David C. Buchanan
- Listed as
- engineer
- Firm
- Ast
- Based in
- Edina
- On San Francisco permits
- Dec 2021 to Jun 2026
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 5, 2026 | In progress filed Jun 2026, not yet issued | 1717 Harrison St | Horizon Retail Construction Inc | interior alteration of existing best buy store, area of work= 18,831 sf. reflow of existing resale floor fixtures, new sales floor display fixture, new section flooring, electrical and low volt disconnect/reconnects, added circuits and fixtures anchoring. updating wayfinding signage in sales floor.Details
interior alteration of existing best buy store, area of work= 18,831 sf. reflow of existing resale floor fixtures, new sales floor display fixture, new section flooring, electrical and low volt disconnect/reconnects, added circuits and fixtures anchoring. updating wayfinding signage in sales floor. | $427,668 |
| Dec 14, 2021 | Completed final sign-off Mar 2023 | 1717 Harrison St | Final Phase Construction Inc | interior remodel to the sales floor including new and relocated sales floor display fixtures and casework. minor electrical work involved. (new samsung display)Details
interior remodel to the sales floor including new and relocated sales floor display fixtures and casework. minor electrical work involved. (new samsung display) | $2,915 |