, new restrooms, any break area. plumbing, mech, any elec work will be pulled under seperate permit prior demo permit 201908199142 | $375,000 |
| Sep 17, 2021 | Completed final sign-off Mar 2023 | 2545 16th St | Brennan Strong Hold Construction Inc | vacant gr floor space to be built out for a tenant. work includes truck bay garage area, work rooms, lab areas, meeting and office areas, storage and new restrooms and showers. mezz area will be be added to space. no work on exterior.Details
vacant gr floor space to be built out for a tenant. work includes truck bay garage area, work rooms, lab areas, meeting and office areas, storage and new restrooms and showers. mezz area will be be added to space. no work on exterior. | $1,400,000 |
| Aug 11, 2021 | Completed final sign-off Apr 2023 | 2525 16th St | Brennan Strong Hold Construction Inc | new window on 16th street, 2x (n) entries on alabama st, 4x(n) garage doors, 1x lovered area for mech. equipment, accessible lift to alow ada access to space.Details
new window on 16th street, 2x (n) entries on alabama st, 4x(n) garage doors, 1x lovered area for mech. equipment, accessible lift to alow ada access to space. | $175,000 |
| Jul 21, 2021 | Completed final sign-off May 2022 | 300 Clay St | Plant Construction Co, Lp | an (e) tenant on 21st fl is alterating portion of the office. (e) conference rm & high-density area will be remove to opening office area and 2 x reading rm. mep, fire, life safety will be separated.Details
an (e) tenant on 21st fl is alterating portion of the office. (e) conference rm & high-density area will be remove to opening office area and 2 x reading rm. mep, fire, life safety will be separated. | $199,900 |
| Jun 23, 2021 | Completed final sign-off Mar 2023 | 2525 16th St | Brennan Strong Hold Construction Inc | a vacant 15,000 plus or minus space on the 2nd floor is to be built out to a new office space. this permit is for architectural work only. mep, sprinkler, and fire/life safety will be applied later.Details
a vacant 15,000 plus or minus space on the 2nd floor is to be built out to a new office space. this permit is for architectural work only. mep, sprinkler, and fire/life safety will be applied later. | $500,000 |
| Jun 11, 2021 | Completed final sign-off Dec 2021 | 300 Clay St | Richlen Construction | 20/f: (e) mens/womens restroom will be flipped in gender.removal and installationg of urinals and misc work including cabinets and finishes will be done. maher n/a.Details
20/f: (e) mens/womens restroom will be flipped in gender.removal and installationg of urinals and misc work including cabinets and finishes will be done. maher n/a. | $150,000 |
| May 17, 2021 | Never finaled issued Aug 2021, no final | 3637 California St | Terence Mcmahon Construction | an exterior walkway inside the porperty line is to be rebuilt to provide accessible entty into the buildings. no work is to be in the public right of way or to the building itself.Details
an exterior walkway inside the porperty line is to be rebuilt to provide accessible entty into the buildings. no work is to be in the public right of way or to the building itself. | $35,000 |
| May 6, 2021 | Completed final sign-off Jan 2022 | 2505 Mariposa St | new bathrooms, new break area, accessible entry/exit, upgrade stair-guardrail.Details
new bathrooms, new break area, accessible entry/exit, upgrade stair-guardrail. | $150,000 | |
| Jan 19, 2021 | Expired or cancelled withdrawn Sep 2021 | 290 Division St | Brennan Strong Hold Construction Inc | 3/f: t.i. to be finished out to include conference rooms, new restrooms, and a break area. mep work will all be performed. ref demo pa 201908199142. maher n/a.Details
3/f: t.i. to be finished out to include conference rooms, new restrooms, and a break area. mep work will all be performed. ref demo pa 201908199142. maher n/a. | $125,000 |
| Jan 19, 2021 | Completed final sign-off Nov 2023 | 2506 Leavenworth St | rev to pa202002184685 at rear of (e) upper level, a portion of (e) railing to be replced as well new exterior heaters will be mounted to the house at the exterior deck. revision to pa# 202002184685Details
rev to pa202002184685 at rear of (e) upper level, a portion of (e) railing to be replced as well new exterior heaters will be mounted to the house at the exterior deck. revision to pa# 202002184685 | $75,000 | |
| Dec 11, 2020 | Completed final sign-off Aug 2021 | 300 Clay St | Richlen Construction | renovation of an existing mother's room (lactation room) in an existing office.Details
renovation of an existing mother's room (lactation room) in an existing office. | $75,000 |
