Jon Eric Henderson
- Listed as
- architect, contractor
- Firm
- Horizon Retail Construction Inc
- Based in
- Sturtevant
- On San Francisco permits
- Feb 2001 to Oct 2026
55 permits since 2000 (contractor on 54 permits, architect on 1 permit): 46 completed, 3 in progress, 3 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Current Construction
- Architects
- Bruce Carlson (3), Quin Wichmann (3), Charlie Coatsworth Architects (2), Gerald S Shremshock (2), Luma Jaffar (2), Patrick Blees (2), Christopher Doerschlag, Don M Dacumos, Dustin Curtis, Frederick Goglia, Gregory Schnackel, James A Haily, James Hamill, James Stapleton, John A Chipman, John Schneider, Kenneth Park, Lingle Carl Lee, Louis Vandeloecht, Nicholas J Tricarico, Richard Sweers Ii, Robert J Sargenti, Stephen Patrick Maher
- Engineers
- Kenneth Urbanek (2), Mark Zappant (2), Christopher Webb, David Buchanan, Don Penn, Electrical Engineer Jenkins, Christopher Andrew, Gregory Doffin, Joseph Thomas, Mark Kaiser, Peter A Leptuch, Ron Hartman, Ross Mcfarland, Skot Mcdaniel
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 19, 2026 | In progress issued Nov 2026 | 3251 20th Av | Horizon Retail Construction Inc | #227: temporary space for victoria's secret & co. replace same wing wall, relocate (e) cashwrap/backwrap from old location, change sign and side wall's. no exterior work. some new partitions.Details
#227: temporary space for victoria's secret & co. replace same wing wall, relocate (e) cashwrap/backwrap from old location, change sign and side wall's. no exterior work. some new partitions. | $185,000 |
| Jun 5, 2026 | In progress filed Jun 2026, not yet issued | 1717 Harrison St | Horizon Retail Construction Inc | interior alteration of existing best buy store, area of work= 18,831 sf. reflow of existing resale floor fixtures, new sales floor display fixture, new section flooring, electrical and low volt disconnect/reconnects, added circuits and fixtures anchoring. updating wayfinding signage in sales floor.Details
interior alteration of existing best buy store, area of work= 18,831 sf. reflow of existing resale floor fixtures, new sales floor display fixture, new section flooring, electrical and low volt disconnect/reconnects, added circuits and fixtures anchoring. updating wayfinding signage in sales floor. | $427,668 |
| Oct 20, 2025 | In progress issued Oct 2025 | 2410 California St | Horizon Retail Construction Inc | interior renovation to (e) one medical space. disciplines to include amep.Details
interior renovation to (e) one medical space. disciplines to include amep. | $278,264 |
| Sep 26, 2025 | Completed final sign-off Apr 2026 | 1533 Sloat Bl | Horizon Retail Construction Inc | revise pa#202507241510 to change exposed ceiling in gym are ato a 2' x 4' grid ceiling.Details
revise pa#202507241510 to change exposed ceiling in gym are ato a 2' x 4' grid ceiling. | $50,000 |
| Jul 24, 2025 | Completed final sign-off Apr 2026 | 1533 Sloat Bl | Horizon Retail Construction Inc | tenant improvement for fitness club and health center: in 3 existing retail spaces, no change of use or square footage. interior restroom, and fitness, replacing hvac and duct work, new tv truss and fan.Details
tenant improvement for fitness club and health center: in 3 existing retail spaces, no change of use or square footage. interior restroom, and fitness, replacing hvac and duct work, new tv truss and fan. | $450,000 |
| Feb 18, 2025 | Completed final sign-off Jun 2025 | 200 West Portal Av | Horizon Retail Construction Inc | walgreens: expand the existing pharmacy into the existing pharmacy waiting aclove, by walling off the pharmacy waiting area, adding a new pharmacy entrance door, expanding the existing 8'-0" wide roll down pharmacy shutter, with a new 12'-0" wide roll pharmacy shutter.Details
walgreens: expand the existing pharmacy into the existing pharmacy waiting aclove, by walling off the pharmacy waiting area, adding a new pharmacy entrance door, expanding the existing 8'-0" wide roll down pharmacy shutter, with a new 12'-0" wide roll pharmacy shutter. | $29,700 |
