Michael Hart
- License
- M24069
- Mechanical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up M24069 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Eea Consulting Engineers
- Based in
- Austin
- On San Francisco permits
- Nov 2022 to May 2023
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- David A Nice Builders Inc, Swinerton Builders
- Architects
- John A. Chipman (2)
- Engineers
- Sara Hamill (2)
- Authorized agents
- Richard Lee Mcintosh
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 9, 2023 | Never finaled issued Aug 2023, no final | 152 Geary St | Swinerton Builders | revision 202211146477 changes included revised 1st fl layout, new fireplace, n interior tree, changing room locations, 2nd fl restroom layout, updated finishes, mep update. no exterior work.Details
revision 202211146477 changes included revised 1st fl layout, new fireplace, n interior tree, changing room locations, 2nd fl restroom layout, updated finishes, mep update. no exterior work. | $80,000 |
| Nov 14, 2022 | Completed final sign-off Oct 2023 | 152 Geary St | David A Nice Builders Inc | new retail w/in (e) vacant building. mep included. new fitting rooms, restrooms & partitions. no work on exterior metal panelsDetails
new retail w/in (e) vacant building. mep included. new fitting rooms, restrooms & partitions. no work on exterior metal panels | $650,000 |