Block 3595, lot 033
412 Capp St
- City’s use
- Multi-Family Residential
- Built
- 1908
- Stories
- 4
- Units
- 3
- Rooms
- 10 bedrooms, 7 bathrooms
- Building
- 6,825 sq ft
- Lot
- 3,135 sq ft
- Zoning
- RH3
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 6, 2020 | Completed final sign-off Jul 2023 | 412 Capp St | comply with physical inspection report cc 8367Details
comply with physical inspection report cc 8367 | $50,000 | |
| Jul 31, 2019 | Never finaled issued Jul 2019, no final | 416 Capp St | streetspaceDetails
streetspace | ||
| May 24, 2019 | Never finaled issued May 2019, no final | 416 Capp St | street spaceDetails
street space | ||
| May 3, 2019 | Never finaled issued May 2019, no final | 416 Capp St | A Step Ahead Construction Llc | rev to pa# 201811095525; to add 2 windows at 1st fl.Details
rev to pa# 201811095525; to add 2 windows at 1st fl. | $2,000 |
| Apr 15, 2019 | Never finaled issued Apr 2019, no final | 416 Capp St | street spaceDetails
street space | ||
| Mar 7, 2019 | Never finaled issued Mar 2019, no final | 412 Capp St | street spaceDetails
street space | ||
| Nov 29, 2018 | Never finaled issued Nov 2018, no final | 412 Capp St | street spaceDetails
street space | ||
| Nov 9, 2018 | Never finaled issued Apr 2019, no final | 416 Capp St | A Step Ahead Construction Llc | convert storage space at rear of 1st fl into habitable space to include 1 bedroom, 1 bath, & 1 family rm connected to 2nd fl unit. replace window with tempered glaze @ lightwell on 1st floor.Details
convert storage space at rear of 1st fl into habitable space to include 1 bedroom, 1 bath, & 1 family rm connected to 2nd fl unit. replace window with tempered glaze @ lightwell on 1st floor. | $20,000 |
| May 17, 2017 | Completed final sign-off Mar 2019 | 412 Capp St | recommencement and completion of work approved under pa#201111179120Details
recommencement and completion of work approved under pa#201111179120 | $20,000 | |
| Nov 17, 2011 | Completed final sign-off Nov 2013 | 412 Capp St | repair (e) gas/water/electric without removal of or addition to (e) walls. fix (e) water & gas (leaks, update toilets & fixtures to comply w/ energy construction ordiance fix gas lines, repair e double hung windows & if necessary replace in kind. faxi pest damage (13), remoel ground all eletricalDetails
repair (e) gas/water/electric without removal of or addition to (e) walls. fix (e) water & gas (leaks, update toilets & fixtures to comply w/ energy construction ordiance fix gas lines, repair e double hung windows & if necessary replace in kind. faxi pest damage (13), remoel ground all eletrical | $25,000 | |
| Nov 17, 2011 | Never finaled issued Nov 2011, no final | 412 Capp St | add additional house number 412-a capp street to 412, 414 and 416 capp street. block 3595 lot 033.Details
add additional house number 412-a capp street to 412, 414 and 416 capp street. block 3595 lot 033. | ||
| Nov 17, 2011 | Never finaled issued Nov 2011, no final | 412 Capp St | repair (e) gas/water/electric, wotyhout removal of or addition to (e) walls. fix (e) plumbing leaks in kitchen & bath areas. updage toilets and fixtures to comply with energy and conservation ordinance. fix gas lines to resolve pg&e hazard notice. repair (e)Details
repair (e) gas/water/electric, wotyhout removal of or addition to (e) walls. fix (e) plumbing leaks in kitchen & bath areas. updage toilets and fixtures to comply with energy and conservation ordinance. fix gas lines to resolve pg&e hazard notice. repair (e) | $25,000 | |
| Jul 26, 2010 | Expired or cancelled withdrawn Sep 2011 | 412 Capp St | merge unit a & b into 1 unit on 3rd floor per plan. remove 1 kitchen.Details
merge unit a & b into 1 unit on 3rd floor per plan. remove 1 kitchen. | $70,000 | |
| Jul 22, 2010 | Completed final sign-off Jul 2010 | 414 Capp St | Lei's Construction Company | to obtain final inspection for work approved under pa #200901069601. all owrk is complete.Details
to obtain final inspection for work approved under pa #200901069601. all owrk is complete. | |
| Jul 22, 2010 | Completed final sign-off Jul 2011 | 414 Capp St | Lei's Construction Company | to obtain final inspection for work approved under pa #200710014213. all owrk is complete.Details
to obtain final inspection for work approved under pa #200710014213. all owrk is complete. | |
| Sep 4, 2009 | Never finaled issued Sep 2009, no final | 412 Capp St | street space and sidewalk repairDetails
street space and sidewalk repair | ||
| Jan 6, 2009 | Expired or cancelled expired Jul 2010 | 414 Capp St | David Huynh | revision to app #200710014213. replace (e) 10 wood windows with double glazed, not visible from street. move bathroom fixtures in 2 bathrooms. add a shower in one (e) toilet. build a shrine (alore) on the (e) hall. move (p) washer/dryer per plans.window not visible from street.Details
revision to app #200710014213. replace (e) 10 wood windows with double glazed, not visible from street. move bathroom fixtures in 2 bathrooms. add a shower in one (e) toilet. build a shrine (alore) on the (e) hall. move (p) washer/dryer per plans.window not visible from street. | $10,000 |
| Oct 1, 2007 | Never finaled issued Oct 2007, no final | 414 Capp St | remodel kitchen, bathroom & living room to master bedroom. add new bathroom (master). change living room to master bedroom, enlarge bedroom, change pantry to dining room, relocate utility room.Details
remodel kitchen, bathroom & living room to master bedroom. add new bathroom (master). change living room to master bedroom, enlarge bedroom, change pantry to dining room, relocate utility room. | $60,000 | |
| Feb 15, 2006 | Completed final sign-off Apr 2006 | 412 Capp St | renew app #200409214719 for final inspectionDetails
renew app #200409214719 for final inspection | ||
| Oct 31, 2005 | Expired or cancelled cancelled Jul 2021 | 416 Capp St | Safco Sound & Security Systems Inc. | replace fire alarmDetails
replace fire alarm | $5,000 |
| Nov 8, 2004 | Completed final sign-off Jul 2005 | 412 Capp St | revision to app #200409214719Details
revision to app #200409214719 | $2,000 | |
| Sep 21, 2004 | Expired or cancelled expired Jan 2006 | 412 Capp St | renovation of baths & kitchen at firest fl flat, new stair to basement level, reconfiguration of rmsDetails
renovation of baths & kitchen at firest fl flat, new stair to basement level, reconfiguration of rms | $70,000 | |
| May 16, 2001 | Completed final sign-off Sep 2001 | 416 Capp St | repair back stairs, loose guardrails, damaged stain treads, risers, landing boards, cloumns & strinDetails
repair back stairs, loose guardrails, damaged stain treads, risers, landing boards, cloumns & strin | $500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- A Step Ahead Construction Llc (2), Lei's Construction Company (2), David Huynh, Safco Sound & Security Systems Inc.
- Engineers
- Gene Wong, John W. Lau
- Designers
- John W Lau
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.