| Dec 20, 2024 | Completed final sign-off Feb 2025 | 1601 Dolores St | Horizon Retail Construction Inc | revision 202410102707- a wall scheduled for demo is a structrual supporting wall. we are leaving the columns in place but removing the drywallDetails
revision 202410102707- a wall scheduled for demo is a structrual supporting wall. we are leaving the columns in place but removing the drywall | |
| Oct 10, 2024 | Completed final sign-off Feb 2025 | 1601 Dolores St | Horizon Retail Construction Inc | interior remodl for an edward jones financial office, sq ft 1409. demo non-load bearing partition walls, add non-load bearing partition walls, minor electrical work, minor plumbing work, minor hvac work, carpet and paint no mechanical work to be doneDetails
interior remodl for an edward jones financial office, sq ft 1409. demo non-load bearing partition walls, add non-load bearing partition walls, minor electrical work, minor plumbing work, minor hvac work, carpet and paint no mechanical work to be done | $68,000 |
| Sep 26, 2024 | Completed final sign-off Dec 2024 | 2300 16th St | Horizon Retail Construction Inc | interior remodel for h and r block office, 1487 sq ft. minor electrical work, carpet and paint. walls are existing to remain.Details
interior remodel for h and r block office, 1487 sq ft. minor electrical work, carpet and paint. walls are existing to remain. | $37,000 |
| Sep 29, 2023 | Completed final sign-off Jan 2024 | 815 Market St | Horizon Retail Construction Inc | add new security grill @ storefrontDetails
add new security grill @ storefront | $2,000 |
| Oct 28, 2022 | Completed final sign-off Apr 2023 | 3251 20th Av | Horizon Retail Construction Inc | suite 101: change of use from retail to general entertainment. approx. 2723sf interior tenant build-out for an immersive group gaming entertainment facility.Details
suite 101: change of use from retail to general entertainment. approx. 2723sf interior tenant build-out for an immersive group gaming entertainment facility. | $400,000 |
| Oct 19, 2022 | Expired or cancelled expired Oct 2026 | 293 Cumberland St | Current Construction | front landscape redesign, including, new stairways, with handrails, retaining walls, decorative metal panels and integrated lighting.Details
front landscape redesign, including, new stairways, with handrails, retaining walls, decorative metal panels and integrated lighting. | $350,000 |
| Apr 22, 2022 | Completed final sign-off Jun 2022 | 1680 Evans Av | Horizon Retail Construction Inc | minor non-structural partition removal, stud gyp-bd infill of (e) pass-throuhts, paint & finishes.automotive repair. exterior- replace front door. replace double doors with roll up.Details
minor non-structural partition removal, stud gyp-bd infill of (e) pass-throuhts, paint & finishes.automotive repair. exterior- replace front door. replace double doors with roll up. | $7,200 |
| Feb 23, 2022 | Completed final sign-off Feb 2022 | 500 Harrison St | Horizon Retail Construction Inc | change address: 390 1st st, sf ca 94105 (202109098100) to 500 harrison st, sf, ca, 94105Details
change address: 390 1st st, sf ca 94105 (202109098100) to 500 harrison st, sf, ca, 94105 | |
| Dec 1, 2021 | Completed final sign-off Nov 2022 | 1215 04th St | Horizon Retail Construction Inc | 1st flr - 1st time tenant, cfc req, new food service, tenant finish out from extg space. extg storefront and entry door to remian. minor store front modification for new louvers.Details
1st flr - 1st time tenant, cfc req, new food service, tenant finish out from extg space. extg storefront and entry door to remian. minor store front modification for new louvers. | $186,000 |
| Sep 9, 2021 | Completed final sign-off Mar 2022 | 390 01st St | Horizon Retail Construction Inc | t.i.finish out space to a cookie shop with new equipment,restroom,finishes and utilities.Details