| Sep 19, 2020 | Completed final sign-off Jun 2021 | 290 Division St | Brennan Strong Hold Construction Inc | revision to pa #2019-1009-4059: flip the restroom layous only, due to site conditions. fixture count remains the same.Details
revision to pa #2019-1009-4059: flip the restroom layous only, due to site conditions. fixture count remains the same. | |
| Feb 18, 2020 | Completed final sign-off Jun 2020 | 2506 Leavenworth St | Matarozzi/Pelsinger Builders Inc. | an existing deck at the rear of the house is to have (n) stairs to grade to be installed and a new railing installedDetails
an existing deck at the rear of the house is to have (n) stairs to grade to be installed and a new railing installed | $10,000 |
| Feb 18, 2020 | Completed final sign-off Jun 2020 | 2506 Leavenworth St | Matarozzi/Pelsinger Builders Inc. | field inspector fergal clancy requested a revision to pa 2018-0712-4459 be submitted to show the roof plan showing the southern skylight to be replaced & installed into (e) skylight framing, and the addition of 2x condensing rooftop units.Details
field inspector fergal clancy requested a revision to pa 2018-0712-4459 be submitted to show the roof plan showing the southern skylight to be replaced & installed into (e) skylight framing, and the addition of 2x condensing rooftop units. | $500 |
| Dec 31, 2019 | Never finaled issued Dec 2019, no final | 2208 Steiner St | Build And Design Construction | remove downstairs bathroom, plumbing, & electrical. replace shower fixtures in upstairs bathroom.Details
remove downstairs bathroom, plumbing, & electrical. replace shower fixtures in upstairs bathroom. | $18,500 |
| Dec 16, 2019 | Never finaled issued Aug 2020, no final | 268 Alabama St | Brennan Strong Hold Construction Inc | revision to 201901029486. to add a mezzanine level to e building and additional egress to exterior also added.**maher n/a**Details
revision to 201901029486. to add a mezzanine level to e building and additional egress to exterior also added.**maher n/a** | $200,000 |
| Oct 9, 2019 | Completed final sign-off Mar 2023 | 290 Division St | Brennan Strong Hold Construction Inc | 4/f: t.i.: new restrooms, to comply with current code, a break area, and conference rooms. open office space aera to allow for occupancy, including finishes, this work will also include the installation of a lift at main entrance. demo for 4/f under pa201902213452. maher n/a.Details
4/f: t.i.: new restrooms, to comply with current code, a break area, and conference rooms. open office space aera to allow for occupancy, including finishes, this work will also include the installation of a lift at main entrance. demo for 4/f under pa201902213452. maher n/a. | $250,000 |
| Aug 19, 2019 | Never finaled issued Aug 2019, no final | 290 Division St | Brennan Strong Hold Construction Inc | 3rd floor: extg 3rd floor of a 4 story bldg to have all extg non-bearing/non structural/non-fire/life safety walls removed to allow for future t.i. for specific needs. associate work in these walls including elec + data wiring, & misc. cabinetry, to be removed as well . no new work to be performed &Details
3rd floor: extg 3rd floor of a 4 story bldg to have all extg non-bearing/non structural/non-fire/life safety walls removed to allow for future t.i. for specific needs. associate work in these walls including elec + data wiring, & misc. cabinetry, to be removed as well . no new work to be performed & | $5,000 |
| Apr 12, 2019 | Completed final sign-off Nov 2019 | 300 Clay St | Plant Construction Co, Lp | 21st flr - to revise permit 201810233851 - remove the requirement for 12" clear at the push side of the door into the accessible toilet stall of the men's room.Details
21st flr - to revise permit 201810233851 - remove the requirement for 12" clear at the push side of the door into the accessible toilet stall of the men's room. | |
| Apr 12, 2019 | Completed final sign-off Oct 2019 | 300 Clay St | Plant Construction Co, Lp | 20th flr - to revise permit 201810233847 - remove the requirement for 12" clear at the push side of the door into the accessible toilet stall of the men's restroom.Details
20th flr - to revise permit 201810233847 - remove the requirement for 12" clear at the push side of the door into the accessible toilet stall of the men's restroom. | |
| Apr 12, 2019 | Never finaled issued Apr 2019, no final | 268 Alabama St | Brennan Strong Hold Construction Inc | mech/ele and plm work only in association with pa# 201901029486 maher naDetails
mech/ele and plm work only in association with pa# 201901029486 maher na | $250,000 |
