David Marlatt
- Listed as
- architect, authorized agent-others, designer, pmt consultant/expediter
- Firm
- Dnm Architect
- Based in
- Sausalito
- On San Francisco permits
- Apr 2002 to Sep 2026
210 permits since 2000 (architect on 203 permits, authorized agent-others on 8 permits, designer on 1 permit, pmt consultant/expediter on 1 permit): 114 completed, 24 in progress, 39 never finaled, 33 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 210.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 555 Pacific Av | B-Side Inc. | core & shell permit: scope of work is limited to the basement(full)& portion of first flr basement, new kitchenette (e) accessible restroom blocs. 1st flr (1) new accessible kitchenette, accessible restroom, and new open interior stairwell, connecting to basement. general: new non-bearing partitionsDetails
core & shell permit: scope of work is limited to the basement(full)& portion of first flr basement, new kitchenette (e) accessible restroom blocs. 1st flr (1) new accessible kitchenette, accessible restroom, and new open interior stairwell, connecting to basement. general: new non-bearing partitions | $200,000 |
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 1365 Columbus Av | convert existing commercial spaces in two buildings to two residental units.no exterior work or additions are proposed. the units are entirely within the existing building envelope. no work on ground floor.fire sprinklers under deferred permitDetails
convert existing commercial spaces in two buildings to two residental units.no exterior work or additions are proposed. the units are entirely within the existing building envelope. no work on ground floor.fire sprinklers under deferred permit | $250,000 | |
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 1335 Columbus Av | convert existing commercial spaces to two residental units,no exterior work or additions are proposed. the units are entirely within the existing building envelope. no work on ground floor fire sprinklers under deferred permitDetails
convert existing commercial spaces to two residental units,no exterior work or additions are proposed. the units are entirely within the existing building envelope. no work on ground floor fire sprinklers under deferred permit | $250,000 | |
| Jul 7, 2026 | Completed final sign-off Aug 2026 | 573 10th Av | Mario Sarmento | revision to 202509246011. replacement of 2 windows on side of property, revise two windows and one door. not visible from street.Details
revision to 202509246011. replacement of 2 windows on side of property, revise two windows and one door. not visible from street. | $5,000 |
| Jun 26, 2026 | In progress issued Jul 2026 | 1201 Ortega St | R E R Construction | remodel class room on 2nd fl., 20th av. wing, demo (e) wall of room on 2nd story, new 1 hr fire rated partition wall no changes to exit pathDetails
remodel class room on 2nd fl., 20th av. wing, demo (e) wall of room on 2nd story, new 1 hr fire rated partition wall no changes to exit path | $10,000 |
| Jun 23, 2026 | In progress filed Jun 2026, not yet issued | 3720 23rd St | Mario Sarmento | add conditioned space to (e) basement, add two bedroom, bath and media room. ref#: 202106091991.Details
add conditioned space to (e) basement, add two bedroom, bath and media room. ref#: 202106091991. | $21,000 |
| Jun 17, 2026 | In progress filed Jun 2026, not yet issued | 3127 Scott St | revision to pa# 202605040574: remove 3rd story water heater from 1st story. add tankless water heater to 3rd story.Details
revision to pa# 202605040574: remove 3rd story water heater from 1st story. add tankless water heater to 3rd story. | ||
| May 15, 2026 | Completed final sign-off Jul 2026 | 755 Ashbury St | R E R Construction | new door between class room 101 & library 102b. demo partition wall at library 102a. demo shower area in toilet room 103a. new partiton to enlarge storage closet. no structurl work.Details
new door between class room 101 & library 102b. demo partition wall at library 102a. demo shower area in toilet room 103a. new partiton to enlarge storage closet. no structurl work. | $10,000 |
| May 15, 2026 | In progress issued Jul 2026 | 1201 Ortega St | R E R Construction | basement: remodel of (e) activities room in basement. demo (e) storage room/closet. demo (e) wall, new wall with doors. relocate (e) furnace.Details
basement: remodel of (e) activities room in basement. demo (e) storage room/closet. demo (e) wall, new wall with doors. relocate (e) furnace. | $75,000 |
| May 4, 2026 | In progress issued May 2026 | 3127 Scott St | Jordan Mendez Construction Inc | add bathroom, remodel kitchen , laundry room, hallway, (e) bathroom. update hvac and water heater to electric heat pumps. replace 3rd story windows in kind, no change to opening and not visible from street.Details
add bathroom, remodel kitchen , laundry room, hallway, (e) bathroom. update hvac and water heater to electric heat pumps. replace 3rd story windows in kind, no change to opening and not visible from street. | $75,000 |
| Apr 8, 2026 | Completed final sign-off Apr 2026 | 2837 23rd St | E. N. A Construction Inc. | administrative ref pa 202512222366 remove deferred permits fire alarm system & fire sprinklersDetails
administrative ref pa 202512222366 remove deferred permits fire alarm system & fire sprinklers | |
