Most recent permits
Showing the 100 most recent of 236.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress filed Sep 2026, not yet issued | 2830 Pacific Av | interior remodel includes limited structural work. includes mep in-kind window replacement in frony, update window openings on sides and rear.Details
interior remodel includes limited structural work. includes mep in-kind window replacement in frony, update window openings on sides and rear. | $1,650,000 | |
| Aug 31, 2026 | In progress issued Aug 2026 | 2574 Union St | Schalich Brothers Construction Inc | rev 202204132114: new rear yard draining & electrical work.Details
rev 202204132114: new rear yard draining & electrical work. | $5,000 |
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 2634 Broderick St | Farallon General Contractors Inc. | renovation & addition to (e) sfh including vertical addition of 1' 8 5/8" & horizontal addition at rear. new roof deck & construction of new adu on 1st floor. includes structural, geotech & landscape work. subject to all electric ordinance, per ab-112.Details
renovation & addition to (e) sfh including vertical addition of 1' 8 5/8" & horizontal addition at rear. new roof deck & construction of new adu on 1st floor. includes structural, geotech & landscape work. subject to all electric ordinance, per ab-112. | $1,500,000 |
| Jul 24, 2026 | In progress filed Jul 2026, not yet issued | 2775 Union St | lower basement foundation w/in habitable area beyond the garage. rear exterior extension at basement, lvl 1, lvl 2 and reconfig of the top floor and roof.Details
lower basement foundation w/in habitable area beyond the garage. rear exterior extension at basement, lvl 1, lvl 2 and reconfig of the top floor and roof. | $1,310,325 | |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 3332 Washington St | replace front facade windows in kind remove second story balcony replace 3rd story balcony in kind with updated guardrails. excavation at rear and side yards for foundation work, new hot tub, and new land scaping. new elevator. new solar panels at roof.Details
replace front facade windows in kind remove second story balcony replace 3rd story balcony in kind with updated guardrails. excavation at rear and side yards for foundation work, new hot tub, and new land scaping. new elevator. new solar panels at roof. | $200,000 | |
| Jun 2, 2026 | In progress issued Jun 2026 | 540 El Camino Del Mar | The Toboni Group | modifications to existing exterior landscape including paving, terraces, and windbreak. add (2) exterior gas fireplaced, outdoor kitchen, and spaDetails
modifications to existing exterior landscape including paving, terraces, and windbreak. add (2) exterior gas fireplaced, outdoor kitchen, and spa | $150,000 |
| Apr 23, 2026 | In progress issued May 2026 | 2780 Vallejo St | Upscale Construction Inc. | in kind kitchen remodel, no changes to stucture or floor plan, no additional plumbing.Details
in kind kitchen remodel, no changes to stucture or floor plan, no additional plumbing. | $50,000 |
| Apr 14, 2026 | Expired or cancelled cancelled Apr 2026 | 2634 Broderick St | renovation & addition to (e) sfd including vertical addition of 18' 5/8" & horizontal addition at rear. new roof deck & construction of new adu on 1st floor includes structural, geotech & landscape work.Details
renovation & addition to (e) sfd including vertical addition of 18' 5/8" & horizontal addition at rear. new roof deck & construction of new adu on 1st floor includes structural, geotech & landscape work. | $1,500,000 | |
| Apr 8, 2026 | In progress filed Apr 2026, not yet issued | 3255 Pacific Av | The Toboni Group | full-gut interior remodel-(n)roof finish, updated facades, rear adu (state program), & basement expansion. proposed revision to north and first 23' - 0" of west facade to be submitted under spearate permit. renovation of rear courtyard & associated landscaping. (e) shed demo under separate permit.Details
full-gut interior remodel-(n)roof finish, updated facades, rear adu (state program), & basement expansion. proposed revision to north and first 23' - 0" of west facade to be submitted under spearate permit. renovation of rear courtyard & associated landscaping. (e) shed demo under separate permit. | $3,700,000 |
| Apr 8, 2026 | In progress filed Apr 2026, not yet issued | 3255 Pacific Av | demolish (e) type 5b, one story rear shed.Details
demolish (e) type 5b, one story rear shed. | $3,000 | |
| Apr 7, 2026 | In progress issued Sep 2026 | 2415 Pierce St | Related California Construction Llc | (e)4-story o/1-basement single family home. remodel (e)dormer to create roof deck horiz.expansion at level-4 within exst bldg footprint . remodel 4 bathrms@levels-3&4. replace in-kind the (e)level-3 deck including waterproofing and decking.Details
(e)4-story o/1-basement single family home. remodel (e)dormer to create roof deck horiz.expansion at level-4 within exst bldg footprint . remodel 4 bathrms@levels-3&4. replace in-kind the (e)level-3 deck including waterproofing and decking. | $274,150 |
| Apr 1, 2026 | In progress issued Apr 2026 | 3090 Pacific Av | Van Acker Const Assoc Inc | exterior stucco to be replaced in kind due to water intrusion at east facade (facing private driveway)Details
exterior stucco to be replaced in kind due to water intrusion at east facade (facing private driveway) | $25,000 |
| Mar 31, 2026 | In progress issued Apr 2026 | 2750 Vallejo St | Forma Construction | replace front french doors with fixed casement windows. remove juliet balcony and replace with juliet railing. replace kitchen and primary bedroom doors in kind. remove and replace pavers in kind. remove glass guardrails and replace with metal. replace one gas fireplace.Details