| Feb 21, 2019 | Completed final sign-off Jul 2021 | 290 Division St | Brennan Strong Hold Construction Inc | 4th fl - all (e) non-bearing/non-structural/non-fire/life safety walls removed to allow for future ti for specific needs. associate work in these walls, including elect & data wiring, and misc cabinetry to be removed as well. no new work to be performed and (e) base bldg system will not be affectedDetails
4th fl - all (e) non-bearing/non-structural/non-fire/life safety walls removed to allow for future ti for specific needs. associate work in these walls, including elect & data wiring, and misc cabinetry to be removed as well. no new work to be performed and (e) base bldg system will not be affected | $5,000 |
| Jan 2, 2019 | Completed final sign-off Feb 2021 | 268 Alabama St | Brennan Strong Hold Construction Inc | interior work, new occupancy retail, arts activities, health servicesDetails
interior work, new occupancy retail, arts activities, health services | $500,000 |
| Dec 12, 2018 | Never finaled filed Dec 2018, never issued | 875 El Camino Del Mar | construction of a new indoor swimming pool below grade in the side yard of an (e) single family residence.Details
construction of a new indoor swimming pool below grade in the side yard of an (e) single family residence. | $500,000 | |
| Oct 23, 2018 | Completed final sign-off Dec 2019 | 1 Maritime Pz | Plant Construction Co, Lp | 21st fl - (e) full floor tenant - (e) conference rooms, intw walls and break room to be removed; (n) conference and meeting rooms and a break room to be construction; (e) skyfold door to be relocated, resulting in small amount of structural work. minor upgrades in restrooms to bring conditions...Details
21st fl - (e) full floor tenant - (e) conference rooms, intw walls and break room to be removed; (n) conference and meeting rooms and a break room to be construction; (e) skyfold door to be relocated, resulting in small amount of structural work. minor upgrades in restrooms to bring conditions... | $1,000,000 |
| Oct 23, 2018 | Completed final sign-off Dec 2019 | 300 Clay St | Plant Construction Co, Lp | 20th fl - (e) full floor tenant - (e) conference rooms, int wall an break room to be removed; (n) conference and meeting rooms, lactation room and break room to be constructed. minor upgrades in restrooms to bring conditions up to code; carpet, paint and other finishes to be upgraded.maher n/a.Details
20th fl - (e) full floor tenant - (e) conference rooms, int wall an break room to be removed; (n) conference and meeting rooms, lactation room and break room to be constructed. minor upgrades in restrooms to bring conditions up to code; carpet, paint and other finishes to be upgraded.maher n/a. | $1,000,000 |
| Sep 27, 2018 | Completed final sign-off Mar 2023 | 2525 16th St | Brennan Strong Hold Construction Inc | 3rd flr - interior non structural ti approx 19,800 sf work to include mech work and upgrades to accessible bathroomDetails
3rd flr - interior non structural ti approx 19,800 sf work to include mech work and upgrades to accessible bathroom | $200,000 |
| Jul 12, 2018 | Completed final sign-off Jun 2020 | 2506 Leavenworth St | Matarozzi/Pelsinger Builders Inc. | interior improvements to (e) home, struct upgrades. flooring, wall treatment, minor non structural wall changes, add lighting and ele.ref 201804267515 & 201804307742. ext non sturcutral demo and window and skylight & siding under sep permitDetails
interior improvements to (e) home, struct upgrades. flooring, wall treatment, minor non structural wall changes, add lighting and ele.ref 201804267515 & 201804307742. ext non sturcutral demo and window and skylight & siding under sep permit | $250,000 |
| May 7, 2018 | Completed final sign-off May 2019 | 300 Clay St | Plant Construction Co, Lp | an existing 1750 sf space in the basement of a high rise office building is to be converted from storage to a corporate workout facility. work will include general fitness as well sa mech, elec., ams, and plumbing.Details
an existing 1750 sf space in the basement of a high rise office building is to be converted from storage to a corporate workout facility. work will include general fitness as well sa mech, elec., ams, and plumbing. | $1,200,000 |
| Apr 26, 2018 | Completed final sign-off Oct 2018 | 475 Sansome St | Richlen Construction | t.i. in extg office tower that comprises 1750 sq ft plus or minus of area on the 7th floor. work to include demolition of extg non-structural partition walls at private offices and break area as well as replacement of break area cabinetry and appliances. n/a for maher.Details
