Lazarit Construction
- Based in
- Hayward
- On San Francisco permits
- May 2016 to Jun 2025
- Last 24 months
- 2 permits filed
45 permits since 2000: 41 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 3, 2025 | Completed final sign-off Aug 2025 | 679 14th Av | to comply with physical inspection report #cc-8704Details
to comply with physical inspection report #cc-8704 | |
| Apr 14, 2025 | Completed final sign-off Nov 2025 | 735 36th Av | unit 1: (1) kitchen remodel, (1) bathroom remodel. relocate electrical subpanel from closet to hallway. new flooring, fresh paint.Details
unit 1: (1) kitchen remodel, (1) bathroom remodel. relocate electrical subpanel from closet to hallway. new flooring, fresh paint. | $32,000 |
| Mar 14, 2023 | Completed final sign-off Dec 2023 | 1770 O'farrell St | unit#: 14, remodel (e) kitchen including removing existing non-bearing wall at end of kitchen coutner. remove existing non-bearing wall at front closetDetails
unit#: 14, remodel (e) kitchen including removing existing non-bearing wall at end of kitchen coutner. remove existing non-bearing wall at front closet | $20,000 |
| Mar 9, 2023 | Completed final sign-off Jun 2023 | 1450 Post St | (1) full kitchen remodel with upgrades. (1) full bathroom remodel new flooring, fresh paint, 2 new lights. no changes to layout and structure.Details
(1) full kitchen remodel with upgrades. (1) full bathroom remodel new flooring, fresh paint, 2 new lights. no changes to layout and structure. | $45,000 |
| Mar 9, 2023 | Completed final sign-off Jun 2023 | 1450 Post St | (2) full bathroom remodel upgrades, (1) kitchen full remodel: new flooring, fresh paint, (3) new lights. no changes to layout and structure.Details
(2) full bathroom remodel upgrades, (1) kitchen full remodel: new flooring, fresh paint, (3) new lights. no changes to layout and structure. | $55,000 |
| Mar 9, 2023 | Completed final sign-off Jun 2023 | 1450 Post St | unit 401: (1) full kitchen remodel with upgrade and (1) full bathroom remodel (4) new wall sconces lightsDetails
unit 401: (1) full kitchen remodel with upgrade and (1) full bathroom remodel (4) new wall sconces lights | $42,000 |
| Nov 21, 2022 | Completed final sign-off Mar 2023 | 1450 Post St | (1) kitchen remodel and upgrades; remodel (1) bathroom remodel. (2) new wall sconces, new flooring, fresh paint.Details
(1) kitchen remodel and upgrades; remodel (1) bathroom remodel. (2) new wall sconces, new flooring, fresh paint. | $36,000 |
| Nov 21, 2022 | Completed final sign-off Mar 2023 | 1450 Post St | 1. kitchen remodel, (1) bathroom remodel, (2) wall sconces, new flooring, new fresh paint. non structural.Details
1. kitchen remodel, (1) bathroom remodel, (2) wall sconces, new flooring, new fresh paint. non structural. | $35,000 |
| Nov 21, 2022 | Completed final sign-off Mar 2023 | 1450 Post St | unit #816: (1) kitchen remodel and upgrade;remodel (2) bathrooms, new wall sconces, new flooring, new fresh paint.Details
unit #816: (1) kitchen remodel and upgrade;remodel (2) bathrooms, new wall sconces, new flooring, new fresh paint. | $45,000 |
| Nov 15, 2022 | Completed final sign-off Jan 2024 | 4080 26th St | remodel kitchen and bath at main floor level. revise height of window at kitchen.Details
remodel kitchen and bath at main floor level. revise height of window at kitchen. | $80,000 |
| Nov 9, 2022 | Completed final sign-off Jan 2023 | 74 New Montgomery St | unit 702: hallway bathroom (1) remodel: from shower tub to shower stall, replace drywall and tiles: shower pan, replace exhaust fan fresh paint.Details
unit 702: hallway bathroom (1) remodel: from shower tub to shower stall, replace drywall and tiles: shower pan, replace exhaust fan fresh paint. | $15,000 |
| Jun 29, 2022 | Completed final sign-off Aug 2022 | 1450 Post St | unit #809: (1) kitchen remode. (1) bathroom remodel. install (2) new wall sconces, new lights, new cabinets, new flooring, new paint job. remodel in-kind, no layout change.Details
unit #809: (1) kitchen remode. (1) bathroom remodel. install (2) new wall sconces, new lights, new cabinets, new flooring, new paint job. remodel in-kind, no layout change. | $45,000 |