t.i.finish out space to a cookie shop with new equipment,restroom,finishes and utilities. | $150,000 |
| Oct 14, 2020 | Completed final sign-off Aug 2022 | 1201 Taraval St | Horizon Retail Construction Inc | making an entry accessible for ada compliance at an existing walgreen's store, by replacing the entry door, adding an automatic door operator, and modifying the door landing to be a non-slip surface.Details
making an entry accessible for ada compliance at an existing walgreen's store, by replacing the entry door, adding an automatic door operator, and modifying the door landing to be a non-slip surface. | $41,649 |
| Mar 11, 2019 | Completed final sign-off Sep 2019 | 3251 20th Av | Horizon Retail Construction Inc | space 155: ti inside the mall. mep, arch new store front inside the mallDetails
space 155: ti inside the mall. mep, arch new store front inside the mall | $100,000 |
| Jun 22, 2018 | Completed final sign-off Oct 2018 | 1071 Market St | Horizon Retail Construction Inc | installing a new hvac system for retail store @ 1071 market st gr lvl. 3.35 ton split system heat pump for store & 5 ton system for the back of house area ref 201804247205Details
installing a new hvac system for retail store @ 1071 market st gr lvl. 3.35 ton split system heat pump for store & 5 ton system for the back of house area ref 201804247205 | $48,900 |
| Apr 24, 2018 | Completed final sign-off Oct 2018 | 1071 Market St | Horizon Retail Construction Inc | new ti - wood stud framing, new interior finishes, mechanical, electrical, plumbing under separate permitDetails
new ti - wood stud framing, new interior finishes, mechanical, electrical, plumbing under separate permit | $52,000 |
| Feb 16, 2018 | Completed final sign-off Aug 2018 | 3251 20th Av | Horizon Retail Construction Inc | space 215: remodel of existing tenant.refinish and reconfigure finishes and fixtures. new lighting.Details
space 215: remodel of existing tenant.refinish and reconfigure finishes and fixtures. new lighting. | $150,000 |
| Aug 28, 2017 | Completed final sign-off Nov 2017 | 333 Jefferson St | Horizon Retail Construction Inc | interior t.i. - minor remodel of an (e) sunglasshut space including new display fixtures, minor lighting modifications, & minor electrical work. no work/change to wall layout, egress, plumbing, mechanical or storefront. n/a maher ordinanceDetails
interior t.i. - minor remodel of an (e) sunglasshut space including new display fixtures, minor lighting modifications, & minor electrical work. no work/change to wall layout, egress, plumbing, mechanical or storefront. n/a maher ordinance | $120,000 |
| Jul 19, 2017 | Completed final sign-off Nov 2017 | 1698 Bryant St | Horizon Retail Construction Inc | tenant improvement - remodel of (e) metro pcs - cashwrap, flooring, fixtures, bathroom, plumbing & conduit work. all other to remain.Details
tenant improvement - remodel of (e) metro pcs - cashwrap, flooring, fixtures, bathroom, plumbing & conduit work. all other to remain. | $93,945 |
| Dec 1, 2015 | Completed final sign-off Mar 2016 | 2 Embarcadero Center | Horizon Retail Construction Inc | center a, space r-2210: interior tenant improvement to existing retail tenant, non structural work, electrical fixture upgrades and minor plumbing fixture updates, total 1,310 sq.ft. n/a ordinance #155-13Details
center a, space r-2210: interior tenant improvement to existing retail tenant, non structural work, electrical fixture upgrades and minor plumbing fixture updates, total 1,310 sq.ft. n/a ordinance #155-13 | $175,000 |
| Jun 24, 2014 | Completed final sign-off Sep 2014 | 101 Post St | Horizon Retail Construction Inc | remodel of existing cafe, new interior walls, new plumbing fixtures, new supply & returns. n/a ordinance #155-13.Details
remodel of existing cafe, new interior walls, new plumbing fixtures, new supply & returns. n/a ordinance #155-13. | $150,000 |