t.i. in extg office tower that comprises 1750 sq ft plus or minus of area on the 7th floor. work to include demolition of extg non-structural partition walls at private offices and break area as well as replacement of break area cabinetry and appliances. n/a for maher. | $135,000 |
| Feb 22, 2018 | Completed final sign-off May 2018 | 473 Bryant St | Moroso Construction Inc | front room @ ground floor is to be renovate to allow for customer pick-up of ordered goods. this work include minor renovation (painting & new door) @ facade. ** maher: n/a **Details
front room @ ground floor is to be renovate to allow for customer pick-up of ordered goods. this work include minor renovation (painting & new door) @ facade. ** maher: n/a ** | $40,000 |
| Feb 8, 2018 | Completed final sign-off Apr 2018 | 473 Bryant St | Moroso Construction Inc | miscellaneous maintenance work, including the addition of a door to the rear alley, voluntary structural work and data distribution, and minor work to upgrade accessibilitly. no mechanical or lighting work is includedDetails
miscellaneous maintenance work, including the addition of a door to the rear alley, voluntary structural work and data distribution, and minor work to upgrade accessibilitly. no mechanical or lighting work is included | $80,000 |
| Dec 23, 2016 | Completed final sign-off Mar 2017 | 1 Maritime Pz | Richlen Construction | 20th floor: this pemit is for the demolition of a limited number of walls at private offices to create new open office areas. n/a for maher.Details
20th floor: this pemit is for the demolition of a limited number of walls at private offices to create new open office areas. n/a for maher. | $45,000 |
| Dec 23, 2016 | Completed final sign-off Mar 2017 | 1 Maritime Pz | Richlen Construction | 21st floor: this pemit is for the demolition of a limited number of walls at conference rooms and offices, and subsequent construction of walls to create new open office areas. n/a for maher.Details
21st floor: this pemit is for the demolition of a limited number of walls at conference rooms and offices, and subsequent construction of walls to create new open office areas. n/a for maher. | $45,000 |
| Oct 26, 2016 | Completed final sign-off Mar 2017 | 1184 Harrison St | Moroso Construction Inc | revision to 201609309255. installation of lighting and electrical work. ref #201604296144Details
revision to 201609309255. installation of lighting and electrical work. ref #201604296144 | $25,000 |
| Jul 28, 2016 | Completed final sign-off Mar 2017 | 1184 Harrison St | Moroso Construction Inc | revision to 201604296144, and to add new work.structural & mechanical work is added to the project &the prior permitted work (bathrooms, breakroom,stairs)is to be re-arranged.an additional stair,corridor & under 2nd floor is added; maher n/a; proposed trade shop use "moroso construction"Details
revision to 201604296144, and to add new work.structural & mechanical work is added to the project &the prior permitted work (bathrooms, breakroom,stairs)is to be re-arranged.an additional stair,corridor & under 2nd floor is added; maher n/a; proposed trade shop use "moroso construction" | $100,000 |
| Jul 18, 2016 | Completed final sign-off Dec 2016 | 1188 Harrison St | Moroso Construction Inc | revision to 201604296138. revision includes construction of platform for mechanical equipment located on the roof, installation of mech equip and installation of lighting maher not reqDetails
revision to 201604296138. revision includes construction of platform for mechanical equipment located on the roof, installation of mech equip and installation of lighting maher not req | $50,000 |
| Jun 13, 2016 | Completed final sign-off Sep 2016 | 1045 Mission St | revision to #2015-0914-6880:orig req'd a door to install @ approx mid-point of extended corridor which connected bldg lobby w/(n) fitness center. revision to replace door in middle of corridor w/door that leads from corridor to ajd gargae sp. (n) door will eliminate dead end corridor condition.Details
revision to #2015-0914-6880:orig req'd a door to install @ approx mid-point of extended corridor which connected bldg lobby w/(n) fitness center. revision to replace door in middle of corridor w/door that leads from corridor to ajd gargae sp. (n) door will eliminate dead end corridor condition. | $5,000 | |
| Apr 29, 2016 | Completed final sign-off Dec 2016 | 1188 Harrison St | Moroso Construction Inc | interior remodel, replace & upgrade interior stairs & restrooms, new entry door, minor facade & window repairs, replace damaged garage door, new breakroom kitchen. n/a ordinance #155-13Details
