John Lau
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- Design Consultants Group Inc.
- Based in
- San Francisco
- On San Francisco permits
- Dec 2002 to Sep 2026
526 permits since 2000 (engineer on 404 permits, architect on 74 permits, authorized agent-others on 48 permits, designer on 6 permits, attorney on 1 permit): 302 completed, 9 in progress, 99 never finaled, 116 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 526.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 2, 2026 | In progress issued Sep 2026 | 1780 Fulton St | J Construction Solutions | tenant improvement of electronics shop. includes new restroom.Details
tenant improvement of electronics shop. includes new restroom. | $40,000 |
| Feb 13, 2026 | In progress issued Sep 2026 | 766 Hayes St | 1/f:new bedrms and living spaces. 766: new bedroom space accessible from west facing light crt with new wetbar,full bath. 768: new living space,wet bard, bedroom space,(n) 1-1/2 bath and new internal stairs. new common hall,storage,mech spaces. 2/f: renovate (e) space,(n) stair connection to lwr fl.Details
1/f:new bedrms and living spaces. 766: new bedroom space accessible from west facing light crt with new wetbar,full bath. 768: new living space,wet bard, bedroom space,(n) 1-1/2 bath and new internal stairs. new common hall,storage,mech spaces. 2/f: renovate (e) space,(n) stair connection to lwr fl. | $120,000 | |
| Sep 12, 2025 | In progress filed Sep 2025, not yet issued | 7333 Geary Bl | convert garage into a 316 sq. ft adu (studio) under state adu program per goverment code section 65852.2Details
convert garage into a 316 sq. ft adu (studio) under state adu program per goverment code section 65852.2 | $25,000 | |
| Aug 26, 2025 | In progress issued Sep 2025 | 766 Hayes St | voluntary foundation capping. add level area at back yard w 3' max retaining wall. remove e brick fireplace.Details
voluntary foundation capping. add level area at back yard w 3' max retaining wall. remove e brick fireplace. | $30,000 | |
| Aug 17, 2025 | In progress filed Aug 2025, not yet issued | 1700 20th St | provide state adu (unit #b, 752 sq ft) at g/f & basement per gvt code 65852.2. cade/commercial space alteration on g/f & basement under #202503061721. no work to (e) residence on 2/f. isntall ceiling hung furnace within adu. provide instant water heater in garage.Details
provide state adu (unit #b, 752 sq ft) at g/f & basement per gvt code 65852.2. cade/commercial space alteration on g/f & basement under #202503061721. no work to (e) residence on 2/f. isntall ceiling hung furnace within adu. provide instant water heater in garage. | $100,000 | |
| Mar 31, 2025 | Completed final sign-off Feb 2026 | 4076 26th St | replace existing damaged front stair with wood and concrete stair.Details
replace existing damaged front stair with wood and concrete stair. | $12,000 | |
| Feb 27, 2025 | Expired or cancelled withdrawn Sep 2025 | 766 Hayes St | Darc Ventures Inc Dba Spl Construction S | foundation upgrade and 174 sq ft infill of unconditioned space beneth cantilevered rooms and associated revision rear facade at ground floor.Details
foundation upgrade and 174 sq ft infill of unconditioned space beneth cantilevered rooms and associated revision rear facade at ground floor. | $95,000 |
| Jan 9, 2025 | Completed final sign-off Feb 2026 | 2154 42nd Av | J P Petrie Associates Inc | revision to bp#201908239699s, to revise master bedroom entrance, (e) walk-in closet on 2nd flr, and fixture configuration in 2nd floor and master bath; add one (n) skylight located in master bathroom. add (e) wet bar in family room on 2nd fl.Details
revision to bp#201908239699s, to revise master bedroom entrance, (e) walk-in closet on 2nd flr, and fixture configuration in 2nd floor and master bath; add one (n) skylight located in master bathroom. add (e) wet bar in family room on 2nd fl. | $20,000 |
| Dec 11, 2024 | In progress issued Dec 2024 | 3470 16th St | Flmc Development Corp Dba Adamo Campagna | structural revision to pa #202209233071. revision to framing and foundation.Details
structural revision to pa #202209233071. revision to framing and foundation. | $10,000 |
| Dec 2, 2024 | Expired or cancelled expired Jan 2026 | 305 Carl St | repair fire damaged rear building. includes replacing ceiling and framing at living rm, replace drywall. reconfig and remodel e kitchen, rplace in kind 13 e alum windows to wood windowsDetails
repair fire damaged rear building. includes replacing ceiling and framing at living rm, replace drywall. reconfig and remodel e kitchen, rplace in kind 13 e alum windows to wood windows | $40,000 | |
| Nov 7, 2024 | Expired or cancelled expired Oct 2025 | 1349 Taraval St | D & A Builders Inc | revision to approved pa #201508033190 & 201805098696 & 201805098711: revise the windows, doors, & parapat on the facade to be as-build. detail no change and shall follow previous pa # 201805098696 & 201805098711.Details
revision to approved pa #201508033190 & 201805098696 & 201805098711: revise the windows, doors, & parapat on the facade to be as-build. detail no change and shall follow previous pa # 201805098696 & 201805098711. | $15,000 |
