Alex Santos
- Listed as
- architect, authorized agent-others, engineer, pmt consultant/expediter
- Firm
- Altos Engineering
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Oct 2026
615 permits since 2000 (engineer on 564 permits, architect on 27 permits, authorized agent-others on 27 permits, pmt consultant/expediter on 1 permit): 413 completed, 116 in progress, 41 never finaled, 45 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 615.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 5, 2026 | In progress issued Oct 2026 | 561 Anderson St | Frederic Grasset Design-Build | change rear stair platform & stair to yard to concrete (previously wood). update internal stair configuration from 2nd to 3rd floor; add (1) entry step for code compliance. add stop @ ground floor. minor framing updatesDetails
change rear stair platform & stair to yard to concrete (previously wood). update internal stair configuration from 2nd to 3rd floor; add (1) entry step for code compliance. add stop @ ground floor. minor framing updates | |
| Oct 5, 2026 | In progress filed Oct 2026, not yet issued | 258 22nd Av | replace northeast window of 1st fl family room facing rear yard with new sliding door. add simpson strong wall & new foundation supportDetails
replace northeast window of 1st fl family room facing rear yard with new sliding door. add simpson strong wall & new foundation support | $23,000 | |
| Sep 25, 2026 | In progress issued Oct 2026 | 30 Eagle St | Rwr Construction Inc | new drilled piers & soldier beams w/ shotcrete wall. to reinforce adjacent retaining wall @ uphill neighbor (46 eagle st). ref pa#202609258676.Details
new drilled piers & soldier beams w/ shotcrete wall. to reinforce adjacent retaining wall @ uphill neighbor (46 eagle st). ref pa#202609258676. | $23,000 |
| Sep 25, 2026 | In progress issued Oct 2026 | 46 Eagle St | Rwr Construction Inc | strengthen (e) east side retaining wall (located completely within 46 eagle st). adjacent to downhill neighbor @ 30-32 eagle st. (e) retaining wall to be strengthened with soldier beams & drilled piers with shotcrete wall located @ 30-32 eagle st. ref pa# 202609258679.Details
strengthen (e) east side retaining wall (located completely within 46 eagle st). adjacent to downhill neighbor @ 30-32 eagle st. (e) retaining wall to be strengthened with soldier beams & drilled piers with shotcrete wall located @ 30-32 eagle st. ref pa# 202609258679. | $23,000 |
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 1310 Clayton St | revision to bpa# 202206216645: floor layout & window changes to (3) proposed adu's.Details
revision to bpa# 202206216645: floor layout & window changes to (3) proposed adu's. | ||
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 900 Marin St | new conference room located in north wing add 2 ada restrooms to serve space.Details
new conference room located in north wing add 2 ada restrooms to serve space. | $90,000 | |
| Sep 8, 2026 | In progress issued Sep 2026 | 1066 Filbert St | revision to pa 202511149623 propose 7'6 height of mech room and hallway stepped down to 8'-8" living space. reconfigure front matslab. update/extend capped uphill west retaining wall. replace downhill east foundation due to brickDetails
revision to pa 202511149623 propose 7'6 height of mech room and hallway stepped down to 8'-8" living space. reconfigure front matslab. update/extend capped uphill west retaining wall. replace downhill east foundation due to brick | ||
| Aug 26, 2026 | In progress filed Aug 2026, not yet issued | 2846 Fillmore St | detached garage structure: convert (e) unoccupied roof to roof deck (395 sqft) w/ new stair accesible from rear yard. preserve (e) rail w/ new 12" glass rail for safety compliance.Details
detached garage structure: convert (e) unoccupied roof to roof deck (395 sqft) w/ new stair accesible from rear yard. preserve (e) rail w/ new 12" glass rail for safety compliance. | $74,000 | |
| Aug 17, 2026 | In progress issued Sep 2026 | 358 Dolores St | Daaron Builders | remove existing 1 story storage shed & replace w/ rear deck (3.5 ft expention) 1/1hr rated wall along south p.lDetails
remove existing 1 story storage shed & replace w/ rear deck (3.5 ft expention) 1/1hr rated wall along south p.l | $43,000 |
| Aug 17, 2026 | In progress issued Sep 2026 | 358 Dolores St | Daaron Builders | common area replacement of dry rot damaged/non-conforming 3 story wood framed rear exterior egress stairDetails
common area replacement of dry rot damaged/non-conforming 3 story wood framed rear exterior egress stair | $32,000 |
| Jul 27, 2026 | Completed final sign-off Sep 2026 | 314 Chestnut St | Douglas Gower Dba Mesa Construction | revision to 202510278163. framing modifications due to constraints of existing lightwell to reconstruct exterior egress stairDetails
revision to 202510278163. framing modifications due to constraints of existing lightwell to reconstruct exterior egress stair | |
| Jul 20, 2026 | In progress issued Jul 2026 | 113 Telegraph Hill Bl | Durkin Inc. | to obtain final inspection for work approved under pa#201604185041& 202106212879. all work is complete.Details
to obtain final inspection for work approved under pa#201604185041& 202106212879. all work is complete. | |
| Jul 14, 2026 | In progress issued Aug 2026 | 930 Noriega St | Gil Construction & Assoc Inc. | replace e) front entry stair in-kind per sfbc 1011.12.3. replace brick stair structure w/ wood framed walls/stucco, concrete foundations, concrete treads. new interior accessibility lift from 1st to 2nd flDetails
replace e) front entry stair in-kind per sfbc 1011.12.3. replace brick stair structure w/ wood framed walls/stucco, concrete foundations, concrete treads. new interior accessibility lift from 1st to 2nd fl | $68,000 |
| Jul 10, 2026 | Completed final sign-off Jul 2026 | 678 Vermont St | revision to bpa#202506309746, widen size of 1st floor laundry room by 16". upgrade top deck guardrail material from steel to glass.Details