interior remodel, replace & upgrade interior stairs & restrooms, new entry door, minor facade & window repairs, replace damaged garage door, new breakroom kitchen. n/a ordinance #155-13 | $119,026 |
| Apr 29, 2016 | Completed final sign-off Mar 2017 | 1184 Harrison St | Moroso Construction Inc | interior remodel, all finishes & new restroom, new stair to 2/f, replace entry door & ramp, minor facade repairs, replace (e) garage door. n/a ordinance #155-13Details
interior remodel, all finishes & new restroom, new stair to 2/f, replace entry door & ramp, minor facade repairs, replace (e) garage door. n/a ordinance #155-13 | $82,402 |
| Feb 24, 2016 | Completed final sign-off Sep 2016 | 1045 Mission St | revision to app#201509146880 to allow for the addition of a wall to seperate the new lounge area into 2 rooms: smaller lounge and a new meeting room will have a break area installed in it, which will include a nw sink. this change will also rearrange the lighting and convenience power located in theDetails
revision to app#201509146880 to allow for the addition of a wall to seperate the new lounge area into 2 rooms: smaller lounge and a new meeting room will have a break area installed in it, which will include a nw sink. this change will also rearrange the lighting and convenience power located in the | $50,000 | |
| Dec 24, 2015 | Completed final sign-off Mar 2017 | 352 Lake St | reconstruction of an existing front stairway and entry porch, add a garage below porch at street level.Details
reconstruction of an existing front stairway and entry porch, add a garage below porch at street level. | $100,000 | |
| Dec 7, 2015 | Expired or cancelled expired Mar 2017 | 2208 Steiner St | Philip Kline | replace existing windows and a door at exterior rear, a few window will be replaced with sidng, resulting in a net loss of glazing, a double height area will be framed in to add a bedroom, replace existing fireplace. n/a ordinance #155-13.Details
replace existing windows and a door at exterior rear, a few window will be replaced with sidng, resulting in a net loss of glazing, a double height area will be framed in to add a bedroom, replace existing fireplace. n/a ordinance #155-13. | $100,000 |
| Nov 30, 2015 | Expired or cancelled expired Mar 2017 | 2208 Steiner St | Philip Kline | remodel two existing bathrooms on the 2nd floor & add a 3rd bathroomon the 1st floor, also add a closet to a bedroom. n/a maher ordinanceDetails
remodel two existing bathrooms on the 2nd floor & add a 3rd bathroomon the 1st floor, also add a closet to a bedroom. n/a maher ordinance | $100,000 |
| Sep 14, 2015 | Completed final sign-off Sep 2016 | 1045 Mission St | relocate existing workout location at gr fl. a lounge will be installed in the vacated space. a corridor to workout area including new opening in a concrete wall. plumb, elec, sprinkler, life/safety under sep permitDetails
relocate existing workout location at gr fl. a lounge will be installed in the vacated space. a corridor to workout area including new opening in a concrete wall. plumb, elec, sprinkler, life/safety under sep permit | $175,000 | |
| Aug 6, 2015 | Completed final sign-off Mar 2016 | 352 Lake St | Peter Harris Construction Inc | interior remodel. no structural. work on 2 levels.Details
interior remodel. no structural. work on 2 levels. | $150,000 |
| Jul 15, 2015 | Completed final sign-off Sep 2015 | 300 Clay St | Richlen Construction | a small amount of work is to be performed on the 11/f. the work consists of removing a wall and door, and construct a new wall and door. also, a large office will be divided into two private office with a new wall. electrical, mechanical, plumbing, sprinkler & fire/life safety will all be under aDetails
a small amount of work is to be performed on the 11/f. the work consists of removing a wall and door, and construct a new wall and door. also, a large office will be divided into two private office with a new wall. electrical, mechanical, plumbing, sprinkler & fire/life safety will all be under a | $50,000 |
| Jun 22, 2015 | Completed final sign-off May 2016 | 1 Sansome St | Stockham Construction | 39th floor t.i. of 5,285 sf of office bldg. space to have all new walls, finishes, mechanical & electrical distrubution. work to include plumbing at a new kitchen (no range).Details
39th floor t.i. of 5,285 sf of office bldg. space to have all new walls, finishes, mechanical & electrical distrubution. work to include plumbing at a new kitchen (no range). | $1,000,000 |
| Jun 12, 2015 | Completed final sign-off Jul 2015 | 1167 Mission St | Paradigm General Contractors | 2nd & 3rd flrs: select non structural demolition of non load bearing walls; maher n/aDetails