| Oct 16, 2024 | In progress issued Jan 2025 | 1747 Buchanan St | 328 Construction, Hong's General Construction Inc | tenant impovement to e ground floor restaurant at 1747 buchanan stDetails
tenant impovement to e ground floor restaurant at 1747 buchanan st | $180,000 |
| May 24, 2024 | Completed final sign-off Mar 2025 | 562 Green St | replace extg entrance door and install automatic door opener in compliance with san francisco accessible business entrance program. abe #202001311606Details
replace extg entrance door and install automatic door opener in compliance with san francisco accessible business entrance program. abe #202001311606 | $10,000 | |
| Mar 7, 2024 | Expired or cancelled cancelled Nov 2024 | 3864 24th St | Bai Construction | rev to pa 201807275807 soft-story retrofit in compliance with ccsf soft-story ordinance 66-13Details
rev to pa 201807275807 soft-story retrofit in compliance with ccsf soft-story ordinance 66-13 | |
| Jan 23, 2024 | Expired or cancelled cancelled Mar 2024 | 7333 Geary Bl | Sincere Construction Company Inc | convert garage into a 316 sq ft adu (studio).Details
convert garage into a 316 sq ft adu (studio). | $25,000 |
| Jan 19, 2024 | Completed final sign-off Feb 2025 | 2465 Filbert St | P3 Builders | revision to 202309217120 install steel beam at unit 4Details
revision to 202309217120 install steel beam at unit 4 | $20,000 |
| Nov 21, 2023 | Completed final sign-off Mar 2024 | 301 Ulloa St | Kingswood Construction | correct the missing water proofing of the foundation as required in pa# 201608084409. install new french drain connect to the city sewer line. add new led lighting with motion sensors at rear wallDetails
correct the missing water proofing of the foundation as required in pa# 201608084409. install new french drain connect to the city sewer line. add new led lighting with motion sensors at rear wall | $10,000 |
| Oct 20, 2023 | Completed final sign-off Nov 2024 | 431 27th Av | revision to 202305198180. remove e stair and landing at right side of bldg. reconfigure kitchen layout. replace window at rear of bldg. reconfigure new office layout at 1st fl.Details
revision to 202305198180. remove e stair and landing at right side of bldg. reconfigure kitchen layout. replace window at rear of bldg. reconfigure new office layout at 1st fl. | $20,000 | |
| Sep 14, 2023 | Completed final sign-off Dec 2023 | 4538 Irving St | J P Petrie Associates Inc | to comply w/accessible business entrance program/technical infeasibility hardship/ord 51-16, abe#202209164482Details
to comply w/accessible business entrance program/technical infeasibility hardship/ord 51-16, abe#202209164482 | |
| Aug 29, 2023 | Completed final sign-off Mar 2024 | 254 Roosevelt Wy | Level 8 Construction Inc | comply w/nov 202308750 replacement of exterior stair in the top floor unit. replacement consist of new 42' stair railing, new post sistered to existing and add new beam under (e) stringer. replace in kind 4 new windows at rearDetails
comply w/nov 202308750 replacement of exterior stair in the top floor unit. replacement consist of new 42' stair railing, new post sistered to existing and add new beam under (e) stringer. replace in kind 4 new windows at rear | $7,000 |
| Aug 28, 2023 | Never finaled filed Aug 2023, never issued | 2370 Market St | Wesco General Contracting Inc | remedy disability access issues identified in the gategory checklist compliance business entrance program. accissible business entrance program per ordinance 51-16 abe 201912310519Details
remedy disability access issues identified in the gategory checklist compliance business entrance program. accissible business entrance program per ordinance 51-16 abe 201912310519 | $6,000 |
| Jan 12, 2023 | Never finaled issued Feb 2023, no final | 566 34th Av | Trust 2 Build, Llc. | rev to pa# 201505287406: ground fl: to add new wet bar in family rm and change the bathtub to shower, 3/fl: reconfigure kitchen, dining and living rms, add new pantry, 4/fl: enlarge master bath and walk-in closet, structural revisions per plan. other details not change, shall follow prev approved.Details
rev to pa# 201505287406: ground fl: to add new wet bar in family rm and change the bathtub to shower, 3/fl: reconfigure kitchen, dining and living rms, add new pantry, 4/fl: enlarge master bath and walk-in closet, structural revisions per plan. other details not change, shall follow prev approved. | |
| Dec 30, 2022 | Completed final sign-off Jul 2023 | 498 Clement St | B R S Construction | comply with sf accessible business entrance program ordinance 51-16 and 102-18 abe 202206241726 automatic door opener at storefrontDetails
comply with sf accessible business entrance program ordinance 51-16 and 102-18 abe 202206241726 automatic door opener at storefront | $5,000 |
| Dec 27, 2022 | Expired or cancelled withdrawn Nov 2023 | 1038 Stockton St | to comply with accessible business entrance (abe) program per ordinance 51-16. install new automatic power door operators and replace a step with a ramp. ref abe 201906285933Details
to comply with accessible business entrance (abe) program per ordinance 51-16. install new automatic power door operators and replace a step with a ramp. ref abe 201906285933 | $20,000 | |