replace front french doors with fixed casement windows. remove juliet balcony and replace with juliet railing. replace kitchen and primary bedroom doors in kind. remove and replace pavers in kind. remove glass guardrails and replace with metal. replace one gas fireplace. | $138,000 |
| Feb 22, 2026 | In progress issued Aug 2026 | 2780 Vallejo St | Upscale Construction Inc. | interior remodel levels 1-3, including new elevator and shaft. remove (e) elevator/shaft and infill . level 1: guest bathroom and laundry remodel. level 2: kitchen, powder room and vestibule remodel. level 3: new gas firplace, 2 bathroom remodel, 2 bedroom remodel. replace front stairs in kind.Details
interior remodel levels 1-3, including new elevator and shaft. remove (e) elevator/shaft and infill . level 1: guest bathroom and laundry remodel. level 2: kitchen, powder room and vestibule remodel. level 3: new gas firplace, 2 bathroom remodel, 2 bedroom remodel. replace front stairs in kind. | $1,375,000 |
| Feb 20, 2026 | In progress issued Mar 2026 | 1990 Lombard St | Upscale Construction Inc. | voluntary structural strengthening at 3rd fl framing. no architectural changes.Details
voluntary structural strengthening at 3rd fl framing. no architectural changes. | $20,000 |
| Feb 19, 2026 | In progress issued May 2026 | 2468 Filbert St | Larkspur Builders Inc. | revision to permits 202312223026 and 202408138574 for t24 calculation updates per revised equipment specification ab-009 for (1) window. facade decor changes, roof guardrail, 1-hr screen wall.Details
revision to permits 202312223026 and 202408138574 for t24 calculation updates per revised equipment specification ab-009 for (1) window. facade decor changes, roof guardrail, 1-hr screen wall. | |
| Dec 19, 2025 | In progress filed Dec 2025, not yet issued | 3516 Clay St | horizontal addition of (e) building footprint, includes full remodel associated in scope of work.Details
horizontal addition of (e) building footprint, includes full remodel associated in scope of work. | $1,900,000 | |
| Dec 10, 2025 | In progress issued Jun 2026 | 30 Commonwealth Av | Mccowan Berrones & Company Llc | interior remodel & rear yard addition of (e) single family home includes structural & shoring work.Details
interior remodel & rear yard addition of (e) single family home includes structural & shoring work. | $462,000 |
| Dec 5, 2025 | In progress issued Feb 2026 | 540 El Camino Del Mar | The Toboni Group | structural revisions to pa 202507150799Details
structural revisions to pa 202507150799 | |
| Dec 5, 2025 | Expired or cancelled cancelled Jan 2026 | 1990 Lombard St | Upscale Construction Inc. | 3/f: conversion of office suite at 3/f into 4 residential dwelling units, new roof decks, new windows at 3/f includes structural work.Details
3/f: conversion of office suite at 3/f into 4 residential dwelling units, new roof decks, new windows at 3/f includes structural work. | $750,000 |
| Nov 18, 2025 | In progress issued Nov 2025 | 540 El Camino Del Mar | The Toboni Group | shoring revisions to bpa# 202507150799Details
shoring revisions to bpa# 202507150799 | |
| Jul 29, 2025 | In progress issued Nov 2025 | 540 El Camino Del Mar | The Toboni Group | interior remodel within existing building, removal and replacement of some windows and doors, expansion of exterior deck. addition of 39 sqft to kitchen. this permit revises previous permits pa #202506118499 and 202505227075.Details
interior remodel within existing building, removal and replacement of some windows and doors, expansion of exterior deck. addition of 39 sqft to kitchen. this permit revises previous permits pa #202506118499 and 202505227075. | $650,000 |
| Jul 14, 2025 | In progress issued Jul 2025 | 294 Page St | The Toboni Group | (n) french door at 2nd level rear facade. demo (e) 2nd level tupet door and replace with window. repair of all windows approved on cofa #2024-003477prj/coaDetails
(n) french door at 2nd level rear facade. demo (e) 2nd level tupet door and replace with window. repair of all windows approved on cofa #2024-003477prj/coa | $10,000 |
| Jun 11, 2025 | In progress issued Jul 2025 | 540 El Camino Del Mar | The Toboni Group | subterranean expansion of existing bathroom in basement; expansion of existing planter; new exterior stair @ grade.Details
subterranean expansion of existing bathroom in basement; expansion of existing planter; new exterior stair @ grade. | $15,000 |
| May 6, 2025 | Completed final sign-off Jul 2025 | 1776 Green St | Achill Beg Construction Inc | convert (e) habitable space to adu, installation of induction range with hood. all other work complete per pa# 201808016167 and 202403127605.Details
convert (e) habitable space to adu, installation of induction range with hood. all other work complete per pa# 201808016167 and 202403127605. | $10,000 |
| Apr 1, 2025 | In progress issued Jun 2026 | 60 Mclaren Av | Cedar House Construction/Brian White | exterior only remodel. replace front yard. rear yard terrace renovation including replacing stamped concrete surfaces with new stone and replacing non compliant concrete guardrail with open steel guardrail along periphery at 3'-6". restore front boundary fence to match approved design flow v.94.592vDetails
exterior only remodel. replace front yard. rear yard terrace renovation including replacing stamped concrete surfaces with new stone and replacing non compliant concrete guardrail with open steel guardrail along periphery at 3'-6". restore front boundary fence to match approved design flow v.94.592v | $65,000 |
| Feb 20, 2025 | Completed final sign-off Aug 2026 | 2855 Pacific Av | The Toboni Group | interior remodel within (e) building. partial work at side facade lightwell. includes structural, electrical & plumbing workDetails
interior remodel within (e) building. partial work at side facade lightwell. includes structural, electrical & plumbing work | $650,000 |