2nd & 3rd flrs: select non structural demolition of non load bearing walls; maher n/a | $3,000 |
| May 8, 2015 | Completed final sign-off Jan 2016 | 1520 Lyon St | Bayside Mechanical Inc | install 11 fan coils; install 8 condensing units; install duct work per plans & spec.Details
install 11 fan coils; install 8 condensing units; install duct work per plans & spec. | $227,900 |
| Apr 2, 2015 | Expired or cancelled cancelled Mar 2026 | 1520 Lyon St | Moroso Construction Inc | revision to pa # 2014 1210 3510: change to wall (block to curved) on both 1st & 2nd flrs: deletion of 2 meeting rooms, minor changes to classroom configuration, relocate restroomDetails
revision to pa # 2014 1210 3510: change to wall (block to curved) on both 1st & 2nd flrs: deletion of 2 meeting rooms, minor changes to classroom configuration, relocate restroom | |
| Dec 10, 2014 | Completed final sign-off Aug 2015 | 1520 Lyon St | Moroso Construction Inc | remodel (e) pre-school - interior work include both non-structural as well as structural work. mechanical, electrical, plumbing, sprinkler & life safety work will be covered by separate permit. new windows & a flat skylight will be added to the envelope.Details
remodel (e) pre-school - interior work include both non-structural as well as structural work. mechanical, electrical, plumbing, sprinkler & life safety work will be covered by separate permit. new windows & a flat skylight will be added to the envelope. | $3,000,000 |
| Dec 2, 2013 | Completed final sign-off Oct 2014 | 111 Sutter St | Gci, Inc | tenant improvement on 10th floor to build new non-load bearing partitions, ceilings, doors, frames, finishes and mep. all life safety and fire sprinklers on seperate permit.Details
tenant improvement on 10th floor to build new non-load bearing partitions, ceilings, doors, frames, finishes and mep. all life safety and fire sprinklers on seperate permit. | $2,135,000 |
| Aug 16, 2013 | Completed final sign-off May 2014 | 2150 Vallejo St | Essex General Contractors Inc | unit #2- existing condominium unit within 3 unit building to have interior, non structural improvement. improvement include new partition walls, finishes, plumbing fixtures, appliances, lighting & structural work.Details
unit #2- existing condominium unit within 3 unit building to have interior, non structural improvement. improvement include new partition walls, finishes, plumbing fixtures, appliances, lighting & structural work. | $125,000 |
| Jul 31, 2013 | Completed final sign-off May 2014 | 300 Clay St | Richlen Construction | 11/f- fully occupied floor, install double door and wing walls. arch only. mech, elec, l/s separate permitDetails
11/f- fully occupied floor, install double door and wing walls. arch only. mech, elec, l/s separate permit | $20,000 |
| Jul 16, 2013 | Completed final sign-off Feb 2014 | 1045 Mission St | Gavin Restoration Lp | interior renovation of primary building entry lobby & replacement of existing entry storefront.Details
interior renovation of primary building entry lobby & replacement of existing entry storefront. | $89,000 |
| Jun 28, 2013 | Never finaled issued Apr 2015, no final | 200 Clayton St | Diamond Home Restoration | demolition of the east most portion of house, new wood deck to replace. demolished portion of house @1/f. new roof dormer. re-built shed roof @south-east side of the house. new bathroom at (e) bedroom. interior remodel portions of storage, 1st floor and 2nd floors of the house.Details
demolition of the east most portion of house, new wood deck to replace. demolished portion of house @1/f. new roof dormer. re-built shed roof @south-east side of the house. new bathroom at (e) bedroom. interior remodel portions of storage, 1st floor and 2nd floors of the house. | $600,000 |
| Jun 11, 2013 | Completed final sign-off Sep 2013 | 300 Clay St | Richlen Construction | an existing office area on a fully occupied floor (11) of a high rise office bldg is to be remodeled. work to includes re-arrangement of offices, this permit is for architectural work only. all other work including mech, electrical, sprinklered and life safety to be under sep permit.Details
an existing office area on a fully occupied floor (11) of a high rise office bldg is to be remodeled. work to includes re-arrangement of offices, this permit is for architectural work only. all other work including mech, electrical, sprinklered and life safety to be under sep permit. | $100,000 |