| Dec 23, 2022 | Completed final sign-off Dec 2024 | 151 Nevada St | 1. enclose the setback at rear part of the right side to create a new 1 story hallway to connect the back yard and garage. 2. add a new rear deck @ 1st floor. 3. add a new roof deck @ 2nd floor.Details
1. enclose the setback at rear part of the right side to create a new 1 story hallway to connect the back yard and garage. 2. add a new rear deck @ 1st floor. 3. add a new roof deck @ 2nd floor. | $25,000 | |
| Dec 16, 2022 | Never finaled filed Dec 2022, never issued | 3055 Clement St | demolish a one-story, type 5b, dance studio building.Details
demolish a one-story, type 5b, dance studio building. | $8,000 | |
| Dec 8, 2022 | Completed final sign-off Nov 2023 | 269 29th Av | Gregory Loughran Construction | architectural design revision to 202205265117. reconfigure 1/f and 2/f interior spaces. relocate the skylight window and protect it with a firewall. add a utility room to (e) b/m (not a living space). remove (e) backyard access stairs. adjust rear deck design. replace windows and doors in kind atDetails
architectural design revision to 202205265117. reconfigure 1/f and 2/f interior spaces. relocate the skylight window and protect it with a firewall. add a utility room to (e) b/m (not a living space). remove (e) backyard access stairs. adjust rear deck design. replace windows and doors in kind at | |
| Dec 1, 2022 | Completed final sign-off Dec 2023 | 4259 22nd St | to comply w/nov#202297386 to remove old deck & construct new deck w/stairsDetails
to comply w/nov#202297386 to remove old deck & construct new deck w/stairs | $10,000 | |
| Nov 15, 2022 | Completed final sign-off Jan 2024 | 4080 26th St | Lazarit Construction | remodel kitchen and bath at main floor level. revise height of window at kitchen.Details
remodel kitchen and bath at main floor level. revise height of window at kitchen. | $80,000 |
| Nov 3, 2022 | Completed final sign-off Aug 2023 | 246 Farallones St | supplemental to apprvd 202108035653.new 208 sf roof deck, new wood stair connecting 2nd fl to rear yard. 3 f rear and 2 fl rear windows change to patio door. rear wall strucutral upgrade. no other work interior and front. shall follow apprvd planDetails
supplemental to apprvd 202108035653.new 208 sf roof deck, new wood stair connecting 2nd fl to rear yard. 3 f rear and 2 fl rear windows change to patio door. rear wall strucutral upgrade. no other work interior and front. shall follow apprvd plan | $25,000 | |
| Oct 3, 2022 | Completed final sign-off Aug 2024 | 45 Loomis St | co2 plan - ref: archs & 201903266287; mech 201612296198Details
co2 plan - ref: archs & 201903266287; mech 201612296198 | $20,000 | |
| Sep 23, 2022 | Never finaled issued Oct 2022, no final | 3466 16th St | Flmc Development Corp Dba Adamo Campagna | structural revision to 202201216408 including framing for solar panel at roof and removing post in garage areaDetails
structural revision to 202201216408 including framing for solar panel at roof and removing post in garage area | $28,000 |
| Sep 7, 2022 | Completed final sign-off Nov 2023 | 269 29th Av | Gregory Loughran Construction | revision to bpa#202205265117. revised footing detail plan. add special inspection & structural observation form. other details no change, shall be followed previously approved plansDetails
revision to bpa#202205265117. revised footing detail plan. add special inspection & structural observation form. other details no change, shall be followed previously approved plans | |
| Jun 30, 2022 | Completed final sign-off Jul 2025 | 434 20th Av | Kingswood Construction | revision to 202007230729/s1 remove the proposed roof deck and railing from the original approved plan to help the owner reduce the building costs. all other detail no change. shall follow previous approved plan unless otherwise noted.Details
revision to 202007230729/s1 remove the proposed roof deck and railing from the original approved plan to help the owner reduce the building costs. all other detail no change. shall follow previous approved plan unless otherwise noted. | |
| May 9, 2022 | Completed final sign-off Dec 2022 | 2325 Taraval St | Home Improvement Company | barrier removal: voluntary upgrade (ada) to restrooms.Details
barrier removal: voluntary upgrade (ada) to restrooms. | $20,000 |
| Apr 8, 2022 | Completed final sign-off Jun 2024 | 177 Belgrave Av | Brookshire Inc | replace unsafe stair ref. 202204011429Details
replace unsafe stair ref. 202204011429 | $60,000 |
| Apr 1, 2022 | Completed final sign-off Dec 2022 | 177 Belgrave Av | Brookshire Inc | construct a new retaining wall extension at front property line to stop unsafe erosion. install new redwood t & g siding over extg and concrete retaining wall to match extg garage doors.Details
construct a new retaining wall extension at front property line to stop unsafe erosion. install new redwood t & g siding over extg and concrete retaining wall to match extg garage doors. | $60,000 |
| Feb 17, 2022 | Never finaled issued Mar 2022, no final | 1126 Alabama St | unit 1126 (3/f) remodel (e) bathroom in kind at 3/f. replace all fixtures.Details