| Feb 19, 2025 | In progress issued Jun 2025 | 3015 Pacific Av | Farallon General Contractors Inc. | basement: foundation replacement. full renovation. (n) guest rm, bath and sauna. 1/f: demo pantry, 2/f: replace fireplace. remodel primary and bedroom, 2 bathrooms, 3/f: bathroom remodel and partial renovation. new residential elevator.Details
basement: foundation replacement. full renovation. (n) guest rm, bath and sauna. 1/f: demo pantry, 2/f: replace fireplace. remodel primary and bedroom, 2 bathrooms, 3/f: bathroom remodel and partial renovation. new residential elevator. | $380,000 |
| Jan 15, 2025 | In progress issued Mar 2025 | 2430 Pacific Av | The Toboni Group | revision to pa 202405091833. after discussion onsite w/ inspector, it was determined the feasibility of construction will require the rear facade to be replaced in kind. the removal of the (e) unreinforced masonry and replacing in kind w/ brick veneer over a wood stud wall.no other proposed changes.Details
revision to pa 202405091833. after discussion onsite w/ inspector, it was determined the feasibility of construction will require the rear facade to be replaced in kind. the removal of the (e) unreinforced masonry and replacing in kind w/ brick veneer over a wood stud wall.no other proposed changes. | $275,000 |
| Dec 10, 2024 | In progress filed Dec 2024, not yet issued | 2519 Broadway | Farallon General Contractors Inc. | new 4th floor vertical addition with deck. converting of area at 1st floor to become new attached adu (under hybrid program). revision to building permit application number 2021 0715 4427 for interior remodeling of 3rd floor and new interior stair configuration on all levels.Details
new 4th floor vertical addition with deck. converting of area at 1st floor to become new attached adu (under hybrid program). revision to building permit application number 2021 0715 4427 for interior remodeling of 3rd floor and new interior stair configuration on all levels. | $300,000 |
| Oct 2, 2024 | In progress issued Oct 2024 | 3090 Pacific Av | Van Acker Const Assoc Inc | exterior stucco repair due to dry rot & water damage included repair/ replace of exterior windows in kind. replace rear yard doors. addition of new front gate at st facade.Details
exterior stucco repair due to dry rot & water damage included repair/ replace of exterior windows in kind. replace rear yard doors. addition of new front gate at st facade. | $80,000 |
| Aug 20, 2024 | In progress issued Sep 2024 | 3740 Clay St | Clayton Timbrell & Co | revision to 202308285413 & 202207188662: restoration of front facade to original discoverd conditions for entry way, wood siding, window sills & window casingsDetails
revision to 202308285413 & 202207188662: restoration of front facade to original discoverd conditions for entry way, wood siding, window sills & window casings | $15,000 |
| Aug 13, 2024 | In progress issued Aug 2024 | 2468 Filbert St | Larkspur Builders Inc., Y M Construction | rev 202312223026 for revised guardrails at rear decks. see pa 202312223026 for structural details.Details
rev 202312223026 for revised guardrails at rear decks. see pa 202312223026 for structural details. | |
| Aug 13, 2024 | Completed final sign-off Feb 2025 | 2786 Vallejo St | Design Line Construction | reconstruct e structural decking in place and in kind to support the work in 202403268647. deck shall be at 3 feet or less abve grade in this case.Details
reconstruct e structural decking in place and in kind to support the work in 202403268647. deck shall be at 3 feet or less abve grade in this case. | $75,000 |
| Aug 2, 2024 | Completed final sign-off Feb 2025 | 294 Page St | The Toboni Group | revision to pa 202403137671 revised structural set according to findings on site during demo. minor interior work added to attic level - built in cabinetry added in between studs of existing wallDetails
revision to pa 202403137671 revised structural set according to findings on site during demo. minor interior work added to attic level - built in cabinetry added in between studs of existing wall | |
| Jun 24, 2024 | In progress issued Aug 2024 | 2518 Jackson St | Farallon General Contractors Inc. | replace fence in kind. repair front stair nosing in kind. all work in front of the building no other work to be performed for this application. fence not exceed 6' height, front must be 75% transparent.Details
replace fence in kind. repair front stair nosing in kind. all work in front of the building no other work to be performed for this application. fence not exceed 6' height, front must be 75% transparent. | $15,000 |
| Jun 11, 2024 | In progress issued Jun 2024 | 1776 Green St | Achill Beg Construction Inc | rev 201808016167-s3 and ref 202205103860- basement updated to reflect site condition for fire alarm retention tank, electrical room updates, ada bathroom in gym. no structrual elementsDetails
rev 201808016167-s3 and ref 202205103860- basement updated to reflect site condition for fire alarm retention tank, electrical room updates, ada bathroom in gym. no structrual elements | |
| Jun 5, 2024 | Completed final sign-off Jun 2024 | 1070 Green St | Zone 4 Power Inc | revision to pa# 2022-0830-1557. layout change. removal of all interior finishes, fixtures, appliances & partition framing. interior remodel as per drawingsDetails
revision to pa# 2022-0830-1557. layout change. removal of all interior finishes, fixtures, appliances & partition framing. interior remodel as per drawings | $20,000 |
| May 22, 2024 | Completed final sign-off Apr 2025 | 1776 Green St | Achill Beg Construction Inc | deferred stair submittal for pa# 201808016167 s3.Details
deferred stair submittal for pa# 201808016167 s3. | |