| Feb 6, 2026 | Completed final sign-off Jul 2026 | 1201 Ortega St | R E R Construction | rev 202411195309: change is exit corridor demensions to reflect as-built conditions.Details
rev 202411195309: change is exit corridor demensions to reflect as-built conditions. | |
| Dec 22, 2025 | Completed final sign-off Apr 2026 | 2837 23rd St | E. N. A Construction Inc. | repair foundation at existing garage, work shop, storage space, trash room and bike storage.Details
repair foundation at existing garage, work shop, storage space, trash room and bike storage. | $10,000 |
| Dec 5, 2025 | In progress issued Dec 2025 | 2793 Pine St | Jordan Mendez Construction Inc | remove 3/f balcony and extend office. remodel 3/f bathroom, extend bedroom #301 over bath below. install new heat pump hvac system. no change in use or parking.Details
remove 3/f balcony and extend office. remodel 3/f bathroom, extend bedroom #301 over bath below. install new heat pump hvac system. no change in use or parking. | $90,000 |
| Nov 26, 2025 | In progress issued Dec 2025 | 1070 Hampshire St | Peninsula Home Remodeling | revision to permit 202409040016 and 202309196851. reduce width of rear door, remove proposed skylight and ceiling opening.Details
revision to permit 202409040016 and 202309196851. reduce width of rear door, remove proposed skylight and ceiling opening. | |
| Oct 30, 2025 | In progress issued Nov 2025 | 1365 Columbus Av | Pineda Construction Inc | demo all non-structural walls, ab-17 maintain fire rating of stairways.Details
demo all non-structural walls, ab-17 maintain fire rating of stairways. | $23,000 |
| Oct 7, 2025 | Completed final sign-off Dec 2025 | 2509 Bryant St | Axel8 Construction | revision to 201903145204 for dropped floor in unit d to comply with nov 202301973Details
revision to 201903145204 for dropped floor in unit d to comply with nov 202301973 | |
| Oct 6, 2025 | Completed final sign-off Jul 2026 | 755 Ashbury St | Build Group Inc. | new 823 sf all electric kitchen withing (e) basement space, including all associated mechanical, electrical, plumbing and finish work. work limited to east (ashbury) wing of the building.Details
new 823 sf all electric kitchen withing (e) basement space, including all associated mechanical, electrical, plumbing and finish work. work limited to east (ashbury) wing of the building. | $500,000 |
| Oct 3, 2025 | In progress issued Jun 2026 | 322 Clement St | West-Tech General Engineer And Builder | 2/f remodel & new adu in (e) space under the state program. remodel (e) unit of 1 bedroom, (e) bathroom and living room. relocate kitchen. adu will be new bathroom, kitchen and remodel (e) rooms.Details
2/f remodel & new adu in (e) space under the state program. remodel (e) unit of 1 bedroom, (e) bathroom and living room. relocate kitchen. adu will be new bathroom, kitchen and remodel (e) rooms. | $150,000 |
| Sep 24, 2025 | In progress issued Oct 2025 | 573 10th Av | Mario Sarmento | interior remodel of kitchen and bathrooms. new water heater & heat pump. replacing 3 windows & 1 door. demo (e) deck, build new deck with exterior stairs.Details
interior remodel of kitchen and bathrooms. new water heater & heat pump. replacing 3 windows & 1 door. demo (e) deck, build new deck with exterior stairs. | $75,000 |
| Sep 9, 2025 | In progress filed Sep 2025, not yet issued | 143 Chilton Av | Pristine Construction | detached new construction 252 sqft local adu with 70 sqft attic and 39 s.f. garage storage closet and 92 sqft deck in the rear yard of the main house. remove existing playhouse and pergola/patio. seperate permit for new pool.Details
detached new construction 252 sqft local adu with 70 sqft attic and 39 s.f. garage storage closet and 92 sqft deck in the rear yard of the main house. remove existing playhouse and pergola/patio. seperate permit for new pool. | $80,000 |
| Jun 30, 2025 | In progress filed Jun 2025, not yet issued | 22 Paloma Av | convert existing lower story storage into adu with new kitchen, 3 baths. replace exterior door with new egress window. comply with nov #201702661.Details
convert existing lower story storage into adu with new kitchen, 3 baths. replace exterior door with new egress window. comply with nov #201702661. | $50,000 | |
| Jun 30, 2025 | Completed final sign-off Jul 2026 | 755 Ashbury St | Build Group Inc. | new door at ashbury facade. demo e walls (partitoins-no strutural work) at e basement, demo e cabinets. new walls for feconfiguration of music and art room. remove and capp off plumbing as requiredDetails
new door at ashbury facade. demo e walls (partitoins-no strutural work) at e basement, demo e cabinets. new walls for feconfiguration of music and art room. remove and capp off plumbing as required | $50,000 |
| May 22, 2025 | In progress filed May 2025, not yet issued | 1483 26th Av | remodel of 1st & 2nd fl. infill roof area over atrium & install skylight. 1st/f: new bathroom, closet, office. 2nd/f: remodel bathroom & new stairwell.Details
remodel of 1st & 2nd fl. infill roof area over atrium & install skylight. 1st/f: new bathroom, closet, office. 2nd/f: remodel bathroom & new stairwell. | $75,000 | |