unit 1126 (3/f) remodel (e) bathroom in kind at 3/f. replace all fixtures. | $5,000 | |
| Feb 1, 2022 | Completed final sign-off Dec 2024 | 231 11th Av | Deleon Builders Inc | to comply with nov #202026181. revision to pa# 202010086147, 202101223125,202106102155,202108196765. add patio door at 1st floor. reconfigure kitchen and master bathroom layout and replace window on 2nd, 3rd floor due to the new steel column encroached into the window. eliminate 1 window at north,Details
to comply with nov #202026181. revision to pa# 202010086147, 202101223125,202106102155,202108196765. add patio door at 1st floor. reconfigure kitchen and master bathroom layout and replace window on 2nd, 3rd floor due to the new steel column encroached into the window. eliminate 1 window at north, | |
| Jan 21, 2022 | Completed final sign-off Apr 2023 | 897 Elizabeth St | Home Improvement Company | 1)301 hoffman:reconfigure interior floor plan including adding 2 new bathrooms & kitchen remodel. 2)305 hoffman: 897 elizabeth, 899 elizabeth reconfigure interior floor plan including remodeling extg bathroom and kitchen. 3)upgrade electrical for entire bldg. 4) comply with nov #202185542Details
1)301 hoffman:reconfigure interior floor plan including adding 2 new bathrooms & kitchen remodel. 2)305 hoffman: 897 elizabeth, 899 elizabeth reconfigure interior floor plan including remodeling extg bathroom and kitchen. 3)upgrade electrical for entire bldg. 4) comply with nov #202185542 | $350,000 |
| Nov 9, 2021 | Completed final sign-off Oct 2022 | 1923 32nd Av | Deleon Builders Inc | 1) comply with nov 202182659 and 202182692. 2) removal of extg walls along front portion of bldg. 3) remodel and expand kitchen area. 4) remodel 4 bathrooms. 5)convert extg room to a bar at rear lower floor. 6)replace all interior finishes.Details
1) comply with nov 202182659 and 202182692. 2) removal of extg walls along front portion of bldg. 3) remodel and expand kitchen area. 4) remodel 4 bathrooms. 5)convert extg room to a bar at rear lower floor. 6)replace all interior finishes. | $100,000 |
| Oct 29, 2021 | Completed final sign-off Dec 2024 | 151 Nevada St | enclose rear part. add bedrm, office @ garage. (n) deck @ 1st flr. remodel kitchen & dining rm @ 2nd flr. combine bathrm & toilet to 1 full bath & 1 powder rm @ 2nd flr.re-roofing. replace windows w/wood clad @ front & w/ vinly @ back.voluntary seismic strengthening with an estimated cost of $35,000Details
enclose rear part. add bedrm, office @ garage. (n) deck @ 1st flr. remodel kitchen & dining rm @ 2nd flr. combine bathrm & toilet to 1 full bath & 1 powder rm @ 2nd flr.re-roofing. replace windows w/wood clad @ front & w/ vinly @ back.voluntary seismic strengthening with an estimated cost of $35,000 | $100,000 | |
| Aug 19, 2021 | Completed final sign-off Dec 2024 | 231 11th Av | Deleon Builders Inc | revision to pa# 2020-1008-6147, 2021-0122-3125, 2021-0610-2155 special moment frame locatins, structural work only, detail and special inspection form no change, shell follow previously approved plan u.o.n.Details
revision to pa# 2020-1008-6147, 2021-0122-3125, 2021-0610-2155 special moment frame locatins, structural work only, detail and special inspection form no change, shell follow previously approved plan u.o.n. | |
| Jul 9, 2021 | Completed final sign-off Aug 2023 | 1343 Taraval St | D & A Builders Inc | construction revision permit that is requested by an inspector for structural underpinning shoring for in house permit #201805098696Details
construction revision permit that is requested by an inspector for structural underpinning shoring for in house permit #201805098696 | |
| May 26, 2021 | Expired or cancelled cancelled Jan 2026 | 2410 45th Av | 1) remove staircase adjoining wall and install glass railing. 2)remove the wall between extg kitchen and extg living area. 3)remodel kitchen area. 4)install a skylight above kitchen. 5)remodel bathroom. there is no layout change. replacing fixtures,Details
1) remove staircase adjoining wall and install glass railing. 2)remove the wall between extg kitchen and extg living area. 3)remodel kitchen area. 4)install a skylight above kitchen. 5)remodel bathroom. there is no layout change. replacing fixtures, | $15,000 | |
| May 21, 2021 | Never finaled issued Apr 2022, no final | 446 34th Av | Mullins General Construction & Fine Pain | remodel garage area and convert (e) 1st floor storage area into a (n) family room with one full bath, (n) furnace, and (n) water heater. construct (n) deck at the rear yard.Details
remodel garage area and convert (e) 1st floor storage area into a (n) family room with one full bath, (n) furnace, and (n) water heater. construct (n) deck at the rear yard. | $15,000 |
| Apr 16, 2021 | Never finaled issued May 2023, no final | 1862 31st Av | Gee Zhang Construction Inc | 2 stories horizontal rear extension to an existing 2 story single family dwelling. associated adu construction on separate permit.Details
2 stories horizontal rear extension to an existing 2 story single family dwelling. associated adu construction on separate permit. | $250,000 |