| Dec 11, 2012 | Never finaled issued Dec 2013, no final | 300 Clay St | Plant Construction Co, Lp | comply w/mahner ord. #155-13 not req'd. excavation less than 50 cu yd revise pa# 201209129562/201212115876 to doc as-built install of access control'd egress card readers/motion sensors/emergency door releases installed. provide egress/const. plan to show all access control'd egressDetails
comply w/mahner ord. #155-13 not req'd. excavation less than 50 cu yd revise pa# 201209129562/201212115876 to doc as-built install of access control'd egress card readers/motion sensors/emergency door releases installed. provide egress/const. plan to show all access control'd egress | |
| Aug 22, 2012 | Never finaled issued Aug 2012, no final | 219 Edgewood Av | Huts And Castles A Construction Co., Inc | revision to appl #2010.11.03.4277 - clarification to demo plan, no change to proposed structure.Details
revision to appl #2010.11.03.4277 - clarification to demo plan, no change to proposed structure. | |
| Oct 18, 2011 | Never finaled issued Oct 2011, no final | 300 Clay St | Plant Construction Company Lp | installation of an over-head skyfold door/wall to allow a large conference room to be divided into two conference rooms. work to occur on the 20th floor. mep and sprinkler life safeth under separate permit.Details
installation of an over-head skyfold door/wall to allow a large conference room to be divided into two conference rooms. work to occur on the 20th floor. mep and sprinkler life safeth under separate permit. | $30,000 |
| Sep 7, 2011 | Never finaled issued Sep 2011, no final | 300 Clay St | Plant Construction Company Lp | 21st floor-miscellaneous minor modifications to (e) occupied full floor office space. as well (e) fully compliant restroom to be expanded. modifications are primarily moving locations of private offices, conference rooms & open office areas- sprinklers and life safety separate permits. mep included.Details
21st floor-miscellaneous minor modifications to (e) occupied full floor office space. as well (e) fully compliant restroom to be expanded. modifications are primarily moving locations of private offices, conference rooms & open office areas- sprinklers and life safety separate permits. mep included. | $300,000 |
| Sep 7, 2011 | Never finaled issued Sep 2011, no final | 300 Clay St | Plant Construction Company Lp | 20th floor-miscellaneous minor modifications to (e) occupied full floor office space. modifications are primarily moving locations of private offices, conference rooms & open office areas.Details
20th floor-miscellaneous minor modifications to (e) occupied full floor office space. modifications are primarily moving locations of private offices, conference rooms & open office areas. | $300,000 |
| Sep 2, 2011 | Completed final sign-off Sep 2012 | 1750 Taylor St | Moroso Construction Inc | interior non structural improvement of apartment. plmg,mech, and elec work to be covered by seperate permit. construction includes bldg rooms for bathrooms, kitchen and bedroom.Details
interior non structural improvement of apartment. plmg,mech, and elec work to be covered by seperate permit. construction includes bldg rooms for bathrooms, kitchen and bedroom. | $500,000 |
| Jun 10, 2011 | Completed final sign-off Mar 2012 | 1750 Taylor St | Moroso Construction Inc | remove all interior finishes including partition walls, plumbing fixtures and flooring. no work in common spaces. no strucgtural demolition. replace all single pane glass with new double pane glass in existing window frames.Details
remove all interior finishes including partition walls, plumbing fixtures and flooring. no work in common spaces. no strucgtural demolition. replace all single pane glass with new double pane glass in existing window frames. | $70,000 |
| Nov 3, 2010 | Completed final sign-off Jul 2014 | 219 Edgewood Av | vertical addition of 3rd fl. horizontal addition at front of 1st fl. interior improvements throughout including kitchen and bathrooms.Details
vertical addition of 3rd fl. horizontal addition at front of 1st fl. interior improvements throughout including kitchen and bathrooms. | $500,000 | |
| Apr 30, 2010 | Completed final sign-off Jul 2010 | 1 Maritime Pz | Plant Construction Company Lp | build-out of toe w(n) meeting rooms on the 11th. of a 21-level office high rise. office 1148 located on the northeast side of the office space. three full height acoustic partitions will be added. m.e.p. and fire/life safety to be submitted on separate permit.Details
build-out of toe w(n) meeting rooms on the 11th. of a 21-level office high rise. office 1148 located on the northeast side of the office space. three full height acoustic partitions will be added. m.e.p. and fire/life safety to be submitted on separate permit. | $30,000 |