| Dec 30, 2024 | Completed final sign-off Oct 2025 | 155 Connecticut St | Nima Construction | prop h:change of occupancy from b to e. remove non structural patitions, add ext door, replace windows inkind new toilets, sinks, kitchenette, partitions, deck & ramp (outdoor) new luxury vynil throughout, paint, interior & exteriorDetails
prop h:change of occupancy from b to e. remove non structural patitions, add ext door, replace windows inkind new toilets, sinks, kitchenette, partitions, deck & ramp (outdoor) new luxury vynil throughout, paint, interior & exterior | $250,000 |
| Nov 19, 2024 | Completed final sign-off Jul 2026 | 1201 Ortega St | R E R Construction | 1611 sf pavilion in (e) courtyard (partial enclosure). new curtain wall and bifold doors at (e) lobby. demo planting beds/ new pavers set in sand. new egress path from ne corner of courtyard to 19th ave. mech and electrical under deferred permit.Details
1611 sf pavilion in (e) courtyard (partial enclosure). new curtain wall and bifold doors at (e) lobby. demo planting beds/ new pavers set in sand. new egress path from ne corner of courtyard to 19th ave. mech and electrical under deferred permit. | $400,000 |
| Oct 9, 2024 | In progress issued Jan 2025 | 1070 Hampshire St | Peninsula Home Remodeling | revision to 202309196851. new layout at 2nd story kitchen and bathrooms. new layout 1st fl media room and bathrooms. reframe & repair damaged floor and roof framing.Details
revision to 202309196851. new layout at 2nd story kitchen and bathrooms. new layout 1st fl media room and bathrooms. reframe & repair damaged floor and roof framing. | $10,000 |
| Sep 30, 2024 | Completed final sign-off Sep 2025 | 22 Stanford Heights Av | Beyond The Horizon Construction | interior remodel of kitchen & bathroom per plans; remove non-permitted construction at 1st story, add primary bed & bathroom @ 1st fl; 1 new existing slider door, 1 new window, 1 new skylight; new shear wall wall, ceiling beam at removed load bearing kitchen wall & foundation. reinforcement s.s.d.Details
interior remodel of kitchen & bathroom per plans; remove non-permitted construction at 1st story, add primary bed & bathroom @ 1st fl; 1 new existing slider door, 1 new window, 1 new skylight; new shear wall wall, ceiling beam at removed load bearing kitchen wall & foundation. reinforcement s.s.d. | $150,000 |
| Aug 28, 2024 | Completed final sign-off Oct 2024 | 2 Genoa Pl | Jari Construction Inc | revision to pa 2018-0927-1660 & 2019-0723-6675 for changes to plan per inspector show door to lightwell correctly. change water heater to tankless and relocated at light well.Details
revision to pa 2018-0927-1660 & 2019-0723-6675 for changes to plan per inspector show door to lightwell correctly. change water heater to tankless and relocated at light well. | |
| Jul 30, 2024 | Completed final sign-off Nov 2025 | 461 Roosevelt Wy | P 3 Construction & Remodeling Inc | legalize and remodel street level office at rear of house. modify rear stairs to garage level. new laundry room at garage level. new kitchen cabinets at 2/f. remodel 2 baths at 3/f. replace deck rail at roof terrace. replace front windows in kind - glazing only. replace water heater and furnace.Details
legalize and remodel street level office at rear of house. modify rear stairs to garage level. new laundry room at garage level. new kitchen cabinets at 2/f. remodel 2 baths at 3/f. replace deck rail at roof terrace. replace front windows in kind - glazing only. replace water heater and furnace. | $150,000 |
| Jul 30, 2024 | Expired or cancelled expired Nov 2025 | 1201 Ortega St | R E R Construction | new foundations for proposed courtyard canopy (no 202400636prj). add drainage and electrical conduits. finish slab under permit# 202406174654. no work above grade.Details
new foundations for proposed courtyard canopy (no 202400636prj). add drainage and electrical conduits. finish slab under permit# 202406174654. no work above grade. | |
| Jul 10, 2024 | In progress issued Jul 2024 | 755 Ashbury St | R E R Construction | room 124: demo (e) wall, expand (e) restroom & build (n) walls to add 2nd toilet and sink. room 125: add (n) child size sink in (e) restroom. room 127: demo (2) adult size sinks and replace with (2) (n) child size sinks in restroom. demo wall between room 303 & 304. no change to (e) exit path/loads.Details
room 124: demo (e) wall, expand (e) restroom & build (n) walls to add 2nd toilet and sink. room 125: add (n) child size sink in (e) restroom. room 127: demo (2) adult size sinks and replace with (2) (n) child size sinks in restroom. demo wall between room 303 & 304. no change to (e) exit path/loads. | $15,000 |
| Jun 20, 2024 | Completed final sign-off Oct 2024 | 2 Genoa Pl | Jari Construction Inc | revision to 2018-09271660, 201907236675, 2021-0905-8036 remove proposed bike parking from architectural floor planDetails
revision to 2018-09271660, 201907236675, 2021-0905-8036 remove proposed bike parking from architectural floor plan | |
| Jun 17, 2024 | Expired or cancelled expired Nov 2025 | 1201 Ortega St | R E R Construction | demolish & rpelace in-kind cocrete slab in courtyard, sog.Details
demolish & rpelace in-kind cocrete slab in courtyard, sog. | $20,000 |
| May 29, 2024 | Completed final sign-off Aug 2024 | 755 Ashbury St | R E R Construction | removal of storage room at classroom 117. new door sign at classroom 111. re-assignment of classrooms (115,116,123, 124, 214,222 and223). improvement of evacuation plans.Details