| Mar 12, 2021 | Never finaled issued Jun 2021, no final | 3156 Clay St | Deleon Builders Inc | revision to app#201512306165(permit reactivated, new expiration date 4/22/2022) 1)reconfigure the interior space of unit # 3158 on level1 & basement and redesign rear yard space. 2)reconfigure the interior space of unit #3156 on level 3. 3) all detail no change. shall follow previous approved plan.Details
revision to app#201512306165(permit reactivated, new expiration date 4/22/2022) 1)reconfigure the interior space of unit # 3158 on level1 & basement and redesign rear yard space. 2)reconfigure the interior space of unit #3156 on level 3. 3) all detail no change. shall follow previous approved plan. | |
| Feb 11, 2021 | Never finaled issued Feb 2021, no final | 120 Graystone Tr | Patrick Keaney Const | aka 127 crown ct: apts 1-9 remodel each unit kitchen & bathroom in-kind. replace cabinets & fixtures, electrical, wiring & plumbing as needed. no changes to any partition walls. no changes to fire life devices. all work in-kind.Details
aka 127 crown ct: apts 1-9 remodel each unit kitchen & bathroom in-kind. replace cabinets & fixtures, electrical, wiring & plumbing as needed. no changes to any partition walls. no changes to fire life devices. all work in-kind. | $180,000 |
| Jan 19, 2021 | In progress issued Jun 2025 | 984 Corbett Av | residential addition & remodel. scope of work includes: basement floor addition to add new storage & utility room first floor addition to expand kitchen, add new media room & powder room second floor addition add new bedroom & bath new third floor addition to provide new master suiteDetails
residential addition & remodel. scope of work includes: basement floor addition to add new storage & utility room first floor addition to expand kitchen, add new media room & powder room second floor addition add new bedroom & bath new third floor addition to provide new master suite | $300,000 | |
| Jan 4, 2021 | Completed final sign-off Jun 2022 | 92 Winfield St | Beyond The Horizon Construction | 1. convert (e) storage space to 161 sf habitable space. 2. add (n) full bathroom at 1/f 3. add 75 sf of (n) deck at rear of bldg.Details
1. convert (e) storage space to 161 sf habitable space. 2. add (n) full bathroom at 1/f 3. add 75 sf of (n) deck at rear of bldg. | $80,000 |
| Dec 16, 2020 | Completed final sign-off Nov 2021 | 115 Henry St | revision to pa 201709158628. revisions to simpson special moment frame, hold-downs, and foundation designs. seismic retrofit of soft-story.Details
revision to pa 201709158628. revisions to simpson special moment frame, hold-downs, and foundation designs. seismic retrofit of soft-story. | ||
| Dec 15, 2020 | Never finaled issued Feb 2021, no final | 2632 Larkin St | revision to pa# 201709158747. revision to the shearwall, and foundation designs on lines 1, b1, and d. omit shearwall construction at line 0 between line a.1 and b, and at line c. seismic retrofit of soft story.Details
revision to pa# 201709158747. revision to the shearwall, and foundation designs on lines 1, b1, and d. omit shearwall construction at line 0 between line a.1 and b, and at line c. seismic retrofit of soft story. | ||
| Dec 2, 2020 | Completed final sign-off Aug 2023 | 1343 Taraval St | D & A Builders Inc | revision to #2018.0509.8696 & 2018.0509.8711. to eliminate elevator which connects each floor. re-configure bedroom & kitchen layout @ the area where residential elevator to be eliminated. add bedroom on 4th floor. detail no change & shall follow previous pa #2018.0509.8696 & 2018.0509.8711.Details
revision to #2018.0509.8696 & 2018.0509.8711. to eliminate elevator which connects each floor. re-configure bedroom & kitchen layout @ the area where residential elevator to be eliminated. add bedroom on 4th floor. detail no change & shall follow previous pa #2018.0509.8696 & 2018.0509.8711. | |
| Oct 14, 2020 | Completed final sign-off Mar 2021 | 1382 Alabama St | Dcs Plumbing Llc | administrative permit to correct records & show 1380-1382 alabama st (rear building) as 2 dwelling unit on 2 floors of occupancy. no work on this permit.Details
administrative permit to correct records & show 1380-1382 alabama st (rear building) as 2 dwelling unit on 2 floors of occupancy. no work on this permit. | |
| Oct 3, 2020 | Completed final sign-off Jul 2022 | 2901 Taraval St | remove e rotted fence and posts and replace fencing on all sides of rear yard. proposed fence to be under 10 ft above grade. repair posts or replace and replace gatesDetails
remove e rotted fence and posts and replace fencing on all sides of rear yard. proposed fence to be under 10 ft above grade. repair posts or replace and replace gates | $1,500 | |
| Sep 16, 2020 | Completed final sign-off Oct 2021 | 1314 10th Av | main flr (2nd flr)-redsgn patio drs.remove wall betwn kitch & din rm, add (n) half bath at 2nd flr.3rd flr- relocate wall between bedrm 2 & bedrm 3.convert (e) bedrm 2 into a mast bed.remodel (e) bath & closet.adding (n) full bath @ 3rd flr & relocate closet of bedrm 3.add skylt, sun tunlDetails
main flr (2nd flr)-redsgn patio drs.remove wall betwn kitch & din rm, add (n) half bath at 2nd flr.3rd flr- relocate wall between bedrm 2 & bedrm 3.convert (e) bedrm 2 into a mast bed.remodel (e) bath & closet.adding (n) full bath @ 3rd flr & relocate closet of bedrm 3.add skylt, sun tunl | $55,000 | |