revision to bpa#202506309746, widen size of 1st floor laundry room by 16". upgrade top deck guardrail material from steel to glass. | ||
| Jul 7, 2026 | In progress issued Sep 2026 | 11 Kenneth Rexroth Pl | Daaron Builders | revision to bpa# 202210053814: update exterior stair configuration to roof deck. remove spiral stair to crawl space level. update elevator shaft & mechanical room. framing revision for stair. switch to tension cable for roof deckDetails
revision to bpa# 202210053814: update exterior stair configuration to roof deck. remove spiral stair to crawl space level. update elevator shaft & mechanical room. framing revision for stair. switch to tension cable for roof deck | |
| Jul 6, 2026 | In progress issued Jul 2026 | 3601 Lyon St | Ashbury Gen Constructing & Eng | remove circular structure (breakout room #1/#2) & mezzanine above located in interior atrium space. replace structure w/ stair & viewing mezzanine (to be connected to (e) mezzanine).Details
remove circular structure (breakout room #1/#2) & mezzanine above located in interior atrium space. replace structure w/ stair & viewing mezzanine (to be connected to (e) mezzanine). | $53,000 |
| Jul 1, 2026 | In progress issued Sep 2026 | 126 Cole St | Ajp General Construction | revision to bpa# 202310269539, 202511210153, 202105240849. framing upgrade to 1st floor and roof, updated rear windows and north lightwell windows, minor reconfiguration of rooms.Details
revision to bpa# 202310269539, 202511210153, 202105240849. framing upgrade to 1st floor and roof, updated rear windows and north lightwell windows, minor reconfiguration of rooms. | |
| Jun 26, 2026 | In progress issued Jul 2026 | 871 Corbett Av | Metzler Brothers General Contractors Inc | reduce 1st fl and add bike storage room accessible to garage. relocate laundry to interior closet adj to stair. add utility sink. voluntary lateral strenthening of garage and crawl space with sill plate epoxy anchor bolts. reinforce crack in foundation at north side of crawl space.Details
reduce 1st fl and add bike storage room accessible to garage. relocate laundry to interior closet adj to stair. add utility sink. voluntary lateral strenthening of garage and crawl space with sill plate epoxy anchor bolts. reinforce crack in foundation at north side of crawl space. | $35,000 |
| Jun 17, 2026 | In progress issued Jul 2026 | 151 Upper Tr | Urban Builder General Contracting Inc | structural & lateral repairs & strengthening of structural post supporting rear bay structure. strengthening & reinforcement of side cantilever structuresDetails
structural & lateral repairs & strengthening of structural post supporting rear bay structure. strengthening & reinforcement of side cantilever structures | $28,000 |
| Jun 17, 2026 | Completed final sign-off Jul 2026 | 231 Diamond St | O'conaire Construction | voluntary lateral plywood strengthening of rear crawl space walls, w/anchor bolts & holdowns. legalize strengthening/repair of rearcrawl space post, girder & 3 internal footingsDetails
voluntary lateral plywood strengthening of rear crawl space walls, w/anchor bolts & holdowns. legalize strengthening/repair of rearcrawl space post, girder & 3 internal footings | $18,000 |
| Jun 12, 2026 | In progress issued Aug 2026 | 845 Lake St | Peace Of Mind Structural Inc | 10 linear feet of foundation replacement garage door (fronting 10th avenue along west pl).Details
10 linear feet of foundation replacement garage door (fronting 10th avenue along west pl). | $28,000 |
| Jun 10, 2026 | In progress issued Jul 2026 | 6001 California St | C & C General Engineering Inc. | revision to permit 202602206263. remodel grocery store layout at basement, first, second (mezzanine), and roof. upgrade 1st floor level framing, expand 2nd floor, new equipment at roof. upgrade accessible requirements.Details
revision to permit 202602206263. remodel grocery store layout at basement, first, second (mezzanine), and roof. upgrade 1st floor level framing, expand 2nd floor, new equipment at roof. upgrade accessible requirements. | $20,000 |
| Jun 3, 2026 | In progress issued Jul 2026 | 478 17th Av | Sage Construction Services | 1st flr: covert storage to 625sf habitable (bedrm, family rm, bath). new vestibule for elect meter & entry to space. 2nd flr: kitchen, bath remodel new sliding dr to patio. 3rd flr: south lightwell infill. (20sf) adj. to neighbor blind wall. add skylight. add bath. remodel bath. renvate bedroomDetails
1st flr: covert storage to 625sf habitable (bedrm, family rm, bath). new vestibule for elect meter & entry to space. 2nd flr: kitchen, bath remodel new sliding dr to patio. 3rd flr: south lightwell infill. (20sf) adj. to neighbor blind wall. add skylight. add bath. remodel bath. renvate bedroom | $242,000 |
| Jun 1, 2026 | In progress issued Jun 2026 | 824 Shotwell St | Metzler Brothers General Contractors Inc | convert 1st floor front storage room to conditioned office (148sq.ft.) add 1st floor front aluminum clad sliding window for light and ventilation. upgrade access to office room 1st floor entry door.Details
convert 1st floor front storage room to conditioned office (148sq.ft.) add 1st floor front aluminum clad sliding window for light and ventilation. upgrade access to office room 1st floor entry door. | $39,000 |
| May 29, 2026 | In progress issued Jul 2026 | 10 South Van Ness Av | Ashbury Gen Constructing & Eng | legalize digital sign at building corner facade. (facing market and van ness) the sign will be only digital sign, not display video. image change only once per hour.Details
legalize digital sign at building corner facade. (facing market and van ness) the sign will be only digital sign, not display video. image change only once per hour. | $15,000 |
| May 29, 2026 | In progress issued Jul 2026 | 10 South Van Ness Av | Ashbury Gen Constructing & Eng | legalize infill of 2nd fl corner window behind digital sign. sign on separate permit. response to 2026-004278enfDetails
legalize infill of 2nd fl corner window behind digital sign. sign on separate permit. response to 2026-004278enf | $27,000 |