| May 6, 2022 | Completed final sign-off Jun 2022 | 1450 Post St | apt #1107: (1) kitchen remodel, (1) bathroom remodel. relocate subpanel box, wall sconces (2), new flooring, new fresh paint job.Details
apt #1107: (1) kitchen remodel, (1) bathroom remodel. relocate subpanel box, wall sconces (2), new flooring, new fresh paint job. | $46,000 |
| May 6, 2022 | Completed final sign-off Jun 2022 | 1450 Post St | unit #509: (1) kitchen remodel, (1) bathroom remodel, install (1) new wall sconce, new lighting, new cabinets, new flooring, fresh paint.Details
unit #509: (1) kitchen remodel, (1) bathroom remodel, install (1) new wall sconce, new lighting, new cabinets, new flooring, fresh paint. | $48,000 |
| Feb 7, 2022 | Completed final sign-off Apr 2022 | 1450 Post St | unit 1109: (1) kitchen remodel and upgarde, new flooring new fresh paint job. new vanity only at maon bathroom (one sink)Details
unit 1109: (1) kitchen remodel and upgarde, new flooring new fresh paint job. new vanity only at maon bathroom (one sink) | $35,000 |
| Feb 7, 2022 | Completed final sign-off Apr 2022 | 1450 Post St | unit 701: (1) kitchen remodel and upgrade. also (1) bathroom remodel to shower stall, new flooring, new paintDetails
unit 701: (1) kitchen remodel and upgrade. also (1) bathroom remodel to shower stall, new flooring, new paint | $42,000 |
| Oct 8, 2021 | Completed final sign-off Nov 2021 | 1450 Post St | two bathroom remodels: add three wall sconces lighting new shower valves (2) new plastic pan (2) new sheetrock at bathrooms, new flooring, new painting job. new lighting shall comply with cec 150.(0)(k)5. no new wall and no existing wall relocation.Details
two bathroom remodels: add three wall sconces lighting new shower valves (2) new plastic pan (2) new sheetrock at bathrooms, new flooring, new painting job. new lighting shall comply with cec 150.(0)(k)5. no new wall and no existing wall relocation. | $38,000 |
| Oct 8, 2021 | Completed final sign-off Dec 2021 | 1450 Post St | (1) bathroom remodel, kitchen remodel 7 ft long: add three wall sconces lighting, new shower valve new plastic pan (1) new sheetrock at bathrooms, new flooring, new painting jobDetails
(1) bathroom remodel, kitchen remodel 7 ft long: add three wall sconces lighting, new shower valve new plastic pan (1) new sheetrock at bathrooms, new flooring, new painting job | $40,000 |
| Sep 22, 2021 | Completed final sign-off Dec 2021 | 1734 Bay St | #206: one kitchen remodel/bathroom remodel(one), relocate 1 subpanel box, new flooring, new fresh paint job. h.e. lighting & controlled per cec 150.0(k)Details
#206: one kitchen remodel/bathroom remodel(one), relocate 1 subpanel box, new flooring, new fresh paint job. h.e. lighting & controlled per cec 150.0(k) | $40,000 |
| Jun 7, 2021 | Completed final sign-off Jan 2022 | 1450 Post St | complete one kitchen and one bathroom remodel. kitchen outlets. new shower valve. new tile work and flooring. new paint job.Details
complete one kitchen and one bathroom remodel. kitchen outlets. new shower valve. new tile work and flooring. new paint job. | $46,000 |
| Jun 7, 2021 | Completed final sign-off Jan 2022 | 1450 Post St | complete one kitchen remodel, bathroom one remodel, upgradee kitchen outlets, new shower valve, new tile work flooring, new fresh paint through-out.Details
complete one kitchen remodel, bathroom one remodel, upgradee kitchen outlets, new shower valve, new tile work flooring, new fresh paint through-out. | $42,000 |
| Feb 26, 2021 | Completed final sign-off Jun 2021 | 701 Wawona St | remodel 4 bathrooms, replacing 8 windows same size (no street facing). new flooring, fresh paint, new subpanel box. one kitchen. at rooms 477, 478, 479, 480, 481, 482, 483, 484 (note shared bathrooms).Details
remodel 4 bathrooms, replacing 8 windows same size (no street facing). new flooring, fresh paint, new subpanel box. one kitchen. at rooms 477, 478, 479, 480, 481, 482, 483, 484 (note shared bathrooms). | $80,000 |
| Nov 30, 2020 | Expired or cancelled expired Mar 2025 | 79 28th St | revision to no plan pa# 202009184457. remodel of all 3 floors. removal of front & rear stairs. (n) aluminum clad windows, doors, garage door, dormers.Details
