On San Francisco permits
Mar 2000 to Sep 2025

194 permits since 2000 (contractor on 194 permits, designer on 2 permits, authorized agent-others on 1 permit): 137 completed, 2 in progress, 34 never finaled, 21 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records

Most recent permits

Showing the 100 most recent of 194.

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 24, 2025Completed
final sign-off Jan 2026
604 Mission StIncom Mechanical Inc3rd & 4th fl - relocate 2 sprinkler heads
Details
Permit
202509245982
Status
complete
Filed
Sep 24, 2025
Permit issued
Sep 24, 2025
Final sign-off
Jan 29, 2026
Declared cost
$4,500
Address
604 Mission St

3rd & 4th fl - relocate 2 sprinkler heads

Open the permit page

$4,500
Sep 24, 2025Completed
final sign-off Oct 2025
407 Jackson StIncom Mechanical Increlocate 3 sprinkler heads
Details
Permit
202509245984
Status
complete
Filed
Sep 24, 2025
Permit issued
Sep 24, 2025
Final sign-off
Oct 10, 2025
Declared cost
$4,500
Address
407 Jackson St

relocate 3 sprinkler heads

Open the permit page

$4,500
Apr 16, 2024In progress
issued Apr 2024
1700 Waller StIncom Mechanical Incwater service from meter to building to accommodate sprinkler system
Details
Permit
202404160037
Status
issued
Filed
Apr 16, 2024
Permit issued
Apr 25, 2024
Declared cost
$20,000
Address
1700 Waller St

water service from meter to building to accommodate sprinkler system

Open the permit page

$20,000
Nov 16, 2023In progress
issued Nov 2023
1700 Waller StIncom Mechanical Incinstalling new pendent protection in new apartment on ground floor
Details
Permit
202311160889
Status
issued
Filed
Nov 16, 2023
Permit issued
Nov 16, 2023
Declared cost
$21,000
Address
1700 Waller St

installing new pendent protection in new apartment on ground floor

Open the permit page

$21,000
Jun 15, 2023Completed
final sign-off Jun 2023
248 Sutter StIncom Mechanical Incinstall pendent protection. as built to permit 202212229006; swap out pendents in yoga hot room to higher temperature
Details
Permit
202306150229
Status
complete
Filed
Jun 15, 2023
Permit issued
Jun 15, 2023
Final sign-off
Jun 26, 2023
Address
248 Sutter St

install pendent protection. as built to permit 202212229006; swap out pendents in yoga hot room to higher temperature

Open the permit page

May 10, 2023Completed
final sign-off Aug 2023
1750 Harrison StIncom Mechanical Incpendant protection for new ceiling. ref t.i. 202210073990.
Details
Permit
202305107487
Status
complete
Filed
May 10, 2023
Permit issued
May 10, 2023
Final sign-off
Aug 14, 2023
Declared cost
$17,250
Address
1750 Harrison St

pendant protection for new ceiling. ref t.i. 202210073990.

Open the permit page

$17,250
Mar 15, 2023Completed
final sign-off Apr 2023
435 Brannan StIncom Mechanical Incadd 2 new pendants (sprinkers) to kitchen ceiling
Details
Permit
202303153720
Status
complete
Filed
Mar 15, 2023
Permit issued
Mar 15, 2023
Final sign-off
Apr 3, 2023
Declared cost
$4,200
Address
435 Brannan St

add 2 new pendants (sprinkers) to kitchen ceiling

Open the permit page

$4,200
Dec 22, 2022Completed
final sign-off Jun 2023
248 Sutter StIncom Mechanical Incinstall 62 new pendent protection ti
Details
Permit
202212229006
Status
complete
Filed
Dec 22, 2022
Permit issued
Dec 22, 2022
Final sign-off
Jun 27, 2023
Declared cost
$20,000
Address
248 Sutter St

install 62 new pendent protection ti

Open the permit page

$20,000
Dec 7, 2022Completed
final sign-off Feb 2023
1318 Stockton StIncom Mechanical Incinstall new pendant protection for t.i. ref t.i permit 202207158575
Details
Permit
202212077825
Status
complete
Filed
Dec 7, 2022
Permit issued
Dec 7, 2022
Final sign-off
Feb 3, 2023
Declared cost
$9,100
Address
1318 Stockton St

install new pendant protection for t.i. ref t.i permit 202207158575

Open the permit page

$9,100
Oct 11, 2022Completed
final sign-off Oct 2022
584 Hayes StIncom Mechanical Incsuite 590: install new pendant protection. ref permit 202207289480
Details
Permit
202210114094
Status
complete
Filed
Oct 11, 2022
Permit issued
Oct 11, 2022
Final sign-off
Oct 28, 2022
Declared cost
$12,000
Address
584 Hayes St

suite 590: install new pendant protection. ref permit 202207289480

Open the permit page

$12,000
Oct 7, 2022Completed
final sign-off Nov 2022
145 Leavenworth StIncom Mechanical Incas-built 90 degree underground added. revision to pa#202108065974.
Details
Permit
202210073996
Status
complete
Filed
Oct 7, 2022
Permit issued
Oct 20, 2022
Final sign-off
Nov 4, 2022
Address
145 Leavenworth St

as-built 90 degree underground added. revision to pa#202108065974.

Open the permit page

Sep 7, 2022Completed
final sign-off Sep 2023
1650 Pacific AvIncom Mechanical Incinstall pendents in vetinary office t.i.
Details
Permit
202209071996
Status
complete
Filed
Sep 7, 2022
Permit issued
Sep 7, 2022
Final sign-off
Sep 26, 2023
Declared cost
$33,000
Address
1650 Pacific Av

install pendents in vetinary office t.i.

Open the permit page

$33,000
Dec 22, 2021Completed
final sign-off Dec 2021
3157 Fillmore StIncom Mechanical Incadd 4 heads to t-bar. ref pa202103015588.
Details
Permit
202112224929
Status
complete
Filed
Dec 22, 2021
Permit issued
Dec 23, 2021
Final sign-off
Dec 28, 2021
Declared cost
$5,000
Address
3157 Fillmore St

add 4 heads to t-bar. ref pa202103015588.

Open the permit page

$5,000
Nov 12, 2021Completed
final sign-off Nov 2021
8 Mission StIncom Mechanical Incmodify piping one head on 8th floor and add 1 sidewalk head on 7th floor.
Details
Permit
202111122294
Status
complete
Filed
Nov 12, 2021
Permit issued
Nov 12, 2021
Final sign-off
Nov 29, 2021
Declared cost
$2,000
Address
8 Mission St

modify piping one head on 8th floor and add 1 sidewalk head on 7th floor.