| May 27, 2026 | In progress issued Sep 2026 | 1290 45th Av | Astorga Construction Inc | remove ceiling over 2nd fl front kitchen, living and dining room to achieve 9'3" ceiling height. reinforce roof rafter framing.Details
remove ceiling over 2nd fl front kitchen, living and dining room to achieve 9'3" ceiling height. reinforce roof rafter framing. | $38,000 |
| May 26, 2026 | In progress issued Jul 2026 | 670 11th Av | Keightley Builders Inc | all work on lower unit, 670 11th: add 2 1st fl bedrooms at rear. replace 9 rear facade windows in kind. remodel bath and powder rm on 2nd fl. bath at 1st fl.Details
all work on lower unit, 670 11th: add 2 1st fl bedrooms at rear. replace 9 rear facade windows in kind. remodel bath and powder rm on 2nd fl. bath at 1st fl. | $63,000 |
| May 21, 2026 | In progress issued Sep 2026 | 72 07th Av | Daaron Builders | revision to pa# 202512313048: remove lvl strengthening of existing girder due to stud wall support underneath girder. remove voluntary 2nd floor shear wall adj. to stair due to mep interference.Details
revision to pa# 202512313048: remove lvl strengthening of existing girder due to stud wall support underneath girder. remove voluntary 2nd floor shear wall adj. to stair due to mep interference. | |
| May 21, 2026 | In progress issued Jun 2026 | 3121 Balboa St | Keightley Builders Inc | revise pa 202602175996 to expand scope of fire damage repair to include full renovation of (2) kitchens & 2 bathrooms. reflect extent of cost for demolition/replacement of smoke & fire damaged materials. plywood shearwalls in transverse/longitudinal due to substantial 67% alteration.Details
revise pa 202602175996 to expand scope of fire damage repair to include full renovation of (2) kitchens & 2 bathrooms. reflect extent of cost for demolition/replacement of smoke & fire damaged materials. plywood shearwalls in transverse/longitudinal due to substantial 67% alteration. | $536,840 |
| May 14, 2026 | Completed final sign-off Jul 2026 | 309 Crestlake Dr | B R S Construction | revision to bpa 202512242589 modify heating to tankless water heater boiler for domestic & radiant floor heating. update west 1 south windows & add window well. modify stair from 1st floor to basementDetails
revision to bpa 202512242589 modify heating to tankless water heater boiler for domestic & radiant floor heating. update west 1 south windows & add window well. modify stair from 1st floor to basement | |
| May 13, 2026 | In progress issued May 2026 | 778 44th Av | Dunros Construction | demo of (e) 1st fl slab on grade & footing, excavation of back area for lower slab. installation of (n) foundations & slab on grade @ a lower 1st fl.replacement of (e) exterior stairs in south lightwell of property. renovation of (e) kitchen & primary bath @ 2nd fl. no additional contitioned spaceDetails
demo of (e) 1st fl slab on grade & footing, excavation of back area for lower slab. installation of (n) foundations & slab on grade @ a lower 1st fl.replacement of (e) exterior stairs in south lightwell of property. renovation of (e) kitchen & primary bath @ 2nd fl. no additional contitioned space | $150,000 |
| May 11, 2026 | In progress issued Jun 2026 | 155 Noe St | M N Construction | renovation of 3rd/f unit (155 noe) new skylight above kitchen & parapet fire wall protection. kitchen remodel. new tankless water heater in unit to replace existing garageDetails
renovation of 3rd/f unit (155 noe) new skylight above kitchen & parapet fire wall protection. kitchen remodel. new tankless water heater in unit to replace existing garage | $48,000 |
| May 11, 2026 | Completed final sign-off Jul 2026 | 1038 Filbert St | Sft Construction Corp | revision to bpa: 202510026543- shift longitudinal shear walls (e/w side) at basement level update gl c shearwall trasition (from garage level to laundry to basement retainig wall)Details
revision to bpa: 202510026543- shift longitudinal shear walls (e/w side) at basement level update gl c shearwall trasition (from garage level to laundry to basement retainig wall) | |
| May 6, 2026 | In progress issued May 2026 | 648 04th Av | M N Construction | addressing permit only: purpose of this permit is to link 648 4th ave to apn 1641/039Details
addressing permit only: purpose of this permit is to link 648 4th ave to apn 1641/039 | |
| May 4, 2026 | In progress issued May 2026 | 646 04th Av | M N Construction | foundation replacement & full seismic upgrade of existing 1st floor( to remain as garage & storage), slab in rear storage to be lowered 12", no habitable space proposed.Details
foundation replacement & full seismic upgrade of existing 1st floor( to remain as garage & storage), slab in rear storage to be lowered 12", no habitable space proposed. | $96,000 |
| Apr 27, 2026 | In progress issued May 2026 | 646 04th Av | M N Construction | replace & reconfigure existing 3-story wood framed rear exterior stair & deck. structure to be extended by 6 ft. install 18 linear ft of fire wall along north property line for deck & stair protection.Details
replace & reconfigure existing 3-story wood framed rear exterior stair & deck. structure to be extended by 6 ft. install 18 linear ft of fire wall along north property line for deck & stair protection. | $46,000 |
| Mar 31, 2026 | Completed final sign-off Sep 2026 | 2611 Pacific Av | Headlands Construction Co | revision to pa 202506188924: update roof framing strengthening & connection to interior/exterior walls. update concrete footing sizes supporting garage posts. changes due to field conditions.Details
revision to pa 202506188924: update roof framing strengthening & connection to interior/exterior walls. update concrete footing sizes supporting garage posts. changes due to field conditions. | |
| Mar 25, 2026 | In progress issued Mar 2026 | 363 Park St | revise pa 2026-0122-4300: foundation revision extend foundation replacement along west & east property line @ front (gl a/1-1.8, gl d/1-2)document shoring of west retaining wall. update retaining wall specification @ rear.Details