revision to no plan pa# 202009184457. remodel of all 3 floors. removal of front & rear stairs. (n) aluminum clad windows, doors, garage door, dormers. | $100,000 |
| Oct 9, 2020 | Never finaled issued Oct 2020, no final | 1450 Post St | apt 902: remove existing bathroom, not alterations of walls, removal shower tub, build new shower stall, replace shower valve, shower pan, new moister resistence walls, shower enclosure, new exhaust fan, light.Details
apt 902: remove existing bathroom, not alterations of walls, removal shower tub, build new shower stall, replace shower valve, shower pan, new moister resistence walls, shower enclosure, new exhaust fan, light. | $10,000 |
| Aug 7, 2020 | Completed final sign-off Oct 2020 | 701 Wawona St | remodel full bathroom (~5'x8') and 5 bedrooms (12'x14' each), in kind. (8) light fixtures, (3) plumbing fixtures, new toilet, new vanity sink, (2) new shower valve. all work in kind.Details
remodel full bathroom (~5'x8') and 5 bedrooms (12'x14' each), in kind. (8) light fixtures, (3) plumbing fixtures, new toilet, new vanity sink, (2) new shower valve. all work in kind. | $40,000 |
| Nov 19, 2019 | Completed final sign-off Sep 2020 | 1095 Natoma St | apt 4: remodel ktichen, bathroom on 3/f. change vanity/sink at 1/f level, shower apnd and add lighting to family room, new wall sconces, relocate subpanel, lghting at stairs. no alt of walls, windows and door.Details
apt 4: remodel ktichen, bathroom on 3/f. change vanity/sink at 1/f level, shower apnd and add lighting to family room, new wall sconces, relocate subpanel, lghting at stairs. no alt of walls, windows and door. | $100,000 |
| Nov 6, 2019 | Completed final sign-off Mar 2020 | 2540 Post St | kitchen rmeodel, bathroom rmeodel, upgrade electrical at kitchen, add lighting at living room and bedrooms (2).Details
kitchen rmeodel, bathroom rmeodel, upgrade electrical at kitchen, add lighting at living room and bedrooms (2). | $35,000 |
| Oct 28, 2019 | Completed final sign-off Nov 2019 | 822 45th Av | to obtain a final inspection for work approved under previous permit pa201304195000/2015081744506. all work is complete.Details
to obtain a final inspection for work approved under previous permit pa201304195000/2015081744506. all work is complete. | |
| Oct 28, 2019 | Completed final sign-off Mar 2020 | 822 45th Av | to obtain a final inspection for work approved under previous permit pa200912072708/201304194998/201508174446. all work is complete.Details
to obtain a final inspection for work approved under previous permit pa200912072708/201304194998/201508174446. all work is complete. | |
| Jul 15, 2019 | Expired or cancelled cancelled Jan 2026 | 1450 Post St | unit 712:remodel kitchen & 2 baths w/ (n)plumbing fixtures & appliances & finishes.open closet walls. add partial soffitts. add washer & electric dryer in one bath, create media room; retrofit lighting, add 6 sconces -all led. no structural changes.Details
unit 712:remodel kitchen & 2 baths w/ (n)plumbing fixtures & appliances & finishes.open closet walls. add partial soffitts. add washer & electric dryer in one bath, create media room; retrofit lighting, add 6 sconces -all led. no structural changes. | |
| Jul 8, 2019 | Completed final sign-off Mar 2020 | 1450 Post St | unit 712 - remodel both bathrooms and kitchen. upgrade electrical @ kitchen area. new vanity sinks, shower rebuild, add 7 new wall scones lighting. no removal of walls.Details
unit 712 - remodel both bathrooms and kitchen. upgrade electrical @ kitchen area. new vanity sinks, shower rebuild, add 7 new wall scones lighting. no removal of walls. | $50,000 |
| Jul 1, 2019 | Expired or cancelled cancelled Jan 2026 | 1450 Post St | unit 712 - remodel both bathrooms and kitchen. upgrade electrical @ kitchen area; new vanity sinks, shower re-build. add 6 new sconce lightsDetails
unit 712 - remodel both bathrooms and kitchen. upgrade electrical @ kitchen area; new vanity sinks, shower re-build. add 6 new sconce lights | $50,000 |
| Mar 19, 2019 | Completed final sign-off May 2019 | 1520 Steiner St | unit 5: demolition of shower, remove tub, build new shower stall, new drywall, new tile work, new shower valveDetails
unit 5: demolition of shower, remove tub, build new shower stall, new drywall, new tile work, new shower valve | $14,000 |