| May 8, 2024 | In progress issued May 2024 | 3368 Jackson St | Farallon General Contractors Inc. | infill of (e) entry with new front door with sidelights. new exterior landing and stairs. no work at ground, second and third level. new mechanical and electrical. no new fixtures, no work in prow.Details
infill of (e) entry with new front door with sidelights. new exterior landing and stairs. no work at ground, second and third level. new mechanical and electrical. no new fixtures, no work in prow. | $15,000 |
| May 8, 2024 | In progress issued Jun 2025 | 2500 Broadway | full int remodel, infill under (e) deck. below grade expansion of north garage. change of exterior stair. minor ext changes- railing, windows, doors. structural upgrade, earth shoring for garage expansionDetails
full int remodel, infill under (e) deck. below grade expansion of north garage. change of exterior stair. minor ext changes- railing, windows, doors. structural upgrade, earth shoring for garage expansion | $650,000 | |
| Apr 11, 2024 | Completed final sign-off Oct 2024 | 2660 Scott St | Van Acker Const Assoc Inc | adding a (n) exterior cornice to the top level of house. new exterior trim added to 4 windows on the top floorDetails
adding a (n) exterior cornice to the top level of house. new exterior trim added to 4 windows on the top floor | $13,000 |
| Mar 26, 2024 | In progress filed Mar 2024, not yet issued | 3028 Clay St | Cairn Construction | interior remodel within an (e) building - structural work, replacement of (e) non reinforced masonry walls, expansion of 1st floor (garage) below the grade, (n) second floor below-grade courtyard, replacement of doors, windows, and finishes.Details
interior remodel within an (e) building - structural work, replacement of (e) non reinforced masonry walls, expansion of 1st floor (garage) below the grade, (n) second floor below-grade courtyard, replacement of doors, windows, and finishes. | $1,000,000 |
| Mar 15, 2024 | Completed final sign-off Mar 2025 | 2430 Pacific Av | The Toboni Group | abatement of asbestos per asbestots report dated 1/15/2024. includes removal of contaminated materials & replacement wjere asbestos is present. interior finishes only entire buildingDetails
abatement of asbestos per asbestots report dated 1/15/2024. includes removal of contaminated materials & replacement wjere asbestos is present. interior finishes only entire building | $65,000 |
| Mar 13, 2024 | Completed final sign-off Feb 2025 | 294 Page St | The Toboni Group | interior remodel only - new finishes and remodel of kitchen 203 and bath 308. removal of interior dumbwaiter and shaft at all levels. (e) window 216 to be removed/replace with new door 203c. (e) door 201 to be removed/replace with new window 216. refer to c of a# 2023-007512prj for window repair.Details
interior remodel only - new finishes and remodel of kitchen 203 and bath 308. removal of interior dumbwaiter and shaft at all levels. (e) window 216 to be removed/replace with new door 203c. (e) door 201 to be removed/replace with new window 216. refer to c of a# 2023-007512prj for window repair. | $10,000 |
| Mar 12, 2024 | In progress issued May 2024 | 1776 Green St | Achill Beg Construction Inc | revision 201808016167- build out garage space for (n) bathroomDetails
revision 201808016167- build out garage space for (n) bathroom | $35,000 |
| Feb 6, 2024 | Completed final sign-off Mar 2025 | 3363 Washington St | Dollard Construction Inc. | revision to pa# 202205164340 lvl 1- floor framing alteration of au pair room 103 & au pair bath 104. lvl 2- floor framing alteration to accommodate kitchen revision- 206 layout, lvl 3- floor framing alteration to accommodate revision primary bath 1- 306,Details
revision to pa# 202205164340 lvl 1- floor framing alteration of au pair room 103 & au pair bath 104. lvl 2- floor framing alteration to accommodate kitchen revision- 206 layout, lvl 3- floor framing alteration to accommodate revision primary bath 1- 306, | $29,000 |
| Jan 26, 2024 | In progress issued Apr 2025 | 2785 Vallejo St | Farallon General Contractors Inc. | excavate to expand garage & 1st level. interior remodel at all levels, seismic upgrade, shoring & structural work. 390 & 310 sqft rear addition at 2nd & 3rd level, respectively. (n) roof deck. replace visible street facing windows & doors in kind, (n) windows, (n) rear landscape wall and yard designDetails
excavate to expand garage & 1st level. interior remodel at all levels, seismic upgrade, shoring & structural work. 390 & 310 sqft rear addition at 2nd & 3rd level, respectively. (n) roof deck. replace visible street facing windows & doors in kind, (n) windows, (n) rear landscape wall and yard design | $780,000 |
| Jan 12, 2024 | In progress issued Mar 2024 | 3368 Jackson St | Farallon General Contractors Inc. | (n) bay wind0w at second level only. addition of 15 habitable square feet. no mechanical or plumbing scope. no work in the public right of way.Details
(n) bay wind0w at second level only. addition of 15 habitable square feet. no mechanical or plumbing scope. no work in the public right of way. | $20,000 |
| Dec 22, 2023 | In progress issued Jun 2024 | 2468 Filbert St | Larkspur Builders Inc., Y M Construction | front and rear facade work, west property line windows replacement, new roof terrace, window replacement throughout, new hvac and water heaters; interior renovation replacing interior finihes throughout with minimal interior layout changes. deferred: fire sprinklers for top unit (levels 3-4)Details
front and rear facade work, west property line windows replacement, new roof terrace, window replacement throughout, new hvac and water heaters; interior renovation replacing interior finihes throughout with minimal interior layout changes. deferred: fire sprinklers for top unit (levels 3-4) | $150,000 |