removal of storage room at classroom 117. new door sign at classroom 111. re-assignment of classrooms (115,116,123, 124, 214,222 and223). improvement of evacuation plans. | $25,000 |
| Apr 17, 2024 | Completed final sign-off Jul 2024 | 1778 48th Av | Rt Quality Construction Services Inc | revision 202206236949 to change roof framing from tji to 2x8, change hdu to simpson strong tie ssb anchor bolts, change open cell spray foam to closed cell and change to title 24Details
revision 202206236949 to change roof framing from tji to 2x8, change hdu to simpson strong tie ssb anchor bolts, change open cell spray foam to closed cell and change to title 24 | |
| Apr 12, 2024 | Completed final sign-off Nov 2024 | 840 Lake St | R A C General Construction & Drywall Ser | unit 2: interior remodel - add new bath, remodel (e) bath, remodel kitchen, relocate doors, remove walls to consolidate closet space.Details
unit 2: interior remodel - add new bath, remodel (e) bath, remodel kitchen, relocate doors, remove walls to consolidate closet space. | $50,000 |
| Dec 4, 2023 | In progress filed Dec 2023, not yet issued | 210 Frederick St | Mario Sarmento | widen curb cut > 10 ft - ref bpa# 202304175837Details
widen curb cut > 10 ft - ref bpa# 202304175837 | $10,000 |
| Nov 14, 2023 | In progress issued Nov 2023 | 2509 Bryant St | Axel8 Construction | provide gas appliance fireplaces in 2 first story units 2509 & 2509a bryant st. ref pmw20231106418 - plum/mech. no change to approved unit sizes or location.Details
provide gas appliance fireplaces in 2 first story units 2509 & 2509a bryant st. ref pmw20231106418 - plum/mech. no change to approved unit sizes or location. | $10,000 |
| Sep 19, 2023 | In progress issued Apr 2024 | 1070 Hampshire St | Peninsula Home Remodeling | interior remodel: 1st story media rm & bathroom. 2nd story kitchen & baths. no change to use or parking.Details
interior remodel: 1st story media rm & bathroom. 2nd story kitchen & baths. no change to use or parking. | $100,000 |
| Aug 8, 2023 | Completed final sign-off Apr 2025 | 3750 Clay St | Daniel Larsen Builders | repair and resurface (e) stairs. relocate bottom run of concrete stairs. replace (e) front fence. add gate. replace roof deck rail.Details
repair and resurface (e) stairs. relocate bottom run of concrete stairs. replace (e) front fence. add gate. replace roof deck rail. | $30,000 |
| Jul 18, 2023 | In progress issued Feb 2024 | 301 Lyon St | Tripalink Builders Llc | interior renovation to create 3 new condominium units exterior work includes: replacement in kind of windows where noted. alteration of 3rd story deck guardrail for code compliance. replacement of garage door w/ pedestrian door/garage door combination.Details
interior renovation to create 3 new condominium units exterior work includes: replacement in kind of windows where noted. alteration of 3rd story deck guardrail for code compliance. replacement of garage door w/ pedestrian door/garage door combination. | $2,000,000 |
| May 17, 2023 | Completed final sign-off Dec 2023 | 4412 17th St | Level 21 Construction Company | 18' linear feet existing foundation replacement. new 74 sqft conditioned space addition in rear/drywall repair exterior siding repair/infill (e) doorway with new door new juliette balanies at(e) 2nd story rear doors fence repair at rear side.Details
18' linear feet existing foundation replacement. new 74 sqft conditioned space addition in rear/drywall repair exterior siding repair/infill (e) doorway with new door new juliette balanies at(e) 2nd story rear doors fence repair at rear side. | $27,000 |
| May 12, 2023 | Expired or cancelled cancelled Jan 2026 | 9 Clarendon Av | interior remodel - kitchen & 2 bathrooms; add (n) bath @ story; replace guardrails @ 3rd & 4th story front terraces; replace windows & doors in-kind; replace (2) furnaces; replace lighting. no changes to structure, parking or useDetails
interior remodel - kitchen & 2 bathrooms; add (n) bath @ story; replace guardrails @ 3rd & 4th story front terraces; replace windows & doors in-kind; replace (2) furnaces; replace lighting. no changes to structure, parking or use | $250,000 | |
| Apr 17, 2023 | Never finaled issued May 2023, no final | 210 Frederick St | Mario Sarmento | revise bpa 2022-0622-6802 for driveway modification & new fence(reference 202212027567 for framing).Details
revise bpa 2022-0622-6802 for driveway modification & new fence(reference 202212027567 for framing). | $1,000 |
| Jan 13, 2023 | Completed final sign-off Sep 2023 | 2839 23rd St | Axel8 Construction | add ventless washer/ dryer to (e) closetDetails
add ventless washer/ dryer to (e) closet | $3,800 |
| Dec 15, 2022 | Completed final sign-off Feb 2024 | 3141 Jackson St | revision to 202203250866 to add structural support and interior wall changes. no added height or mass, no ext changesDetails
revision to 202203250866 to add structural support and interior wall changes. no added height or mass, no ext changes | $500 | |
| Dec 9, 2022 | Never finaled filed Dec 2022, never issued | 347 10th St | 14' horizontal addition to increase unit sizes & add bedrooms. 2-story vertical addition to add new 5 bedroom townhouse unit. addition is set back 10' from front facade. depth decreases from 61' to 60'. height increases from 23.5' to 44'. sesimic upgrades, add fire sprinklers, egress & code updates.Details
