John A. Chipman
- Listed as
- architect, designer
- Firm
- Chipman Design Architecture
- On San Francisco permits
- Apr 2012 to Aug 2025
38 permits since 2000 (architect on 37 permits, designer on 1 permit): 27 completed, 2 in progress, 3 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 25, 2025 | Completed final sign-off Jan 2026 | 2226 Fillmore St | Gray West Construction Inc | revision to pa #202506178857. replace existing double entry doors with new doors, which include new door hardware.Details
revision to pa #202506178857. replace existing double entry doors with new doors, which include new door hardware. | $1,000 |
| Jun 17, 2025 | Completed final sign-off Jan 2026 | 2226 Fillmore St | Gray West Construction Inc | interior ti is on ground floor "mezzanine" level. no hvac and plumbing to scope. ti includes: demo and electrical work.Details
interior ti is on ground floor "mezzanine" level. no hvac and plumbing to scope. ti includes: demo and electrical work. | $70,000 |
| Nov 15, 2024 | Completed final sign-off Mar 2025 | 2 Folsom St | Swinerton Builders | 12th & 14th fl- interior demo & ti. including install of new non load bearing partitions. install new lighting & receptacles. install new millwork. associated mep workDetails
12th & 14th fl- interior demo & ti. including install of new non load bearing partitions. install new lighting & receptacles. install new millwork. associated mep work | $554,436 |
| Nov 15, 2024 | Completed final sign-off Mar 2025 | 2 Folsom St | Swinerton Builders | 11th & 13th fl- interior demo & ti. includes install of (n) non load bearing partitions. install (n) lighting & receptacles. install (n) millwork. associated mep work.Details
11th & 13th fl- interior demo & ti. includes install of (n) non load bearing partitions. install (n) lighting & receptacles. install (n) millwork. associated mep work. | $399,158 |
| Nov 7, 2024 | In progress issued May 2025 | 2 Folsom St | Swinerton Builders | 3/f: deferred electrical permit for pa# 202405101903. clarification that no deferred mechanical or plumbing required. trade permit required.Details
3/f: deferred electrical permit for pa# 202405101903. clarification that no deferred mechanical or plumbing required. trade permit required. | |
| Jul 18, 2024 | Completed final sign-off Feb 2025 | 2 Folsom St | Swinerton Builders | 15th fl ti: new partitons, ceilings, fixtures, finishes & mepDetails
15th fl ti: new partitons, ceilings, fixtures, finishes & mep | $2,465,940 |
| May 10, 2024 | In progress issued May 2024 | 2 Folsom St | Swinerton Builders | 3rd fl interior ti new non load bearing partitoins, doors, finishes. existing lighting shall remain with some fixtures to be relocated per new wall locations. mep deferred.Details
3rd fl interior ti new non load bearing partitoins, doors, finishes. existing lighting shall remain with some fixtures to be relocated per new wall locations. mep deferred. | $717,000 |
| Apr 24, 2024 | Completed final sign-off Nov 2024 | 2 Folsom St | Swinerton Builders | 7th fl - interior ti includes 3 new training spaces, office space & storage space. new non-load bearing partitions, ceilings, finishes & mech/elecDetails
7th fl - interior ti includes 3 new training spaces, office space & storage space. new non-load bearing partitions, ceilings, finishes & mech/elec | $900,000 |
| Apr 9, 2024 | Completed final sign-off Aug 2024 | 2 Folsom St | Swinerton Builders | 9th fl interior ti new mock store and open office. includes new non load bearing partitions and altered lightingDetails
9th fl interior ti new mock store and open office. includes new non load bearing partitions and altered lighting | $99,322 |
| Mar 25, 2024 | Completed final sign-off May 2024 | 2 Folsom St | Swinerton Builders | 7/f: demo existing non-load bearing partitions for future office ti. per ab-017.Details
7/f: demo existing non-load bearing partitions for future office ti. per ab-017. | $60,000 |
| Sep 28, 2023 | Completed final sign-off Apr 2024 | 2 Folsom St | Swinerton Builders | 9/f: revision to pa# 202307202579, reduced scope updated lighting & finishes, added equipmenmt & power locations, revised room layout, added structural details.Details
9/f: revision to pa# 202307202579, reduced scope updated lighting & finishes, added equipmenmt & power locations, revised room layout, added structural details. | |
| Sep 28, 2023 | Completed final sign-off May 2024 | 2 Folsom St | Swinerton Builders | 12/f: revision to pa# 202308295512, reduced scope of work no longer done in designed accessDetails
12/f: revision to pa# 202308295512, reduced scope of work no longer done in designed access | |
| Aug 29, 2023 | Never finaled issued Sep 2023, no final | 2 Folsom St | Swinerton Builders | 12/f - interior ti incudes new non-load bearing partitions, lighting, & finishes. mep deferred.Details