Open the permit page

$2,000
Sep 30, 2021Completed
final sign-off May 2022
8 Mission StIncom Mechanical Incadd (8) and relocate (8) sprinkler heads to 1st and 2nd fl
Details
Permit
202109309598
Status
complete
Filed
Sep 30, 2021
Permit issued
Nov 2, 2021
Final sign-off
May 16, 2022
Declared cost
$10,260
Address
8 Mission St

add (8) and relocate (8) sprinkler heads to 1st and 2nd fl

Open the permit page

$10,260
Sep 14, 2021Completed
final sign-off Sep 2021
406 Jackson StIncom Mechanical Incraise lower existing heads for new cielings.
Details
Permit
202109148400
Status
complete
Filed
Sep 14, 2021
Permit issued
Sep 14, 2021
Final sign-off
Sep 29, 2021
Declared cost
$9,000
Address
406 Jackson St

raise lower existing heads for new cielings.

Open the permit page

$9,000
Sep 8, 2021Completed
final sign-off May 2023
2306 Market StIncom Mechanical Incsprinkler heads to elevator shaft and mechanical room
Details
Permit
202109087977
Status
complete
Filed
Sep 8, 2021
Permit issued
May 12, 2023
Final sign-off
May 30, 2023
Declared cost
$5,000
Address
2306 Market St

sprinkler heads to elevator shaft and mechanical room

Open the permit page

$5,000
Aug 6, 2021Completed
final sign-off Nov 2022
145 Leavenworth StIncom Mechanical Incfire underground only. install new 6" underground service - 14 feet on vacant lot. see site permit 201804136335 (s). sprinkler/sprinkler monitoring under sep permits.
Details
Permit
202108065974
Status
complete
Filed
Aug 6, 2021
Permit issued
Aug 12, 2021
Final sign-off
Nov 4, 2022
Declared cost
$15,000
Address
145 Leavenworth St

fire underground only. install new 6" underground service - 14 feet on vacant lot. see site permit 201804136335 (s). sprinkler/sprinkler monitoring under sep permits.

Open the permit page

$15,000
May 25, 2021Completed
final sign-off Sep 2021
355 11th StIncom Mechanical Incinstall new pendents off existing uprights in new offices & storage. add upright heads for new full height wall. #5 heads. ref ti: 2021-0210-4342
Details
Permit
202105251039
Status
complete
Filed
May 25, 2021
Permit issued
Aug 11, 2021
Final sign-off
Sep 13, 2021
Declared cost
$3,500
Address
355 11th St

install new pendents off existing uprights in new offices & storage. add upright heads for new full height wall. #5 heads. ref ti: 2021-0210-4342

Open the permit page

$3,500
Apr 15, 2021Completed
final sign-off Nov 2022
361 Turk StIncom Mechanical Incfire underground only: install new 6" underground fire service from curb to inside of new building. bldg is low-rise residential. see site permit #2018-0413-6327.
Details
Permit
202104158654
Status
complete
Filed
Apr 15, 2021
Permit issued
Jun 4, 2021
Final sign-off
Nov 4, 2022
Declared cost
$20,000
Address
361 Turk St

fire underground only: install new 6" underground fire service from curb to inside of new building. bldg is low-rise residential. see site permit #2018-0413-6327.

Open the permit page

$20,000
Jul 27, 2020Completed
final sign-off Dec 2020
111 New Montgomery StIncom Mechanical Inc2nd fl: as-built fire sprinkler plan for pa 202007079754. branch line relocationg due to hvac ductwork. ref t.i. pa 202001172199/ maher n/a.
Details
Permit
202007270816
Status
complete
Filed
Jul 27, 2020
Permit issued
Oct 27, 2020
Final sign-off
Dec 14, 2020
Address
111 New Montgomery St

2nd fl: as-built fire sprinkler plan for pa 202007079754. branch line relocationg due to hvac ductwork. ref t.i. pa 202001172199/ maher n/a.

Open the permit page

Jul 7, 2020Completed
final sign-off Dec 2020
111 New Montgomery StIncom Mechanical Inc2nd fl: remove (24) (e) drop pendants, relocate (r) (11) existitng uprights for new walls, add (4) new sprinkler heads. ref ti permit #202001172199
Details
Permit
202007079754
Status
complete
Filed
Jul 7, 2020
Permit issued
Jul 9, 2020
Final sign-off
Dec 14, 2020
Declared cost
$3,500
Address
111 New Montgomery St

2nd fl: remove (24) (e) drop pendants, relocate (r) (11) existitng uprights for new walls, add (4) new sprinkler heads. ref ti permit #202001172199

Open the permit page

$3,500
Feb 26, 2020Never finaled
issued Feb 2020, no final
1890 Bryant StIncom Mechanical Incpendant protection for (e) uprights for restaurant remodel #3 heads. ref pa 2019-0918-2012
Details
Permit
202002265470
Status
issued
Filed
Feb 26, 2020
Permit issued
Feb 26, 2020
Declared cost
$2,500
Address
1890 Bryant St

pendant protection for (e) uprights for restaurant remodel #3 heads. ref pa 2019-0918-2012

Open the permit page

$2,500
Jan 14, 2020Completed
final sign-off Apr 2021
420 Folsom StIncom Mechanical Incpendent protection restaurant remodel relocate 14 heads na/ maher
Details
Permit
202001141796
Status
complete
Filed
Jan 14, 2020
Permit issued
Jan 14, 2020
Final sign-off
Apr 19, 2021
Declared cost
$4,500
Address
420 Folsom St

pendent protection restaurant remodel relocate 14 heads na/ maher

Open the permit page

$4,500
Dec 9, 2019Completed
final sign-off Apr 2020
260 California StIncom Mechanical Inc10/f: fire sprinkler : pendant protection for (e) uprights for office remodel number of heads (13). ref t.i. pa201905301970. maher n/a.
Details
Permit
201912099037
Status
complete
Filed
Dec 9, 2019
Permit issued
Dec 9, 2019
Final sign-off
Apr 9, 2020
Declared cost
$4,500
Address
260 California St

10/f: fire sprinkler : pendant protection for (e) uprights for office remodel number of heads (13). ref t.i. pa201905301970. maher n/a.

Open the permit page

$4,500
Nov 20, 2019Completed
final sign-off Nov 2020
155 12th StIncom Mechanical Incinstall new underground fire sprinkler line into extg bldg. ref app#201803274695
Details
Permit
201911207815
Status
complete
Filed
Nov 20, 2019
Permit issued
Jan 31, 2020
Final sign-off
Nov 25, 2020
Declared cost
$25,000
Address
155 12th St

install new underground fire sprinkler line into extg bldg. ref app#201803274695

Open the permit page

$25,000
Oct 2, 2019Completed
final sign-off Oct 2019
625 Market StIncom Mechanical Inc15/f: relocate 31 upright to pendant add 2 new pendants. pendant protection for (e) upgrights like for like. ref t.i. 201908148751. maher n/a.
Details
Permit
201910023341
Status
complete
Filed
Oct 2, 2019
Permit issued
Oct 2, 2019
Final sign-off
Oct 25, 2019
Declared cost
$4,500
Address
625 Market St

15/f: relocate 31 upright to pendant add 2 new pendants. pendant protection for (e) upgrights like for like. ref t.i. 201908148751. maher n/a.