revise pa 2026-0122-4300: foundation revision extend foundation replacement along west & east property line @ front (gl a/1-1.8, gl d/1-2)document shoring of west retaining wall. update retaining wall specification @ rear. | ||
| Mar 20, 2026 | In progress issued Apr 2026 | 112 Anderson St | Urban West Construction Inc | revision to 202204252925. no interior work at 1st/2nd flor of main structure reduction in structural work to reflect only structural upgrades to rear front structure eliminate special inspection 18c for hold down. pull test since work has been eliminated.Details
revision to 202204252925. no interior work at 1st/2nd flor of main structure reduction in structural work to reflect only structural upgrades to rear front structure eliminate special inspection 18c for hold down. pull test since work has been eliminated. | |
| Mar 18, 2026 | In progress issued Apr 2026 | 311 Baden St | E & E General Builder Inc | 152 sq ft ground floor addition in rear of residence. convert 146 sq ft of garage to habitable. 81 sq ft 2nd floor addition in rear of residence. (n) 66 sq ft landing and stairs on 1st floor. electrical work in new and remodeled areas.Details
152 sq ft ground floor addition in rear of residence. convert 146 sq ft of garage to habitable. 81 sq ft 2nd floor addition in rear of residence. (n) 66 sq ft landing and stairs on 1st floor. electrical work in new and remodeled areas. | $120,000 |
| Mar 17, 2026 | In progress filed Mar 2026, not yet issued | 1372 Jackson St | one adu at the ground floor of the front building per ab68. scope includes enlarged and new opening at the lowest floor of both publicly visible facades. no work proposed at the rear building.Details
one adu at the ground floor of the front building per ab68. scope includes enlarged and new opening at the lowest floor of both publicly visible facades. no work proposed at the rear building. | $50,000 | |
| Feb 20, 2026 | In progress issued Mar 2026 | 1150 Lombard St | Andrew Chekene Enterprises/ Dba Ac Enter | unit#: 7; repair dry rot damaged structural framing for existing cantilever balcony. no expansion of balcony proposed, to comply w/housing complaint 202535080 item 2. structual repair per section 604.Details
unit#: 7; repair dry rot damaged structural framing for existing cantilever balcony. no expansion of balcony proposed, to comply w/housing complaint 202535080 item 2. structual repair per section 604. | $17,000 |
| Feb 20, 2026 | In progress issued Mar 2026 | 1150 Lombard St | Andrew Chekene Enterprises/ Dba Ac Enter | unit#: 9; repair dry rot damaged structural framing for existing cantilever balcony. no expansion of balcony proposed, to comply w/housing complaint 202535080 item 2. structual repair per section 604.Details
unit#: 9; repair dry rot damaged structural framing for existing cantilever balcony. no expansion of balcony proposed, to comply w/housing complaint 202535080 item 2. structual repair per section 604. | $17,000 |
| Feb 17, 2026 | Completed final sign-off Jul 2026 | 50 Samoset St | Metzler Brothers General Contractors Inc | dry rot repair: structural girder & header beam, rim joist, wall plates & studs and post that has been damaged. located at rear office room of ground levelDetails
dry rot repair: structural girder & header beam, rim joist, wall plates & studs and post that has been damaged. located at rear office room of ground level | $8,000 |
| Feb 17, 2026 | In progress issued Mar 2026 | 3121 Balboa St | Keightley Builders Inc | comply with nov 202649472 - fire damage repair -replace damaged structural framaing (roof rafters, floor joists, wall studs); hvac, plumbing & electrcial systesm; upgrade replacement members to code compliance; in-kind replacement of (e) window not visible from streetDetails
comply with nov 202649472 - fire damage repair -replace damaged structural framaing (roof rafters, floor joists, wall studs); hvac, plumbing & electrcial systesm; upgrade replacement members to code compliance; in-kind replacement of (e) window not visible from street | $136,000 |
| Feb 13, 2026 | In progress filed Feb 2026, not yet issued | 45 Cerritos Av | revision to 202501158339: basement add bathroom. 1st/f revise bedroom/bath size, switch to tankless water heater. 2nd/f revise kitchen. 3rd/f add washer/dryer, add skylight.Details
revision to 202501158339: basement add bathroom. 1st/f revise bedroom/bath size, switch to tankless water heater. 2nd/f revise kitchen. 3rd/f add washer/dryer, add skylight. | ||
| Feb 13, 2026 | Completed final sign-off Jul 2026 | 678 Vermont St | to comply with boa's decision no 25-055 reconstruction & legalization of rear yard deck located in the rear yard setback per sf planning code sec 188.1 maintaining. all required fire separation distances from property lines. the northern & southern property line shall have 3 ft setback. minor floorDetails
to comply with boa's decision no 25-055 reconstruction & legalization of rear yard deck located in the rear yard setback per sf planning code sec 188.1 maintaining. all required fire separation distances from property lines. the northern & southern property line shall have 3 ft setback. minor floor | ||
| Feb 9, 2026 | In progress issued Mar 2026 | 446 Waller St | Keightley Builders Inc | revision to 202502059700: update heating system- electric heat pump water heater for radiant floor & domestic water heating, update title-24Details
revision to 202502059700: update heating system- electric heat pump water heater for radiant floor & domestic water heating, update title-24 | |
| Jan 26, 2026 | In progress issued Mar 2026 | 306 Arlington St | Norwood Construction | 2/f: remove (2) kitchen structral beams and reinforce (e) ceiling framing. reconfigure kitchen plumbing fixtures. infill rear swing door and replace rear sliding window with french door to access rear deck/yard. ref bpa 202512051114.Details
2/f: remove (2) kitchen structral beams and reinforce (e) ceiling framing. reconfigure kitchen plumbing fixtures. infill rear swing door and replace rear sliding window with french door to access rear deck/yard. ref bpa 202512051114. | $36,000 |