12/f - interior ti incudes new non-load bearing partitions, lighting, & finishes. mep deferred. | $717,000 |
| Jul 20, 2023 | Completed final sign-off Mar 2024 | 2 Folsom St | Swinerton Builders | 10/f: interior ti includes new non-load bearing partitions, lighting, millwork and finishes. mep deferred.Details
10/f: interior ti includes new non-load bearing partitions, lighting, millwork and finishes. mep deferred. | $987,106 |
| Jul 20, 2023 | Completed final sign-off Apr 2024 | 2 Folsom St | Swinerton Builders | 9/f: interior ti includes new non-load bearing partitions, lighting, millwork and finishes. mep deferred.Details
9/f: interior ti includes new non-load bearing partitions, lighting, millwork and finishes. mep deferred. | $2,465,940 |
| May 9, 2023 | Never finaled issued Aug 2023, no final | 152 Geary St | Swinerton Builders | revision 202211146477 changes included revised 1st fl layout, new fireplace, n interior tree, changing room locations, 2nd fl restroom layout, updated finishes, mep update. no exterior work.Details
revision 202211146477 changes included revised 1st fl layout, new fireplace, n interior tree, changing room locations, 2nd fl restroom layout, updated finishes, mep update. no exterior work. | $80,000 |
| Nov 14, 2022 | Completed final sign-off Oct 2023 | 152 Geary St | David A Nice Builders Inc | new retail w/in (e) vacant building. mep included. new fitting rooms, restrooms & partitions. no work on exterior metal panelsDetails
new retail w/in (e) vacant building. mep included. new fitting rooms, restrooms & partitions. no work on exterior metal panels | $650,000 |
| Apr 22, 2022 | Completed final sign-off Sep 2022 | 2226 Fillmore St | Acetop Electric Inc | installation of (1) security camera to exterior facade of (e) atheleta retail storeDetails
installation of (1) security camera to exterior facade of (e) atheleta retail store | $8,000 |
| Sep 10, 2021 | Completed final sign-off Sep 2022 | 2 Folsom St | Build Group Inc. | ti on ground floor interior remodel mercantile/interios space contained within the existing shell, suites. 2c + 2d fire alarm, fire sprinkler, signage, racking under seperate permit.Details
ti on ground floor interior remodel mercantile/interios space contained within the existing shell, suites. 2c + 2d fire alarm, fire sprinkler, signage, racking under seperate permit. | $715,000 |
| Sep 9, 2021 | Completed final sign-off Sep 2022 | 2 Folsom St | Build Group Inc. | tenant improvement for new retail space in ste 2a & 2b - fire alarm, fire sprinkler, signage, racking, under separate permitDetails
tenant improvement for new retail space in ste 2a & 2b - fire alarm, fire sprinkler, signage, racking, under separate permit | $674,500 |
| Jun 30, 2021 | Completed final sign-off Sep 2022 | 2 Folsom St | Build Group Inc. | ground floor change use from office to retail. no change in building gross floor area. scope include replacementof (e) storefront glazing /new storefront door and sides lights interior ti build out under seperate permit.Details
ground floor change use from office to retail. no change in building gross floor area. scope include replacementof (e) storefront glazing /new storefront door and sides lights interior ti build out under seperate permit. | $160,000 |
| Nov 17, 2020 | Completed final sign-off Jul 2026 | 934 Market St | J K S - Ca Corp Dba Everstrong Construct | t.i. & exterior alteration: change payless store to restaurant. tenant build-out (n) tenant space, for a sit-down restaurant w/ no sq ft being added. signage & all hood ansul modifications shall be designed by a license ansul contractor under sep permit.Details
t.i. & exterior alteration: change payless store to restaurant. tenant build-out (n) tenant space, for a sit-down restaurant w/ no sq ft being added. signage & all hood ansul modifications shall be designed by a license ansul contractor under sep permit. | $1,050,000 |
| Oct 21, 2020 | Completed final sign-off Jul 2021 | 225 Powell St | Peacock Construction | addition of interior security grilles to an (e) retail space.Details
addition of interior security grilles to an (e) retail space. | $45,000 |
| Mar 11, 2020 | Expired or cancelled withdrawn Mar 2021 | 755 Sansome St | 3rd fl - new ti of existing office space. no exterior work proposed. new floor, wall, ceiling, millwork & fixture finishes. new electrical & lighting. demo of (e) non bearing partitions w/limited ceiling construction. updated mep. no food/beverages or third party catering will be provided by theDetails
3rd fl - new ti of existing office space. no exterior work proposed. new floor, wall, ceiling, millwork & fixture finishes. new electrical & lighting. demo of (e) non bearing partitions w/limited ceiling construction. updated mep. no food/beverages or third party catering will be provided by the | $590,000 | |