| Dec 17, 2009 | Completed final sign-off Jul 2010 | 300 Clay St | Plant Construction Company Lp | 11th floor-build one new office, one large office wall be divided into two smaller offices located on the east side of bldg. in addition the wall located on the e.side of 11.47 storage will be changed to 1-hr rated constr, add a door to 11.24 server room,mep,fire/life safety under separate permit.Details
11th floor-build one new office, one large office wall be divided into two smaller offices located on the east side of bldg. in addition the wall located on the e.side of 11.47 storage will be changed to 1-hr rated constr, add a door to 11.24 server room,mep,fire/life safety under separate permit. | $30,000 |
| Dec 17, 2009 | Completed final sign-off Jul 2010 | 300 Clay St | Plant Construction Company Lp | 20th floor- build out one new office on west side of 20th floor, seven offices will be combined to one big office at 1,110 sq ft, mep,fire/life safety submitted under separate permit.Details
20th floor- build out one new office on west side of 20th floor, seven offices will be combined to one big office at 1,110 sq ft, mep,fire/life safety submitted under separate permit. | $30,000 |
| Sep 25, 2009 | Expired or cancelled cancelled Nov 2009 | 1 Maritime Pz | build out of 1 new office (630 s.f.) on the 11 th fl of office high rise. mep and fire life safety will be submitted on separate permit.Details
build out of 1 new office (630 s.f.) on the 11 th fl of office high rise. mep and fire life safety will be submitted on separate permit. | $30,000 | |
| Sep 2, 2009 | Expired or cancelled cancelled Nov 2009 | 1 Maritime Pz | build out one new office on the 11th floor of office highrise. m.e.p & fire/life safety under seperate permitDetails
build out one new office on the 11th floor of office highrise. m.e.p & fire/life safety under seperate permit | $30,000 | |
| Oct 28, 2008 | Expired or cancelled cancelled Aug 2022 | 300 Clay St | build 2 offices on 11th for of high riseDetails
build 2 offices on 11th for of high rise | $50,000 | |
| Apr 7, 2008 | Expired or cancelled expired Aug 2011 | 300 Clay St | replace part of an (e) compartment wall with an equivalently rated glass partition. all mep work under seperate permit. life safety work, if required under seperate permitDetails
replace part of an (e) compartment wall with an equivalently rated glass partition. all mep work under seperate permit. life safety work, if required under seperate permit | $15,000 | |
| Jan 10, 2008 | Expired or cancelled withdrawn Jul 2008 | 300 Clay St | demolish 2 existing walls of (e) reception area for office area. mep under separate permit, fire, life safety under seperate permit.Details
demolish 2 existing walls of (e) reception area for office area. mep under separate permit, fire, life safety under seperate permit. | $50,000 | |
| Jan 8, 2008 | Completed final sign-off Dec 2008 | 1 Maritime Pz | 15th floor: small t.i. to office area. demolish server room walls to expand floor area of open office. (n) walls to be built and rated as req'd. mep work under separate permit. fire/life safety under separate permit.Details
15th floor: small t.i. to office area. demolish server room walls to expand floor area of open office. (n) walls to be built and rated as req'd. mep work under separate permit. fire/life safety under separate permit. | $75,000 | |
| Dec 21, 2007 | Completed final sign-off Mar 2009 | 1 Maritime Pz | office ti existing walls to be demolished and new offices and reception area will be created. new wood flooring installed. new mep under separate permitDetails
office ti existing walls to be demolished and new offices and reception area will be created. new wood flooring installed. new mep under separate permit | $100,000 | |
| Dec 13, 2007 | Completed final sign-off Nov 2008 | 300 Clay St | revision to original application #2007/0914/2748. upgrade existing server rm. to 1-hr. construction with 60-min. door. work includes mechanical and electrical (me).Details
revision to original application #2007/0914/2748. upgrade existing server rm. to 1-hr. construction with 60-min. door. work includes mechanical and electrical (me). | $50,000 | |
| Dec 5, 2007 | Completed final sign-off Nov 2008 | 1 Maritime Pz | 11th floor-revision to mep work relate to tenant improvemnet work on 11th floor, referencing to approved permit application #200709213350.Details
11th floor-revision to mep work relate to tenant improvemnet work on 11th floor, referencing to approved permit application #200709213350. | $100,000 |