| Jan 22, 2026 | In progress issued Feb 2026 | 363 Park St | Ground Builders Llc | 1st fl - excavate 1.5 at rear storage for added habitable space (3 bed/2 bath); new exterior stair with firewall. relocate entry to east side.2/f: reduce massing of (e) non-comforming ne corner. (2) lightwell infills at east.Details
1st fl - excavate 1.5 at rear storage for added habitable space (3 bed/2 bath); new exterior stair with firewall. relocate entry to east side.2/f: reduce massing of (e) non-comforming ne corner. (2) lightwell infills at east. | $162,000 |
| Jan 22, 2026 | In progress issued Apr 2026 | 561 Anderson St | Harmony Design & Development Inc, Frederic Grasset Design-Build | revision to pa 202411134888 update front window operation & size, replace siding in-kind increase depth of entry westibule for accesible clearance. revise exterior stair to rear yard. internalwall layout updates framing/foundation revisions due to field conditionsDetails
revision to pa 202411134888 update front window operation & size, replace siding in-kind increase depth of entry westibule for accesible clearance. revise exterior stair to rear yard. internalwall layout updates framing/foundation revisions due to field conditions | |
| Jan 12, 2026 | In progress filed Jan 2026, not yet issued | 1216 Fulton St | addition & alteration to an (e) 2-unit victorian building to a 4-unit building using the mandelman legislation- sfpc 207(c)(8)- on this rh-3 lot.Details
addition & alteration to an (e) 2-unit victorian building to a 4-unit building using the mandelman legislation- sfpc 207(c)(8)- on this rh-3 lot. | $2,000,000 | |
| Jan 7, 2026 | Completed final sign-off Jun 2026 | 231 Diamond St | O'conaire Construction | response to nov 202542952 document (4) deck posts & concrete piers. install lateral bracing @ 1st & 2nd floor deck postsDetails
response to nov 202542952 document (4) deck posts & concrete piers. install lateral bracing @ 1st & 2nd floor deck posts | $17,000 |
| Jan 5, 2026 | In progress filed Jan 2026, not yet issued | 2918 Jackson St | Keightley Builders Inc | common area - expansion of existing garage to accomodate 3 parking spaces; remove/replace (e) concrete & brick retainig wall/foundations (garage & rear 1st floor)Details
common area - expansion of existing garage to accomodate 3 parking spaces; remove/replace (e) concrete & brick retainig wall/foundations (garage & rear 1st floor) | $200,000 |
| Dec 31, 2025 | In progress issued Jul 2026 | 241 Granville Wy | We Do Construction Inc. | convert 640 sf of ground floor storage at rear into habitable. reconfigure windows and doors and facade at rear. add master suite on 1st floor. reconfigure rear stair to yard.Details
convert 640 sf of ground floor storage at rear into habitable. reconfigure windows and doors and facade at rear. add master suite on 1st floor. reconfigure rear stair to yard. | $92,000 |
| Dec 31, 2025 | In progress issued Jan 2026 | 72 07th Av | Daaron Builders | convert sf of ground floor storage at rear into habitable. add internal stair between 2nd and 1st floor. remodel bedroom, bathroom, and closet on 2nd floor. add master suite on 1st floorDetails
convert sf of ground floor storage at rear into habitable. add internal stair between 2nd and 1st floor. remodel bedroom, bathroom, and closet on 2nd floor. add master suite on 1st floor | $108,000 |
| Dec 24, 2025 | Completed final sign-off Jan 2026 | 1675 Green St | Sft Construction Corp | revision to pa 202508153118 minor relocation of steel moment columns @ garages. foundation revision lateral brace modifications. remove required special inspections 2,18a for original permit - n/a for retrofit since only stl moment framesDetails
revision to pa 202508153118 minor relocation of steel moment columns @ garages. foundation revision lateral brace modifications. remove required special inspections 2,18a for original permit - n/a for retrofit since only stl moment frames | |
| Dec 24, 2025 | Completed final sign-off Jul 2026 | 309 Crestlake Dr | B R S Construction | excavate existing crawl space for new basement. add 640 sq ft conditioned space (2 bed, 2 bath) & add stair up to rear yard remove chimneyDetails
excavate existing crawl space for new basement. add 640 sq ft conditioned space (2 bed, 2 bath) & add stair up to rear yard remove chimney | $193,000 |
| Dec 13, 2025 | In progress filed Dec 2025, not yet issued | 1918 22nd Av | rear 1-story horizontal addition with roof deck and rear stairs. remodel ground floor for new habitable space. 2nd flr: remodel closet, new deck out to rear stairs. new sliding & glass doors.Details
rear 1-story horizontal addition with roof deck and rear stairs. remodel ground floor for new habitable space. 2nd flr: remodel closet, new deck out to rear stairs. new sliding & glass doors. | $250,000 | |
| Dec 12, 2025 | In progress issued Jan 2026 | 446 Waller St | Keightley Builders Inc | revision to pa 202502059700 install steel moment frame @ rear of 1st fl; replace foundations @ 1st fl - no slab level change; replace foundation for 3 garage postsDetails
revision to pa 202502059700 install steel moment frame @ rear of 1st fl; replace foundations @ 1st fl - no slab level change; replace foundation for 3 garage posts | $18,000 |
| Dec 9, 2025 | In progress filed Dec 2025, not yet issued | 1419 Rivera St | the project consists of a remodel and addition to an existing single family residence includeing: rear dining room addition, kitchen remodel, new balcony and door from bedroom 1Details
the project consists of a remodel and addition to an existing single family residence includeing: rear dining room addition, kitchen remodel, new balcony and door from bedroom 1 | $90,000 | |
| Dec 9, 2025 | Completed final sign-off Aug 2026 | 634 12th Av | Aura Building Company Llc | convert ground floor rear storage area to bedroom, add eero compliant window. establish compliance for rescue per eg-02. construct new, interior partion wall to separate garage from habitable spaces. document as-built bathroom configuration.Details