| Nov 18, 2019 | Expired or cancelled withdrawn Nov 2020 | 28 02nd St | 4th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing.Details
4th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing. | $150,000 | |
| Nov 18, 2019 | Expired or cancelled withdrawn Nov 2020 | 28 02nd St | 5th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing.Details
5th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing. | $100,000 | |
| Nov 18, 2019 | Expired or cancelled withdrawn Nov 2020 | 28 02nd St | 7th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing.Details
7th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing. | $150,000 | |
| Nov 18, 2019 | Expired or cancelled withdrawn Nov 2020 | 28 02nd St | 6th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing.Details
6th fl - new ti of (e) office space. new floor & ceiling finishes, new non-bearing partitions, new millwork & fixtures, new electrical & lighting fixtures, & update mechanical and plumbing. | $150,000 | |
| Oct 16, 2019 | Expired or cancelled withdrawn Nov 2020 | 28 02nd St | 3rd floor: t.i. of (e) office space. no exterior work. t.i. to include new floor, wall, and ceiling finishes; new non-bearing partitions and limited ceiling construction; new millwork and fixtures, new electrical and lighting fixtures; updated mechanical and plumbing layout.new restroom and fixturesDetails
3rd floor: t.i. of (e) office space. no exterior work. t.i. to include new floor, wall, and ceiling finishes; new non-bearing partitions and limited ceiling construction; new millwork and fixtures, new electrical and lighting fixtures; updated mechanical and plumbing layout.new restroom and fixtures | $200,000 | |
| Oct 9, 2019 | Completed final sign-off Oct 2020 | 890 Market St | Sea Security Services Low Voltage | like for like replacement of door hardware, ada signage & power door operators, exist signage & associated electrical workDetails
like for like replacement of door hardware, ada signage & power door operators, exist signage & associated electrical work | $7,000 |
| Apr 10, 2019 | Completed final sign-off Aug 2019 | 2226 Fillmore St | Timberwolff Construction Inc | storefront renovationDetails
storefront renovation | $25,000 |
| Jul 26, 2016 | Never finaled issued Sep 2016, no final | 256 Grant Av | Gray West Construction Inc | suite a - modification at basement level regarding installation of cabinets, relocating sidewall next to duct, new plumbing connections, and removing switches, conduit, conductors, and all associated devices.Details
suite a - modification at basement level regarding installation of cabinets, relocating sidewall next to duct, new plumbing connections, and removing switches, conduit, conductors, and all associated devices. | $20,000 |
| Apr 29, 2016 | Completed final sign-off Nov 2016 | 555 09th St | Bogart Construction Inc . | interior t.i. within existing shell bldg. to include new fixtures, finishes and equipment. mep included. n/a ordinance #155-13Details
interior t.i. within existing shell bldg. to include new fixtures, finishes and equipment. mep included. n/a ordinance #155-13 | $654,295 |
| Jan 11, 2016 | Completed final sign-off Apr 2017 | 256 Grant Av | Gray West Construction Inc | ste a - interior remodeling, build-out of merchantile/interior space contained within existing shell of building.Details
ste a - interior remodeling, build-out of merchantile/interior space contained within existing shell of building. | $300,000 |
| Nov 10, 2015 | Completed final sign-off Apr 2017 | 256 Grant Av | Gray West Construction Inc | store front renovation. minor permit to alter facade.Details
store front renovation. minor permit to alter facade. | $25,000 |
| Jun 25, 2014 | Completed final sign-off Jul 2015 | 2675 Geary Bl | Bogart Construction Inc . | interior tenant improvement of 9,488 sf. finish floors, ceiling, electrical, mechanical, plumbing for "ulta". n/a maher ordinance.Details
interior tenant improvement of 9,488 sf. finish floors, ceiling, electrical, mechanical, plumbing for "ulta". n/a maher ordinance. | $92,500 |
| Jul 18, 2013 | Completed final sign-off Apr 2015 | 575 Market St | Dome Construction Corp | change of use from retail to restaurant. tenant improvement to existing retail shell space.Details
change of use from retail to restaurant. tenant improvement to existing retail shell space. | $120,000 |
| Apr 9, 2012 | Completed final sign-off Jun 2012 | 3251 20th Av | Horizon Retail Construction Inc | sapce #159 tenant improvement - new non-load bearing partition walls, interior storefront glazing system, diffusers, lighting, finishes.Details
sapce #159 tenant improvement - new non-load bearing partition walls, interior storefront glazing system, diffusers, lighting, finishes. | $180,000 |