Open the permit page

$4,500
Aug 15, 2019Completed
final sign-off Sep 2021
1365 04th StIncom Mechanical Incpendant protection for (e) uprights for office remodel: 5 heads. ref t.i.: pa201906102971. maher n/a. 12 relocates 5 new.
Details
Permit
201908158939
Status
complete
Filed
Aug 15, 2019
Permit issued
Oct 2, 2019
Final sign-off
Sep 1, 2021
Declared cost
$4,000
Address
1365 04th St

pendant protection for (e) uprights for office remodel: 5 heads. ref t.i.: pa201906102971. maher n/a. 12 relocates 5 new.

Open the permit page

$4,000
Jul 22, 2019Completed
final sign-off Aug 2019
900 Kearny StIncom Mechanical Inc7/f, suite 700 - fire sprinklers: change 11 uprights to pendants. ref t.i. 201906173510.
Details
Permit
201907226463
Status
complete
Filed
Jul 22, 2019
Permit issued
Aug 15, 2019
Final sign-off
Aug 29, 2019
Declared cost
$2,500
Address
900 Kearny St

7/f, suite 700 - fire sprinklers: change 11 uprights to pendants. ref t.i. 201906173510.

Open the permit page

$2,500
Feb 26, 2019Completed
final sign-off Mar 2020
2741 16th StIncom Mechanical Incinstall new fire sprinkler system per nfpa 3 through-out existing building with new 4-inch fire service off of 8-inch main on 16th st per nfpa 24. install 271 sprinklers. ref pa # 2018/10/18/3533.
Details
Permit
201902263812
Status
complete
Filed
Feb 26, 2019
Permit issued
Mar 12, 2019
Final sign-off
Mar 3, 2020
Declared cost
$95,582
Address
2741 16th St

install new fire sprinkler system per nfpa 3 through-out existing building with new 4-inch fire service off of 8-inch main on 16th st per nfpa 24. install 271 sprinklers. ref pa # 2018/10/18/3533.

Open the permit page

$95,582
Jan 31, 2019Completed
final sign-off Jul 2020
562 Sutter StIncom Mechanical Increplace e fire pump with code legal fire pump of equal pressure & flow rates. ref ti 201810294425. n/a for maher.
Details
Permit
201901311729
Status
complete
Filed
Jan 31, 2019
Permit issued
May 10, 2019
Final sign-off
Jul 8, 2020
Declared cost
$35,550
Address
562 Sutter St

replace e fire pump with code legal fire pump of equal pressure & flow rates. ref ti 201810294425. n/a for maher.

Open the permit page

$35,550
Oct 17, 2018Never finaled
issued Oct 2018, no final
350 Treat AvIncom Mechanical Incinstall 45 new pendants off of 29 new mechanical tees for new room configuration ref 201809049004-ordianary hazard spacing and new siesmic bracing calcs
Details
Permit
201810173462
Status
issued
Filed
Oct 17, 2018
Permit issued
Oct 31, 2018
Declared cost
$10,000
Address
350 Treat Av

install 45 new pendants off of 29 new mechanical tees for new room configuration ref 201809049004-ordianary hazard spacing and new siesmic bracing calcs

Open the permit page

$10,000
Sep 17, 2018Completed
final sign-off Oct 2018
900 Kearny StIncom Mechanical Incsuite 500: pendent protection on existing uprights (7) new pendants. ref ti pa2018-0626-2931
Details
Permit
201809170476
Status
complete
Filed
Sep 17, 2018
Permit issued
Sep 19, 2018
Final sign-off
Oct 1, 2018
Declared cost
$3,500
Address
900 Kearny St

suite 500: pendent protection on existing uprights (7) new pendants. ref ti pa2018-0626-2931

Open the permit page

$3,500
Sep 12, 2018Completed
final sign-off Sep 2022
1076 Howard StIncom Mechanical Incinstall new fire sprinkler system through-out the existing building with heads #132 per nfpa 13. installation of new 4-inch fire service is under separatre application. ref pa# 2017/04/19/4368.
Details
Permit
201809129897
Status
complete
Filed
Sep 12, 2018
Permit issued
Mar 6, 2019
Final sign-off
Sep 20, 2022
Declared cost
$57,570
Address
1076 Howard St

install new fire sprinkler system through-out the existing building with heads #132 per nfpa 13. installation of new 4-inch fire service is under separatre application. ref pa# 2017/04/19/4368.

Open the permit page

$57,570
Jun 1, 2018Completed
final sign-off Jun 2018
4355 Geary BlIncom Mechanical Incadjust pendant protection for new office space - relocate 29 heads. ref pa 2018-0322-4324
Details
Permit
201806010796
Status
complete
Filed
Jun 1, 2018
Permit issued
Jun 1, 2018
Final sign-off
Jun 14, 2018
Declared cost
$5,000
Address
4355 Geary Bl

adjust pendant protection for new office space - relocate 29 heads. ref pa 2018-0322-4324

Open the permit page

$5,000
May 22, 2018Completed
final sign-off Jun 2019
1226 09th AvIncom Mechanical Incinstall new fire sprinkler system in extg restaurant bldg for 39 heads. ref ti #201805250190.
Details
Permit
201805229815
Status
complete
Filed
May 22, 2018
Permit issued
Sep 12, 2018
Final sign-off
Jun 7, 2019
Declared cost
$17,000
Address
1226 09th Av

install new fire sprinkler system in extg restaurant bldg for 39 heads. ref ti #201805250190.

Open the permit page

$17,000
Apr 11, 2018Completed
final sign-off May 2018
351 Harriet StIncom Mechanical Incinstall 13 new pendants & 22 new uprights off 2 new mech tees for new room configurations & full height walls. ref pa 2018-0403-5336
Details
Permit
201804116073
Status
complete
Filed
Apr 11, 2018
Permit issued
May 8, 2018
Final sign-off
May 30, 2018
Declared cost
$9,000
Address
351 Harriet St

install 13 new pendants & 22 new uprights off 2 new mech tees for new room configurations & full height walls. ref pa 2018-0403-5336

Open the permit page

$9,000
Jan 30, 2018Completed
final sign-off Mar 2018
350 Treat AvIncom Mechanical Incinstall 11 pendants & 11 new uprights of 13 new mechanical tees for new configurations. ref pa 2017-1121-4631
Details
Permit
201801309928
Status
complete
Filed
Jan 30, 2018
Permit issued
Mar 7, 2018
Final sign-off
Mar 19, 2018
Declared cost
$6,500
Address
350 Treat Av

install 11 pendants & 11 new uprights of 13 new mechanical tees for new configurations. ref pa 2017-1121-4631

Open the permit page

$6,500
Jan 30, 2018Completed
final sign-off Apr 2019
631 Howard StIncom Mechanical Incturn 7 uprights to pendants in basement & relocate 3 heads on 2nd floor. ref pa 2017-1220-7009
Details
Permit
201801309930
Status
complete
Filed
Jan 30, 2018
Permit issued
Jan 30, 2018
Final sign-off
Apr 25, 2019
Declared cost
$1,500
Address
631 Howard St

turn 7 uprights to pendants in basement & relocate 3 heads on 2nd floor. ref pa 2017-1220-7009

