16 permits since 2000 (contractor on 16 permits, authorized agent-others on 1 permit): 15 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 29, 2026 | Completed final sign-off Aug 2026 | 638 38th Av | E. N. A Construction Inc. | install 46.5" x 46.5" skylight at kitchen-all existing roof framing to remain, no changes to structure.Details
install 46.5" x 46.5" skylight at kitchen-all existing roof framing to remain, no changes to structure. | $2,000 |
| Apr 8, 2026 | Completed final sign-off Apr 2026 | 2837 23rd St | E. N. A Construction Inc. | administrative ref pa 202512222366 remove deferred permits fire alarm system & fire sprinklersDetails
administrative ref pa 202512222366 remove deferred permits fire alarm system & fire sprinklers | |
| Jan 12, 2026 | Completed final sign-off Feb 2026 | 4117 Cesar Chavez St | E. N. A Construction Inc. | to obtain final inspection for pa #202305198161. all work is complete.Details
to obtain final inspection for pa #202305198161. all work is complete. | |
| Dec 22, 2025 | Completed final sign-off Apr 2026 | 2837 23rd St | E. N. A Construction Inc. | repair foundation at existing garage, work shop, storage space, trash room and bike storage.Details
repair foundation at existing garage, work shop, storage space, trash room and bike storage. | $10,000 |
| Oct 6, 2025 | Completed final sign-off Feb 2026 | 4117 Cesar Chavez St | E. N. A Construction Inc. | rev to pa# 2023-0519-8161: to reflect structural rev for the sky light at the 3rd fl bath.Details
rev to pa# 2023-0519-8161: to reflect structural rev for the sky light at the 3rd fl bath. | $1,000 |
| Jun 10, 2025 | Completed final sign-off Nov 2025 | 1756 Union St | E. N. A Construction Inc. | revision to 202310279686. reconfigure meter cabinet location at 1st flDetails
revision to 202310279686. reconfigure meter cabinet location at 1st fl | $1,250 |
| Jun 17, 2024 | Completed final sign-off Apr 2025 | 2509 Bryant St | E. N. A Construction Inc. | replace dry-rotted treads & stringers of exterior rear stairs less than 50% repairDetails
replace dry-rotted treads & stringers of exterior rear stairs less than 50% repair | $250 |
| Apr 3, 2024 | Completed final sign-off Aug 2024 | 380 10th St | E. N. A Construction Inc. | unit #10: to remodel (2) bathrooms, one at the 1/f and the other at the 2/f. no structural work to be done. relocate the (e) laundry area - washer/dryer- from the 1st floor to the 2nd floor.Details
unit #10: to remodel (2) bathrooms, one at the 1/f and the other at the 2/f. no structural work to be done. relocate the (e) laundry area - washer/dryer- from the 1st floor to the 2nd floor. | $35,000 |
| Mar 14, 2024 | Completed final sign-off Nov 2025 | 1756 Union St | E. N. A Construction Inc. | revision to permit 202310279686. structural framing revisions based on existing conditions. removal of existing masonry fireplace at front (3 levels). all interior work.Details
revision to permit 202310279686. structural framing revisions based on existing conditions. removal of existing masonry fireplace at front (3 levels). all interior work. | $1,000 |
| Oct 27, 2023 | Completed final sign-off Nov 2025 | 1756 Union St | E. N. A Construction Inc. | 3/f unit 1758: reconfigure kithcen & dining areas, adding 2nd bath for primary bedrm, suite & new laundry area; 2/f unit 1756: remodel kitchen area and the addition of 2nd bath; unit 1754: a infill area at 1/f level under an existing 2nd flr rm to add new unconditioned laundry area.Details
3/f unit 1758: reconfigure kithcen & dining areas, adding 2nd bath for primary bedrm, suite & new laundry area; 2/f unit 1756: remodel kitchen area and the addition of 2nd bath; unit 1754: a infill area at 1/f level under an existing 2nd flr rm to add new unconditioned laundry area. | $275,000 |
| Apr 21, 2023 | Completed final sign-off Sep 2023 | 3121 20th St | E. N. A Construction Inc. | remove plywood from back approx 12ft x 30ft sq ft for now. remove building paper and damage fireproof drywall. minor dry rot repair (in kind) call inspector if major dryrot. take photos as required.Details
remove plywood from back approx 12ft x 30ft sq ft for now. remove building paper and damage fireproof drywall. minor dry rot repair (in kind) call inspector if major dryrot. take photos as required. | $15,000 |
| Jun 9, 2022 | Completed final sign-off Oct 2024 | 338 Cumberland St | E. N. A Construction Inc. | revision to pa# 202202077491. revisions to framing based on field conditions. remove portion of non habitable attic floor above living room. relocate skylight. attic to remain non habitable.Details
revision to pa# 202202077491. revisions to framing based on field conditions. remove portion of non habitable attic floor above living room. relocate skylight. attic to remain non habitable. | |
| Feb 7, 2022 | Completed final sign-off Oct 2024 | 338 Cumberland St | E. N. A Construction Inc. | remodel to (e) 2/f condo.reconfig kithcen & bathroom. remodel partitions and walls. replace rear facing windows and doors. new access stair to attic, relocate heater and furnace to atic. new skylight not visible from street.Details
remodel to (e) 2/f condo.reconfig kithcen & bathroom. remodel partitions and walls. replace rear facing windows and doors. new access stair to attic, relocate heater and furnace to atic. new skylight not visible from street. | $45,000 |
| Oct 28, 2021 | Completed final sign-off Mar 2022 | 880 Corbett Av | E. N. A Construction Inc. | remove existing non bearing wall between kitchen and dining at unit 4Details
remove existing non bearing wall between kitchen and dining at unit 4 | $2,000 |
| Aug 20, 2020 | In progress issued Aug 2024 | 657 Natoma St | E. N. A Construction Inc. | remodel 4 unit, 2 story building. replace foundation, replace rear stairs and deck, no change to occupancy or number of units, infill lightwell, where indicated, no vertical or horizontal addition.Details
remodel 4 unit, 2 story building. replace foundation, replace rear stairs and deck, no change to occupancy or number of units, infill lightwell, where indicated, no vertical or horizontal addition. | $250,000 |
| Jul 19, 2020 | Completed final sign-off May 2021 | 78 Mars St | E. N. A Construction Inc. | third story interior remodel. remodel kitchen and bath. replace (e) kitchen windows & glass door withne windows, glass door and window box.Details
third story interior remodel. remodel kitchen and bath. replace (e) kitchen windows & glass door withne windows, glass door and window box. | $40,000 |