| Dec 13, 2023 | Completed final sign-off Jun 2024 | 2320 Lyon St | Van Acker Const Assoc Inc | revision to pa 202302081612 for new la features: planters and fountain.Details
revision to pa 202302081612 for new la features: planters and fountain. | $5,000 |
| Nov 28, 2023 | Completed final sign-off Dec 2023 | 900 North Point St | J H Construction | e211: revision to permit 202308245163. correct type of construction to 3bDetails
e211: revision to permit 202308245163. correct type of construction to 3b | |
| Nov 27, 2023 | In progress filed Nov 2023, not yet issued | 2500 Broadway | revision to permit 202306150227. changes include updated work in the public right of way and associated work on the property.Details
revision to permit 202306150227. changes include updated work in the public right of way and associated work on the property. | ||
| Nov 10, 2023 | In progress issued May 2026 | 183 Edgewood Av | Jeff King And Company Inc | two story horizontal additions to the east, west and north sides of the existing single family residence including: conversion of existing non-habitable basement @ lowest level to a new first story; interior alterations to the existing 2nd & 3rd levels; new front entry & covered porch; & new garage.Details
two story horizontal additions to the east, west and north sides of the existing single family residence including: conversion of existing non-habitable basement @ lowest level to a new first story; interior alterations to the existing 2nd & 3rd levels; new front entry & covered porch; & new garage. | $1,150,000 |
| Oct 19, 2023 | Completed final sign-off Oct 2024 | 2660 Scott St | Van Acker Const Assoc Inc | 3/f: revision to no-plan permit 202309277554. interior remodel on 3/f. bathroom to be converted into closet. existing bedroom to be converted into bathroom. wall in (e) bedroom to be removed-not a structural wall, no shear wall or posts. no work in the prow.Details
3/f: revision to no-plan permit 202309277554. interior remodel on 3/f. bathroom to be converted into closet. existing bedroom to be converted into bathroom. wall in (e) bedroom to be removed-not a structural wall, no shear wall or posts. no work in the prow. | |
| Oct 11, 2023 | Expired or cancelled withdrawn Nov 2023 | 3368 Jackson St | Farallon General Contractors Inc. | interior only non-structural demo. finishes, cabinetry, fixtures and non-structural walls to be removed. no exterior work. all walls & exterior to remain.Details
interior only non-structural demo. finishes, cabinetry, fixtures and non-structural walls to be removed. no exterior work. all walls & exterior to remain. | $10,000 |
| Sep 5, 2023 | Completed final sign-off Oct 2024 | 3410 Jackson St | Upscale Construction Inc. | 2nd/f: (n) cabinetry & fixtures at kitchem, pantry & bar. 3rd/f: primary bath, primary bedroom & (n) minisplits @ 4th/f. new gate at 1st entry to replace (e), repaint exterior facade, replace window at primary bath. no work affect public rowDetails
2nd/f: (n) cabinetry & fixtures at kitchem, pantry & bar. 3rd/f: primary bath, primary bedroom & (n) minisplits @ 4th/f. new gate at 1st entry to replace (e), repaint exterior facade, replace window at primary bath. no work affect public row | $200,000 |
| Aug 31, 2023 | Never finaled issued Aug 2023, no final | 900 North Point St | J H Construction | bldg e, e211 restaurant:interior demo-demo walls and ceiling. no residential unit will be converted or demolished.Details
bldg e, e211 restaurant:interior demo-demo walls and ceiling. no residential unit will be converted or demolished. | $1,000 |
| Aug 30, 2023 | Never finaled filed Aug 2023, never issued | 2760 Divisadero St | removal of (e) fire pit, low metal gate & jomy ladder on 4th/f. recreation & decorative gas appliances added & extension of guard wall (for 4th/f upper terrace facing). no added sf, no change of bldg envelopeDetails
removal of (e) fire pit, low metal gate & jomy ladder on 4th/f. recreation & decorative gas appliances added & extension of guard wall (for 4th/f upper terrace facing). no added sf, no change of bldg envelope | $2,000 | |
| Aug 24, 2023 | Completed final sign-off Mar 2024 | 900 North Point St | J H Construction | bldg e/ ste #211: new t.i. interior. new bar, interior wall, new sinks, mop sink, new fridge, new electric & plumbingDetails
bldg e/ ste #211: new t.i. interior. new bar, interior wall, new sinks, mop sink, new fridge, new electric & plumbing | $120,000 |
| Aug 17, 2023 | Completed final sign-off Mar 2025 | 3363 Washington St | Dollard Construction Inc. | revision to pa# 202105261115, new concrete walls to replace existing brick garage walls due to structural failure. ref 202106222973 for shoring permit.Details
revision to pa# 202105261115, new concrete walls to replace existing brick garage walls due to structural failure. ref 202106222973 for shoring permit. | $35,000 |
| Aug 16, 2023 | Completed final sign-off May 2026 | 3368 Jackson St | Farallon General Contractors Inc. | interior remodel with (e) envelope (n) finishes, fixtures, in kind window repair/replace, floor reconfiguration-minor with voluntary strengthening. no expansion, no work in prow. interior only.Details
interior remodel with (e) envelope (n) finishes, fixtures, in kind window repair/replace, floor reconfiguration-minor with voluntary strengthening. no expansion, no work in prow. interior only. | $200,000 |
| Aug 3, 2023 | Completed final sign-off Apr 2025 | 1776 Green St | Achill Beg Construction Inc | pid review of storm water control plumbing scope. associate with pa#201808016167Details
pid review of storm water control plumbing scope. associate with pa#201808016167 | |
| Aug 1, 2023 | Never finaled issued Aug 2023, no final | 3766 Clay St | Clayton Timbrell & Co | new heat pump and air handlers at 3rd and 4th fls. new interior partition and soffit at 3rd fl bedrooms. new non structural partitions at air handler at 4th fl with access panel. no exterior or structural work.Details