Open the permit page

$1,500
Jan 22, 2018Completed
final sign-off Apr 2018
2630 Mission StIncom Mechanical Incpendent protection for (e) uprights for new dental office 76 sprinkler heads, will rewire hydro - ref 201710100775
Details
Permit
201801229178
Status
complete
Filed
Jan 22, 2018
Permit issued
Jan 22, 2018
Final sign-off
Apr 16, 2018
Declared cost
$30,000
Address
2630 Mission St

pendent protection for (e) uprights for new dental office 76 sprinkler heads, will rewire hydro - ref 201710100775

Open the permit page

$30,000
Jan 22, 2018Never finaled
issued Jan 2018, no final
2349 Lombard StIncom Mechanical Incas built per inspectors request depicting correct sprinkler main layout orig approved plan showed main in incorrect location due to provided drawing. ref 201709279715 maher na
Details
Permit
201801229179
Status
issued
Filed
Jan 22, 2018
Permit issued
Jan 22, 2018
Address
2349 Lombard St

as built per inspectors request depicting correct sprinkler main layout orig approved plan showed main in incorrect location due to provided drawing. ref 201709279715 maher na

Open the permit page

Dec 19, 2017Completed
final sign-off Jan 2018
386 Geary StIncom Mechanical Incpendant protection for extg uprights. 5 heads. ref app#201710121065. n/a for maher
Details
Permit
201712196865
Status
complete
Filed
Dec 19, 2017
Permit issued
Dec 19, 2017
Final sign-off
Jan 8, 2018
Declared cost
$1,500
Address
386 Geary St

pendant protection for extg uprights. 5 heads. ref app#201710121065. n/a for maher

Open the permit page

$1,500
Dec 4, 2017Completed
final sign-off Mar 2018
435 Brannan StIncom Mechanical Incsuite #110: sprinkler revision to 201706129068; as builts per inspectors request. deleted (1) strorage container. maher na add seismic seperation assembly detail
Details
Permit
201712045371
Status
complete
Filed
Dec 4, 2017
Permit issued
Mar 7, 2018
Final sign-off
Mar 12, 2018
Address
435 Brannan St

suite #110: sprinkler revision to 201706129068; as builts per inspectors request. deleted (1) strorage container. maher na add seismic seperation assembly detail

Open the permit page

Nov 3, 2017Completed
final sign-off Mar 2018
435 Brannan StIncom Mechanical Incsuite 110: as-built fire sprinklers per inspector's request: ref pa201706129068. maher n/a.
Details
Permit
201711033067
Status
complete
Filed
Nov 3, 2017
Permit issued
Nov 3, 2017
Final sign-off
Mar 12, 2018
Address
435 Brannan St

suite 110: as-built fire sprinklers per inspector's request: ref pa201706129068. maher n/a.

Open the permit page

Sep 27, 2017Completed
final sign-off Jan 2018
2349 Lombard StIncom Mechanical Incf/s: modify pendent heads throughout for new walls & ceilings for gym. 12 new pendents, 12 relocates. (24 total pendants). ref ti #201705166703
Details
Permit
201709279713
Status
complete
Filed
Sep 27, 2017
Permit issued
Sep 27, 2017
Final sign-off
Jan 8, 2018
Declared cost
$8,850
Address
2349 Lombard St

f/s: modify pendent heads throughout for new walls & ceilings for gym. 12 new pendents, 12 relocates. (24 total pendants). ref ti #201705166703

Open the permit page

$8,850
Sep 27, 2017Completed
final sign-off Dec 2017
2800 Leavenworth StIncom Mechanical Incste. a30: f/s: (49) pendent protection for existing uprights for donut store. ref ti #201705116355. maher na
Details
Permit
201709279711
Status
complete
Filed
Sep 27, 2017
Permit issued
Oct 18, 2017
Final sign-off
Dec 8, 2017
Declared cost
$8,000
Address
2800 Leavenworth St

ste. a30: f/s: (49) pendent protection for existing uprights for donut store. ref ti #201705116355. maher na

Open the permit page

$8,000
Aug 1, 2017Completed
final sign-off Aug 2017
425 North Point StIncom Mechanical Inc1st fl: as built for 2 demoed sidewall fire sprinkler heads and adding 2 f/s heads in new socket per app 2017-0324-2332 and arch app #201609016556. n/a for maher. requested by field inspector.
Details
Permit
201708013552
Status
complete
Filed
Aug 1, 2017
Permit issued
Aug 1, 2017
Final sign-off
Aug 23, 2017
Declared cost
$5,000
Address
425 North Point St

1st fl: as built for 2 demoed sidewall fire sprinkler heads and adding 2 f/s heads in new socket per app 2017-0324-2332 and arch app #201609016556. n/a for maher. requested by field inspector.

Open the permit page

$5,000
Jul 25, 2017Completed
final sign-off Nov 2017
1415 Howard StIncom Mechanical Increvision to 2017-0223-9983: replace underground ductile pipe with c900 pipe; maher ord 155-13
Details
Permit
201707252910
Status
complete
Filed
Jul 25, 2017
Permit issued
Aug 2, 2017
Final sign-off
Nov 27, 2017
Declared cost
$11,000
Address
1415 Howard St

revision to 2017-0223-9983: replace underground ductile pipe with c900 pipe; maher ord 155-13

Open the permit page

$11,000
Jul 13, 2017Completed
final sign-off Oct 2017
781 Beach StIncom Mechanical Incpendant protection for existing uprights. relo 60 heads. ref. #2017-0329-2676
Details
Permit
201707131806
Status
complete
Filed
Jul 13, 2017
Permit issued
Jul 25, 2017
Final sign-off
Oct 18, 2017
Declared cost
$2,500
Address
781 Beach St

pendant protection for existing uprights. relo 60 heads. ref. #2017-0329-2676

Open the permit page

$2,500
Jun 12, 2017Completed
final sign-off May 2018
435 Brannan StIncom Mechanical Incpendent protection for existing uprights system with additional protection of 24 heads ref ti 2016-1202-4033
Details
Permit
201706129068
Status
complete
Filed
Jun 12, 2017
Permit issued
Jun 12, 2017
Final sign-off
May 4, 2018
Declared cost
$4,500
Address
435 Brannan St

pendent protection for existing uprights system with additional protection of 24 heads ref ti 2016-1202-4033

Open the permit page

$4,500
May 23, 2017Completed
final sign-off Sep 2017
586 Hayes StIncom Mechanical Incpendant protection for new restaurant. 14 heads. t.i. app#201312093685
Details
Permit
201705237432
Status
complete
Filed
May 23, 2017
Permit issued
May 23, 2017
Final sign-off
Sep 14, 2017
Declared cost
$2,500
Address
586 Hayes St

pendant protection for new restaurant. 14 heads. t.i. app#201312093685

Open the permit page

$2,500
May 15, 2017Completed
final sign-off Jul 2017
250 Beach StIncom Mechanical Incpendant protection for existing uprights. heads: 4. ti pa# 201701207619
Details
Permit
201705156600
Status
complete
Filed
May 15, 2017
Permit issued
May 15, 2017
Final sign-off
Jul 7, 2017
Declared cost
$1,500
Address
250 Beach St

pendant protection for existing uprights. heads: 4. ti pa# 201701207619

Open the permit page

$1,500
Mar 24, 2017Completed
final sign-off Aug 2017
425 North Point StIncom Mechanical Incground floor lobby: relocate and add sprinklers due to new wall configuration. fire sprinkler heads 3. ref app#201609016556. n/a for maher.
Details
Permit
201703242332
Status
complete
Filed
Mar 24, 2017
Permit issued
Mar 24, 2017
Final sign-off
Aug 23, 2017
Declared cost
$1,200
Address
425 North Point St

ground floor lobby: relocate and add sprinklers due to new wall configuration. fire sprinkler heads 3. ref app#201609016556. n/a for maher.