| Jun 18, 2014 | Completed final sign-off Jul 2014 | 333 Jefferson St | Horizon Retail Construction Inc | unit b101: revision to 201404153276; light gauge stud frame and light ceiling changes; compliance with ord 155-13 not requiredDetails
unit b101: revision to 201404153276; light gauge stud frame and light ceiling changes; compliance with ord 155-13 not required | |
| Apr 15, 2014 | Completed final sign-off Jul 2014 | 333 Jefferson St | Horizon Retail Construction Inc | b101: expansion of e retail store into adjacent space (774 sq ft) work includes removal of demising wall, new fixtures, finishes, lighting. e mech to remain. fire protection and exterior signage under seperate permitDetails
b101: expansion of e retail store into adjacent space (774 sq ft) work includes removal of demising wall, new fixtures, finishes, lighting. e mech to remain. fire protection and exterior signage under seperate permit | $125,000 |
| Dec 16, 2013 | Never finaled issued Mar 2014, no final | 3251 20th Av | Horizon Retail Construction Inc | shelving for retail space 167. ref ti 201311061240Details
shelving for retail space 167. ref ti 201311061240 | $16,881 |
| Nov 7, 2013 | Completed final sign-off Mar 2014 | 601 Market St | Horizon Retail Construction Inc | to allow the use of the 2010 cbc 8/1/12 supplement section 1115b.4.1 for toilet fixture center line to be 16" - 18" from wall to center line of water closet. revision to app#201207094326Details
to allow the use of the 2010 cbc 8/1/12 supplement section 1115b.4.1 for toilet fixture center line to be 16" - 18" from wall to center line of water closet. revision to app#201207094326 | $500 |
| Nov 6, 2013 | Completed final sign-off May 2014 | 3251 20th Av | Horizon Retail Construction Inc | space 167: t.i, mep and partitions work and finishes. new storefront work inside the mall. one restroom to remain. ref app#200404131188 r2. storage racks and signage under separate permit. sprinklers under separate permit.Details
space 167: t.i, mep and partitions work and finishes. new storefront work inside the mall. one restroom to remain. ref app#200404131188 r2. storage racks and signage under separate permit. sprinklers under separate permit. | $225,000 |
| Nov 6, 2013 | Completed final sign-off Nov 2013 | 845 Market St | Horizon Retail Construction Inc | space #237: revision to app#201310229902. relocation of extg toilet door. the new door location will comply with california accessibilty requirement. no additional changes.Details
space #237: revision to app#201310229902. relocation of extg toilet door. the new door location will comply with california accessibilty requirement. no additional changes. | |
| Oct 22, 2013 | Completed final sign-off Nov 2013 | 845 Market St | Horizon Retail Construction Inc | space 237: demo, new electrical and fixtures, existing demising walls and hvac to remain as existing. sprinklers and fa to be submitted on separate permit. no change to egress or ls. jjcDetails
space 237: demo, new electrical and fixtures, existing demising walls and hvac to remain as existing. sprinklers and fa to be submitted on separate permit. no change to egress or ls. jjc | $73,250 |
| Oct 1, 2013 | Never finaled issued Dec 2013, no final | 28 03rd St | Horizon Retail Construction Inc | demo existing restaurant, kitchen hood, grease trap. new tbar ceiling, relocate mop sink, and water heater. new replacement of lighting, new ducts, supply and return, ttl work area 2,787 sq ft. and 2 ada restroom within remodeled spaceDetails
demo existing restaurant, kitchen hood, grease trap. new tbar ceiling, relocate mop sink, and water heater. new replacement of lighting, new ducts, supply and return, ttl work area 2,787 sq ft. and 2 ada restroom within remodeled space | $123,457 |
| Sep 25, 2013 | Completed final sign-off Jan 2015 | 50 03rd St | Horizon Retail Construction Inc | lobby level - new retail space is connected to existing lobby lounge. millwork installation & final power connection, arch work only. ref. to pa# 201304154588Details