new heat pump and air handlers at 3rd and 4th fls. new interior partition and soffit at 3rd fl bedrooms. new non structural partitions at air handler at 4th fl with access panel. no exterior or structural work. | $45,000 |
| Jul 21, 2023 | In progress issued Feb 2024 | 3525 Washington St | Ggd Inc. | horizontal addition on 1st fl family rm, overall building depth to remain. (e) facing window on 3rd floor to shift 2'4" to the north. (e) skylight to be removed. no work in the public right of way. no mechanical, no changes to fixture count.Details
horizontal addition on 1st fl family rm, overall building depth to remain. (e) facing window on 3rd floor to shift 2'4" to the north. (e) skylight to be removed. no work in the public right of way. no mechanical, no changes to fixture count. | $50,000 |
| Jul 5, 2023 | In progress issued Jan 2024 | 3525 Washington St | Ggd Inc. | exterior rear yard grading & installation of retaining walls. remodel of existing rear yard staircase. all existing retaining walls to remain. no wokr in public right of way. no mechanical, no changes to fixture count.Details
exterior rear yard grading & installation of retaining walls. remodel of existing rear yard staircase. all existing retaining walls to remain. no wokr in public right of way. no mechanical, no changes to fixture count. | $30,000 |
| Jun 29, 2023 | Completed final sign-off May 2024 | 3080 Pacific Av | Krekow Jennings Inc. | repair south facade water damaged occurs, replace w/ n sheathing, waterproofing & stucco. enlarge & replace 1 garage door @ e location. replace e roof @ garage area. remove e unused chimney @ east elevation, patch roof & stucco. new copper roof @ e bay window.Details
repair south facade water damaged occurs, replace w/ n sheathing, waterproofing & stucco. enlarge & replace 1 garage door @ e location. replace e roof @ garage area. remove e unused chimney @ east elevation, patch roof & stucco. new copper roof @ e bay window. | $40,000 |
| May 23, 2023 | Completed final sign-off Nov 2024 | 3570 21st St | Upscale Construction Inc. | garage extension, excavation & construction, increase height of retaining wall.Details
garage extension, excavation & construction, increase height of retaining wall. | $53,000 |
| May 19, 2023 | Expired or cancelled cancelled Jan 2026 | 524 Vallejo St | remodel to comply with city planning notice of enforcement 2022000583enf.Details
remodel to comply with city planning notice of enforcement 2022000583enf. | $100,000 | |
| May 16, 2023 | Completed final sign-off Aug 2026 | 3368 Jackson St | Farallon General Contractors Inc. | remodel of(e)roof to provide a(n)dormer and extend a portion of an(e)flat roof area along with a small extension at the 3rd floor north facade.no work at 1st and 2nd floor. remodel 3/f, limited structural work. no work in prow. no change in fixture count.Details
remodel of(e)roof to provide a(n)dormer and extend a portion of an(e)flat roof area along with a small extension at the 3rd floor north facade.no work at 1st and 2nd floor. remodel 3/f, limited structural work. no work in prow. no change in fixture count. | $388,000 |
| Apr 27, 2023 | Expired or cancelled cancelled May 2023 | 2552 Baker St | Millan & Associates | new fence @ rear yard, fence is to have 10' 6x6 posts w/stipness steel wire between posts for vine growth.Details
new fence @ rear yard, fence is to have 10' 6x6 posts w/stipness steel wire between posts for vine growth. | $5,000 |
| Mar 22, 2023 | Completed final sign-off Jan 2025 | 3570 21st St | Upscale Construction Inc. | new outdoor pg&e alcove with new gate for access. new relocated retaining wall.Details
new outdoor pg&e alcove with new gate for access. new relocated retaining wall. | $100,000 |
| Mar 17, 2023 | Completed final sign-off Oct 2023 | 2730 Broderick St | Cairn Construction | in kind replacement of exterior stucco at front of house and cement fiber siding at the back of house, in kind replacement of front facing wood windows and rear facing alum windows and doors, in kind replacement of skylights. in kind replacement of exterior metalDetails
in kind replacement of exterior stucco at front of house and cement fiber siding at the back of house, in kind replacement of front facing wood windows and rear facing alum windows and doors, in kind replacement of skylights. in kind replacement of exterior metal | $250,000 |
| Feb 16, 2023 | Completed final sign-off Jul 2025 | 2590 Green St | Urbnbuild Inc, Kenneally Construction | new elevator for accessibility/ mobility w/ related dormer & reconfigure bathroom on 2nd flr and powder room on 3rd flr to accommodate elevator, replace 2 north facing windows.Details
new elevator for accessibility/ mobility w/ related dormer & reconfigure bathroom on 2nd flr and powder room on 3rd flr to accommodate elevator, replace 2 north facing windows. | $650,000 |
| Feb 8, 2023 | Never finaled issued Jun 2023, no final | 2320 Lyon St | Van Acker Const Assoc Inc | bring building into compliance with pa2014.0221.9040. entry roof and portion of outdoor deck to be repaird in kind du to water damage, exterior and interior non -conforming struct conn. to be remediated and conform to designed standards. roof ht decrease. remove non-permitted workDetails
bring building into compliance with pa2014.0221.9040. entry roof and portion of outdoor deck to be repaird in kind du to water damage, exterior and interior non -conforming struct conn. to be remediated and conform to designed standards. roof ht decrease. remove non-permitted work | $100,000 |
| Feb 8, 2023 | Completed final sign-off Jun 2024 | 2320 Lyon St | Van Acker Const Assoc Inc | repair and remediation of (e) concrete property wall due to water damageDetails