convert ground floor rear storage area to bedroom, add eero compliant window. establish compliance for rescue per eg-02. construct new, interior partion wall to separate garage from habitable spaces. document as-built bathroom configuration. | $15,000 |
| Dec 5, 2025 | Completed final sign-off Aug 2026 | 1259 15th Av | The Sustainable Cbo Inc Dba Oliver Macki | revision to 202504154419: minor framing, foundation modification based on e) field conditions. reinforce property line wall & roof of rear 2nd/f popout structureDetails
revision to 202504154419: minor framing, foundation modification based on e) field conditions. reinforce property line wall & roof of rear 2nd/f popout structure | |
| Dec 3, 2025 | Completed final sign-off Jul 2026 | 1038 Filbert St | Sft Construction Corp | voluntary soft story retrofit to comply with sf ab-094 (per asce 7-16)/chapter 4d per 2022 cebc appendix a-4 standards.there are (3)target stories given the slope of the site.lateral system to consist of(2)n steel special moment frames over garage openings adjDetails
voluntary soft story retrofit to comply with sf ab-094 (per asce 7-16)/chapter 4d per 2022 cebc appendix a-4 standards.there are (3)target stories given the slope of the site.lateral system to consist of(2)n steel special moment frames over garage openings adj | $82,000 |
| Dec 1, 2025 | In progress issued Aug 2026 | 1066 Filbert St | rev to bpa 201904016779 to add state adu unit 1066a and remodel units 1066,1068,1070 as follows: relocate and update gathroomsand kitchens.improve common areas including new garbage area, utility and meter upgrades gas,electrical,upgrade entrance to lower two units1066-1066a to code.infill existingDetails
rev to bpa 201904016779 to add state adu unit 1066a and remodel units 1066,1068,1070 as follows: relocate and update gathroomsand kitchens.improve common areas including new garbage area, utility and meter upgrades gas,electrical,upgrade entrance to lower two units1066-1066a to code.infill existing | $70,000 | |
| Nov 26, 2025 | In progress issued Jun 2026 | 1025 Ashbury St | Igreen Builders Inc. | garage/basement lvl: excavate vertical & horizontal (e)garage area to create ceiling height & flr area; excavate adjacent crawl space area for (n) habitable areas (office, bathrm, inter stairs,laundry rm); 1/f inter remodel & in-fill (e) light well on south facade; 2/f inter remodel & in-fill (e) lDetails
garage/basement lvl: excavate vertical & horizontal (e)garage area to create ceiling height & flr area; excavate adjacent crawl space area for (n) habitable areas (office, bathrm, inter stairs,laundry rm); 1/f inter remodel & in-fill (e) light well on south facade; 2/f inter remodel & in-fill (e) l | $650,000 |
| Nov 24, 2025 | Completed final sign-off Jul 2026 | 678 Vermont St | revision to 202506309746. full in kind replacement of existing rear year deck located in rear yard setback per sf planning code 188.1. minor floor layout and structural modifications. update heating to boiler for radiant floor heating and domestic water heating.Details
revision to 202506309746. full in kind replacement of existing rear year deck located in rear yard setback per sf planning code 188.1. minor floor layout and structural modifications. update heating to boiler for radiant floor heating and domestic water heating. | $12,000 | |
| Nov 21, 2025 | In progress issued Dec 2025 | 126 Cole St | Ajp General Construction | revision to bpa 202310269539 new owner, change aor, eor. rear addition to 1 story wood deck. no 4th floor dormer; ground floor - foundation & framing upgrades; 2nd fl - add powder, kitchen remodel. change windows; 3rd fl add bathDetails
revision to bpa 202310269539 new owner, change aor, eor. rear addition to 1 story wood deck. no 4th floor dormer; ground floor - foundation & framing upgrades; 2nd fl - add powder, kitchen remodel. change windows; 3rd fl add bath | |
| Nov 21, 2025 | In progress issued Nov 2025 | 3101 Clay St | Petru Construction Inc | interior renovation to 4th fl, unit 5; kitchen remodel (2) bath remodel, minor reconfiguration of load bearing wall will require roof & floor reinforcement within unit no exterior alterationsDetails
interior renovation to 4th fl, unit 5; kitchen remodel (2) bath remodel, minor reconfiguration of load bearing wall will require roof & floor reinforcement within unit no exterior alterations | $62,000 |
| Nov 18, 2025 | Completed final sign-off Dec 2025 | 616 Belvedere St | Keightley Builders Inc | rear yard landscaping work and concrete retaining walls- 4'-6" height maxDetails
rear yard landscaping work and concrete retaining walls- 4'-6" height max | $18,000 |
| Nov 14, 2025 | In progress issued Dec 2025 | 10 Arbor St | Harmony Design & Development Inc | revision 202507211224- 3rd floor 2 bathroom remodel , 2nd floor powder room, kitchen remodel to remove load bearing wall and add seismic plywood shear wallsto 1st floor. 1st floor plywood shearwalls and holddownsDetails
revision 202507211224- 3rd floor 2 bathroom remodel , 2nd floor powder room, kitchen remodel to remove load bearing wall and add seismic plywood shear wallsto 1st floor. 1st floor plywood shearwalls and holddowns | $48,000 |
| Oct 27, 2025 | In progress issued Oct 2025 | 1567 Sanchez St | Metzler Brothers General Contractors Inc | remodel of 2nd fl powder room; convert powder closet to shower; add pocket door to front bedroom. no structural workDetails
remodel of 2nd fl powder room; convert powder closet to shower; add pocket door to front bedroom. no structural work | $18,000 |
| Oct 27, 2025 | Completed final sign-off Sep 2026 | 314 Chestnut St | Douglas Gower Dba Mesa Construction | reconstruct (e) 4 story east lightwell egress stair in-kind; replace all wood framing & foundations; comply with section 604 item 2 of sf housing code nov 201580623Details
reconstruct (e) 4 story east lightwell egress stair in-kind; replace all wood framing & foundations; comply with section 604 item 2 of sf housing code nov 201580623 | $21,000 |