| Aug 25, 2020 | Never finaled issued Sep 2020, no final | 1314 10th Av | kitchen & bathroom remodel in-kind, replace cabinets & fixtures, electrical wiring & plumbing as needed. investigate (e) structural conditions w/out removing any structural bearing walls.Details
kitchen & bathroom remodel in-kind, replace cabinets & fixtures, electrical wiring & plumbing as needed. investigate (e) structural conditions w/out removing any structural bearing walls. | $15,000 | |
| Jun 24, 2020 | Never finaled filed Jun 2020, never issued | 930 Baker St | rev to 201501230679 reduce scope to hor'l expansion, reconfig int layouts, new windows & doors, new roof deck, landscaping, new garage structure @ st joseph's ave. no longer adding 2 units below (e) 2 floors. all details & dwgs not shown to follow 2015-0123-0679Details
rev to 201501230679 reduce scope to hor'l expansion, reconfig int layouts, new windows & doors, new roof deck, landscaping, new garage structure @ st joseph's ave. no longer adding 2 units below (e) 2 floors. all details & dwgs not shown to follow 2015-0123-0679 | ||
| Jun 23, 2020 | Completed final sign-off Sep 2020 | 46 Iris Av | repair rear decks & stairs by replacing all dry-rotted lumber in place in kind.(e) deck & stairs has lass than 50% damage. not visible from street. less than 50% repairDetails
repair rear decks & stairs by replacing all dry-rotted lumber in place in kind.(e) deck & stairs has lass than 50% damage. not visible from street. less than 50% repair | $5,000 | |
| May 27, 2020 | Completed final sign-off Oct 2020 | 1550 Sloat Bl | Parkson Construction Company | inkind 2 window replacement with milgard aluminum windows (thin profile) front facadeDetails
inkind 2 window replacement with milgard aluminum windows (thin profile) front facade | $7,000 |
| Feb 27, 2020 | Completed final sign-off Jan 2021 | 850 Clement St | F C Company | mandatory disability access improvement, install power door operator for unit 852 and techincal infeasibility request for unit 850 to comply with abe ordinance 51-16Details
mandatory disability access improvement, install power door operator for unit 852 and techincal infeasibility request for unit 850 to comply with abe ordinance 51-16 | $1,000 |
| Feb 12, 2020 | Never finaled issued Sep 2021, no final | 279 Ocean Av | response to notice of violation [nov] #2018.2.8.811. to legalize an unauthorized dwelling unit at the ground floor commercial space per ordinance 43-14.Details
response to notice of violation [nov] #2018.2.8.811. to legalize an unauthorized dwelling unit at the ground floor commercial space per ordinance 43-14. | $12,000 | |
| Feb 11, 2020 | Completed final sign-off Jun 2020 | 5349 California St | Maca Builders Inc. | 1) moving the exg kitchen to a new location. 2)change the extg to be a study room. 3)adding a new bathroom for the mian floor. 4)change the size to window in front.Details
1) moving the exg kitchen to a new location. 2)change the extg to be a study room. 3)adding a new bathroom for the mian floor. 4)change the size to window in front. | $30,000 |
| Feb 10, 2020 | Expired or cancelled expired Apr 2025 | 236 30th Av | to comply with nov 202009571 to legalized unpermitted rear deckDetails
to comply with nov 202009571 to legalized unpermitted rear deck | $5,000 | |
| Feb 6, 2020 | Never finaled filed Feb 2020, never issued | 631 34th Av | per adu ordinance# 95-17, new adu @ 1st floor with 1 kitchen, living area & 1 bedroom.Details
per adu ordinance# 95-17, new adu @ 1st floor with 1 kitchen, living area & 1 bedroom. | $30,000 | |
| Jan 16, 2020 | Never finaled issued Feb 2020, no final | 4021 24th St | to add and bew bathroom adjacent to extg bedroom at unit #4023f on 1st floor.Details
to add and bew bathroom adjacent to extg bedroom at unit #4023f on 1st floor. | $15,000 | |
| Jan 13, 2020 | Never finaled issued Jan 2020, no final | 615 Belvedere St | Payesko Constructioin Inc | foundation revision to app#201905160786Details
foundation revision to app#201905160786 | $10,000 |
| Jan 9, 2020 | Completed final sign-off Jul 2022 | 1261 Filbert St | Joel Mark | interior remodel on main floor & convert (e) storage @ basement into habitable space. add stair connect new habitable space @ basement floor, add 1 bedroom, 1 bathroo and laundry on basement floor. replace (e) brick retaining wall foundationDetails
interior remodel on main floor & convert (e) storage @ basement into habitable space. add stair connect new habitable space @ basement floor, add 1 bedroom, 1 bathroo and laundry on basement floor. replace (e) brick retaining wall foundation | $80,000 |
| Dec 9, 2019 | Expired or cancelled cancelled Nov 2023 | 525 04th St | install hvac system for canibus grow. no consumption on site; convert extg industrial space into new grow siteDetails
install hvac system for canibus grow. no consumption on site; convert extg industrial space into new grow site | $25,000 | |