repair and remediation of (e) concrete property wall due to water damage | $50,000 |
| Jan 26, 2023 | Completed final sign-off Feb 2024 | 3080 Pacific Av | Krekow Jennings Inc. | revision to pa# 202211015601. replace perforated panel door with arched soled wooden door.Details
revision to pa# 202211015601. replace perforated panel door with arched soled wooden door. | |
| Dec 14, 2022 | Never finaled issued May 2023, no final | 3525 Washington St | Ggd Inc. | interior remodel within (e) building including structural work, new mat slab foundation, light well infill at 1st fl. and 2nd fl. addition under overchange at 1st fl. window relocation on east elevation (n) windows and doors at rearDetails
interior remodel within (e) building including structural work, new mat slab foundation, light well infill at 1st fl. and 2nd fl. addition under overchange at 1st fl. window relocation on east elevation (n) windows and doors at rear | $800,000 |
| Nov 1, 2022 | Completed final sign-off May 2024 | 3080 Pacific Av | Krekow Jennings Inc. | replace entry gate in private alley w/stucco wall & wood framed perforated doorDetails
replace entry gate in private alley w/stucco wall & wood framed perforated door | $10,000 |
| Oct 25, 2022 | Expired or cancelled expired Nov 2025 | 34 West Clay St | Crown Construction San Francisco | revision to previously approved bpa#202108236934. level 1 & 2: gas fireplace insert @ (e) fireplace location ventsing to west elevation. level 3 (n) terrace at rear (n) windows & door/ no facade work or expansion of exterior envelope.Details
revision to previously approved bpa#202108236934. level 1 & 2: gas fireplace insert @ (e) fireplace location ventsing to west elevation. level 3 (n) terrace at rear (n) windows & door/ no facade work or expansion of exterior envelope. | $21,750 |
| Oct 21, 2022 | Expired or cancelled withdrawn Oct 2023 | 2468 Filbert St | interior remodel, front and rear facade work. west property line windows replacement, penthouse expansion, addition of a unit, partial foundation replacement.Details
interior remodel, front and rear facade work. west property line windows replacement, penthouse expansion, addition of a unit, partial foundation replacement. | $880,000 | |
| Sep 23, 2022 | Completed final sign-off Sep 2023 | 1750 Taylor St | Black Mountain Development | unit 605-interior remodel: new walls, doors, cabinetry, flooring. new appliances & fixtures. replace glazing & exterior sliding doors as noted. no structural work. revision to 2022 0627 7187.Details
unit 605-interior remodel: new walls, doors, cabinetry, flooring. new appliances & fixtures. replace glazing & exterior sliding doors as noted. no structural work. revision to 2022 0627 7187. | $85,000 |
| Sep 16, 2022 | Completed final sign-off Dec 2023 | 59 Potomac St | Seapoint Construction | composition shingle roof replacement in kind. repair, replacement in kind, and alterations at front elevation. removal of (e) concrete curbs and driveway and replacement with (n) concrete curbs, planters, and previous driveway paving. revision to pa#202010217073 & 201804196759.Details
composition shingle roof replacement in kind. repair, replacement in kind, and alterations at front elevation. removal of (e) concrete curbs and driveway and replacement with (n) concrete curbs, planters, and previous driveway paving. revision to pa#202010217073 & 201804196759. | $100 |
| Sep 14, 2022 | Completed final sign-off Aug 2025 | 2826 Union St | Cairn Construction | interior remodel, rear facade modifications, garage door widening, partial lightwell infill, roof/siding replacement, basement expansion/foundation upgrade, roof dormers addedDetails
interior remodel, rear facade modifications, garage door widening, partial lightwell infill, roof/siding replacement, basement expansion/foundation upgrade, roof dormers added | $1,800,000 |
| Sep 1, 2022 | Expired or cancelled withdrawn May 2023 | 3712 Jackson St | unconditioned addition at garage for garbage bin storage. no structural work.Details
unconditioned addition at garage for garbage bin storage. no structural work. | $12,000 | |
| Aug 26, 2022 | Never finaled issued Sep 2022, no final | 2518 Jackson St | Farallon General Contractors Inc. | interior remodel in (e) building, (n) fixtures, finishes, minor reconfiguration of floor plan with same structural. foundation infill, replace windows in kind. no expansion of envelope. no work in public right of way.Details
interior remodel in (e) building, (n) fixtures, finishes, minor reconfiguration of floor plan with same structural. foundation infill, replace windows in kind. no expansion of envelope. no work in public right of way. | $1,200,000 |
| Aug 15, 2022 | Completed final sign-off Nov 2024 | 3570 21st St | Upscale Construction Inc. | rev to pa# 2021-0525-1031 & 2021-0713-4237: design change to (w) pl fence, t24, in kind replacement of windows, replace sheathing as needed on (e) (w),(s) walls partial framing and drywall replacement, revised rcp, (n) roofing, structural revisionsDetails
rev to pa# 2021-0525-1031 & 2021-0713-4237: design change to (w) pl fence, t24, in kind replacement of windows, replace sheathing as needed on (e) (w),(s) walls partial framing and drywall replacement, revised rcp, (n) roofing, structural revisions | $20,000 |
| Jul 25, 2022 | Completed final sign-off Feb 2025 | 2320 Lyon St | Van Acker Const Assoc Inc | replace exterior doors, exterior windows & finishes, visible from street, w/in-kind due to water damage & dry rot. replace sheathing due to dry rot & water damageDetails
replace exterior doors, exterior windows & finishes, visible from street, w/in-kind due to water damage & dry rot. replace sheathing due to dry rot & water damage | $250,000 |