14' horizontal addition to increase unit sizes & add bedrooms. 2-story vertical addition to add new 5 bedroom townhouse unit. addition is set back 10' from front facade. depth decreases from 61' to 60'. height increases from 23.5' to 44'. sesimic upgrades, add fire sprinklers, egress & code updates. | $1,000,000 | |
| Dec 5, 2022 | Completed final sign-off Dec 2022 | 208 Noe St | B-Side Inc. | add 2 skylights to roof. ref pa 201801118370.Details
add 2 skylights to roof. ref pa 201801118370. | |
| Dec 2, 2022 | Never finaled issued Dec 2022, no final | 210 Frederick St | Mario Sarmento | revision to pa#2022-0622-6802, structural changes resubmitting for exposure of existing framing.Details
revision to pa#2022-0622-6802, structural changes resubmitting for exposure of existing framing. | |
| Nov 16, 2022 | Completed final sign-off Jun 2024 | 2965 Mission St | accessible business entrance program per ordinance 51-16 install powered door acturator per plan for compliance w/the abe program abe# 2019111067840Details
accessible business entrance program per ordinance 51-16 install powered door acturator per plan for compliance w/the abe program abe# 2019111067840 | $1,000 | |
| Nov 16, 2022 | Never finaled filed Nov 2022, never issued | 434 Cortland Av | demolish a 1 story,type b-v. n/c bpa#202201196200Details
demolish a 1 story,type b-v. n/c bpa#202201196200 | $40,000 | |
| Nov 16, 2022 | Never finaled filed Nov 2022, never issued | 432 Cortland Av | demolish a 1 story bldg.low rise, type b-v. n/c bpa #201709077207Details
demolish a 1 story bldg.low rise, type b-v. n/c bpa #201709077207 | $40,000 | |
| Sep 29, 2022 | Completed final sign-off Sep 2023 | 1014 Castro St | Level 21 Construction Company | revision to bpa#202103116324, change lightwell & backwall to stuccoDetails
revision to bpa#202103116324, change lightwell & backwall to stucco | |
| Aug 30, 2022 | Expired or cancelled expired Nov 2025 | 2829 23rd St | Axel8 Construction | revision to site bpa#2019/0314/5203. maintain (e) mechanical room & reduce the size. interior layout changes. no change to the unit area. window w103 to remian for eero; door d101 removed from scope. replace east patio with a sump pump well at the north east corner of the building.Details
revision to site bpa#2019/0314/5203. maintain (e) mechanical room & reduce the size. interior layout changes. no change to the unit area. window w103 to remian for eero; door d101 removed from scope. replace east patio with a sump pump well at the north east corner of the building. | |
| Aug 30, 2022 | Completed final sign-off Dec 2025 | 2509 Bryant St | Axel8 Construction | revision to bpa#201903145204 to provide for future work as approved by planning per #202/0921/4663.modified interior layout & windows,requesting exposure waiver for unit "e";elimination of shear wall @ grid line 4;(n)shear wall @ grid line 1.Details
revision to bpa#201903145204 to provide for future work as approved by planning per #202/0921/4663.modified interior layout & windows,requesting exposure waiver for unit "e";elimination of shear wall @ grid line 4;(n)shear wall @ grid line 1. | |
| Jul 15, 2022 | Completed final sign-off Sep 2023 | 1014 Castro St | Level 21 Construction Company | new skylight fire rated, parapet, new solar tube to 1st story bath, replace living rm windows in kind, aluminum clad wood windows. change concrete slab to pavers in rear patiosDetails
new skylight fire rated, parapet, new solar tube to 1st story bath, replace living rm windows in kind, aluminum clad wood windows. change concrete slab to pavers in rear patios | $10,000 |
| Jun 23, 2022 | Completed final sign-off Jul 2024 | 1778 48th Av | Rt Quality Construction Services Inc | new 200 sqft accessory structure on the backyard for office/gym.Details
new 200 sqft accessory structure on the backyard for office/gym. | $110,000 |
| Jun 22, 2022 | Completed final sign-off Jul 2022 | 210 Frederick St | Mario Sarmento | to obtain final inspection for work approved under pa# 201510028709. all work is complete.Details
to obtain final inspection for work approved under pa# 201510028709. all work is complete. | |
| Jun 22, 2022 | Never finaled issued Oct 2022, no final | 210 Frederick St | Mario Sarmento | update two unit's kitchens, remodel primary bed & bath, remodel other bathrooms, add dorrmer per za-bulletin no.3; replace doors & windows per plan. fence under defferred permitDetails
update two unit's kitchens, remodel primary bed & bath, remodel other bathrooms, add dorrmer per za-bulletin no.3; replace doors & windows per plan. fence under defferred permit | $200,000 |
| May 16, 2022 | Completed final sign-off Jun 2024 | 2965 Mission St | commercial storefront merger for arts activity. add interior door. interior work onlyDetails
commercial storefront merger for arts activity. add interior door. interior work only | $500 | |
| Mar 25, 2022 | Completed final sign-off Feb 2024 | 3141 Jackson St | first story remodel: add bedroom, bath to habitable spacing unit above. include replacing damaged slab on grade and columns. replace front window with wood or alum. clad wood window per plan.Details