lobby level - new retail space is connected to existing lobby lounge. millwork installation & final power connection, arch work only. ref. to pa# 201304154588 | $64,621 |
| Sep 25, 2013 | Never finaled issued Nov 2013, no final | 1799 Lombard St | Horizon Retail Construction Inc | change of use from retail-m to b-10. add new ada restrooms & title 24. remove non bearing partition/slat wallDetails
change of use from retail-m to b-10. add new ada restrooms & title 24. remove non bearing partition/slat wall | $35,000 |
| Dec 5, 2012 | Completed final sign-off Sep 2017 | 601 Market St | Horizon Retail Construction Inc | to comply with nov 2013-41592. minor revision to make entry doors ada compliant to pa#201207094326. delta 2 revision is limited to new storefront entry doors per ada requirements.Details
to comply with nov 2013-41592. minor revision to make entry doors ada compliant to pa#201207094326. delta 2 revision is limited to new storefront entry doors per ada requirements. | $7,000 |
| Sep 27, 2012 | Completed final sign-off Apr 2013 | 50 Post St | Horizon Retail Construction Inc | suites 19 & 26th:demolition of extg space. install new acoustical cieling. relocate sprinkler heads as required. install new partitions. install new lighting. install new flooring. paint install new outlets and exit lights. install new millwork.Details
suites 19 & 26th:demolition of extg space. install new acoustical cieling. relocate sprinkler heads as required. install new partitions. install new lighting. install new flooring. paint install new outlets and exit lights. install new millwork. | $80,000 |
| Sep 7, 2012 | Completed final sign-off Oct 2013 | 557 Buckingham Wy | Horizon Retail Construction Inc | change of use. 1st fl - remodel of interior floors, walls, electric, plumbing hvac to meet new tenant improvement customer needs.Details
change of use. 1st fl - remodel of interior floors, walls, electric, plumbing hvac to meet new tenant improvement customer needs. | $100,000 |
| Jul 26, 2012 | Completed final sign-off Feb 2013 | 2276 Chestnut St | Horizon Retail Construction Inc | construction of david's tea store consisting of complete t.i. construction including all partitions, storefront, ceilings & electrical, mechanical & plumbing systems within the landlord's shell.Details
construction of david's tea store consisting of complete t.i. construction including all partitions, storefront, ceilings & electrical, mechanical & plumbing systems within the landlord's shell. | $75,000 |
| Jul 9, 2012 | Completed final sign-off Mar 2014 | 601 Market St | Horizon Retail Construction Inc | interior alteration to include architectural, mechanical, electrical & plumbing. fire alarm and fire sprinklers on separate permits.Details
interior alteration to include architectural, mechanical, electrical & plumbing. fire alarm and fire sprinklers on separate permits. | $600,000 |
| Apr 9, 2012 | Completed final sign-off Jun 2012 | 3251 20th Av | Horizon Retail Construction Inc | sapce #159 tenant improvement - new non-load bearing partition walls, interior storefront glazing system, diffusers, lighting, finishes.Details
sapce #159 tenant improvement - new non-load bearing partition walls, interior storefront glazing system, diffusers, lighting, finishes. | $180,000 |
| Feb 2, 2012 | Completed final sign-off Nov 2012 | 3251 20th Av | Horizon Retail Construction Inc | #266 - tenant improvement for footlocker retail store.Details
#266 - tenant improvement for footlocker retail store. | $70,000 |
| Feb 2, 2012 | Completed final sign-off Nov 2012 | 3251 20th Av | Horizon Retail Construction Inc | #266 - installation of stockroom shelves for footlocker retail store.Details
#266 - installation of stockroom shelves for footlocker retail store. | $3,000 |
| Oct 27, 2011 | Completed final sign-off Jan 2012 | 567 Golden Gate Av | Horizon Retail Construction Inc | interior remodel to include partition walls, drywall finishes and furniture. install mop sink.Details