| Feb 14, 2019 | Completed final sign-off Jul 2019 | 1450 Post St | unit 517. remodel unit incl upgrades. relocate kitchen, relocate and remodel 1 bathroom, create 1 (n) half bathroom, build (n) room, build (n) denDetails
unit 517. remodel unit incl upgrades. relocate kitchen, relocate and remodel 1 bathroom, create 1 (n) half bathroom, build (n) room, build (n) den | $48,000 |
| Jan 18, 2019 | Completed final sign-off Mar 2019 | 1760 Ofarrell St | unit #18: bathroom remodel, new shower valve, new tub,Details
unit #18: bathroom remodel, new shower valve, new tub, | $8,000 |
| Nov 20, 2018 | Completed final sign-off Jan 2019 | 1450 Post St | remodel two bathrooms. new wallboards. new shower valve, shower pan, tile work. no change to wall layouts and openings.Details
remodel two bathrooms. new wallboards. new shower valve, shower pan, tile work. no change to wall layouts and openings. | $14,000 |
| Aug 8, 2018 | Completed final sign-off Nov 2018 | 1139 Moraga St | kitchen remodel, relocate kitchen sink, electrical outlet, master bath, and relocate sink, add toilet, add exaust fan, new tub, shower pan.Details
kitchen remodel, relocate kitchen sink, electrical outlet, master bath, and relocate sink, add toilet, add exaust fan, new tub, shower pan. | $22,000 |
| Jul 11, 2018 | Completed final sign-off Sep 2018 | 1450 Post St | shower remodel, new shower pan, new shower valve, removing (e) drywall around showerDetails
shower remodel, new shower pan, new shower valve, removing (e) drywall around shower | $6,000 |
| May 31, 2018 | Completed final sign-off Aug 2018 | 219 Mangels Av | bathroom remodel downstairs. reroute/replace drain lines in garage. relocate outlet.Details
bathroom remodel downstairs. reroute/replace drain lines in garage. relocate outlet. | $14,000 |
| Aug 8, 2017 | Completed final sign-off Oct 2017 | 1450 Post St | #708: kitchen remodel - include new cabinets, countertop, tile back splash, appliances, sink & cabinet lights/new duplex gfi outlets. remove tub and add laundry in guest bathrm, install outlet for medicine cabinet in master bathrm. replace (e) light fixture with owner's pendent light in entry foyerDetails
#708: kitchen remodel - include new cabinets, countertop, tile back splash, appliances, sink & cabinet lights/new duplex gfi outlets. remove tub and add laundry in guest bathrm, install outlet for medicine cabinet in master bathrm. replace (e) light fixture with owner's pendent light in entry foyer | $10,000 |
| Apr 10, 2017 | Completed final sign-off Jun 2017 | 1450 Post St | unit 909: kitchen remodel, moth bathrooms new counter tops, new sinks only, relocation of two outlets in kitchen.Details
unit 909: kitchen remodel, moth bathrooms new counter tops, new sinks only, relocation of two outlets in kitchen. | $5,000 |
| Nov 14, 2016 | Completed final sign-off Aug 2017 | 862 Moultrie St | change extg storage to new bedroom add hallway from upper floor to new bedrooms.Details
change extg storage to new bedroom add hallway from upper floor to new bedrooms. | $5,000 |
| Sep 26, 2016 | Completed final sign-off May 2018 | 351 Mangels Av | new accessory unit at ground floor. provide new living room/kitchen, new bedroom and new bathroom. no work on second floor.Details
new accessory unit at ground floor. provide new living room/kitchen, new bedroom and new bathroom. no work on second floor. | $30,000 |
| Jul 13, 2016 | Completed final sign-off Nov 2016 | 74 New Montgomery St | unit #608 - remove a closet, add 1/2" thick plate glass wall & sliding door; add 4 ceiling lights. n/a maher ordinanceDetails
unit #608 - remove a closet, add 1/2" thick plate glass wall & sliding door; add 4 ceiling lights. n/a maher ordinance | $2,000 |
| May 4, 2016 | Completed final sign-off Sep 2016 | 75 Folsom St | interior renovation of kitchen, bathroom, & laundry room. scope to include new plumbing fixtures, cabinetry, appliances, lighting electrical & plumbing work as required. no structural work.Details
interior renovation of kitchen, bathroom, & laundry room. scope to include new plumbing fixtures, cabinetry, appliances, lighting electrical & plumbing work as required. no structural work. | $65,000 |