first story remodel: add bedroom, bath to habitable spacing unit above. include replacing damaged slab on grade and columns. replace front window with wood or alum. clad wood window per plan. | $75,000 | |
| Jan 19, 2022 | Never finaled filed Jan 2022, never issued | 434 Cortland Av | to erect a type 5b, 3-story over basement building consisting of four dwelling units and one retail commercial space at street level provide five class 1 and two class 2 bike parking spaces.Details
to erect a type 5b, 3-story over basement building consisting of four dwelling units and one retail commercial space at street level provide five class 1 and two class 2 bike parking spaces. | $1,750,000 | |
| Jan 10, 2022 | Completed final sign-off Oct 2024 | 628 29th St | Mario Sarmento | new concrete parking deck on pt joists with steel beams, fence and parking are not within front set back; fence is less than 10' high.Details
new concrete parking deck on pt joists with steel beams, fence and parking are not within front set back; fence is less than 10' high. | $50,000 |
| Dec 14, 2021 | Completed final sign-off Aug 2022 | 612 Haight St | Unlimited Builders | add 30" parapet to roof as required by inspector. ref pa 2021-0308-6101Details
add 30" parapet to roof as required by inspector. ref pa 2021-0308-6101 | |
| Nov 23, 2021 | Expired or cancelled withdrawn Jan 2022 | 628 29th St | Mario Sarmento | new concrete parking deck on pt joists with steel beams. fence and parking are not within the front setback. fence is less than 10' high.Details
new concrete parking deck on pt joists with steel beams. fence and parking are not within the front setback. fence is less than 10' high. | $50,000 |
| Nov 23, 2021 | Expired or cancelled expired May 2023 | 684 08th Av | B-Side Inc. | guest room renovation at ground floor with new patio door. 2nd and 3rd floor window replacement with a french double door and new juliet balconyDetails
guest room renovation at ground floor with new patio door. 2nd and 3rd floor window replacement with a french double door and new juliet balcony | $30,000 |
| Nov 10, 2021 | Completed final sign-off Aug 2024 | 1457 23rd Av | Mario Sarmento | interior remodel: convert unconditioned garage to [n] living, kitchen, bath. add 27sf as downward infill@ garage level. infill two lightwells. remodel bedrooms & 3 baths on 2nd story. rebuild front steps in kind. relocate garage door.Details
interior remodel: convert unconditioned garage to [n] living, kitchen, bath. add 27sf as downward infill@ garage level. infill two lightwells. remodel bedrooms & 3 baths on 2nd story. rebuild front steps in kind. relocate garage door. | $250,000 |
| Sep 9, 2021 | Completed final sign-off Oct 2024 | 2 Genoa Pl | revision to pa 201907236675 due to as built conditions. two windows in living room changed to one larger window, unit entry moved over several inches, structural shear wall relocated and footings and structural details modified per clouded structural drawings.Details
revision to pa 201907236675 due to as built conditions. two windows in living room changed to one larger window, unit entry moved over several inches, structural shear wall relocated and footings and structural details modified per clouded structural drawings. | ||
| Jun 28, 2021 | Expired or cancelled withdrawn Jan 2024 | 20 Paloma Av | demolition of a type 5, 1 story, detach garage.Details
demolition of a type 5, 1 story, detach garage. | $5,000 | |
| Jun 9, 2021 | Expired or cancelled suspend Jul 2026 | 3720 23rd St | Mario Sarmento | add a vertical addition comprised of 3 bedrooms, 2 bathrooms, roof deck and stairs. replace foundations in unconditioned basement. remodel interior of first floor.Details
add a vertical addition comprised of 3 bedrooms, 2 bathrooms, roof deck and stairs. replace foundations in unconditioned basement. remodel interior of first floor. | $350,000 |
| Mar 18, 2021 | Never finaled issued Jan 2023, no final | 179 Kensington Wy | 1. remodel existing home, including addition of 1 bathroom 2. horizontal addition at rear of home (within existing footprint) at basement, new 1st & new 2nd stories. (3. creation of adu) - under separate permitDetails
1. remodel existing home, including addition of 1 bathroom 2. horizontal addition at rear of home (within existing footprint) at basement, new 1st & new 2nd stories. (3. creation of adu) - under separate permit | $750,000 | |
| Mar 11, 2021 | Completed final sign-off Sep 2023 | 1014 Castro St | Level 21 Construction Company | remodeling kitchen, bathroom and dining room. adding bathroom and bedroom in (e) basement. excavating part of rear yeard for new 1st story access.Details
remodeling kitchen, bathroom and dining room. adding bathroom and bedroom in (e) basement. excavating part of rear yeard for new 1st story access. | $145,000 |
| Mar 8, 2021 | Completed final sign-off Aug 2022 | 612 Haight St | Unlimited Builders | 3rd fl only: remodel kitchen and bath 1. add skylights, doorand windows in kitchen. add storage loft (mezzanine) at bedroom. in-kind replacement of all other 3rd story windows.Details
3rd fl only: remodel kitchen and bath 1. add skylights, doorand windows in kitchen. add storage loft (mezzanine) at bedroom. in-kind replacement of all other 3rd story windows. | $100,000 |