| May 16, 2022 | Completed final sign-off Mar 2025 | 3363 Washington St | Dollard Construction Inc., Clayton Timbrell & Co | interior remodel of (e) single family residence. remodel scope includes basement levels 01-04 with structural upgrades. foundation (basement & level 1) permitted under pa#202105261115; note that pts updated to ind. an exist/proposed 4/1 story count, dmj 03/13/2023;Details
interior remodel of (e) single family residence. remodel scope includes basement levels 01-04 with structural upgrades. foundation (basement & level 1) permitted under pa#202105261115; note that pts updated to ind. an exist/proposed 4/1 story count, dmj 03/13/2023; | $850,000 |
| Apr 13, 2022 | In progress issued Aug 2024 | 2574 Union St | Schalich Brothers Construction Inc, Flmc Development Corp Dba Adamo Campagna | horizontal expansion at levels 1,2 and 3. interior renovations at all levels. new deck at level 2 with stair to rear yard. new deck over level 3. new window at front facade.Details
horizontal expansion at levels 1,2 and 3. interior renovations at all levels. new deck at level 2 with stair to rear yard. new deck over level 3. new window at front facade. | $500,000 |
| Mar 22, 2022 | In progress issued Jan 2025 | 3160 Jackson St | Clayton Timbrell & Co, Farallon General Contractors Inc. | excavating a garage,renovating the(e)structure,a west side yard addition to the property line @ basement,level 1,level 2,level 3(within 3'partial setback)west side yard addition @level 4 with 3' setback.**maher n/a**Details
excavating a garage,renovating the(e)structure,a west side yard addition to the property line @ basement,level 1,level 2,level 3(within 3'partial setback)west side yard addition @level 4 with 3' setback.**maher n/a** | $3,267,048 |
| Nov 29, 2021 | Never finaled issued Jan 2023, no final | 863 Carolina St | Current Construction | alter-site. alteration to approved site permit 201702028536. new 2-dwelling family home, 3 stories over basement, includes structural work. alteration is adding additonal 1,271 sq ft. with 3,236 cubic yards excavation. additonal conditioned space a basement level: 576 sq ft.)Details
alter-site. alteration to approved site permit 201702028536. new 2-dwelling family home, 3 stories over basement, includes structural work. alteration is adding additonal 1,271 sq ft. with 3,236 cubic yards excavation. additonal conditioned space a basement level: 576 sq ft.) | $250,000 |
| Oct 27, 2021 | Expired or cancelled expired Jan 2024 | 2552 Baker St | Millan & Associates | revision to pa# 2021-1026-2312: relocate bathroom at 1st level, light well infill at 2nd level, plus revised area calculations and structural updatesDetails
revision to pa# 2021-1026-2312: relocate bathroom at 1st level, light well infill at 2nd level, plus revised area calculations and structural updates | $25,000 |
| Oct 6, 2021 | Completed final sign-off Aug 2022 | 2700 Pierce St | The Toboni Group | interior remodel - family room, hall, kitchen, primary bathroom, 2 secondary bathroom, 2 secondary bathrooms & laundry room. patio to be remade in kindDetails
interior remodel - family room, hall, kitchen, primary bathroom, 2 secondary bathroom, 2 secondary bathrooms & laundry room. patio to be remade in kind | $200,000 |
| May 20, 2021 | Never finaled issued Jun 2021, no final | 2714 Steiner St | Plath & Company Inc | revision to pa 2019-0606-2691. revise size of permitted trellis. add new fireplace @ rear yardDetails
revision to pa 2019-0606-2691. revise size of permitted trellis. add new fireplace @ rear yard | $10,000 |
| Feb 23, 2021 | Never finaled issued May 2023, no final | 2760 Divisadero St | Fma Builders | extension of 4th level rear deck over (e) flat roof including new railings. no added square footage. no changes to building envelope.Details
extension of 4th level rear deck over (e) flat roof including new railings. no added square footage. no changes to building envelope. | $6,000 |
| Feb 12, 2021 | Never finaled issued May 2021, no final | 2221 Baker St | Clayton Timbrell & Co | limited interior remodel and structural work within existing building.Details
limited interior remodel and structural work within existing building. | $50,000 |
| Feb 11, 2021 | In progress issued Apr 2024 | 2519 Broadway | Farallon General Contractors Inc. | demolition, excavation & expansion of garage and 1st level w/ (n) interior partitions, minor modifications to (e) windows at north & east facade. (n) stair from garage to 2nd flr living level. shoring & sprinkler under deferred permits.Details
demolition, excavation & expansion of garage and 1st level w/ (n) interior partitions, minor modifications to (e) windows at north & east facade. (n) stair from garage to 2nd flr living level. shoring & sprinkler under deferred permits. | $350,000 |
| Feb 5, 2021 | Completed final sign-off Jan 2026 | 2900 Broadway | The Toboni Group | interior remodel & extension @ 1-3 level at rear facade. remodel bedrooms, bathrooms & kitchen. new staircase & elevator. new finish & casework throughout. reconfigu exterior openings on e & w facade. new landcaping in rear yard, handscaped terraces, planters, stairs @ grade & retainig walls.Details
interior remodel & extension @ 1-3 level at rear facade. remodel bedrooms, bathrooms & kitchen. new staircase & elevator. new finish & casework throughout. reconfigu exterior openings on e & w facade. new landcaping in rear yard, handscaped terraces, planters, stairs @ grade & retainig walls. | $1,500,000 |
| Nov 9, 2020 | Completed final sign-off Sep 2022 | 1501 Monterey Bl | Wilkinson Preservation Fine Home Mainten | interior stair remodel from 1st to 2nd floor. all within (e) building envelope. revision to bpa # 2019-0122-0918.Details
interior stair remodel from 1st to 2nd floor. all within (e) building envelope. revision to bpa # 2019-0122-0918. | $80,000 |