Philip Kline
- Based in
- San Anselmo
- On San Francisco permits
- Jul 2000 to Feb 2017
- Last 24 months
- 0 permits filed
15 permits since 2000: 7 completed, 8 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2017 | Completed final sign-off Mar 2017 | 2208 Steiner St | to obtain final inspection of work approved under pa#s: 2015-12-07-4367 and 2015-11-30-3782. all work is completeDetails
to obtain final inspection of work approved under pa#s: 2015-12-07-4367 and 2015-11-30-3782. all work is complete | |
| Dec 7, 2015 | Expired or cancelled expired Mar 2017 | 2208 Steiner St | replace existing windows and a door at exterior rear, a few window will be replaced with sidng, resulting in a net loss of glazing, a double height area will be framed in to add a bedroom, replace existing fireplace. n/a ordinance #155-13.Details
replace existing windows and a door at exterior rear, a few window will be replaced with sidng, resulting in a net loss of glazing, a double height area will be framed in to add a bedroom, replace existing fireplace. n/a ordinance #155-13. | $100,000 |
| Nov 30, 2015 | Expired or cancelled expired Mar 2017 | 2208 Steiner St | remodel two existing bathrooms on the 2nd floor & add a 3rd bathroomon the 1st floor, also add a closet to a bedroom. n/a maher ordinanceDetails
remodel two existing bathrooms on the 2nd floor & add a 3rd bathroomon the 1st floor, also add a closet to a bedroom. n/a maher ordinance | $100,000 |
| Nov 16, 2015 | Completed final sign-off Jul 2016 | 1817 California St | remodel existing kitchen and bathroom. add laundry to existing closet in hall way(ventless washer and dryer). n0 new walls or change to fixture location or wall location. electric washer and dryer.Details
remodel existing kitchen and bathroom. add laundry to existing closet in hall way(ventless washer and dryer). n0 new walls or change to fixture location or wall location. electric washer and dryer. | $60,000 |
| Jun 4, 2015 | Completed final sign-off Jul 2015 | 40 Cerritos Av | to obtain final inspection for work approved under app#201403120522. all work is complete.Details
to obtain final inspection for work approved under app#201403120522. all work is complete. | |
| Jun 4, 2015 | Completed final sign-off Jul 2015 | 40 Cerritos Av | to obtain final inspection for work approved under app#201309247543 all work is complete.Details
to obtain final inspection for work approved under app#201309247543 all work is complete. | |
| Jun 4, 2015 | Completed final sign-off May 2016 | 40 Cerritos Av | to obtain final inspection for work approved under app#201311262916. all work is complete.Details
to obtain final inspection for work approved under app#201311262916. all work is complete. | |
| Mar 12, 2014 | Expired or cancelled expired May 2015 | 40 Cerritos Av | wood trellis frame with poly-carbonate panel covering, trellis posts set on cocrete footing, trellis provides covering for wood deck patio.Details
wood trellis frame with poly-carbonate panel covering, trellis posts set on cocrete footing, trellis provides covering for wood deck patio. | $5,000 |
| Nov 26, 2013 | Expired or cancelled expired May 2015 | 40 Cerritos Av | landscape/hardscape includes:wood deck to replace extg, concrete patio, small concrete retaining walls, gas fireplace, bbq enclosure, and lighting.Details
landscape/hardscape includes:wood deck to replace extg, concrete patio, small concrete retaining walls, gas fireplace, bbq enclosure, and lighting. | $70,000 |
| Sep 24, 2013 | Expired or cancelled expired May 2015 | 40 Cerritos Av | bathroom remodel - all fixtures changed out in existing locations, change tile, vanity, window - same style & sizeDetails
bathroom remodel - all fixtures changed out in existing locations, change tile, vanity, window - same style & size | $35,000 |
| Apr 27, 2001 | Completed final sign-off May 2001 | 3618 Scott St | new master bath renew pa#200004215829Details
new master bath renew pa#200004215829 | |
| Apr 27, 2001 | Completed final sign-off May 2001 | 3618 Scott St | renew app#200004268331 for final inspectionDetails
renew app#200004268331 for final inspection | |
| Apr 25, 2001 | Expired or cancelled cancelled Oct 2024 | 3618 Scott St | to renew app#2000/04/21/5829 for final inspection.Details
to renew app#2000/04/21/5829 for final inspection. | |
| Apr 24, 2001 | Expired or cancelled cancelled Oct 2024 | 3618 Scott St | renew pa 2000/04/21/5829. new master bath.Details
renew pa 2000/04/21/5829. new master bath. | |
| Jul 21, 2000 | Expired or cancelled expired May 2001 | 3618 Scott St | add new master bathroomDetails
add new master bathroom | $9,000 |