| Mar 8, 2021 | Expired or cancelled cancelled Nov 2024 | 2808 Fulton St | add (n) non load bearing partition and door at 2nd floorDetails
add (n) non load bearing partition and door at 2nd floor | $1,000 | |
| Feb 18, 2021 | Never finaled filed Feb 2021, never issued | 491 23rd Av | horizontal addition. and add 2nd unit on 1st floor under separate permit (bpa#2022-0624-7065 per state adu program). remodel of all stories w/ (n) bathrooms & (n) kitchen. (n) stairs @ 1st story. (n) deck @ 2nd story. no change to height, occupancy or parking.Details
horizontal addition. and add 2nd unit on 1st floor under separate permit (bpa#2022-0624-7065 per state adu program). remodel of all stories w/ (n) bathrooms & (n) kitchen. (n) stairs @ 1st story. (n) deck @ 2nd story. no change to height, occupancy or parking. | $450,000 | |
| Sep 21, 2020 | Never finaled issued Jun 2022, no final | 2507 Bryant St | create 3 adu's per ordinance 162-16 within (e) live/work unit. add dormer per za bulletin no.3. add (n) stairs on 1/f and alter 1st story as indicated in drawings. reconfigure exit stair from basement of 2501 bryant under deferred permit. rev to g/f adu units under pa201903145204.Details
create 3 adu's per ordinance 162-16 within (e) live/work unit. add dormer per za bulletin no.3. add (n) stairs on 1/f and alter 1st story as indicated in drawings. reconfigure exit stair from basement of 2501 bryant under deferred permit. rev to g/f adu units under pa201903145204. | $200,000 | |
| Aug 20, 2020 | In progress issued Aug 2024 | 657 Natoma St | E. N. A Construction Inc. | remodel 4 unit, 2 story building. replace foundation, replace rear stairs and deck, no change to occupancy or number of units, infill lightwell, where indicated, no vertical or horizontal addition.Details
remodel 4 unit, 2 story building. replace foundation, replace rear stairs and deck, no change to occupancy or number of units, infill lightwell, where indicated, no vertical or horizontal addition. | $250,000 |
| Jun 29, 2020 | In progress issued Sep 2024 | 20 Paloma Av | horizontal addition. add new basement storage, remodel of all stories, no change to occupancy or parking.Details
horizontal addition. add new basement storage, remodel of all stories, no change to occupancy or parking. | $500,000 | |
| Feb 28, 2020 | Completed final sign-off Nov 2020 | 755 Ashbury St | R E R Construction | adding wooden stage w/ steps @ the multipurpose room in the basement. adding (n) ramp to acces the stage. adding movable curtain in the multipurpose room.Details
adding wooden stage w/ steps @ the multipurpose room in the basement. adding (n) ramp to acces the stage. adding movable curtain in the multipurpose room. | $1,800 |
| Feb 5, 2020 | Never finaled issued Feb 2020, no final | 5024 Fulton St | revision to pa 2019-0107-9714 add exist gate to existing fenceDetails
revision to pa 2019-0107-9714 add exist gate to existing fence | $200 | |
| Jan 15, 2020 | Completed final sign-off Dec 2022 | 208 Noe St | B-Side Inc. | issue in accordance with board of appeals special conditions permit per #19-061, date 8/7/2019Details
issue in accordance with board of appeals special conditions permit per #19-061, date 8/7/2019 | $5,000 |
| Sep 25, 2019 | Completed final sign-off Nov 2020 | 628 29th St | Mario Sarmento | revision to pa# 2014-1016-9104: revise deck new stairs and firewall at front of entry: alteration of previously permitted deck; no changes to building area, coverage, height or parking.Details
revision to pa# 2014-1016-9104: revise deck new stairs and firewall at front of entry: alteration of previously permitted deck; no changes to building area, coverage, height or parking. | $5,000 |
| Sep 23, 2019 | Completed final sign-off Jun 2020 | 1201 Ortega St | R E R Construction | remodel basement studio. remove and add walls in area; add ventilation to resulting room 20.Details
remodel basement studio. remove and add walls in area; add ventilation to resulting room 20. | $1,300 |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 755 Ashbury St | R E R Construction | new closet & built-in base cabinet in rm. 214, permanently secure unneeded fire door (outside rm 214) in open position, change grade of room 214 from 3rd grade to 2nd grade, disconnect of alarm & magnetic hold-open under deferred permitDetails
new closet & built-in base cabinet in rm. 214, permanently secure unneeded fire door (outside rm 214) in open position, change grade of room 214 from 3rd grade to 2nd grade, disconnect of alarm & magnetic hold-open under deferred permit | $1,400 |
| Aug 16, 2019 | Never finaled issued Sep 2021, no final | 79 Uranus Tr | 1st fl:12x15 horizontal add'n. rear yard: add pool per sfpc 136(c)24(b). 3rd fl: demo (e) deck & rebuild 5' from lot line. interior remodel. 1st fl: (n) bedroom, bath & stair. 2nd fl: remodel kitchen/bath,entryhall, new deck.Details
1st fl:12x15 horizontal add'n. rear yard: add pool per sfpc 136(c)24(b). 3rd fl: demo (e) deck & rebuild 5' from lot line. interior remodel. 1st fl: (n) bedroom, bath & stair. 2nd fl: remodel kitchen/bath,entryhall, new deck. | $150,000 | |
| Jul 24, 2019 | Completed final sign-off Dec 2022 | 1201 Ortega St | W C S S Dba Solid Build Construction | remodel existing libary to create a podcast recording studio.Details
remodel existing libary to create a podcast recording studio. | $12,000 |