Open the permit page

$1,200
Mar 24, 2017Completed
final sign-off Jun 2017
1266 09th AvIncom Mechanical Incas built for extg permit #201701197476. removed uprights incorrectly shown on plans and relocate heads that were not as shown per inspectors request. t.i. app#201611082192
Details
Permit
201703242336
Status
complete
Filed
Mar 24, 2017
Permit issued
Mar 24, 2017
Final sign-off
Jun 5, 2017
Declared cost
$1,500
Address
1266 09th Av

as built for extg permit #201701197476. removed uprights incorrectly shown on plans and relocate heads that were not as shown per inspectors request. t.i. app#201611082192

Open the permit page

$1,500
Feb 23, 2017Completed
final sign-off Jan 2018
1415 Howard StIncom Mechanical Incinstall new overhead fire sprinkle system heads: 115 ti 201608114810 maher na underground 4" fire only
Details
Permit
201702239983
Status
complete
Filed
Feb 23, 2017
Permit issued
Feb 23, 2017
Final sign-off
Jan 29, 2018
Declared cost
$11,000
Address
1415 Howard St

install new overhead fire sprinkle system heads: 115 ti 201608114810 maher na underground 4" fire only

Open the permit page

$11,000
Jan 19, 2017Completed
final sign-off Jun 2017
1266 09th AvIncom Mechanical Incg/f: pendant protection for already (e) uprights: 24 heads. t.i. ref pa#201611082192.
Details
Permit
201701197476
Status
complete
Filed
Jan 19, 2017
Permit issued
Jan 19, 2017
Final sign-off
Jun 5, 2017
Declared cost
$1,500
Address
1266 09th Av

g/f: pendant protection for already (e) uprights: 24 heads. t.i. ref pa#201611082192.

Open the permit page

$1,500
Dec 7, 2016Completed
final sign-off Dec 2016
250 Beach StIncom Mechanical Inc1/f- ref. 201511021475; re-route existing piping around new electrical room. adjust sprinkler spacing with the new walls; maher n/a
Details
Permit
201612074367
Status
complete
Filed
Dec 7, 2016
Permit issued
Dec 7, 2016
Final sign-off
Dec 20, 2016
Declared cost
$2,500
Address
250 Beach St

1/f- ref. 201511021475; re-route existing piping around new electrical room. adjust sprinkler spacing with the new walls; maher n/a

Open the permit page

$2,500
Dec 7, 2016Never finaled
issued Dec 2016, no final
875 Stevenson StIncom Mechanical Incbasement- ref. 201608175226; added (2) sprinkler heads for the hvac units per request of inspector.
Details
Permit
201612074369
Status
issued
Filed
Dec 7, 2016
Permit issued
Dec 7, 2016
Declared cost
$1,000
Address
875 Stevenson St

basement- ref. 201608175226; added (2) sprinkler heads for the hvac units per request of inspector.

Open the permit page

$1,000
Sep 15, 2016Completed
final sign-off Oct 2016
1029 Geary StIncom Mechanical Incfire sprinklers - raise piping in (e) electrical room & new laundry room. add 6 pendents to (e) uprights. add 1 upright in corridor ref pa 2016-0429-6129. maher na
Details
Permit
201609157805
Status
complete
Filed
Sep 15, 2016
Permit issued
Sep 15, 2016
Final sign-off
Oct 18, 2016
Declared cost
$1,000
Address
1029 Geary St

fire sprinklers - raise piping in (e) electrical room & new laundry room. add 6 pendents to (e) uprights. add 1 upright in corridor ref pa 2016-0429-6129. maher na

Open the permit page

$1,000
Sep 1, 2016Completed
final sign-off Oct 2016
260 California StIncom Mechanical Inc12th floor - relocate fire riser due to moving of a closet. ref pa #201606220563. n/a maher ordinance
Details
Permit
201609016596
Status
complete
Filed
Sep 1, 2016
Permit issued
Sep 1, 2016
Final sign-off
Oct 7, 2016
Declared cost
$1,500
Address
260 California St

12th floor - relocate fire riser due to moving of a closet. ref pa #201606220563. n/a maher ordinance

Open the permit page

$1,500
Aug 16, 2016Never finaled
issued Aug 2016, no final
545 Post StIncom Mechanical Inc1st & mezz: adjust & relocate sprinklers to new wall & ceiling configuration. total relocates 11 ref pa 201606200396
Details
Permit
201608165134
Status
issued
Filed
Aug 16, 2016
Permit issued
Aug 19, 2016
Declared cost
$2,500
Address
545 Post St

1st & mezz: adjust & relocate sprinklers to new wall & ceiling configuration. total relocates 11 ref pa 201606200396

Open the permit page

$2,500
Jul 22, 2016Completed
final sign-off Oct 2016
981 Mission StIncom Mechanical Increvision to pa 2016-0323-2866, coversheet clarification to correctly identify a-2 occupancy
Details
Permit
201607223059
Status
complete
Filed
Jul 22, 2016
Permit issued
Jul 25, 2016
Final sign-off
Oct 4, 2016
Address
981 Mission St

revision to pa 2016-0323-2866, coversheet clarification to correctly identify a-2 occupancy

Open the permit page

May 6, 2016Never finaled
issued Jun 2016, no final
981 Mission StIncom Mechanical Inc1st, 2nd & mezz floors: adjusting (e) fire sprinkler system to accomodate new office. new pendents 14. relocated pendents - 29. relocated uprights - 6. ref t.i. pa#201603232866
Details
Permit
201605066804
Status
issued
Filed
May 6, 2016
Permit issued
Jun 3, 2016
Declared cost
$10,000
Address
981 Mission St

1st, 2nd & mezz floors: adjusting (e) fire sprinkler system to accomodate new office. new pendents 14. relocated pendents - 29. relocated uprights - 6. ref t.i. pa#201603232866

Open the permit page

$10,000
May 5, 2016Completed
final sign-off Jul 2016
300 04th StIncom Mechanical Inc1st - 3rd floors only - modify existing fire sprinkler system & dry stand pipe modification to wetted dry. 1.st flr: 14 new, 17 existing, 2nd flr: 11 new, 19 existing, 3rd flr: 1 new, 25 existing. total 26 new heads. ref t.i. #201503029730. n/a maher ordinance
Details
Permit
201605056670
Status
complete
Filed
May 5, 2016
Permit issued
May 19, 2016
Final sign-off
Jul 19, 2016
Declared cost
$3,500
Address
300 04th St

1st - 3rd floors only - modify existing fire sprinkler system & dry stand pipe modification to wetted dry. 1.st flr: 14 new, 17 existing, 2nd flr: 11 new, 19 existing, 3rd flr: 1 new, 25 existing. total 26 new heads. ref t.i. #201503029730. n/a maher ordinance

Open the permit page

$3,500
May 5, 2016Completed
final sign-off Jun 2016
1292 Market StIncom Mechanical Incground floor add pendants to exisitng uprights for new offices, new 15 pendants. relocate 1, existing uprights 17. ref t.i. #201602038726.
Details
Permit
201605056666
Status
complete
Filed
May 5, 2016
Permit issued
May 5, 2016
Final sign-off
Jun 28, 2016
Declared cost
$500
Address
1292 Market St

ground floor add pendants to exisitng uprights for new offices, new 15 pendants. relocate 1, existing uprights 17. ref t.i. #201602038726.