| Oct 22, 2025 | In progress issued Dec 2025 | 1735 47th Av | Norwood Construction | revision to approved pa#: 202410283881. add new roof deck and roof hatch per a13-057.Details
revision to approved pa#: 202410283881. add new roof deck and roof hatch per a13-057. | $50,000 |
| Oct 21, 2025 | Completed final sign-off Mar 2026 | 5124 Diamond Heights Bl | The G B Group Inc. | replace 2 cantilever balconay beams; remove (e) cantilever portion of beam, salvage interior protion; sister (n) cantilever beam that extends to interior girder support; re-attach (e) hdr to (n) beam; replace solid guardrailDetails
replace 2 cantilever balconay beams; remove (e) cantilever portion of beam, salvage interior protion; sister (n) cantilever beam that extends to interior girder support; re-attach (e) hdr to (n) beam; replace solid guardrail | $22,500 |
| Oct 21, 2025 | Completed final sign-off Nov 2025 | 188 Noe St | Daaron Builders | revision to pa 202505166613 common entry stair replacement stair replacement to match existing stair riser height & tread; reattached to new guardrailDetails
revision to pa 202505166613 common entry stair replacement stair replacement to match existing stair riser height & tread; reattached to new guardrail | |
| Oct 14, 2025 | Completed final sign-off Apr 2026 | 4185 Cesar Chavez St | revision to pa#: 202505277247. remove & replace garage slab and east foundation (25 linear ft).Details
revision to pa#: 202505277247. remove & replace garage slab and east foundation (25 linear ft). | $30,000 | |
| Oct 1, 2025 | In progress issued Oct 2025 | 30 Thor Av | Michael Paul Murray | revision to pa 202305036995 construction has revealed shared foundation/north neighbor existing foundation to remain & underpinned no work in adjacent property document 2x8 floor joists. preserve front foundation & underpin holdown anchorsDetails
revision to pa 202305036995 construction has revealed shared foundation/north neighbor existing foundation to remain & underpinned no work in adjacent property document 2x8 floor joists. preserve front foundation & underpin holdown anchors | |
| Sep 18, 2025 | Completed final sign-off May 2026 | 35 Rico Wy | De Brus Construction Inc | revision to 202211287193, 1st fl new sauna, relocate furnace, 2nd fl remove wall between nook and kitchen. new stl beam, new simpson strong wallDetails
revision to 202211287193, 1st fl new sauna, relocate furnace, 2nd fl remove wall between nook and kitchen. new stl beam, new simpson strong wall | |
| Sep 8, 2025 | Completed final sign-off Jul 2026 | 678 Vermont St | revision to pa # 2025-0630-9746. new 400 sqft roof deck with retractable skylight for roof access per ab-057.Details
revision to pa # 2025-0630-9746. new 400 sqft roof deck with retractable skylight for roof access per ab-057. | $48,000 | |
| Sep 4, 2025 | In progress issued Dec 2025 | 1 Country Club Dr | Ly Green Construction Inc, Harmony Design & Development Inc | revision 202504083895- reconfigure bathroom remodel layouts (2 total) add side (north) door at 1st floor garage to access side breezeway with landing and stairs to grade. add platform & steps to access rear yard on one side & public row on the otherDetails
revision 202504083895- reconfigure bathroom remodel layouts (2 total) add side (north) door at 1st floor garage to access side breezeway with landing and stairs to grade. add platform & steps to access rear yard on one side & public row on the other | |
| Sep 2, 2025 | In progress issued Mar 2026 | 39 Santa Ynez Av | Amherst Associates Const | 322 sq. ft 2nd floor addition in rear of residence. remodel(e) kitchen. convert 68 sq ft of garage to habitable. add new bathroom on 2nd floor. add new wood deck and stairs in rear yard. plumbing and electrical work in remodeling areas.Details
322 sq. ft 2nd floor addition in rear of residence. remodel(e) kitchen. convert 68 sq ft of garage to habitable. add new bathroom on 2nd floor. add new wood deck and stairs in rear yard. plumbing and electrical work in remodeling areas. | $200,000 |
| Sep 2, 2025 | Completed final sign-off Sep 2025 | 2611 Pacific Av | for documentation purpose the legal use of the bldg is one residential dwelling unit. the determination is based on the review of the city records and a site visit. no work to be performed under this permit.Details
for documentation purpose the legal use of the bldg is one residential dwelling unit. the determination is based on the review of the city records and a site visit. no work to be performed under this permit. | ||
| Aug 19, 2025 | In progress issued Aug 2025 | 678 Green St | Daaron Builders | exploratory demolition for sampling/replication of balcony components (guardrail, balustrades, balcony and corbels) to facilitate repair under bpa 202304135635. destructive evacuation/testing of guardrail & ballstrade. non-destructive/visual examiniations of balcony band/corbezsDetails
exploratory demolition for sampling/replication of balcony components (guardrail, balustrades, balcony and corbels) to facilitate repair under bpa 202304135635. destructive evacuation/testing of guardrail & ballstrade. non-destructive/visual examiniations of balcony band/corbezs | $10,000 |
| Aug 19, 2025 | Completed final sign-off Nov 2025 | 188 Noe St | Daaron Builders | structural revision to bpa 202505166613 (entry stair). upgrade entry stair landing beam/framing, 2 support posts and 2 corner footings. minor modification to terrazzo stair support.Details
structural revision to bpa 202505166613 (entry stair). upgrade entry stair landing beam/framing, 2 support posts and 2 corner footings. minor modification to terrazzo stair support. | $6,000 |
| Aug 12, 2025 | Completed final sign-off Nov 2025 | 450 08th Av | Matthew Kelly Construction Inc | to comply with 202539414 reconstruction (e) 3 story wood framed egress stair & deck; structure in-kind replace/upgrade all framing & replace and upgrade all framing & foundationsDetails
to comply with 202539414 reconstruction (e) 3 story wood framed egress stair & deck; structure in-kind replace/upgrade all framing & replace and upgrade all framing & foundations | $10,000 |
