Block 1210, lot 030
200 Clayton St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 4 bathrooms
- Building
- 3,252 sq ft
- Lot
- 2,656 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 21, 2022 | Completed final sign-off Jun 2022 | 200 Clayton St | Bay Area Window Pros | replace (e) windows total (1) front middle floor living and (4) lower floor windows to all wood double hungs with continous ogee lugs and grids (sdl) to match (e) patterns (3) windows lower floor back not visible to wood alum clad in (e) opening . ufactor 0.30Details
replace (e) windows total (1) front middle floor living and (4) lower floor windows to all wood double hungs with continous ogee lugs and grids (sdl) to match (e) patterns (3) windows lower floor back not visible to wood alum clad in (e) opening . ufactor 0.30 | $11,900 |
| Mar 28, 2016 | Never finaled issued Mar 2016, no final | 200 Clayton St | street spaceDetails
street space | ||
| Sep 14, 2015 | Never finaled issued Sep 2015, no final | 200 Clayton St | street spaceDetails
street space | ||
| Jun 28, 2013 | Never finaled issued Apr 2015, no final | 200 Clayton St | Diamond Home Restoration | demolition of the east most portion of house, new wood deck to replace. demolished portion of house @1/f. new roof dormer. re-built shed roof @south-east side of the house. new bathroom at (e) bedroom. interior remodel portions of storage, 1st floor and 2nd floors of the house.Details
demolition of the east most portion of house, new wood deck to replace. demolished portion of house @1/f. new roof dormer. re-built shed roof @south-east side of the house. new bathroom at (e) bedroom. interior remodel portions of storage, 1st floor and 2nd floors of the house. | $600,000 |
| Feb 3, 2012 | Never finaled issued Feb 2012, no final | 200 Clayton St | Bay Area Window Pros/Quality Constru | 16 windows replacement, wood to wood clad (marvin), like for like, double glass, same size, same openingDetails
16 windows replacement, wood to wood clad (marvin), like for like, double glass, same size, same opening | $18,000 |
| May 31, 2005 | Never finaled issued May 2005, no final | 200 Clayton St | sidewalk repairDetails
sidewalk repair |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay Area Window Pros, Bay Area Window Pros/Quality Constru, Diamond Home Restoration
- Architects
- Mark Horton
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.