Block 0116, lot 019
562 Green St
- City’s use
- Multi-Family Residential
- Built
- 1907
- Stories
- 3
- Units
- 3
- Rooms
- 4 bathrooms
- Building
- 3,588 sq ft
- Lot
- 1,320 sq ft
- Zoning
- NBEACH
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 17, 2024 | Completed final sign-off Jun 2025 | 562 Green St | Constantine Construction | replace dry rot & repair at front facade. replace stucco in-kind. replace (13) windows. same size and location.Details
replace dry rot & repair at front facade. replace stucco in-kind. replace (13) windows. same size and location. | $11,231 |
| May 24, 2024 | Completed final sign-off Mar 2025 | 562 Green St | replace extg entrance door and install automatic door opener in compliance with san francisco accessible business entrance program. abe #202001311606Details
replace extg entrance door and install automatic door opener in compliance with san francisco accessible business entrance program. abe #202001311606 | $10,000 | |
| Feb 19, 2021 | Completed final sign-off Mar 2021 | 560 Green St | Seismic Retrofitters Inc. | bolt (e) foundation with 3/4 tr min 8" embedment (brick epoxy) max spacing 16" oc, add struc i plwood over (e) cripple walls nail (w) 10d short 6" edge 12" field.Details
bolt (e) foundation with 3/4 tr min 8" embedment (brick epoxy) max spacing 16" oc, add struc i plwood over (e) cripple walls nail (w) 10d short 6" edge 12" field. | $16,800 |
| Jul 31, 2015 | Never finaled issued Jul 2015, no final | 558 Green St | street space permit | ||
| Mar 9, 2015 | Never finaled issued Mar 2015, no final | 558 Green St | street space | ||
| Mar 12, 2014 | Completed final sign-off Nov 2015 | 558 Green St | roof deck above 3rd fl unitDetails
roof deck above 3rd fl unit | $8,000 | |
| Jan 28, 2013 | Never finaled issued Jan 2013, no final | 558 Green St | street space | ||
| Oct 1, 2012 | Completed final sign-off Dec 2012 | 558 Green St | revision to 2012-07-30-6073. add parapet to roof to protect skylights. not visible from street. add insulation, upgrade roof drainage.Details
revision to 2012-07-30-6073. add parapet to roof to protect skylights. not visible from street. add insulation, upgrade roof drainage. | $2,000 | |
| Sep 27, 2012 | Never finaled issued Sep 2012, no final | 558 Green St | street space and mta parking | ||
| Jul 30, 2012 | Completed final sign-off Dec 2012 | 558 Green St | voluntary roof framing retrofit by replacing (e) roof framing with new framing. new skylight framing is a revision to pa# 2012-0221-4526Details
voluntary roof framing retrofit by replacing (e) roof framing with new framing. new skylight framing is a revision to pa# 2012-0221-4526 | $8,000 | |
| Feb 21, 2012 | Completed final sign-off Nov 2013 | 558 Green St | revision to ap #2011.12.13.0609 exisitng top/3rd floor unit it be renovated: existing ktichen to be rebuilt with new appliances & cabinets, a new bath is ot be added, some interior walls to be reconfigured, 3 skylights added, & existing windows to be replaced in kind & not visible from street.Details
revision to ap #2011.12.13.0609 exisitng top/3rd floor unit it be renovated: existing ktichen to be rebuilt with new appliances & cabinets, a new bath is ot be added, some interior walls to be reconfigured, 3 skylights added, & existing windows to be replaced in kind & not visible from street. | $85,000 | |
| Dec 13, 2011 | Completed final sign-off Nov 2013 | 558 Green St | replace in kind fixtures, appliances and cabinetry work includes new electrical subpanel with all new copper wire and upgrade plumbing fixtures to reduce water usage ie toilet and valves.Details
replace in kind fixtures, appliances and cabinetry work includes new electrical subpanel with all new copper wire and upgrade plumbing fixtures to reduce water usage ie toilet and valves. | $14,350 | |
| Aug 5, 2008 | Never finaled issued Aug 2008, no final | 560 Green St | street space and sidewalk permit | ||
| Jun 27, 2007 | Expired or cancelled expired Oct 2008 | 560 Green St | Qse Construction | front sidewalk basement repair and voluntary footing wall strengtheningDetails
front sidewalk basement repair and voluntary footing wall strengthening | $24,395 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Constantine Construction, Qse Construction, Seismic Retrofitters Inc.
- Architects
- James Treman (2), Richard Gillern, Thomas Lutge
- Engineers
- John Lau
- Attorneys
- Edward Yu
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.