| Oct 21, 2019 | Never finaled issued Dec 2020, no final | 1955 33rd Av | 2 stories horizontal addition to an (e) 2 stories sfd to include kitchen, dinning & bedroom @ lower floor & a master suite @ 2nd floor. enlarge living room by relocate kitchen @ main floor. split (e) bathroom into 2 baht @ (e) uppder floor.Details
2 stories horizontal addition to an (e) 2 stories sfd to include kitchen, dinning & bedroom @ lower floor & a master suite @ 2nd floor. enlarge living room by relocate kitchen @ main floor. split (e) bathroom into 2 baht @ (e) uppder floor. | $100,000 | |
| Oct 11, 2019 | Completed final sign-off Jun 2024 | 740 Castro St | interior remodel 2 e baths, relocate e 1/2 bath at main level. new sliding doors at den. no floor area or height added to bldgDetails
interior remodel 2 e baths, relocate e 1/2 bath at main level. new sliding doors at den. no floor area or height added to bldg | $55,000 | |
| Sep 23, 2019 | Expired or cancelled expired Apr 2026 | 227 Church St | Brookshire Inc | facade alteration, change of use from bookstore to yoga studio. vertical additionDetails
facade alteration, change of use from bookstore to yoga studio. vertical addition | $350,000 |
| Sep 5, 2019 | Completed final sign-off May 2023 | 442 London St | in response to appl #2018005862 enf by planning dept. to legalize unathorized unit @ ground fl per ordinance 43-13. legalizing of unpermit addtion at rear yard in separated permit pa# 2019-1224-0476.Details
in response to appl #2018005862 enf by planning dept. to legalize unathorized unit @ ground fl per ordinance 43-13. legalizing of unpermit addtion at rear yard in separated permit pa# 2019-1224-0476. | $10,000 | |
| Aug 28, 2019 | Never finaled issued Dec 2019, no final | 2126 40th Av | Golden One Construction Inc | revision to pa 2016-0909-7348 to correct structural foundation plan @ rear addition. all unchanged feature and details shall follow pa 2016-0909-7348Details
revision to pa 2016-0909-7348 to correct structural foundation plan @ rear addition. all unchanged feature and details shall follow pa 2016-0909-7348 | |
| Aug 23, 2019 | Completed final sign-off Feb 2026 | 2154 42nd Av | J P Petrie Associates Inc | horizontal addition to the rear of an (e) 2 stories, single family bldg. relocated kitchen to grd flr. add 3 bedrooms on 2nd flr.Details
horizontal addition to the rear of an (e) 2 stories, single family bldg. relocated kitchen to grd flr. add 3 bedrooms on 2nd flr. | $100,000 |
| Jul 11, 2019 | Expired or cancelled cancelled Jan 2026 | 3520 Broderick St | enlarge garage door to 12 feet wide. no change on curb cut. n/a for maherDetails
enlarge garage door to 12 feet wide. no change on curb cut. n/a for maher | $3,000 | |
| Jun 19, 2019 | Completed final sign-off May 2020 | 936 Geary St | remodel commercial storefront entrance to comply with mandatory disability access improvement program.Details
remodel commercial storefront entrance to comply with mandatory disability access improvement program. | $20,000 | |
| Jun 5, 2019 | Completed final sign-off Apr 2023 | 1901 Pacific Av | Nextech Security Solutions | revised 11/12/21: restore legal use & occupancy of this 9 unit apt building. correct all work done w/o permit-separate eid & pid permits to be obtained for final inspec. comply w/planning enf case 2018-012306enf. resolve 201889561;201890541;201809811;201809801. comp. 201989472 to be resolved sep.Details
revised 11/12/21: restore legal use & occupancy of this 9 unit apt building. correct all work done w/o permit-separate eid & pid permits to be obtained for final inspec. comply w/planning enf case 2018-012306enf. resolve 201889561;201890541;201809811;201809801. comp. 201989472 to be resolved sep. | $500 |
| Jun 3, 2019 | Expired or cancelled cancelled Oct 2019 | 631 34th Av | (n) adu in the 1st flr w/ one kitchen, living area and one bedroom per ord# 162-16. construct (n) spiral stair connects rear yard & 3rd flr. convert sevice stair into storage @ 3rd flr.Details
(n) adu in the 1st flr w/ one kitchen, living area and one bedroom per ord# 162-16. construct (n) spiral stair connects rear yard & 3rd flr. convert sevice stair into storage @ 3rd flr. | $20,000 | |
| May 31, 2019 | Completed final sign-off Aug 2019 | 1818 Pacific Av | revision to pa 2019-0523-1528 to revise (n) corridor's wall length & relocate (n) doorDetails
revision to pa 2019-0523-1528 to revise (n) corridor's wall length & relocate (n) door | ||
| May 28, 2019 | Expired or cancelled cancelled Jan 2026 | 525 04th St | convert e industrial space into new grow site warehouseDetails
convert e industrial space into new grow site warehouse | $70,000 | |
| May 24, 2019 | Completed final sign-off Nov 2019 | 1435 19th Av | Harkin Services | repair dryrotted deck in kind and structural strengthening at rear landing/stairs.Details
repair dryrotted deck in kind and structural strengthening at rear landing/stairs. | $5,000 |
| May 23, 2019 | Never finaled issued May 2019, no final | 1818 Pacific Av | add new hallway at basement floor for egress purposeDetails
add new hallway at basement floor for egress purpose | $1,000 | |
| May 9, 2019 | Completed final sign-off Apr 2020 | 163 Paris St | Gee Construction Co Inc | revision to pa 2018-1018-3611 to switch door & window @ front facade on 1st fl; detail no change and shall follow previous approved plansDetails