| Jul 23, 2019 | Completed final sign-off Oct 2024 | 2 Genoa Pl | Sf Gonzalez Concrete Inc. | structural work to permit #201809271660 for cost, see prior permit @ $90,000. no exteroir work under this permit. including minor plan changes, energy sheets & electrical plan.Details
structural work to permit #201809271660 for cost, see prior permit @ $90,000. no exteroir work under this permit. including minor plan changes, energy sheets & electrical plan. | $25,000 |
| Jul 17, 2019 | Never finaled issued Aug 2019, no final | 755 Ashbury St | R E R Construction | add a door to room 201a and to room 203 (2nd floor); add a wall and door to create room 301b (3rd floor) ref app#201703131280Details
add a door to room 201a and to room 203 (2nd floor); add a wall and door to create room 301b (3rd floor) ref app#201703131280 | $1,500 |
| Mar 29, 2019 | Expired or cancelled cancelled Nov 2022 | 445 Natoma St | to comply with the accessible business entrance program. ** maher: n/a **Details
to comply with the accessible business entrance program. ** maher: n/a ** | $360 | |
| Mar 14, 2019 | Expired or cancelled expired Nov 2025 | 2829 23rd St | Axel8 Construction | remodel (e) live/work space at 2829 bryant st into (n) adu per ord# 162-16. rebuild (e) stairs leading down to the (n) space. create lightwell & patio @ front of (n) space. rebuild exterior stairs & walkway leading to (e) upper flrs. in combination w/ exterior work proposed @ 2837 23rd st.Details
remodel (e) live/work space at 2829 bryant st into (n) adu per ord# 162-16. rebuild (e) stairs leading down to the (n) space. create lightwell & patio @ front of (n) space. rebuild exterior stairs & walkway leading to (e) upper flrs. in combination w/ exterior work proposed @ 2837 23rd st. | $50,000 |
| Mar 14, 2019 | Completed final sign-off Dec 2025 | 2509 Bryant St | Axel8 Construction | create adu per ord# 162-16 w/ (e) unit @ 2509 bryant st. remodel (e) unit. deepen (e) entry to create (n) entry porch. plant street tree. no change to bldg height. **maher n/a**Details
create adu per ord# 162-16 w/ (e) unit @ 2509 bryant st. remodel (e) unit. deepen (e) entry to create (n) entry porch. plant street tree. no change to bldg height. **maher n/a** | $50,000 |
| Mar 14, 2019 | Expired or cancelled cancelled Aug 2022 | 2837 23rd St | demo (e) exterior stairs & walkways & rebuild (n) stair/walkway in courtyard. remodel (e) grd flr to create 2 adus per ord# 162-16. remodel (e) garage to include trash rm & 7 (n) class-1 bike parkinbg. plant 1 street tree. relocate gas meters. no change to bldg height. **maher n/a**Details
demo (e) exterior stairs & walkways & rebuild (n) stair/walkway in courtyard. remodel (e) grd flr to create 2 adus per ord# 162-16. remodel (e) garage to include trash rm & 7 (n) class-1 bike parkinbg. plant 1 street tree. relocate gas meters. no change to bldg height. **maher n/a** | $100,000 | |
| Mar 12, 2019 | Completed final sign-off Sep 2019 | 715 Marina Bl | Mario Sarmento | add bath fan to 2nd story bath. vent thru roofDetails
add bath fan to 2nd story bath. vent thru roof | $1,000 |
| Mar 7, 2019 | Completed final sign-off Sep 2019 | 69 Gough St | B-Side Inc. | revision to pa# 201901230985; elec (lighting) & mech (venting)Details
revision to pa# 201901230985; elec (lighting) & mech (venting) | $10,000 |
| Mar 7, 2019 | Completed final sign-off Nov 2020 | 628 29th St | remodel on 2nd fl. relocate (r) kitchen and (e) bathe no work on 1st fl. or roof,no changes to bldg area, coverage, height or parking no structuralDetails
remodel on 2nd fl. relocate (r) kitchen and (e) bathe no work on 1st fl. or roof,no changes to bldg area, coverage, height or parking no structural | $15,000 | |
| Jan 23, 2019 | Completed final sign-off Sep 2019 | 69 Gough St | B-Side Inc. | tenant improvement to include new accessible bath, new interior stairs to rear patio and storage. new storefront doors and windows, new interior partitoins, cabinets, sinks, new utilities, elec, mechDetails
tenant improvement to include new accessible bath, new interior stairs to rear patio and storage. new storefront doors and windows, new interior partitoins, cabinets, sinks, new utilities, elec, mech | $120,000 |
| Jan 9, 2019 | Never finaled issued Aug 2020, no final | 2763 22nd St | vertical addition & remodel (e) sfh: create 1br residential unit @ 1st flr; remodel 3rd flr. add stairs to connect to 2nd flr; add (n) bath @ 3rd flr; construct (n) roof over rear 2/3 of structure, (n) street tree.Details
vertical addition & remodel (e) sfh: create 1br residential unit @ 1st flr; remodel 3rd flr. add stairs to connect to 2nd flr; add (n) bath @ 3rd flr; construct (n) roof over rear 2/3 of structure, (n) street tree. | $150,000 | |
| Jan 7, 2019 | Completed final sign-off Aug 2022 | 5024 Fulton St | L & G Construction | add 3rd unit to botom story of (e) apartment bldg. fire sprinklers under deferred permit.Details
add 3rd unit to botom story of (e) apartment bldg. fire sprinklers under deferred permit. | $30,000 |
| Dec 14, 2018 | Never finaled issued Jul 2019, no final | 1935 19th Av | Rivera Construction, R E R Construction | rev to pa# 201706260314 s-1 r/2; foundation system for pre-manufactured classroom.Details
rev to pa# 201706260314 s-1 r/2; foundation system for pre-manufactured classroom. |