Open the permit page

$500
Apr 29, 2016Never finaled
issued Apr 2016, no final
601 19th StIncom Mechanical Increvision to as built for (e) permit 2015 0619 9420 for fire sprinklers. reference 2016.03.15.2065 (as built); compliance with maher ordinance no 155-13 not required.
Details
Permit
201604296151
Status
issued
Filed
Apr 29, 2016
Permit issued
Apr 29, 2016
Address
601 19th St

revision to as built for (e) permit 2015 0619 9420 for fire sprinklers. reference 2016.03.15.2065 (as built); compliance with maher ordinance no 155-13 not required.

Open the permit page

Mar 15, 2016Completed
final sign-off Sep 2016
1000 Larkin StIncom Mechanical Incchanging existing uprights to pendants for new rrestaurant. t.i. #201512285972. n/a mahe ordinance
Details
Permit
201603152069
Status
complete
Filed
Mar 15, 2016
Permit issued
Mar 15, 2016
Final sign-off
Sep 21, 2016
Declared cost
$5,000
Address
1000 Larkin St

changing existing uprights to pendants for new rrestaurant. t.i. #201512285972. n/a mahe ordinance

Open the permit page

$5,000
Mar 15, 2016Never finaled
issued Mar 2016, no final
601 19th StIncom Mechanical Incas built for exisitng permit for fire sprinkler. ref pa #201506199420. moving sprinkler main &concealing 2" pipe. n/a maher ordinance
Details
Permit
201603152065
Status
issued
Filed
Mar 15, 2016
Permit issued
Mar 25, 2016
Address
601 19th St

as built for exisitng permit for fire sprinkler. ref pa #201506199420. moving sprinkler main &concealing 2" pipe. n/a maher ordinance

Open the permit page

Feb 18, 2016Never finaled
issued Feb 2016, no final
424 09th StIncom Mechanical Incas built fire sprinkler for 201508053386
Details
Permit
201602189956
Status
issued
Filed
Feb 18, 2016
Permit issued
Feb 18, 2016
Address
424 09th St

as built fire sprinkler for 201508053386

Open the permit page

Jan 29, 2016Never finaled
issued Jan 2016, no final
424 09th StIncom Mechanical Incas built per fire inspector's request for existing permit 2015-0805-3386. maher na
Details
Permit
201601298365
Status
issued
Filed
Jan 29, 2016
Permit issued
Jan 29, 2016
Declared cost
$1,000
Address
424 09th St

as built per fire inspector's request for existing permit 2015-0805-3386. maher na

Open the permit page

$1,000
Jan 21, 2016Completed
final sign-off Feb 2016
1282 Market StIncom Mechanical Inc1st floor: relocate 12 pendants for office remodel; ref ti 2015-1008-9267.
Details
Permit
201601217582
Status
complete
Filed
Jan 21, 2016
Permit issued
Jan 21, 2016
Final sign-off
Feb 23, 2016
Declared cost
$5,000
Address
1282 Market St

1st floor: relocate 12 pendants for office remodel; ref ti 2015-1008-9267.

Open the permit page

$5,000
Jan 7, 2016Completed
final sign-off Feb 2016
920 North Point StIncom Mechanical Inchook up fire sprinkler system to captive air hood fire suppression system. t.i. pa# 201505196645, 201507010493 & 201512296013. n/a ordinance #155-13 valve monitoring separte permit.
Details
Permit
201601076538
Status
complete
Filed
Jan 7, 2016
Permit issued
Jan 7, 2016
Final sign-off
Feb 10, 2016
Declared cost
$3,000
Address
920 North Point St

hook up fire sprinkler system to captive air hood fire suppression system. t.i. pa# 201505196645, 201507010493 & 201512296013. n/a ordinance #155-13 valve monitoring separte permit.

Open the permit page

$3,000
Dec 24, 2015Completed
final sign-off Mar 2016
424 09th StIncom Mechanical Increlocate & remove fire sprinklers to accomodate new construction. t.i. pa# 201510220499. n/a ordinance #155-13
Details
Permit
201512245901
Status
complete
Filed
Dec 24, 2015
Permit issued
Dec 24, 2015
Final sign-off
Mar 28, 2016
Declared cost
$5,000
Address
424 09th St

relocate & remove fire sprinklers to accomodate new construction. t.i. pa# 201510220499. n/a ordinance #155-13

Open the permit page

$5,000
Dec 18, 2015Completed
final sign-off Mar 2016
555 Post StIncom Mechanical Incas built for fourth floor to be applied to existing fire sprinkler permit 2015-1216-5216
Details
Permit
201512185479
Status
complete
Filed
Dec 18, 2015
Permit issued
Dec 18, 2015
Final sign-off
Mar 3, 2016
Declared cost
$1,500
Address
555 Post St

as built for fourth floor to be applied to existing fire sprinkler permit 2015-1216-5216

Open the permit page

$1,500
Dec 16, 2015Completed
final sign-off Mar 2016
555 Post StIncom Mechanical Incas built to be applied to existing fire sprinkler permit 2015-1211-4863- relocate 32 on floors 5,6 and 7 for new units configurations- as built required with calculations and 5 year certifaction update
Details
Permit
201512165246
Status
complete
Filed
Dec 16, 2015
Permit issued
Dec 16, 2015
Final sign-off
Mar 3, 2016
Declared cost
$5,000
Address
555 Post St

as built to be applied to existing fire sprinkler permit 2015-1211-4863- relocate 32 on floors 5,6 and 7 for new units configurations- as built required with calculations and 5 year certifaction update

Open the permit page

$5,000
Dec 15, 2015Completed
final sign-off Jan 2016
148 Townsend StIncom Mechanical Incadding (3) fire sprinkler to accommodate new construction. t.i. pa# 201509157044. n/a ordinance #155-13
Details
Permit
201512155176
Status
complete
Filed
Dec 15, 2015
Permit issued
Dec 15, 2015
Final sign-off
Jan 14, 2016
Declared cost
$1,000
Address
148 Townsend St

adding (3) fire sprinkler to accommodate new construction. t.i. pa# 201509157044. n/a ordinance #155-13