revision to pa 2018-1018-3611 to switch door & window @ front facade on 1st fl; detail no change and shall follow previous approved plans | |
| May 3, 2019 | Never finaled issued May 2019, no final | 416 Capp St | A Step Ahead Construction Llc | rev to pa# 201811095525; to add 2 windows at 1st fl.Details
rev to pa# 201811095525; to add 2 windows at 1st fl. | $2,000 |
| May 1, 2019 | Expired or cancelled cancelled Apr 2023 | 541 Duncan St | vertical & horizontal addition to a 2 story, 2-unit residential to become 3 story, 2 units and adu per ord 162-17.Details
vertical & horizontal addition to a 2 story, 2-unit residential to become 3 story, 2 units and adu per ord 162-17. | $250,000 | |
| Apr 18, 2019 | Completed final sign-off Aug 2020 | 1274 Geneva Av | revision to previous approved pa #201805078368 to relocate stair to rear yard. remove partial wall at (e) hallway. relocate water heater and furnace. replace (e) foundation at rear. detail no change shall follow previous approved plan. u.o.nDetails
revision to previous approved pa #201805078368 to relocate stair to rear yard. remove partial wall at (e) hallway. relocate water heater and furnace. replace (e) foundation at rear. detail no change shall follow previous approved plan. u.o.n | $500 | |
| Mar 14, 2019 | Completed final sign-off Nov 2020 | 250 Urbano Dr | J P Petrie Associates Inc | comply with planning enforcement case no# 2018-012863enf. revision will be restored to reflect the changes approved under pa# 2010/12/30/7653 & pa# 2018/04/27/7618 . to document demoliution per planning department requirement.Details
comply with planning enforcement case no# 2018-012863enf. revision will be restored to reflect the changes approved under pa# 2010/12/30/7653 & pa# 2018/04/27/7618 . to document demoliution per planning department requirement. | $20,000 |
| Dec 13, 2018 | Completed final sign-off Sep 2020 | 5727 Geary Bl | Wl Construction Group, L T Standard Const Co Ltd | t.i. (n) day care at the ground fl. with new ada restroomDetails
t.i. (n) day care at the ground fl. with new ada restroom | $40,000 |
| Nov 9, 2018 | Completed final sign-off Jun 2019 | 1877 Union St | revision to approved pa# 2018/09/26/1484. store front modification only. tenant improvement to be deferred permit by new tenant. all details. no change shall follow previous approved plan. ** maher: n/a **Details
revision to approved pa# 2018/09/26/1484. store front modification only. tenant improvement to be deferred permit by new tenant. all details. no change shall follow previous approved plan. ** maher: n/a ** | ||
| Nov 9, 2018 | Never finaled issued Apr 2019, no final | 416 Capp St | A Step Ahead Construction Llc | convert storage space at rear of 1st fl into habitable space to include 1 bedroom, 1 bath, & 1 family rm connected to 2nd fl unit. replace window with tempered glaze @ lightwell on 1st floor.Details
convert storage space at rear of 1st fl into habitable space to include 1 bedroom, 1 bath, & 1 family rm connected to 2nd fl unit. replace window with tempered glaze @ lightwell on 1st floor. | $20,000 |
| Nov 8, 2018 | Never finaled filed Nov 2018, never issued | 204 02nd Av | addition of new unit at the 1st floor w/ one new kitchen, living area and bedroom.Details
addition of new unit at the 1st floor w/ one new kitchen, living area and bedroom. | $20,000 | |
| Nov 8, 2018 | Completed final sign-off Jun 2020 | 4021 24th St | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 (commercial ada upgrade)Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 (commercial ada upgrade) | $20,000 | |
| Oct 11, 2018 | Completed final sign-off Jun 2019 | 220 Liberty St | Level 8 Construction Inc | kitchen and bath remodel and add full bathDetails
kitchen and bath remodel and add full bath | $75,000 |
| Sep 21, 2018 | Never finaled issued Sep 2018, no final | 835 33rd Av | revision to app#201609026666 to omit fire sprinkler due to 2 exits are provided.Details
revision to app#201609026666 to omit fire sprinkler due to 2 exits are provided. | ||
| Sep 21, 2018 | Never finaled issued Oct 2018, no final | 43 Diamond St | revision to app#201707131742 to repair dry rotted deck in kind and structural strengthen. n/a for maher.Details
revision to app#201707131742 to repair dry rotted deck in kind and structural strengthen. n/a for maher. | $10,000 | |
| Sep 20, 2018 | Completed final sign-off Jan 2020 | 1119 Stanyan St | replacing deteriorated rear deck and stairs to comply with nov #201828841.Details
replacing deteriorated rear deck and stairs to comply with nov #201828841. | $14,000 | |
| Sep 13, 2018 | Expired or cancelled cancelled Jan 2026 | 42 Vernon St | revision to app#201805239940. relocate door and corridor on ground floor. detail no change shall follow previous approved plan.Details
revision to app#201805239940. relocate door and corridor on ground floor. detail no change shall follow previous approved plan. | $5,000 | |
| Sep 13, 2018 | Expired or cancelled withdrawn Dec 2024 | 1270 La Playa | soft story retrofit to comply with soft story retrofit ord 66-13Details
soft story retrofit to comply with soft story retrofit ord 66-13 | $150,000 |