| Aug 11, 2025 | Completed final sign-off Nov 2025 | 440 Waller St | Keightley Builders Inc | demolish a 1-story, type v, rear storage shed.Details
demolish a 1-story, type v, rear storage shed. | $11,000 |
| Aug 6, 2025 | In progress issued Aug 2025 | 314 Chestnut St | Douglas Gower Dba Mesa Construction | revision to 202210073966. add 4 drilled piers to strengthen rear retaining wall.Details
revision to 202210073966. add 4 drilled piers to strengthen rear retaining wall. | $15,000 |
| Jul 29, 2025 | Completed final sign-off Nov 2025 | 1564 Jones St | all work located in 3rd floor unit: add bathroom and bedroom. relocate kitchen to rear, relocate bedroom to front. add (2) rear property line windows at rear (east) property line. 45 min rated windows. ref pa# 202504255274Details
all work located in 3rd floor unit: add bathroom and bedroom. relocate kitchen to rear, relocate bedroom to front. add (2) rear property line windows at rear (east) property line. 45 min rated windows. ref pa# 202504255274 | $11,000 | |
| Jul 28, 2025 | Completed final sign-off Nov 2025 | 446 Waller St | Keightley Builders Inc | demolish a 1-story, type v, rear shed.Details
demolish a 1-story, type v, rear shed. | $11,000 |
| Jul 28, 2025 | Completed final sign-off Dec 2025 | 467 Sanchez St | Metzler Brothers General Contractors Inc | structural upgrade of existing front cantilever balcony and stair per ca sb 326 ordinance. replace guard rail with steel. this stair provides primary ingress and egress for all 6 units of the building.Details
structural upgrade of existing front cantilever balcony and stair per ca sb 326 ordinance. replace guard rail with steel. this stair provides primary ingress and egress for all 6 units of the building. | $28,000 |
| Jul 22, 2025 | Completed final sign-off Mar 2026 | 1108 Cabrillo St | Urban Builder General Contracting Inc | demolish existing sunroom and rebuild in its place and increasing it's size by 65 sq. ft unconditioned space. new deck on ground levelDetails
demolish existing sunroom and rebuild in its place and increasing it's size by 65 sq. ft unconditioned space. new deck on ground level | $99,660 |
| Jul 22, 2025 | In progress issued Aug 2025 | 1737 Webster St | Ren Lei Construction Co | revision to 202201216446, construction has revealed an existing retaining wall that needs to be replaced along rear north prop line within builinding envelope, adjacent to neighboring rear yards. height of wall is 8 ft8inch, length of wall is 45 ftDetails
revision to 202201216446, construction has revealed an existing retaining wall that needs to be replaced along rear north prop line within builinding envelope, adjacent to neighboring rear yards. height of wall is 8 ft8inch, length of wall is 45 ft | $26,000 |
| Jul 21, 2025 | In progress issued Jul 2025 | 372 05th St | Occidental Express | revision pa 202404049302 and 202404049299 (soft stoty retrofit) upgrade 1st fl plywood sw collectors to steel channel revise connection of seismic holdw2on plate to existing steel channel. eliminate basement shearwall & replace w/psl bmDetails
revision pa 202404049302 and 202404049299 (soft stoty retrofit) upgrade 1st fl plywood sw collectors to steel channel revise connection of seismic holdw2on plate to existing steel channel. eliminate basement shearwall & replace w/psl bm | |
| Jul 9, 2025 | Completed final sign-off Feb 2026 | 75 Wawona St | Gil Construction & Assoc Inc. | revision to pa # 2024-1223-7281 proposed 3 ft height concrete retaining wall further to rear property line (3ft setback) from east and south property lineDetails
revision to pa # 2024-1223-7281 proposed 3 ft height concrete retaining wall further to rear property line (3ft setback) from east and south property line | $23,000 |
| Jul 2, 2025 | In progress issued Jul 2025 | 900 Marin St | B-Side Inc. | revision to pa#: 2025-0225-1012 to document revisions to structural steel framing revisions (wbx to wgx girder beams) and minor modifications to concrete footings supporting hss columns to accommodate existing field conditions.Details
revision to pa#: 2025-0225-1012 to document revisions to structural steel framing revisions (wbx to wgx girder beams) and minor modifications to concrete footings supporting hss columns to accommodate existing field conditions. | |
| Jun 30, 2025 | Completed final sign-off Jul 2026 | 678 Vermont St | relocate 2nd flr kitchen to rear. move bedrooms to front. south lightwell infill. 1st flr north lightwell infill and partial 2nd flr infill. rear deck repair (not to proceed 50%). add 1st flr bath; office & media rm (540 sqft conditioned). new internal stair to 1st flr. remove (e) utility stairDetails
relocate 2nd flr kitchen to rear. move bedrooms to front. south lightwell infill. 1st flr north lightwell infill and partial 2nd flr infill. rear deck repair (not to proceed 50%). add 1st flr bath; office & media rm (540 sqft conditioned). new internal stair to 1st flr. remove (e) utility stair | $176,000 | |
| Jun 26, 2025 | Expired or cancelled withdrawn Jan 2026 | 1918 22nd Av | construction of 1 story rear deck (200 sqft) w/ stair to rear yard. new sliding glass doors onto deck & new site retaining walls with 7' fence (max) above gradeDetails
construction of 1 story rear deck (200 sqft) w/ stair to rear yard. new sliding glass doors onto deck & new site retaining walls with 7' fence (max) above grade | $85,000 | |
| Jun 26, 2025 | Completed final sign-off Sep 2025 | 1557 Fulton St | upgrade front entry stair to comply w/ current cbc life safety standards replace raise guardrail to 42" and handrail to 34" -38" height match (e) guardrail style with 24 intermediates correct scope of ea tread non slip steel plates painted to match (e)Details
upgrade front entry stair to comply w/ current cbc life safety standards replace raise guardrail to 42" and handrail to 34" -38" height match (e) guardrail style with 24 intermediates correct scope of ea tread non slip steel plates painted to match (e) | $4,000 |