interior remodel to include partition walls, drywall finishes and furniture. install mop sink. | $41,000 |
| Dec 1, 2010 | Expired or cancelled cancelled Jun 2013 | 287 Geary St | Horizon Retail Construction Inc | new store front renovation to raise the glass line and revise panels.Details
new store front renovation to raise the glass line and revise panels. | $12,000 |
| Aug 26, 2010 | Completed final sign-off Nov 2010 | 287 Geary St | Horizon Retail Construction Inc | interior alterations for retail and barber shop (the art of shaving new york) including finishes of floors, walls, cabinets, ceilings, mep traders, b new interior walls.restroom shall remain as is except finish alteration. new water heater.Details
interior alterations for retail and barber shop (the art of shaving new york) including finishes of floors, walls, cabinets, ceilings, mep traders, b new interior walls.restroom shall remain as is except finish alteration. new water heater. | $130,000 |
| Mar 23, 2010 | Completed final sign-off May 2010 | 111 Sutter St | Horizon Retail Construction Inc | 13th floor tenant improvement - restore to previous floor plan to build partition walls, electrical outlets, switches & lights, no plumbing work. srpinkler & fire alarm revisions under separate appl.Details
13th floor tenant improvement - restore to previous floor plan to build partition walls, electrical outlets, switches & lights, no plumbing work. srpinkler & fire alarm revisions under separate appl. | $50,000 |
| Mar 19, 2010 | Completed final sign-off Apr 2010 | 111 Sutter St | Horizon Retail Construction Inc | 13th floor. demolition only. tenant improvements under separate permit. ab-017.Details
13th floor. demolition only. tenant improvements under separate permit. ab-017. | $10,000 |
| Dec 19, 2008 | Completed final sign-off Jul 2009 | 3251 20th Av | Horizon Retail Construction Inc | suite 247: t.i.(remodel) no structural. reuse electric service,hvac,toilet. reuse path partitions. new wall finishes/lighting/flooring/some ceiling.Details
suite 247: t.i.(remodel) no structural. reuse electric service,hvac,toilet. reuse path partitions. new wall finishes/lighting/flooring/some ceiling. | $175,000 |
| Mar 26, 2002 | Completed final sign-off Apr 2002 | 3251 20th Av | Horizon Retail Construction Inc | soft demo construction & remodel under app#2002/02/20/9519.soft demo to include non bearing walls,fiDetails
soft demo construction & remodel under app#2002/02/20/9519.soft demo to include non bearing walls,fi | |
| Dec 4, 2001 | Completed final sign-off Jan 2002 | 530 Monterey Bl | Horizon Retail Construction Inc | construct new interior non bearing partition,finish paint,re-carpet,convenience outletsDetails
construct new interior non bearing partition,finish paint,re-carpet,convenience outlets | $13,200 |
| Oct 11, 2001 | Expired or cancelled cancelled Aug 2002 | 3251 20th Av | Horizon Retail Construction Inc | submit as built rvsd dwellings 200011024685 storefront remodel replacement minor interior rmdlDetails
submit as built rvsd dwellings 200011024685 storefront remodel replacement minor interior rmdl | $107,000 |
| May 9, 2001 | Completed final sign-off May 2001 | 728 20th St | Horizon Retail Construction Inc | correction notice required revisions: handicap ramp, window replacementDetails
correction notice required revisions: handicap ramp, window replacement | $20,000 |
| Feb 27, 2001 | Completed final sign-off May 2001 | 728 20th St | Horizon Retail Construction Inc | remv asbestos,demo sev walls reconstruct new walls to form larger area redo restrms to ada code newDetails
remv asbestos,demo sev walls reconstruct new walls to form larger area redo restrms to ada code new | $295,000 |
| Feb 27, 2001 | Completed final sign-off May 2001 | 728 20th St | Horizon Retail Construction Inc | remove asbestos,tearout several walls,remove all flooring, all 12x12 ceiling,all cabnts and plumb fxDetails
remove asbestos,tearout several walls,remove all flooring, all 12x12 ceiling,all cabnts and plumb fx | $25,000 |