Open the permit page

$1,000
Dec 11, 2015Completed
final sign-off Mar 2016
555 Post StIncom Mechanical Incmodify (e) fire sprinkler system to accomodate guest room changes on floor 5 - 7. relocate 17 and remove 5
Details
Permit
201512114863
Status
complete
Filed
Dec 11, 2015
Permit issued
Dec 11, 2015
Final sign-off
Mar 3, 2016
Declared cost
$5,000
Address
555 Post St

modify (e) fire sprinkler system to accomodate guest room changes on floor 5 - 7. relocate 17 and remove 5

Open the permit page

$5,000
Dec 10, 2015Completed
final sign-off Mar 2016
545 Post StIncom Mechanical Incmodify (e) fire sprinkler system to accomodate guest room changes for floors 2,3,4,5,6. ref pa 2015-0401-2566 36 relocates---
Details
Permit
201512104680
Status
complete
Filed
Dec 10, 2015
Permit issued
Jan 7, 2016
Final sign-off
Mar 3, 2016
Declared cost
$6,000
Address
545 Post St

modify (e) fire sprinkler system to accomodate guest room changes for floors 2,3,4,5,6. ref pa 2015-0401-2566 36 relocates---

Open the permit page

$6,000
Oct 28, 2015Never finaled
issued Oct 2015, no final
1023 Mission StIncom Mechanical Incoperable fire sprinkler system throughout entire building. 380 heads maher na ref pa 201509156930- underground and mneter request separate permit
Details
Permit
201510281013
Status
issued
Filed
Oct 28, 2015
Permit issued
Oct 28, 2015
Declared cost
$75,000
Address
1023 Mission St

operable fire sprinkler system throughout entire building. 380 heads maher na ref pa 201509156930- underground and mneter request separate permit

Open the permit page

$75,000
Sep 10, 2015Completed
final sign-off Oct 2015
334 Grant AvIncom Mechanical Incground floor - install pendant sprinklers for restroom & walk in 2 heads total. t.i. #201507242380.
Details
Permit
201509106582
Status
complete
Filed
Sep 10, 2015
Permit issued
Sep 10, 2015
Final sign-off
Oct 5, 2015
Declared cost
$1,000
Address
334 Grant Av

ground floor - install pendant sprinklers for restroom & walk in 2 heads total. t.i. #201507242380.

Open the permit page

$1,000
Sep 3, 2015Completed
final sign-off Feb 2016
920 North Point StIncom Mechanical Incfire sprinkler- 1st floor: relocation of restaurant remodel 18 new, 6 relocated, 6 split. maher na
Details
Permit
201509036099
Status
complete
Filed
Sep 3, 2015
Permit issued
Sep 3, 2015
Final sign-off
Feb 10, 2016
Declared cost
$8,000
Address
920 North Point St

fire sprinkler- 1st floor: relocation of restaurant remodel 18 new, 6 relocated, 6 split. maher na

Open the permit page

$8,000
Aug 5, 2015Completed
final sign-off May 2016
424 09th StIncom Mechanical Increvision: provide & install complete f/s system throughout entire building. maher na ref pa #2015 0722 2180
Details
Permit
201508053386
Status
complete
Filed
Aug 5, 2015
Permit issued
Aug 17, 2015
Final sign-off
May 10, 2016
Declared cost
$63,000
Address
424 09th St

revision: provide & install complete f/s system throughout entire building. maher na ref pa #2015 0722 2180

Open the permit page

$63,000
Jul 30, 2015Never finaled
issued Jul 2015, no final
799 Van Ness AvIncom Mechanical Incinstall (6) new heads to accomodate full length wall install, t.i. delete 8 heads. first floor. pa#201505206745. n/a ordinance #155-13
Details
Permit
201507302920
Status
issued
Filed
Jul 30, 2015
Permit issued
Jul 30, 2015
Declared cost
$4,000
Address
799 Van Ness Av

install (6) new heads to accomodate full length wall install, t.i. delete 8 heads. first floor. pa#201505206745. n/a ordinance #155-13

Open the permit page

$4,000
Jul 29, 2015Completed
final sign-off Mar 2016
1263 Mission StIncom Mechanical Incas built for sprinkler work for shell & t.i. as requested by fire inspector. t.i. pa#201503231540. n/a ordinance #155-13
Details
Permit
201507292806
Status
complete
Filed
Jul 29, 2015
Permit issued
Jul 29, 2015
Final sign-off
Mar 4, 2016
Address
1263 Mission St

as built for sprinkler work for shell & t.i. as requested by fire inspector. t.i. pa#201503231540. n/a ordinance #155-13

Open the permit page

Jul 22, 2015Completed
final sign-off Mar 2016
424 09th StIncom Mechanical Incprovide and install complete f/s system throughout entire building, heads 439; maher n/a
Details
Permit
201507222180
Status
complete
Filed
Jul 22, 2015
Final sign-off
Mar 28, 2016
Declared cost
$63,000
Address
424 09th St

provide and install complete f/s system throughout entire building, heads 439; maher n/a

Open the permit page

$63,000
Jul 14, 2015Completed
final sign-off Sep 2015
854 Folsom StIncom Mechanical Incsprinklers- 2nd floor relocate uprights & install pendant sprinklers for new office (2nd floor): new 12 heads, relocate 7. t.i. pa#201403180973 & 201504072935. n/a ordinance #155-13
Details
Permit
201507141451
Status
complete
Filed
Jul 14, 2015
Permit issued
Jul 14, 2015
Final sign-off
Sep 11, 2015
Declared cost
$6,000
Address
854 Folsom St

sprinklers- 2nd floor relocate uprights & install pendant sprinklers for new office (2nd floor): new 12 heads, relocate 7. t.i. pa#201403180973 & 201504072935. n/a ordinance #155-13

Open the permit page

$6,000
Jun 19, 2015Completed
final sign-off Jun 2016
601 19th StIncom Mechanical Inc1st, 2nd and mezz. -install new pendant f/s for new restaurant/catering prep space for new dropped ceiling. 69 new heads, protection remaining above ceiling. hydro required. n/a maher ord. 155-13
Details
Permit
201506199420
Status
complete
Filed
Jun 19, 2015
Permit issued
Jun 24, 2015
Final sign-off
Jun 25, 2016
Declared cost
$51,561
Address
601 19th St

1st, 2nd and mezz. -install new pendant f/s for new restaurant/catering prep space for new dropped ceiling. 69 new heads, protection remaining above ceiling. hydro required. n/a maher ord. 155-13

Open the permit page

$51,561
May 21, 2015Completed
final sign-off Aug 2015
415 De Haro StIncom Mechanical Incground floor: modify extg sprinkler system. new pendent drops 13 heads. ref app#201503231587. n/a for the maher.
Details
Permit
201505216934
Status
complete
Filed
May 21, 2015
Permit issued
May 21, 2015
Final sign-off
Aug 7, 2015
Declared cost
$5,500
Address
415 De Haro St

ground floor: modify extg sprinkler system. new pendent drops 13 heads. ref app#201503231587. n/a for the maher.

