Back to kitchen remodel contractors
Philip Kline
- Based in
- San Anselmo
- On San Francisco permits
- Jul 2000 to Feb 2017
- Last 24 months
- 0 permits filed
15 permits since 2000: 7 completed, 8 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2015 | Completed final sign-off Jul 2016 | 1817 California St | remodel existing kitchen and bathroom. add laundry to existing closet in hall way(ventless washer and dryer). n0 new walls or change to fixture location or wall location. electric washer and dryer.Details
remodel existing kitchen and bathroom. add laundry to existing closet in hall way(ventless washer and dryer). n0 new walls or change to fixture location or wall location. electric washer and dryer. | $60,000 |