Block 0536, lot 025
2465 Filbert St
- City’s use
- Multi-Family Residential
- Built
- 1923
- Stories
- 3
- Units
- 4
- Rooms
- 6 bedrooms, 6 bathrooms
- Building
- 6,003 sq ft
- Lot
- 5,096 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2024 | Completed final sign-off Feb 2025 | 2465 Filbert St | P3 Builders | revision to pa #202309217120. remove proposed framing and foundation from approved plans.Details
revision to pa #202309217120. remove proposed framing and foundation from approved plans. | |
| Jan 19, 2024 | Completed final sign-off Feb 2025 | 2465 Filbert St | P3 Builders | revision to 202309217120 install steel beam at unit 4Details
revision to 202309217120 install steel beam at unit 4 | $20,000 |
| Sep 21, 2023 | Completed final sign-off Feb 2025 | 2465 Filbert St | P3 Builders | renovation of unit 4 - removing 6 (e) wall between living room & study. reconfigure (e) entry to unitDetails
renovation of unit 4 - removing 6 (e) wall between living room & study. reconfigure (e) entry to unit | $25,000 |
| May 26, 2023 | Completed final sign-off Nov 2023 | 2465 Filbert St | P3 Builders | unit 4: replace (2) 24 x 36" single hung window on side property line w/ (2) 1-hr rated 24 x 55" fixed windowDetails
unit 4: replace (2) 24 x 36" single hung window on side property line w/ (2) 1-hr rated 24 x 55" fixed window | $15,000 |
| Nov 23, 2022 | Completed final sign-off Nov 2023 | 2465 Filbert St | P3 Builders | renovation of front unit #1. consisting of: kithcen remodel/expansion into (e) mech room, remove (e) closet between living and dining room, remodel (e) bathroom.Details
renovation of front unit #1. consisting of: kithcen remodel/expansion into (e) mech room, remove (e) closet between living and dining room, remodel (e) bathroom. | $80,000 |
| Nov 3, 2022 | Completed final sign-off Nov 2023 | 2465 Filbert St | P3 Builders | to comply with nov 202297664 - structural work to strengthen framing from existing interior building settlements due to lack of existing vertical supportDetails
to comply with nov 202297664 - structural work to strengthen framing from existing interior building settlements due to lack of existing vertical support | $50,000 |
| Oct 11, 2022 | Completed final sign-off Apr 2023 | 2465 Filbert St | P3 Builders | roof repair in front of building. dryrot repair.Details
roof repair in front of building. dryrot repair. | $4,500 |
| Mar 4, 2015 | Completed final sign-off Sep 2015 | 2465 Filbert St | Schmitt Heating Co Inc | new steel ductwork in dropped ceiling of hallway within the unit.Details
new steel ductwork in dropped ceiling of hallway within the unit. | $14,000 |
| Feb 12, 2015 | Completed final sign-off Aug 2015 | 2465 Filbert St | Make Ready Maintenance Inc | #4- revision to pa# 201502027231, add plans to move non load wall in kitchen and bathroom.Details
#4- revision to pa# 201502027231, add plans to move non load wall in kitchen and bathroom. | |
| Feb 12, 2015 | Completed final sign-off Aug 2015 | 2465 Filbert St | Make Ready Maintenance Inc | #3- revision to pa# 201502027230, add plans to move non load wall in kitchen and bathroom; remove bedroom partitioin wall non-bearing and french doors bedroom 2.Details
#3- revision to pa# 201502027230, add plans to move non load wall in kitchen and bathroom; remove bedroom partitioin wall non-bearing and french doors bedroom 2. | |
| Feb 2, 2015 | Never finaled issued Feb 2015, no final | 2465 Filbert St | Make Ready Maintenance Inc | unit 3 - kitchen and bathroom remodel - no windows or structural; to comply with cec150.0(k)3 & 5Details
unit 3 - kitchen and bathroom remodel - no windows or structural; to comply with cec150.0(k)3 & 5 | $27,000 |
| Feb 2, 2015 | Never finaled issued Feb 2015, no final | 2465 Filbert St | Make Ready Maintenance Inc | unit 4 - kitchen and balthroom, remodel ; no windows or structural work; to comply with cec150.0(k)3&5Details
unit 4 - kitchen and balthroom, remodel ; no windows or structural work; to comply with cec150.0(k)3&5 | $27,000 |
| May 22, 2001 | Completed final sign-off Nov 2001 | 2465 Filbert St | Crj Construction | dry rot repairDetails
dry rot repair | $20,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.