Open the permit page

$5,500
May 21, 2015Never finaled
issued May 2015, no final
100 Brannan StIncom Mechanical Incsprinkler system ti for on first floor- adding 2 and relocating 34- hydro required- construction 201503191358
Details
Permit
201505216935
Status
issued
Filed
May 21, 2015
Permit issued
May 21, 2015
Declared cost
$13,000
Address
100 Brannan St

sprinkler system ti for on first floor- adding 2 and relocating 34- hydro required- construction 201503191358

Open the permit page

$13,000
Apr 24, 2015Expired or cancelled
cancelled Sep 2023
100 Brannan StIncom Mechanical Incinstall sprinklers for new restaurant 36 total heads 34 pendents & 2 dry
Details
Permit
201504244581
Status
cancelled
Filed
Apr 24, 2015
Declared cost
$13,000
Address
100 Brannan St

install sprinklers for new restaurant 36 total heads 34 pendents & 2 dry

Open the permit page

$13,000
Apr 24, 2015Completed
final sign-off Aug 2015
644 BroadwayIncom Mechanical Inc4th flr: modify (e) fire sprinklers system to accomodate ti: 6 new heads, 17 (e) ref pa # 2015 0226 9397
Details
Permit
201504244580
Status
complete
Filed
Apr 24, 2015
Permit issued
Apr 24, 2015
Final sign-off
Aug 20, 2015
Declared cost
$10,000
Address
644 Broadway

4th flr: modify (e) fire sprinklers system to accomodate ti: 6 new heads, 17 (e) ref pa # 2015 0226 9397

Open the permit page

$10,000
Apr 21, 2015Completed
final sign-off May 2015
675 Townsend StIncom Mechanical Incground floor: install pendant sprinklers for new retail space, 21 heads. ref ti 2015-0225-9255. compliance with maher ordinance no 155-13 not reuqired.
Details
Permit
201504214181
Status
complete
Filed
Apr 21, 2015
Permit issued
Apr 21, 2015
Final sign-off
May 1, 2015
Declared cost
$6,000
Address
675 Townsend St

ground floor: install pendant sprinklers for new retail space, 21 heads. ref ti 2015-0225-9255. compliance with maher ordinance no 155-13 not reuqired.

Open the permit page

$6,000
Apr 10, 2015Completed
final sign-off Aug 2015
1263 Mission StIncom Mechanical Incinstall 1 sprinkler head to accomodate new window per ab-009 and plan 201502279634
Details
Permit
201504103353
Status
complete
Filed
Apr 10, 2015
Permit issued
Apr 10, 2015
Final sign-off
Aug 20, 2015
Declared cost
$750
Address
1263 Mission St

install 1 sprinkler head to accomodate new window per ab-009 and plan 201502279634

Open the permit page

$750
Apr 10, 2015Completed
final sign-off Aug 2015
1355 Market StIncom Mechanical Incfire sprinkler -1st flr space f2: install pendant sprinkler for new restaurant 28 heads ti 2014 0514 5712. maher -not req'd
Details
Permit
201504103352
Status
complete
Filed
Apr 10, 2015
Permit issued
Apr 10, 2015
Final sign-off
Aug 7, 2015
Declared cost
$16,750
Address
1355 Market St

fire sprinkler -1st flr space f2: install pendant sprinkler for new restaurant 28 heads ti 2014 0514 5712. maher -not req'd

Open the permit page

$16,750
Apr 8, 2015Completed
final sign-off Aug 2015
1263 Mission StIncom Mechanical Incmodification of (e) fire sprinkler system. heads 61 ref 2015 0323 1540- adding 61 delete 50, property line window under separate construction and sprinkler plan maher - not req'd
Details
Permit
201504083111
Status
complete
Filed
Apr 8, 2015
Permit issued
Apr 8, 2015
Final sign-off
Aug 20, 2015
Declared cost
$26,700
Address
1263 Mission St

modification of (e) fire sprinkler system. heads 61 ref 2015 0323 1540- adding 61 delete 50, property line window under separate construction and sprinkler plan maher - not req'd

Open the permit page

$26,700
Mar 25, 2015Completed
final sign-off Jul 2015
1263 Mission StIncom Mechanical Incas built for underground permit 201410310457; maher n/a
Details
Permit
201503251847
Status
complete
Filed
Mar 25, 2015
Permit issued
Mar 25, 2015
Final sign-off
Jul 9, 2015
Declared cost
$10,000
Address
1263 Mission St

as built for underground permit 201410310457; maher n/a

Open the permit page

$10,000
Jan 27, 2015Completed
final sign-off May 2015
1019 Market StIncom Mechanical Incsprinkler system t.i. dropped ceilings- protection above and below ceilings. add 23 heads and relocate 4- new end of line restraints. t.i. 201411212279
Details
Permit
201501276752
Status
complete
Filed
Jan 27, 2015
Permit issued
Jan 27, 2015
Final sign-off
May 12, 2015
Declared cost
$8,000
Address
1019 Market St

sprinkler system t.i. dropped ceilings- protection above and below ceilings. add 23 heads and relocate 4- new end of line restraints. t.i. 201411212279

Open the permit page

$8,000
Jan 27, 2015Completed
final sign-off Apr 2015
854 Folsom StIncom Mechanical Incsprinkler system ti- ground and mezz- hydralic design ord. hazard ii- modify by adding 77 heads and new bracing. 77 total heads, t.i. 201403180973; maher n/a
Details
Permit
201501276751
Status
complete
Filed
Jan 27, 2015
Permit issued
Feb 9, 2015
Final sign-off
Apr 30, 2015
Declared cost
$43,500
Address
854 Folsom St

sprinkler system ti- ground and mezz- hydralic design ord. hazard ii- modify by adding 77 heads and new bracing. 77 total heads, t.i. 201403180973; maher n/a

Open the permit page

$43,500
Dec 16, 2014Never finaled
issued Dec 2014, no final
1675 Howard StIncom Mechanical Incmodify (e) sprinkler system to accomodate the additon of a new ceiling in the service drive area. 54 heads, above and below ceiling protection.. ref. appl. 2014.1106.0858. maher n/a.
Details
Permit
201412163815
Status
issued
Filed
Dec 16, 2014
Permit issued
Dec 17, 2014
Declared cost
$8,725
Address
1675 Howard St

modify (e) sprinkler system to accomodate the additon of a new ceiling in the service drive area. 54 heads, above and below ceiling protection.. ref. appl. 2014.1106.0858. maher n/a.

Open the permit page

$8,725
Dec 12, 2014Completed
final sign-off Jan 2015
260 California StIncom Mechanical Inc5th floor - modifying existing fire sprinkler system - relocate of 4 heads. refer t.i. #2014.1021.9460.
Details
Permit
201412123635
Status
complete
Filed
Dec 12, 2014
Permit issued
Dec 12, 2014
Final sign-off
Jan 15, 2015
Declared cost
$3,475
Address
260 California St

5th floor - modifying existing fire sprinkler system - relocate of 4 heads. refer t.i. #2014.1021.9460.

Open the permit page

$3,475